RFI RAISED PENDING CLOSE

NO RFI REFERENCE NO DESCRIPTION OF WORK DISCIPLINE PIC SSP GAMUDA Total Due (Days) COMMENTS
CODE

1 RWTP-GB-CNS-RFI-000967 CWT 1 : Base Slab ZONE 12a GL E1a-(Fa-F1a)/1-(4a-5) CNS Hazwani - OVERDUE 60 Comment was added by Hanan on 23/2/24:
& ZONE 5c GL D2-E1a/(1a-2) - Post Concreting Records are still pending

2 RWTP-GB-CNS-RFI-000990 CWT 1 : Weir Channel RC Wall & Ramp (GL 1-6/B1- CNS Hazwani - OVERDUE 47 RFI reference number was added by Hazwani on
B2) - Post-Concreting 14/2//24 : 990

3 RWTP-GB-CNS-RFI-000991 CWT 1 : Base Slab ZONE 3a (GL B2-C1/(3a-4)-(6a-7) - CNS Hazwani - OVERDUE 47 RFI reference number was added by Hazwani on
Post-Concreting 14/2//24 : 991

4 RWTP-GB-CNS-RFI-001004 CWT 1 : Base Slab ZONE 4 (GL (A-A2a)/(1-(6a-7) - CNS Kai Chuen - OVERDUE 47 RFI reference number was added by Hazwani on
Post-Concreting 14/2//24 : 1004

5 RWTP-GB-CNS-RFI-001005 CWT 1 : Base Slab ZONE 4 (GL (A-A2a)/(1-(6a-7) - Pre- CNS Kai Chuen - OVERDUE 42 Comment was added by Suffian on 29/2/24 : During
Concreting & Concreting Work checklist to revert for comment.

6 RWTP-GB-CNS-RFI-001006 CWT 1 : Base Slab ZONE 4 (GL (A-A2a)/(1-(6a-7) - Pre- CNS Kai Chuen - OVERDUE 44 Comment was added by Suffian on 29/2/24 :
Concreting & Concreting Work Checklist to revert for comment & sign

7 RWTP-GB-CNS-RFI-001025 CWT 1 : RC Wall 1 (GL 1/B1a-(B2-C2)) - Post- CNS Azizah - OVERDUE 38 RFI reference number was added by Hazwani on
Concreting 16/2//24 : 1025

8 RWTP-GB-CNS-RFI-001026 CWT 1 : Weir Channel Wall (GL B1-B2/2-6) - Post- CNS Azizah - OVERDUE 38 RFI reference number was added by Hazwani on
Concreting 28/2//24 : 1026

9 RWTP-GB-CNS-RFI-001027 BAC : Excavation, Lean Con, and Pile Plug Works CNS Azizah - OVERDUE 38 Comment was added by Hanan on 29/2/24 : As-
(1/1/24-7/1/24) built survey data for pile positioning...??

10 RWTP-GB-CNS-RFI-001047 CWT 1 : RC Wall 3 (GL A-B1/1) - Pre-Concreting & CNS Azizah - OVERDUE 33 OPEN IN ANSWER : AZIZAH
Concreting Work

11 RWTP-GB-CNS-RFI-001049 NCR 18 Honeycomb at CWT Base Slab Gridline 3a/D- CNS Azizah - OVERDUE 33 Due date was updated by Azizah on 26/2/24 -
E1 31/1/24 to 15/3/24

12 RWTP-GB-CNS-RFI-001067 CWT 1 : RC Wall 6b & 6c (GL B1-C/1-2) - Pre- CNS Azizah - OVERDUE 32 Comment was added by Suffian on 23/2/24 :
Concreting & Concreting Work Drawing attachment..??

13 RWTP-GB-CNS-RFI-001068 CWT 1 : RC Wall 5 (GL C1/1-5) - Pre-Concreting & CNS Azizah - OVERDUE 30 Comment was added by Suffian on 23/2/24 :
Concreting Work Working area drawing attachment?

