Professional Documents
Culture Documents
DXB 411 ADC AD-80 Refurbishment Engineering All Pos received. All invoices submitted
DXB 642 Keppel LeTourneau Design of Sponsons on Rig 657 (2nd stage) PO received; work ongoing. 90% invoice submitted.
Work ongoing.
Proposal for detail engineering approved. PO received;
DXB 655 PISB Design of barge
work ongoing.
PO to ABS provided.
DXB 679 Antelopus Energy PMT for D12 field development Proposal prepared. Need to finalize CVs.
DXB 687 TTS Grillage & seafastening design for cranes Proposal submitted & work ongoing