You are on page 1of 6

Purvachal Expressway TL-2 ###

COS Summary Of PKG-V

Total No. of COS 44 Status


COS Submitted 36
COS approved 31
Box culvert CH 190+072 (MCW)& BS Service road/Box
culvert CH 194+520(MCW) Put for CoS order
COS Estimate Balance in UPIEDA 2
Box culvert CH 175+677 Put for CoS order
Toilet Block Revised CoS is under
preparation by contractor
COS EstimateUnder Rivew With
3
AE
Electrification of Structures Under Examination
Istallation of Cameras to be submitted by 30-05-22

Change in Skewb Angle MNB Ch 175+700/MNB Ch


175+700/MNB Ch 175+700/service road 211+775 to
211+989.07 LHS and ch 211+768 to 212+186.8
Under preparation
Increase in minimum vertical clearance FO and De-
COS Estimate not Submitted by scope of RE Wall Under preparation
the contractor 8
Half diamond Interchange Ch 203+399 Under preparation
Subway ch 164+400 Under preparation
Way side Amenities Under preparation
De-scoping of Toe wall / retaining wall Under preparation
Doubly Fenced kachcha coridor Under preparation
Line Drain Under preparation
COS Summary Of PKG-VI

Total No. of COS 22 Status


COS Submitted 16
COS approved 14

Waiting for reply from


contractor on Observation
Change of Scope for New construction of 3 Nos LVUP, 1 Nos MNRB
COS Estimate Balance in UPIEDA 1 and 1 no Box Culverts raised by UPEIDA

COS EstimateUnder Rivew With


1 Toilet Block Revised CoS is under
AE
preparation by contractor
(I)Flyover Bridges, Chainges in Height( Vertical Clearance) from 5.5
meter to 6.5metre

(II)Negative COS Re Wall at Approach of F.O.


(III)Flyover At Chainage km 234+619 Under preparation
(IV)Flyover At Chainage km 234+895
(V)Flyover At Chainage km 242+120
Lighting at new Structures Under preparation
COS Estimate not Submitted by 1. Interchange-Two Lane to Four Lane
the contractor 6
2. Flyover At Chainage km 3+893
3. Additional PUP at 1+690 Under preparation
4. Additional PUP at 3+445
5. Additional PUP at 4+102
Negative COS for Height of MNB at Service Road Under preparation
Cameras with Automatic number plate recognition to be submitted by 30-05-22
5 nos nos box culverts on loop and ramp Under preparation
COS Summary Of PKG-VII

Total No. of COS 21 Status


COS Submitted 17
COS approved 11
COS rejected 1 COS order no 2 rejected by UPEIDA

COS Estimate Balance in UPIEDA 1 De-Scoping of PUP at Ch 274+700

Raising of vertical clearance of Flyover at Km Correction in profile and CoS


253+828 from 5.50 m to 6.50 m proposal to be resubmitted

Correction in Drawing and CoS


Additional PUP at Ch 273+820
proposal to be resubmitted
COS EstimateUnder Rivew With
AE 5
Construction of Toilet Block at Ch.260+700 (RHS) Revised CoS to be submitted
Positive COS for Installation of Camera with ANPR
to be submitted by 30-05-22
Capacity
Correction in Drawing and CoS
Nagative COS for RE wall shortage at ROB 286 proposal to be resubmitted

Proposal for construction of Vented Causeway at to be submitted by 30-05-22


km 288+130 in Service Road inplace of MNB (SR)

COS Estimate not Submitted by Electrification of Structures which are constructed Revised CoS to be submitted
the contractor 4 under COS
Negative COS for Minor Bridges on Service Road at to be submitted by 30-05-22
Ch.272+300 and Ch.274+860
Rate analysis to be corrected by
Negative COS for Day lighting in Service Road contractor

COS Summary Of PKG-VIII

Total No. of COS 19 Status


COS Submitted 19
COS approved 16

Change in Loop from 2 Lane to 4 Lane


Put for CoS order
COS Estimate Balance in UPIEDA 2
Awaiting of recommendation
Cameras with Automatic number plate recognition
from PIU
COS EstimateUnder Rivew With Negative Change of Scope for Day-lighting in Service Rate analysis to be corrected by
1
AE Road contractor

COS Estimate not Submitted by


the contractor 0

Packages I-IV V-VIII Total


Total No. of COS 97 106 203
COS Submitted 77 88 165
COS approved 52 72 124
COS rejected 1 1
COS EstimateUnder Rivew With
AE 10 10 20
COS Estimate not Submitted by
20 18 38
the contractor
Purvachal Expressway TL-1 ###
COS Summary Of PKG-I
Total No. of COS 24 Status
COS Submitted 19
COS approved 12
Toilet Block Correction under process by contractor
Increase in minimum vertical clearance FO Submitted pofile is not under norms
COS Estimate Balance in UPIEDA 4
DE scoping of 29 nos Utility crossing on SR Awaited for PIU recommendation
De-scoping daylight of GSB Rate analysis to be corrected by contractor
Service road with Box culvert 38+150 to 38+700 under examination
COS EstimateUnder Rivew With Istallation of Cameras under examination
3
AE Negative cos for MNB SR under examination

