Road & Traffic Engineering


Date: 13 July 2020
Our Reference: 252-A-003-08-0183 10594-20 pwt dated 14.07.20
29th June 2021 Our Ref. 200924.27-RTC-LT-00179-DXB
Dubai Electricity and Water Authority
Dubai, Electricity
P.O Box: and
564 Water Authority 5935-21 pwt dated 05.07.21
Po Box. 564
Dubai, United Arab Emirates
Dubai, UAE
Tel: 04 324 4444
Attention
Fax: 04 324 8111 to: Mr. Rajeevan Parangan
Senior Manager - Projects Water Transmission

Project:
Mr. RajeevanRFX 2131900041
Parangan (Section
- Senior Manager A) -Water
- Project Supply, Installation, Testing and
Transmission
Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of

Project: Subject: Request


P52 Proposed for Alignment
New Entry Approval
and Exit for - Line Free
Dubai Airport CL204 (LOS)
Zone 600mm Dubai,
Authority, Dia from Safa
UAE Park to Jumeirah Road

Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July


Subject: 2020
Shop Drawings for DEWA-WD 600mm dia Works
Dear Sir,
Dear Sir, Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.
Reference is made to Contractor KTC lnternational's letter ref. P52-INF-WD-SD-013 RS dated 26th
June2021 AEC
concerning the approval
has conducted of site
a joint Shop Drawings
visit with theofContractor
DEWA-WD andWorks forthe
verified aforementioned project.
submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
Please be the Contractor's
informed proposal of 600mm
that DEWA-WD revised alignment
dia works and
ShoptheDrawings
reasons have
for deviation are notedbyinusthe
been reviewed attached key
and
plan
found those for your ready reference.
in order.
We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.
Hence, recommended to extend approval for subject project. To,
Mr. Ponnam,
Your approval
This in
is this regards
for your is highlyreview
information, appreciated.
and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
� Ji ith best regards,
��
� AQLEH ENGINEERING CONSULTANTPRESSURE TEST Thanks!
FOR 10 BARS TO BE CARRIED OUT DURING THE
With best regards,
SHUTDOWN.
RTC Road & Traffic Engineering

07-07-2021
PE AM - Projects Service Coord
Ponnam China Chitti
Resident Engineer
Tarek El Sakka compliance to noted comments on dwg. /noc conditions
Resident Engineer and Dewa standards
M: +971 50 46 22 650 ... minimum 1.5m clearance to maintain if possible
E: t.sakka@rtceng.com ·-:���
Encl: As stated above as per site conditions with protection
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah
Encl: Road.docp
as stated above
Mr. Ahmed Ali Al Mahmoud - Assistant Director, Infrastructure & Engineering - Dafza
Mr. Alaa H. Najjar - Senior Executive, Engineering Contracts - Dafza
Mr. Ibrahim Abueram - Project Manager - KTC
Approval subject to the above and the
contract conditions/specifications.
M01 Office, Makateb Building, Airport Road, Port Saeed, Deira, P. 0. Box 60833, T. +971 4 295 3440 F. +971 4 295 3445 Dubai, U. A. E
E-mail: rtceng@rtceng.com www.rtceng.com
5935-21 pwt dated 05.07.21
Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road 5935-21 pwt dated 05.07.21
Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July
2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
ith best regards,
�� � Ji
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer

Encl: As stated above

CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT)


Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING 07-07-2021
SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
compliance to noc conditions and Dewa standards
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp minimum 1.5m clearance to maintain if possible
as per site conditions with protection
27.7.21
plan for your ready reference.
5935-21 pwt dated 05.07.21
We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.
To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
� Ji ith best regards,
��
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer

compliance to noc conditions and Dewa standards


minimum 1.5m clearance to maintain if possible
Encl: As stated above
as per site conditions with protection
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp
2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory. 5935-21 pwt dated 05.07.21

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
Ji ith best regards,
�� �
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer
compliance to noc conditions and Dewa standards
27.7.21
Encl: As stated above

CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT)


Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp
Business Bay, P.O. Box 214060
Dubai, United Arab Emirates

Date: 13 July 2020


Our Reference: 252-A-003-08-0183 10594-20 pwt dated 14.07.20
Dubai Electricity and Water Authority
P.O Box: 564
Dubai, United Arab Emirates

