IHHK - Work Status

Sr. # Work Description Project Remarks Add. Info

1 PRV 2 " Required KHI Musadique is working ion this

2 Sanitary Fixtures HB-1 KHI Shahrukh is doing Qty Take Off works

9 UV Lamp with Cartridge filter KHI

3 HB-1 Meridian-200 PCs - PO and Delivery date is Required KHI Order done Delivery to be check with the supplier

4 Flush Tank - Order and Delivery status KHI Order done Delivery to be check with the supplier

Total Filter Requirement for HB-1 KHI Long

6 GI Duct Sheets 20 gage 20 MT KHI Ordering works has been submitted to Finance

7 PP Silenta Pipe for Kitchen KHI Ordering works in process

8 Pneumatic Tubing system - Financial Comparative works KHI Final Negotiations is under process

10 Cold Room - Handing takong over works remains KHI Just Handover remains

11 Heat Exchanger-HB-1 - Sending to Supply chain KHI

12 Pipings caldding works for Chilled water system-Roof etc KHI

13 Partical and microbial counter for clean lab KHI

14 Bore Well Operational KHI Pump will arrive by end of December

15 RO Water Plant Operational KHI System is arrived at SITE, Installation to be done


Priority # Work Description

1 Air Cooled Chiller

2 FCU

3 AHU

4 Primary CHW Pump

5 Secondary CHW Pump

6 Make-up Pump CHW

7 Transfer Pumps

8 Air Seperator

9 Expansion Tank

10 Chemical Dosing Units

11 Ecology Unit

12 Fans

13 CAV/VAV

14 Fire Fighting Pump

15 MS pipe

16 PVC pipes

17 MS Sheet

18 Insulation

19 Gate Valves ordering

20 Laundry Equipment schedule to be float

21 Eye Washer (BC)

22 Water Fountain (BC)

23 Cooled Room (BC)


24 RO Plant

25 STP

26 Humidifier - Infra Red

27 Louvers Work

28 Electric Heater - CSSD

29 Lahore CSSD - Laminar Box

30 Insulation Required
IHHK/L - Work Status

LHR/KHI Delivery Date Required


HK/L - Work Status

Remarks
Repeat order to be given to M/s Greaves on package deal
Chiller
AHU
FCU
Under Review by Technical Team. Comments shared with Supplier

Under Review by Technical Team. Comments shared with Supplier

Technical evaluation completed. CS pending at SCM end. To be negotiated and ordered as a package deal

At SC End

We need it by 2023 June and the delivery time is only one month.

CS pending at SCM end

At SC End

Under Review by Technical Team

At SC End

Pipe has been Delivered at SITE for First Quarter Quantity

Technical Proposals not received yet

Quotes awaited from SC


Awarded to Crescent Corp for KIMMCO
LOI shared with KIMMCO. PFI awaited

At SC End. Comments Given

Proposlas Not Received yet

Order placed. Payment done. Under manufacturing

Payment awaited at Finance dept. end

Payment awaited at Finance dept. end


Temperoarily hold due to Water testing and drain works

Matter shared with ARCOP


Two Duct mounted infrared humidifier required
TRION
STULZ
Attached Email
PFI Required if ordered and Date at which Invoice Submitted to finance

SC needs to Chase Suppliers

PFI Required if ordered and Date at which Invoice Submitted to finance