SH. PARDEEP KUMAR SSE/C/D ------ STATUS OF DESIGN & DRAWINGS Date: 05.02.

2018
S.NO. DEPART/NHAI NAME OF ROB Dy.CE/C ITEMS TO BE DESIGNED STATUS OF DESIGN AND DRAWING HELP REQD. FROM FIELD REMARKS
Substructure:- 1. Drawing of foundation for pier P1 and P2
PIERS:-  approved
 CP1 2. Common pier loads for pier CP1 and Cp2
LC 39 C Patli on DLI-RE section received on 10.01.18. and foundation for
1 RAILWAYS 1x19.080+1 x 25.080+1x19.080 (skew 13 Dy.CE/C/SSB  P1 P2 
common piers are under design.
degree) CP2          3. Pier caps for all piers are to be taken up .

CP1,CP2,RP1,RP2,RP3,RP4 1.Foundation and wall for pier RP1 and RP4


(SUBSTRUCTURE) Approved.
ROB near Amausi Railway station on LKO- Dy.CE/C/LKO-IV 2. Foundation for pier RP2 is under proof RP2 yet to be
2 RAILWAYS checking and feasibility signatures and yet to submitted after
CNB section. proof checking
be submitted.

Construction of ROB at Km. 832/22-26 at NH  PIERS-  A1, A2 1. Substructure under checking.


km.224/360 on NH56 on BSB-SLN section (SUBSTRUCTURE) 2. Test pile report received for vertical only on
3 NHAI near Jaunpur byepass Dy.CE/C/LKO 08.02.2018.

Construction of ROBin lieu of L-Xing no. C-  PIERS-  CP1 & CP2 Pier cap put up for approval on 08.02.2018 for
221 at KM. 264/0-1 on NH254 on DLI-BTI (SUBSTRUCTURE) approval
4 NHAI section at Maur (Maur-Talwandi) Dy.CE/C/UMB-I

1. Initial test pile darwing and design is to be


submitted after signatures of field DY. And
Construction of ROB in Lieu of L-Xing no.B- proof checking by the consultant.
5 PWD punjab 31 on FZR-BTI rail section at Km.351/5-6 Dy.CE/C/JUC PIERS- CP1,CP2           
(SUBSTRUCTURE) 2. Minutes/ observations on substr. drgs.
near Faridkot station. Given to consultant on 15.01.18

Widening of existing ROB to(Six lane) at KM. Dy. CE/C/Tilak Repeated reminders five given ,last reminder Observations reply
6 NHAI (1500/12-13 ) 36.8 on DLI-AGC Highway A1,P1,P2,A2
between BVH & ASI stn bridge Survey on date 26.07.2017 from NHAI awaited.

Construction of ROB in Lieu of L-Xing no.A- Test pile drawing received on 05.02.2018 and
7 NHAI 12 at rly Km.112.50 of NH -15(old)/NH 54 Dy. CE/C/JUC CP1,P1,CP2 put up for approval on 07.02.2018
9New)at Amritsar

Construction of ROB in Lieu of L-Xing no.S-


8 NHAI 26 at rly Km.341/4-5 of NH -15(old)/NH 54 Dy. CE/C/JUC CP1,P1,P2,P3,P4,P5,P6,P7,CP2 Test pile drawing received on 02.02.2018 and
put up for approval on 07.02.2018
9New)at Faridkot-Kotkapura section

Proposed ROB in Lieu of L-Xing no.A-54/2E


at rly Km.381/1-2 on BTI-FZR section Inspection pltform drg/design recd on
Sent back on 31.01.2018 to Drawing awited from
9 PWD punjab between Kasu Begu and Firozpur cantt. Dy. CE/C/JUC CP1,P1,P2,CP2 30.1.2018 proof checked but not signed by DY.CE/C/JUC for signatures. DY.CE/C /JUC
field .CE/C /JUC.
station