PRECAST RATES

SL.NO Item Code Item Description Unit Rate


1 Labour charges for Erection of Precast girders and beams as per instruction of EIC. MT 30

Labour charges for Loading & Shifting of I Girder from PC Yard as per instruction of
2 MT 21
EIC.
Labour charges for Erection of Precast Box segments(RUB & MIB) as per instruction of
3 MT 134.4
EIC.
4 Labour Charges for Erection of Precast solid slab as per instruction of EIC. MT 18
5 Labour Charges for Loading & shifting of Precast solid slab as per instruction of EIC. MT 15

Labour charges for Tilting/Erection of Road Under Bridge(RUB) Box Segments


6 MT 112
(Precast at Site) as per instruction of EIC.

7 Labour charges for Erection of Precast RCC Slab(RUB & MIB) as per instruction of EIC. MT 123

Labour charges for Erection of Precast Retaining Wall of Road Under Bridge(RUB) as
8 MT 116
per instruction of EIC.
Labour charges for Loading & Shifting of Retaining Wall of Road Under Bridge from PC
9 Yard as per instruction of EIC MT 32

Labour charges for Loading & Shifting of Precast RCC Slab of RUB & MIB from PC Yard
10 MT 33
as per instruction of EIC.
Labour charges for Casting of precast I girder Scope also include Shuttering, De-
11 shuttering, Reinforcement tying, Concrete pouring and Stacking of Precast segment. sqm 310
Measurement will be taken both side. (Rajasthan)
Labour charges of Chipping of Dowel bar left for Shear key and Ballast Retainer for
12 sqm 121
Precast MIB/RUB structure as per instructed by EIC