Professional Documents
Culture Documents
4/1/2024
DH0008. Dubai Land Residence Complex (DLRC)-Phase 2 & 3
Landscaping Work zone 6
4-Jan-2024 & 6 am
4-FEB-20234& 6 am
KTC-DH-0008-SK-KP-PL-01
SUBIN GANESAN
0581092530
YASIR
05556494400
Save As Reset
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
Reference to the above subject , we are hereby have NO OBJECTION for your proposed work subject to the following
conditions and attached Drawings / Documents.
General Conditions :
G1 . NOC is issued for Landscaping work within plot limit only. Separate NOC to be obtained for Irrigation / power supply
work.
G2 . DEWA approved NOC documents to be downloaded from DEWA Infrastructure NOC Customer Portal at https://
crm.dewa.gov.ae/irj/portal/anonymous
G3 . No Trees/Long Planting to be installed over existing DEWA ED & WD services / corridors. Otherwise, the same have
to be relocated on client cost.
G4 . During any emergency maintenance work DEWA will not be responsible for reinstatement of the landscaping etc.
G5 . Trees pit to be installed minimum 4.0 M away from existing DEWA Electrical/Water services / corridors.
G6 . Existing ground level not to be raised / lowered more than 30 cm.
G7 . No Heavy Vehicles / Equipment movement / Parking / Material storage are permitted over existing DEWA-
Electrical/Water services / corridors and Valve Chambers.
G8 . DEWA reserves all the rights to lay future services in DEWA Electrical/Water corridor, reinstatement for the
landscaping to be carried out by concerned party.
G9 . Contractor to ensure the implementation of all precautionary measures to ensure safety and integrity of existing
DEWA services within the project limits. Damage to any existing Services/Plant/Structure/SCADA system/ Control
Unit and RTU due to the proposed work, will be charged against contractor as per DEWA regulations.
G10 . All DEWA NOC conditions should be maintained and any violation; NOC will be suspended and action will be taken as
per Law (6)/2015 of Dubai Government.
G11 . Completion certificate to be obtained from DEWA within one month from the date of completion of Project.
G12 . Access to DEWA Corridors/Sub-Stations/Plants should not be blocked by the proposed work at all time until/unless
approved by DEWA. In case existing access is affected, an alternative access with proper direction signs to be provided
without any financial cost to DEWA.
Electricity Conditions :
Page 1 of 3
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
E1 . All existing HV/LV cables to be lowered/raised to 0.9 M from the proposed ground level without any financial cost to
DEWA.
E2 . Cable joints locations to be avoided from the Landscaping and Irrigation lines.
E3 . Link box areas to be protected from the Landscaping and Water accumulation from the Irrigation lines / sprayers /
sprinkler.
Water Conditions :
W1 . Written intimation should be given to DEWA Water Project & Engineering and New Connection Department 3 days in
advance prior to start the works close to existing waterline. (For contact details, please refer to annexure sheet)
Page 2 of 3
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
The Conditions / Precautions stated on the attached GIS sheet(s) & Annexure are to be adhere to :
For any further clarifications / queries , please contact Infrastructure Information & Permits Department
Tel : 04 -3221614
Notes : 1 This approval valid for six months from the date of approval
2 An unauthorized amendment to the document / approved drawings will shall void this NOC , and will be
liable to prosecute as per relevant Government of Dubai Law.
3 This is a computer generated document and may not require any signature.
Page 3 of 3
Infrastructure Information & Permits
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
DUBAI, U.A.E. Web: www.dewa.gov.ae
11 k
V
In O - 2x12
pera
tion
ion
at
er 6489268
Op
2777100
2777100
6488524 In
k V
11
5A
7 26
6489122
S1
-S
85A 6489116
PK0
7
13 14
aid
101
PK A -LVD
As L
B1-F
01 4
00 V
tion
In O
pera
tion
truc
6489121
aid
ons
As L
8)- C
6489119
tion
8
168
truc
(SS
ons
-
uct)
8)- C
6488526
8
ptic
168
SS
e rO
6489126
01
(SS
COMMUNITY : WADI AL SAFA 5
72
(Fib
6489127
-
65
uct)
A -L
D
VD
ptic
B
e rO
1-F
03
(Fib
4
6489128
00
V
LV
In
In O - 2
pera
O
tion
pe
ra
tio
SS17265A-SS19458A 11 kV In Operation
132kV - 1x11
n
Proposed
In Operation
11 kV - 2x6
tion
2777000
2777000
pera
In O
132k
V
In Op - 1x11
kV
eratio
In Opera 6
tion
In Operation
11 kV - 2x6
2x
A 11
11 kV -
848
.