Descope of 200.45mt RE Wall under dispute


Negative COS forRainwater harvesting To be submitted by 30-05-2022
COS Estimate not Submitted by
the contractor 5 De-scoping of Toe wall / retaining wall under dispute
Electrification of Structures under dispute
Breakdwon vehicle parking within scope of contractor
COS Summary Of PKG-II
Total No. of COS 20 Status
COS Submitted 17
COS approved 10
Toilet Block Correction under process by contractor
72+836 PUP Change in profile under process by contractor
Negative COS forRainwater harvesting Awaited for PIU recommendation
COS Estimate Balance in UPIEDA 7 COS for 492 mt.SR of 3.75 mt wide Awaited for PIU recommendation
Istallation of Cameras Revised COS to be submitted by contractor
SR at 73+600 to74+800 icluding 3Nos. Box Culvert put up for CoS order
De-scoping daylight of GSB Rate analysis to be corrected by contractor
COS EstimateUnder Rivew With
AE 0

Negative COS for Minor Bridges in SR drawing not approved


COS Estimate not Submitted by
the contractor 3 Electrification
De-scoping of of Structures
Flexible Apron of 42 nos.of box culvert (S.R.)& 24 nos. under dispute
of utility crossing on S.R. and Toe wall / retaining wall 390 mt. length under dispute
in MCW and 7000 mt length in S.R
COS Summary Of PKG-III
Total No. of COS 20 Status
COS Submitted 14
COS approved 11

COS Estimate Balance in UPIEDA 0

Construction service road ch 119+800 to 120+550 under examination


COS EstimateUnder Rivew With
3 Negative COS forRainwater harvesting under examination
AE Add. PUP CH 92+660/PUP CH 114+710/ De scoping service road
under examination
114+700 115+000 SR
Toilet Block to be submitted by 30-05-22
Descoping temperory diverssion under dispute
COS Estimate not Submitted by Negativeve Cos of MNB -SR under dispute
the contractor 6
Descoping of Toe Wall / retaining wall under dispute
Istallation of Cameras to be submitted by 30-05-22
Construction service road ch 120+960 to 121+145 to be withdrawl
COS Summary Of PKG-IV
Total No. of COS 33 Status
COS Submitted 27
COS approved 19
Retrun Cos dt 12.05.22 (MNB) correction in Drawing under process by contractor
Negative COS for daylighted of GSB in SR Rate analysis to be corrected by contractor
Istallation of Cameras Revised COS to be submitted by contractor
COS Estimate Balance in UPIEDA 7 Toilet Block put up for CoS order
Non-Execution of GSB in Shoulder of Airstrip portion Document under marking
Electrification of Structures Document under marking
Descoping of Rainwater Harvesting correction in Drawing under process by contractor
COS EstimateUnder Rivew With
AE 1
Provision of interchange @ Ch. 161+085 under examination
Negative COS for costruction of Toll Plaza @Ch.138+155 to be submitted by 31-05-22
Raising of vertical clearance of Flyover cnstruction of viaduct at entry/
to be submitted by 31-05-22
exit of 2X19.2 m span
COS Estimate not Submitted by Negativeve Cos of MNB @ Ch.128+805 & Ch.125+213 to be submitted by 31-05-22
the contractor 6
additional work at emergency landing to be submitted by 30-05-22
De-scoping of Balance S.R. (350mt.)not Constructed due to Land
Dispute to be submitted by 30-05-22
Descoping of Toe Wall / retaining wall to be submitted by 31-05-22
Total No. of COS 97
COS Submitted 77
COS approved 52
COS EstimateUnder Rivew With
AE 7
COS Estimate not Submitted by
the contractor 20
COS Summary Of PKG-IV

Total No. of COS 33


COS Submitted 26
COS approved 19
Negative COS of Minorbridge @ Ch. 149+891
Negative COS for daylighted of GSB in SR
COS Estimate Balance in UPIEDA 4
Istallation of Cameras
Descoping of Rainwater Harvesting
Toilet Block
COS EstimateUnder Rivew With Electrification of Structures
3
AE
Provision of interchange @ Ch. 161+085

Negative COS for costruction of Toll Plaza @Ch.138+155

Raising of vertical clearance of Flyover cnstruction of


viaduct at entry/ exit of 2X19.2 m span
COS Estimate not Submitted by
7 Negativeve Cos of MNB @ Ch.128+805 & Ch.125+213
the contractor
additional work at emergency landing
De-scoping of Balance S.R. (350mt.)not Constructed due
to Land Dispute
Descoping of Toe Wall / retaining wall
Non-Execution of GSB in Shoulder of Airstrip portion