Attention to: Mr. Rajeevan Parangan


Senior Manager - Projects Water Transmission

Project: RFX 2131900041 (Section A) - Supply, Installation, Testing and


Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of

Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road

Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July


2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
ith best regards,
�� � Ji
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer

Encl: As stated above


compliance to noc conditions and Dewa standards
as per Dewa
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
prevailing Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
standards Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp
Dubai, United Arab Emirates

Date: 13 July 2020


Our Reference: 252-A-003-08-0183 10594-20 pwt dated 14.07.20
Dubai Electricity and Water Authority
P.O Box: 564
Dubai, United Arab Emirates

Attention to: Mr. Rajeevan Parangan


Senior Manager - Projects Water Transmission

Project: RFX 2131900041 (Section A) - Supply, Installation, Testing and


Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of

Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road

Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July


2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
Ji ith best regards,
�� �
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer

Encl: As stated above compliance to noc conditions and Dewa standards


27.7.21
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT)
Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp
•st aec AQLEH Engineering Consultant
• 1 ,·,.ll.:.1;L.....,!u..,)UL__J;�
Suite 406, Building No.12, Bay Square
Business Bay, P.O. Box 214060
T +971 4 3686364
F+9714 3686412
www.aqleh.com

Dubai, United Arab Emirates

Date: 13 July 2020


Our Reference: 252-A-003-08-0183 10594-20 pwt dated 14.07.20
Dubai Electricity and Water Authority
P.O Box: 564
Dubai, United Arab Emirates

Attention to: Mr. Rajeevan Parangan


Senior Manager - Projects Water Transmission

Project: RFX 2131900041 (Section A) - Supply, Installation, Testing and


Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of

Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road

Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July


2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
Ji ith best regards,
�� �
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer
as per prevailing
Dewa standards
Encl: As stated above
compliance to noc conditions and Dewa standards
compaction with
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
95% Patil
Mr. Rajendra mdd
- Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
Mgr-Reservoir SM-PWT
Z:ISECTION A\CORRESPONDANCE\OUTGOING SECTION-AIDEWA\EDITABLE\252-A- 1 of 1
003-08-0183 Request for Alignment Approval- Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road.docp
•st aec AQLEH Engineering Consultant
• 1 ,·,.ll.:.1;L.....,!u..,)UL__J;�
Suite 406, Building No.12, Bay Square
Business Bay, P.O. Box 214060
T +971 4 3686364
F+9714 3686412
www.aqleh.com

Dubai, United Arab Emirates

Date: 13 July 2020


Our Reference: 252-A-003-08-0183 10594-20 pwt dated 14.07.20
Dubai Electricity and Water Authority
P.O Box: 564
Dubai, United Arab Emirates

Attention to: Mr. Rajeevan Parangan


Senior Manager - Projects Water Transmission

Project: RFX 2131900041 (Section A) - Supply, Installation, Testing and


Commissioning of Glass Reinforced Epoxy Water Transmission Pipelines
and Associated Works at Various Location of

Subject: Request for Alignment Approval - Line CL204 (LOS) 600mm Dia from Safa
Park to Jumeirah Road

Ref: The Contractor's letter ref# SPML/LTR/RFX041/AEC/HP/159, Dtd 27th July


2020

Dear Sir,

Reference is made to the Contractors letter reference above regarding the aforementioned subject, the
contents of which is self-explanatory.

AEC has conducted a joint site visit with the Contractor and verified the submitted details, and we concur
with the points/concerns stated by the Contractor in his above letter. Alignment as per tender drawing and
the Contractor's proposal of revised alignment and the reasons for deviation are noted in the attached key
plan for your ready reference.

We have no objection to the Contractor's proposa1/subject to DEWA-PWT and Authorities approval.


To,
Mr. Ponnam,
This is for your information, review and approval. DEWA have no objection to revision provided,
1. Tapping points as per tender remain unchanged,
2. No extra cost to DEWA
3. Subject to all NOCs approval
Ji ith best regards,
�� �
� AQLEH ENGINEERING CONSULTANT Thanks!

PE AM - Projects Service Coord,


Ponnam China Chitti
Resident Engineer

compliance to noc conditions and Dewa standards


Encl: As stated above must be within Dewa corridor not over the pipe
CC: Mr. Mohamed Abdul Matheen - Manager Reservoirs - DEWA (PWT) 27.7.21
Mr. Rajendra Patil - Sr. Engineer - OEWA (PWT)
Mr. Hatem Elbaz - SCADA Manager - DEWA (PWT)
SM-PWT