PK15928A S16
-S
-SS17503A 132
k
01A
11 kV In O In O V - 1x1
In Op - 2x6
n
peration
eratio
pera 1
41
tion
PK1
11 kV
6488532 6489019 504200 504300 504400
6488534
A3
NOC TYPE : Construction NOC ELECTRICITY/WATER NETWORK IS
PREPARED BY : ADNAN ALHAMMADI SHOWN WITHIN YOUR SCOPE OF WORK.
APPROVED BY : ENG. AMINA ALI HASHEM
DATE : 03-07-2023
ANY DAMAGE TO THE NETWORK SHALL Electricity Map
BE CHARGED AS PER DEWA'S
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
SCALE : 1:725
RULES AND REGULATIONS.
Infrastructure Information & Permits
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
DUBAI, U.A.E. Web: www.dewa.gov.ae
Û
RT U
B
504200 504300 504400
t
6488525
B
Z c e
150MM
In Service 150
M MI
e rv i nSe
rvic
InS e
M
5M
22
6489268
2777100
2777100
6488524
ce
r vi
Se e
In r vic
M Se 6489122
5M In
22 M 6489116
0M
15
ce
vi
6489121
r
Se
In
M
0M
6489119
15
6488526
6489126
COMMUNITY : WADI AL SAFA 5
6489127
d
6489128
Z
Z
450MM In
Service
450M
M In
Serv
2777000
2777000
rvice
ic e
InSe
m
32 m
225MM InService
6488532 6489019
NOC NO : 100518619
504200
225MM In
6488534
Service 504300
A3
NOC TYPE : Construction NOC ELECTRICITY/WATER NETWORK IS
PREPARED BY : ADNAN ALHAMMADI SHOWN WITHIN YOUR SCOPE OF WORK.
APPROVED BY : ENG. AMINA ALI HASHEM
DATE : 03-07-2023
ANY DAMAGE TO THE NETWORK SHALL Water Map
BE CHARGED AS PER DEWA'S
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
SCALE : 1:725
RULES AND REGULATIONS.
03/Jul/2023
100518619
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
Reference to the above subject , we are hereby have NO OBJECTION for your proposed work subject to the following
conditions and attached Drawings / Documents.
General Conditions :
G1 . DEWA approved NOC documents to be downloaded from DEWA Infrastructure NOC Customer Portal at https://
crm.dewa.gov.ae/irj/portal/anonymous
G2 . NOC is issued for Landscaping work only. Separate NOC to be obtained for Irrigation work.
G3 . No Trees/Long Planting to be installed over existing DEWA ED & WD services / corridors. Otherwise, the same have
to be relocated on client cost.
G4 . During any emergency maintenance work DEWA will not be responsible for reinstatement of the landscaping etc.
G5 . Trees pit to be installed minimum 4.0 M away from existing DEWA Electrical/Water services / corridors.
G6 . Existing ground level not to be raised / lowered more than 30 cm.
G7 . No Heavy Vehicles / Equipment movement / Parking / Material storage are permitted over existing DEWA-
Electrical/Water services / corridors and Valve Chambers.
G8 . DEWA reserves all the rights to lay future services in DEWA Electrical/Water corridor, reinstatement for the
landscaping to be carried out by concerned party.
G9 . Contractor to ensure the implementation of all precautionary measures to ensure safety and integrity of existing
DEWA services within the project limits. Damage to any existing Services/Plant/Structure/SCADA system/ Control
Unit and RTU due to the proposed work, will be charged against contractor as per DEWA regulations.
G10 . All DEWA NOC conditions should be maintained and any violation; NOC will be suspended and action will be taken as
per Law (6)/2015 of Dubai Government.
