You are on page 1of 2

Bore Log Details

Bridge No. Pile no. Date:-

Contract CIVIL ,BUILDING AND TRACK WORK,CONTRTACT COMBINED PACKAGE CTP-1 & CTP-2.
Client DFCCIL
Contractor SOJITZ-L & T consortium
RFI No.
Site Location
Chainage
Drawing No.

Casing Detail
Time of installation
Date Time Casing length Cummulative Length Remarks
From To

Bore Details
Time Bore depth (m)
Date Description of soil Remarks
From To From To

Cage details
Cummulative. Lowering Time
Date Cage length C.T.L.
length From To

G.L.
C.O.L.

Polymer/Bentonite Details

Date PH Value Density Viscosity Remarks

F.L
.
Trimmie details

Cummulative Qty of Concrete Cummulative Length of trimme Cummulative


Date Length of Trimmie Built up height Balance
Length (cum) Quantity removed length removed

Trimmie Lowering Start time


Trimmie Lowering Finish time

You might also like