You are on page 1of 1

CHECKLIST FOR DIAPHRAGM WALL

Date:_________________ Supervisor Name:_____________


Client:________________ Site:_________________________
Panel No. :_____________ Average Ground Level:___________
Top of guide wall level : ______________ Bottom of guide wall level : _______
Length of Panel:_______________ Thickness of Diaphragm Wall:___________
Type of drilling fluid:_____________ (Bentonite/Polymer)

Parameters Fresh Mix Reused Slurry Before Concrete Pour


Viscosity (seconds)
Specific Gravity
PH of Bentonite
Soaking period of
Bentonite
Liquid Limit of
Bentonite

Penetration Records
Time Depth
Sr. No. Date Soil Type Remark
From To From To

Cut-off Level of Diaphragm Wall: __________________


Diaphragm Wall Final Depth:____________________
Actual volume of concrete used:_____________
Casting Date:____________

Reinforcement Details:

Cage Length:_________________________

No. of No. of No. of Weight Total


Sr. No. of Lapping Total
Dia Vertical Distribution Open Per Weight
No. Stirrups Length Length
Steel steel links Meter of Steel

You might also like