Project:
Mr. RajeevanRFX 2131900041
Parangan (Section
- Senior Manager A) -Water
- Project Supply, Installation, Testing and
Transmission
Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of
07-07-2021
PE AM - Projects Service Coord
Ponnam China Chitti
Resident Engineer
Tarek El Sakka compliance to noted comments on dwg. /noc conditions
Resident Engineer and Dewa standards
M: +971 50 46 22 650 ... minimum 1.5m clearance to maintain if possible
E: t.sakka@rtceng.com ·-:���
Encl: As stated above as per site conditions with protection
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah
Encl: Road.docp
as stated above
Mr. Ahmed Ali Al Mahmoud - Assistant Director, Infrastructure & Engineering - Dafza
Mr. Alaa H. Najjar - Senior Executive, Engineering Contracts - Dafza
Mr. Ibrahim Abueram - Project Manager - KTC
Approval subject to the above and the
contract conditions/specifications.
M01 Office, Makateb Building, Airport Road, Port Saeed, Deira, P. 0. Box 60833, T. +971 4 295 3440 F. +971 4 295 3445 Dubai, U. A. E
E-mail: rtceng@rtceng.com www.rtceng.com
5935-21 pwt dated 05.07.21
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road 5935-21 pwt dated 05.07.21
Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July
2020
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory. 5935-21 pwt dated 05.07.21
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road
Dear Sir,
Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.