Professional Documents
Culture Documents
www.autodesk.com/revit
NOTES:
1. This drawing must be read in conjunction with all relevant
contract drawing.
Y10@200C/C-EF Y10@200C/C-EF Y10@200C/C-EF 2. The contractor must confirm all dimensions on the site before
commencing any work and any discrepancy in any of the drawings
to be adressed before implementation.
1000
class shall be as prescribed
11. This drawing remains property of the engiineer until that time all
remunerations are settled in full.
LIFT BASE 12. This drawing shall not be altered shared or coppied to a third
party not known to the engineer without a written request to the
1 1 : 25
engineer and subsequent approval by the engineer
D10@200C/C
D12@200C/C
D12@200 C/C
D10@200B2/T2
D12@200B1/T1
Drawn by KTO
Checked by FPB
15/11/2023 11:51:04
S.5
Scale 1 : 25