G11 . Completion certificate to be obtained from DEWA within one month from the date of completion of Project.
G12 . Access to DEWA Corridors/Sub-Stations/Plants should not be blocked by the proposed work at all time until/unless
approved by DEWA. In case existing access is affected, an alternative access with proper direction signs to be provided
without any financial cost to DEWA.
Electricity Conditions :
Page 1 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
E1 . Work intimation request (duly filled by Client/Consultant & Contractor) to be forwarded 2 days in advance on
patrolling.dm@dewa.gov.ae (Contact numbers 04-322-7496, 04-322-7533) along with location map enabling Dist-
Maintenance staff to visit the site and assist the Contractors in locating & protecting DEWA-HV services.
E2 . DEWA -Distribution Maintenance site staff will inspect the site for the existing cable protection and availability of
work permit and NOC copy at site.
E3 . Distribution Maint. Cable sign board showing depth & numbers to be placed along the cable route (Please refer
attached copy Size A3 Laminated).
E4 . Weekly work program to be forwarded (along with Location map & contact Name and Numbers) to us every
Wednesday. For any new planned work intimation to be forwarded at least 2 working days in advance.
E5 . If any cable found at site which is not shown in the GIS or in the submitted drawing and affecting by the proposed
work, will be treated as per DEWA procedure or as per our site inspector instruction.
E6 . Only manual excavation is allowed close to the cables with hand shovel (or with flat side of the pickaxe if required.)
E7 . Regarding existing HV services, all necessary safety and protection measures to be taken at site in co-ordination with
DEWA inspector at site.
E8 . Plantation of shrubs and trees should not be done over the existing HV cables and HV corridors as shown in the
revised drawings.
E9 . Clearance between trees and cables should be maintained as shown in the revised drawings.
E10 . 11KV corridor can be either soft landscape (grass, bushes, small plants etc.) or standard interlocked tiles without
concrete, separate NOC should be obtained for installation of any kind of decorative tiles.
E11 . Plantation of trees next to DEWA-ED corridors should be protected by providing root barriers at the edge of corridor
to block root encroachment.
E12 . Note: NOC subject to undertaking letter from the client Dubai Holding for Emergency Maintenance work Ref: DHRE/
DEWA/DH-0008/MG/L/5885/2023/vi Dated 26th June 2023.
E13 . General conditions
E14 . Before starting any kind of works in near to existing 400/132kv services Prior intimation to be given to DEWA TLM
department by Email – tlm.supervision@dewa.gov.ae or Fax: 04-3229095 and confirmed to engineer Mr. Atul Dubal :
055-3468479.
Page 2 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
E15 . NOC issued only for the proposed landscaping work. Working location -A and sectional details as shown in the TLP
staff verified drawing. No.KTC-DH-0008-CNOC-132KV-01-Z6
E16 . NOC Issued as per the attached undertaking letter Ref.DHRE/DEWA/DH-0008/MG/L/5885/2023/vi
E17 . Existing ground level not to be raised / lowered more than 30 cm from GL in the vicinity of the existing 132kV cable /
corridor.
E18 . No any landscape are allowed within 5m Horizontal clearance from existing 132kV cable joint / link box locations, only
small size gravel (or) geotextile gravels permitted.(if any)
E19 . Existing 132kV cable route /corridor to be free from any kind of services / obstruction.
E20 . 24 x 7 full time access to be provided to DEWA for maintenance / patrolling / new cable laying / etc... Within DEWA
reservation corridor.
E21 . Access to DEWA cable Corridors / substation should not be blocked by the proposed work.
E22 . In case of emergency for rectification & repair of the existing 132kV cables / routine maintenance , the landscaping to
be removed and 132kV cables area to be reinstated in the original position with immediate effect , upon request of
DEWA at any time and all reinstatement work ( removal & reinstatement) will be carried out by the client
E23 . Existing 132kV link box ground level not change during the works. (Proposed finished level should be match with
existing link box foundation/door level) (if any)
E24 . No any Trees are allowed within the 5.0mtr vicinity of existing 132 kv cable route.