'Comment was added by Abdul Hanan on


CWT 1 : Excavation, Lean Con, and Pile Plug Works
14 RWTP-GB-CNS-RFI-001094
(8/01-14/01/24)
CNS Azizah - OVERDUE 27 23/2/24
-Records are still pending

'A file reference was added by SP Mega on


15 RWTP-GB-CNS-RFI-001095 BAC 1: Excavation, Lean Con, and Pile Plug Works CNS Azizah - OVERDUE 27
28/2/24
(8/1-14/01/24) -Rasau_BAC - Lean Conc As-Built - 02 -
20240219 Revised.pdf

16 RWTP-GB-CNS-RFI-001097 CWT 1 : RC Wall 1 (GL A-B1/1) - Post-Concreting CNS Azizah - OVERDUE 26 RFI reference number was added by Hazwani on
20/2//24 : 1097

17 RWTP-GB-CNS-RFI-001098 CWT 1 : Column 10nos (GL B2-E/2-4) - Post-Concreting CNS Azizah - OVERDUE 26 A photo reference was added by SP Mega on
15/02/24

18 RWTP-GB-CNS-RFI-001099 CWT 1 : Column 12nos (GL A-B1/1-4) - Pre-Concreting CNS Azizah - OVERDUE 26 A file reference was added by SP Mega on 1/3/24 :
& Concreting Work column -15.1.pdf

19 RWTP-GB-CNS-RFI-001100 CWT 1 : RC Wall 2 (GL A/1(4-5)) - Pre-Concreting & CNS Azizah - OVERDUE 26 A file reference was added by SP Mega on 28/2/24 :
Concreting Work RFI-1100.pdf

20 RWTP-GB-CNS-RFI-001116 BAC 1: RC Wall Cofferdam Casting GL 4-6/I-G CNS Azizah - OVERDUE 25 Comment was added added hanan on 23/2/23 :
Records are still pending

21 RWTP-GB-CNS-RFI-001119 CWT 1 : RC Wall 6b - 2nd lift (GL B2/2-6) - Pre- CNS Azizah - OVERDUE 25 A file reference was added by SP Mega on 28/2/24 :
Concreting & Concreting Work RC Wall 6b & 6c -2nd lift.pdf

22 RWTP-GB-CNS-RFI-001120 CWT 1 : RC Wall 6C - 2nd lift (GL C-B2/1-2) - Pre- CNS Azizah - OVERDUE 25 A file reference was added by SP Mega on 28/2/24 :
Concreting & Concreting Work CWT-3.2.24 Casting wall 6b & 6c-2nd lift

23 RWTP-GB-CNS-RFI-001121 CWT 1 : RC Wall 3 - 2nd lift (GL A-B1/1) - Pre- CNS Azizah - OVERDUE 25 A file reference was added by SP Mega on 28/2/24 :
Concreting & Concreting Work Formwork Rc wall 3

24 RWTP-GB-CNS-RFI-001122 CWT 1 : RC Wall 14 - 2nd lift (GL B1/1-2) - Pre- CNS Azizah - OVERDUE 25 A file reference was added by SP Mega on 28/2/24 :
Concreting & Concreting Work CWT-3.2.24 Casting Wall 6B, 6C, 7, 14

25 RWTP-GB-CNS-RFI-001144 CWT 1 : RC Wall 5 -2nd lift (GL C1/1-5) - Pre- CNS Hazwani - OVERDUE 19 Comment was added added hanan on 23/2/23 :
Concreting & Concreting Work Records are still pending

26 RWTP-GB-CNS-RFI-001146 CWT 1 : Column 5nos (GL B2-C1/2-5) - Pre-Concreting CNS Hazwani - OVERDUE 19 A file reference was added by Azizah on 26/2/24 :
& Concreting Work NCR 22.jpeg

27 RWTP-GB-CNS-RFI-001151 CWT 1 : Base Slab ZONE 18b & 15b (GL Ga-Ja/3a-(6a- CNS Azizah - OVERDUE 18 Comment was added added hanan on 23/2/23 :
7)) - Pre-Concreting & Concreting Work Records are still pending

