Professional Documents
Culture Documents
ADVANCE COPY
FOUNDATION SCHEDULE
SCALE 1:25
REVISIONS
R0
CONTRACTOR
DRAWING NO. - ST - 01
DATE 18-08-2022
1. All dimensions are in mm unless
E
-
otherwise mentioned
2. (i) Grade of concrete -M25
(ii) Grade of steel Fe-500
A A
- - (iii) P.C.C. grade -1:4:8
(iv) Grade of concrete for water tank
-M30
D D 3. Angle of repose assumed = 40°
- -
Coefficient of friction µ=0.45
C
-
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
E
-
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
B B
- - 2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
C
-
Drawing.
ADVANCE COPY
LVL. ±00
G
-
N.G.L.
F F
- -
G
-
SECTION F-F
LVL. ±00
N.G.L. R0
CONTRACTOR
HOTEL BUILDING
SECTION G-G NOTE:-
RAFT LAYOUT PLAN
DRAWING NO. - ST - 02
DATE 18-08-2022
1. All dimensions are in mm unless
otherwise mentioned
2. (i) Grade of concrete -M25
(ii) Grade of steel Fe-500
(iii) P.C.C. grade -1:4:8
(iv) Grade of concrete for water tank
-M30
3. Angle of repose assumed = 40°
Coefficient of friction µ=0.45
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
Drawing.
ADVANCE COPY
REVISIONS
LEGENDS
R0
CONTRACTOR
DRAWING NO. - ST - 03
DATE 18-08-2022
1. All dimensions are in mm unless
otherwise mentioned
F.F.L AS/ARCH. 2. (i) Grade of concrete -M25
F.F.L AS/ARCH. F.F.L AS/ARCH. (ii) Grade of steel Fe-500
LVL. ±00 (iii) P.C.C. grade -1:4:8
LVL. ±00 LVL. ±00 N.G.L. (iv) Grade of concrete for water tank
N.G.L. N.G.L. -M30
3. Angle of repose assumed = 40°
Coefficient of friction µ=0.45
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
SECTION A-A Drawing.
SECTION C-C
ADVANCE COPY
F.F.L AS/ARCH.
LVL. ±00
N.G.L.
SECTION D-D
LVL. ±00
LVL. ±00 N.G.L.
N.G.L.
REVISIONS
R0
CONTRACTOR
NOTE:-
HOTEL BUILDING
SECTION DETAIL
DRAWING NO. - ST - 04
DATE 18-08-2022