You are on page 1of 4

1.

All dimensions are in mm unless


otherwise mentioned
2. (i) Grade of concrete -M25
(ii) Grade of steel Fe-500
(iii) P.C.C. grade -1:4:8
(iv) Grade of concrete for water tank
-M30
3. Angle of repose assumed = 40°
Coefficient of friction µ=0.45
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
Drawing.

ADVANCE COPY

PEDESTAL LAYOUT PLAN

FOUNDATION SCHEDULE
SCALE 1:25

REVISIONS

R0

REV. DATE DESCRIPTION


PRIME CONSULTANT

KOHIMA SMART CITY DEVELOPMENT LTD.


(A Government of India Undertaking)

CONTRACTOR

VILLELIE KHAMO & SONS


PROJECT
REDEVELOPMENT OF OLD SECRETARIAT
SCALE 1:100 @ A3 STRUCTURAL DRAWING
DRAWING TITLE

NOTE:- HOTEL BUILDING


PEDESTAL LAYOUT PLAN

DRAWING NO. - ST - 01
DATE 18-08-2022
1. All dimensions are in mm unless

E
-
otherwise mentioned
2. (i) Grade of concrete -M25
(ii) Grade of steel Fe-500
A A
- - (iii) P.C.C. grade -1:4:8
(iv) Grade of concrete for water tank
-M30
D D 3. Angle of repose assumed = 40°
- -
Coefficient of friction µ=0.45

C
-
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However

E
-
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
B B
- - 2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
C
-

Drawing.

ADVANCE COPY

F.F.L AS/ARCH. RAFT LAYOUT PLAN

LVL. ±00

G
-
N.G.L.

F F
- -

G
-
SECTION F-F

F.F.L AS/ARCH. REVISIONS

LVL. ±00
N.G.L. R0

REV. DATE DESCRIPTION


PRIME CONSULTANT

KOHIMA SMART CITY DEVELOPMENT LTD.


(A Government of India Undertaking)

CONTRACTOR

VILLELIE KHAMO & SONS


PROJECT
REDEVELOPMENT OF OLD SECRETARIAT
SCALE 1:100 @ A3 STRUCTURAL DRAWING
DRAWING TITLE

HOTEL BUILDING
SECTION G-G NOTE:-
RAFT LAYOUT PLAN

DRAWING NO. - ST - 02
DATE 18-08-2022
1. All dimensions are in mm unless
otherwise mentioned
2. (i) Grade of concrete -M25
(ii) Grade of steel Fe-500
(iii) P.C.C. grade -1:4:8
(iv) Grade of concrete for water tank
-M30
3. Angle of repose assumed = 40°
Coefficient of friction µ=0.45
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
Drawing.

ADVANCE COPY

RAFT THROUGH REINF. TOP & BOTTOM DETAIL

REVISIONS
LEGENDS

R0

REV. DATE DESCRIPTION


PRIME CONSULTANT

KOHIMA SMART CITY DEVELOPMENT LTD.


(A Government of India Undertaking)

CONTRACTOR

VILLELIE KHAMO & SONS


PROJECT
REDEVELOPMENT OF OLD SECRETARIAT
SCALE 1:100 @ A3 STRUCTURAL DRAWING
DRAWING TITLE

NOTE:- HOTEL BUILDING


RAFT THROUGH REINF. TOP & BOTTOM
DETAIL

DRAWING NO. - ST - 03
DATE 18-08-2022
1. All dimensions are in mm unless
otherwise mentioned
F.F.L AS/ARCH. 2. (i) Grade of concrete -M25
F.F.L AS/ARCH. F.F.L AS/ARCH. (ii) Grade of steel Fe-500
LVL. ±00 (iii) P.C.C. grade -1:4:8
LVL. ±00 LVL. ±00 N.G.L. (iv) Grade of concrete for water tank
N.G.L. N.G.L. -M30
3. Angle of repose assumed = 40°
Coefficient of friction µ=0.45
5 The S.B.C. assumed is 13.5 t/m2 AT 2.5M
depth from NGL .The soil strata
assumed as hard strata. However
the contractor on board will re- design
the structure as per revised geo -
technical
report.
6. The raft of the building is at 2.5 m level from
NGL and SBC calculated is as per IS 1893:
2016.
7. The drawings are solely for Advance copy Purpose.
8. Pedestal shall be cast in Accordance with Anchor
bolt and base plate layout, Based on PEB Vendor Shop
SECTION A-A Drawing.

SECTION C-C

ADVANCE COPY
F.F.L AS/ARCH.

LVL. ±00
N.G.L.

SECTION D-D

F.F.L AS/ARCH. F.F.L AS/ARCH.

LVL. ±00
LVL. ±00 N.G.L.
N.G.L.
REVISIONS

R0

REV. DATE DESCRIPTION


PRIME CONSULTANT

KOHIMA SMART CITY DEVELOPMENT LTD.


(A Government of India Undertaking)

CONTRACTOR

VILLELIE KHAMO & SONS


PROJECT
REDEVELOPMENT OF OLD SECRETARIAT
SECTION E-E SECTION B-B SCALE 1:100 @ A3 STRUCTURAL DRAWING
DRAWING TITLE

NOTE:-
HOTEL BUILDING
SECTION DETAIL

DRAWING NO. - ST - 04
DATE 18-08-2022

You might also like