You are on page 1of 1

BORED PILE RECORD

Project Title:
Proj. Ref. No.: Time & Date of Casting:
Pile Ref No.: Pile Size:

BORING DETAILS Ground Level:

Cut-Off Level:

Pay Length:
Penetration:

Toe Level:

Time Boring Started


Time Boring Ended

BORE PILE DETAIL BORE LOG


Steel Casing Depth (m) Soil Description
Size (mm) Diameter:
Length (m):

Reinforcement
No. / Bar Size (mm):
Length (m):
Link Size / Spacing (mm):

#
Concreting Method: Dry / Tremie
2
Concrete Grade (N/mm ):
No. of Cubes Taken:
Test Cube Ref. No:

INSPECTION
Builder's Site Rep.
Site Supervisor 1st 
2nd 
COMMENTS

Prepared by:
Name & Signature of Builder's Site Rep. Date

Confirmed by:
Name & Signature of Site Supervisor Date

Checked & approved by:


Name & Signature of QP Date
# Delete Accordingly
Note: This form serves as a guideline only

You might also like