CWT 1 : RC Wall 2 - 2nd lift (GL A/1(4-7) - Pre- Title was updated by Azizah on 27/2/24 : CWT 1 :
28 RWTP-GB-CNS-RFI-001167 CNS Hazwani - OVERDUE 16 RC Wall 2 - 2nd lift (GL A/1(4-7) - Pre-Concreting &
Concreting & Concreting Work
Concreting Work

29 RWTP-GB-CNS-RFI-001168 Material Delivery Inspection - Rebar CNS Azizah - OVERDUE 15 Comment was added added hanan on 19/2/23 :
Pending checklist

30 RWTP-GB-CNS-RFI-001176 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Comment was added added hanan on 23/2/23 :
(15/01-21/01/24) Records are still pending

31 RWTP-GB-CNS-RFI-001177 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Comment was added added hanan on 23/2/23 :
(15/1-21/01/24) Records are still pending

32 RWTP-GB-CNS-RFI-001178 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Comment was added added hanan on 23/2/23 :
(22/01-28/01/24) Records are still pending

33 RWTP-GB-CNS-RFI-001179 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Comment was added added hanan on 23/2/23 :
(22/01-28/01/24) Records are still pending

34 RWTP-GB-CNS-RFI-001181 CWT 1 : RC Wall 11 (GL A-A2/1) - Pre-Concreting & CNS Hazwani CURRENT 0 Comment was added by Suffian on 22/2/24 :
Concreting Work Details attachment??? Photos..??

35 RWTP-GB-CNS-RFI-001182 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Comment was added by Suffian on 23/2/24 :
(29/01-04/02/24) Details attachment..?? as-built..?? Photos..??
BAC : Excavation, Lean Con, and Pile Plug Works
### 36 RWTP-GB-CNS-RFI-001183
(29/01-04/02/24)
CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1183

37 RWTP-GB-CNS-RFI-001184 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1184
(05/02-11/02/24)

38 RWTP-GB-CNS-RFI-001185 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1185
(05/02-11/02/24)

39 RWTP-GB-CNS-RFI-001186 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1186
(12/02-18/02/24)

40 RWTP-GB-CNS-RFI-001187 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1187
(12/02-18/02/24)

41 RWTP-GB-CNS-RFI-001188 CWT 1 : RC Wall 6b & 6c (GL B1-C/1-2) - Post- CNS Hazwani CURRENT 0 RFI reference number was updated by Hazwani :
Concreting 1180 - 1188

42 RWTP-GB-CNS-RFI-001189 CWT 1 : RC Wall 5 (GL C1/1-5)1st lift - Post-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1189

43 RWTP-GB-CNS-RFI-001190 BAC : Slab (GL - (4A-5/G-H ) - Post Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1190

44 RWTP-GB-CNS-RFI-001191 CWT 1 : RC Wall 2 (GL A/1(4-5)) 2nd lift- Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1191
Concreting

45 RWTP-GB-CNS-RFI-001192 BAC : RC Wall Cofferdam Casting GL (4-6/I-G) Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1192
Concreting

46 RWTP-GB-CNS-RFI-001193 CWT 1 : RC Wall 6b - 2nd lift (GL B2/2-6) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1193
Concreting

47 RWTP-GB-CNS-RFI-001194 CWT 1 : RC Wall 6C - 2nd lift (GL C-B2/1-2) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1194
Concreting

48 RWTP-GB-CNS-RFI-001195 CWT 1 : RC Wall 3 - 2nd lift (GL A-B1/1) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1195
Concreting

49 RWTP-GB-CNS-RFI-001196 CWT 1 : RC Wall 14 - 2nd lift (GL B1/1-2) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1196
Concreting

50 RWTP-GB-CNS-RFI-001197 CWT 1 : RC Wall 5 -2nd lift (GL C1/1-5) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1197
Concreting

51 RWTP-GB-CNS-RFI-001200 CWT 1 : Column 10nos (GL A-B1/4-6) - Pre-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1200
& Concreting Work

52 RWTP-GB-CNS-RFI-001205 BAC : Slab (GL E-B/1-2A) - Pre-Concreting & CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1205
Concreting

