You are on page 1of 7

BALANCE CONCRETE SCOPE OF PKG-D (31-05-21)

SR NO LOCATION BOOM POUR QTY CC QTY


1 RANI FOB 40
2 FALNA FOB 106
3 JAWAIBANDH FOB 65
4 LC-105 40 55
5 LC-112 28 30
6 769 40
7 BANAS PS 27
8 BANAS FOB 12 LANDING PCC & CC
9 BHIMANA PS 10 LANDING PCC & CC
10 RWH OF LC"S
11 LC-147 5
12 IQBALGADH FOB 12
13 MAVAL PS
14 MAVAL FOB 6
15 LC-138
16 COVER SLAB FOR IMB-792
17 791 - CC 41
391
CUM

Batching Plant Requirement


Items Kothar Kiwarli
Structure 287 458
Safety Wall 12 42
Building 349 1065
Total 648 1565
OF PKG-D (31-05-21)
LANDING CC DIRECT POUR QTY Reamrk
12
12
12

10

LANDING PCC & CC


LANDING PCC & CC
250
5
12

12 Landing pcc & cc


4 ROW wall extention
25

354
CUM

atching Plant Requirement


Bangurgram Marwar
1697
28 21
345 210
2070 231
Steel 8 mm 10 mm 12 mm 16 mm
Requirement 22 21 10 20
20 mm 25 mm 32 mm Total
15 12 100
3656.25
Jawali 122
Biroliya 152
Keshavganj 75
Banas 550
Swarupganj 325
Amirgadh 190
Summary PKG-C Balance Concrete
S.No. Structure Qty (cum) BP
1 Except ROB Sendra, LC-01 & LC-13 508 Bangurgram
2 ROB Sendra 1084 Bangurgram
3 CC/DLC 293 Bangurgram
4 Pump House 105 Bangurgram
Total Balance Concrete Qty(cum) 1990