RC Wall 1 - 2nd lift (GL (B-B1)-(B1-B2a)/1) - Pre- Title was updated by Hazwani on 19/2/24 : RC Wall
53 RWTP-GB-CNS-RFI-001211 CNS Hazwani CURRENT 0 1 - 2nd lift (GL (B-B1)-(B1-B2a)/1) - Pre-Concreting
Concreting & Concreting Work
& Concreting Work

54 RWTP-GB-CNS-RFI-001212 CWT 1 : RC Wall 2 - 1st lift (GL A/(4-5)-7) - Pre- CNS Hazwani CURRENT 0 Open Waiting for submission - Open in Review
Concreting & Concreting Work

55 RWTP-GB-CNS-RFI-001220 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Due date was updated by hazwani on 20/2/23 :
(19/02-25/02/24) Mar 13, 2024 - Mar 5, 2024

56 RWTP-GB-CNS-RFI-001221 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1221
(19/02-25/02/24)

57 RWTP-GB-CNS-RFI-001222 BAC : Slab (GL E-B/1-2A) - Post-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani : 1222

58 RWTP-GB-CNS-RFI-001223 CWT 1 : Column 10nos (GL A-B1/4-6) - Post- CNS Hazwani CURRENT 0 Due date was updated by hazwani on 20/2/23 :
Concreting Mar 7, 2024

59 RWTP-GB-CNS-RFI-001241 CWT 1: NCR 22 Honeycomb at Base Slab Gridline B2- CNS Azizah CURRENT 0 A file reference was added by Azizah on 26/2/24 :
C1/3a-7 NCR 22.jpeg

60 RWTP-GB-CNS-RFI-001242 CWT 1: NCR 25 Honeycomb at Clear Water Tank Wall CNS Azizah CURRENT 0 Further description of the work (if any) was added
3 GL A-B2/1 by Azizah on 26/2/24 : NCR closing

61 RWTP-GB-CNS-RFI-001243 CWT 1: NCR 21 Honeycomb and Bulging of Concrete CNS Azizah CURRENT 0 A file reference was added by Azizah on 26/2/24 :
at CWT Wall (Gridline C-C2/1) NCR 21.jpeg

62 RWTP-GB-CNS-RFI-001246 CWT 1 : RC Wall 3 (GL A-B1/1) - Post-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
27/2/24 : 1246

63 RWTP-GB-CNS-RFI-001247 CWT 1 : RC Wall 11 (GL A-A2/1) - Post-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
27/2/24 : 1247

64 RWTP-GB-CNS-RFI-001248 CWT 1 : Base Slab ZONE 18b & 15b (GL Ga-Ja/3a-(6a- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
7)) - Post-Concreting 27/2/24 : 1248

65 RWTP-GB-CNS-RFI-001249 CWT 1 : Column 5nos (GL B2-C1/2-5) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
Concreting 27/2/24 : 1249

66 RWTP-GB-CNS-RFI-001250 CWT 1 : Column 5nos (GL B2-C1/2-5) - Post- CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
Concreting 27/2/24 : 1250

67 RWTP-GB-CNS-RFI-001251 CWT 1 : RC Wall 2 (GL A/1(4-5)) - Post-Concreting CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
27/2/24 : 1251

CWT 1 : RC Column Zone 12a & 5a GL E-G/1-4 - Pre- Title was updated by Hazwani on 28/2/24 : CWT 1 :
68 RWTP-GB-CNS-RFI-001252 CNS Hazwani CURRENT 0 RC Column Zone 12a & 5a GL E-G/1-4 - Pre-
Concreting & Concreting Work
Concreting & Concreting Work

69 RWTP-GB-CNS-RFI-001253 CWT 1 : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 Due date was updated by Hazwani on 28/2/24 :
(26/02-03/03/24) Mar 18, 2024 to Mar 15, 2024

70 RWTP-GB-CNS-RFI-001254 BAC : Excavation, Lean Con, and Pile Plug Works CNS Hazwani CURRENT 0 RFI reference number was added by Hazwani on
(26/02-03/03/24) 28/2/24 : 1254