E25 . 132kV cable route marker to be replaced /re-instated in the same position (visible) / place after completion of work.
E26 . Existing 132kV cable pole markers (if any) to be replaced with flush markers in the same area and confirm with TLP
staff.
E27 . Access to existing 132kV cable joint location should be confirmed with DEWA TLP staff before / after completion of
the work on site.
E28 . For Irrigation line work within the vicinity of Existing 132 kv cable route, a separate NOC to be Obtained.
E29 . NOC issued based on the existing transmission lines (400/132kV cable & OHL) clearances. If any other services /
utilities in this proposed working area, concerned department approval/NOC to be obtained.
E30 . Works to be carried out under DEWA TLP staff supervision.
Page 3 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
E31 . For any other work and other location, a separate NOC to be obtained.
E32 . Access to the DEWA cable & corridor / substation should not be blocked by the proposed work.
E33 . 24 x 7 full time access to be provided to DEWA for maintenance / patrolling / new cable laying / etc... Within DEWA
reservation corridor.
E34 . Parallel & vertical clearances from the existing 32kV cables to proposed work as shown on the drawing should be
strictly followed and confirmed with TLP staff before starting the work.
E35 . If any new transmission lines (400/132 kV cables / OHL) are energized in this proposed working area before
completion of the work, a separate NOC to be obtained for the affected area.
E36 . No any heavy vehicles & equipment movements / storage of material / Parking / excavated Soil are permitted over
the existing 132kV cables.
E37 . All clearance / comments shown in the drawing shall be maintained.
E38 . After completion of the work, the area to be reinstated in the original position and the same to be confirmed with
DEWA TLP staff.
E39 . For any other work and other locations, a separate NOC to be obtained.
E40 . Machinery conditions.
E41 . Only Manual Excavation permitted within 2.0 mtr. Horizontal clearance from existing 132kV cable trough, duct bank
and 5.0 mtr. Horizontal clearance from the existing 132kV cable joints / link box / HDD / FO cable.
E42 . Protection conditions
E43 . The nearest/ affected existing 132kV cable should be identified and confirmed with trial pit in the presence of DEWA-
TLP staff. After confirming the existing 132kV cables depth/alignment, the area should be protected/barricaded
along with a caution signboard as per DEWA requirements and site conditions before starting work on site.
E44 . Proposed work should be carried out with extreme care without any heavy vibration.
E45 . If any construction vehicle/equipment require to cross existing 132kv cable at unmade area, crossing area to be
protected with suitable protection slab/steel sheet with extra sand fill/road base (ramp to be provided), in presence of
TLP staff before starting the vehicle/equipment/ machinery crossing.
Page 4 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
E46 . Contractor to ensure the implementation of all precautionary measures to ensure safety and integrity of existing
transmission lines within the project limits. Damage to any existing transmission lines due to the proposed work, will
be charged against a contractor as per DEWA regulations.
E47 . All existing HV/LV cables to be lowered/raised to 0.9 M from the proposed ground level without any financial cost to
DEWA.
E48 . Cable joints locations to be avoided from the Landscaping and Irrigation lines.
E49 . Link box areas to be protected from the Landscaping and Water accumulation from the Irrigation lines / sprayers /
sprinkler.
Water Conditions :
W1 . Provide adequate safety measures to avoid any damages to existing water lines along the activity area from
movements of machinery / vehicles etc.
W2 . • Contractor has to take all precautionary measures for deep excavation and lose ground strata. Consultant /
contractor are fully responsible to take all precautions to ensure utmost safety of DEWA pipelines. Any damages and/
or losses due to damages will be subject to penalty in addition to recovery of compensation, with respect to direct or
indirect losses of material/property/personnel, etc.
W3 . • Corridor reserved for water lines shall be left free of other services incase such services are found above/ laid in
DEWA water corridor without our prior approval the same shall be relocated at your cost.
W4 . • Separate NOC shall be obtained for crossing the existing / proposed water line with sufficient vertical clearances and
protection details along with method statement.
W5 . • Horizontal clearance of 1.50 m from the water pipeline up to 450 mm dia and 4.00 m from water pipeline greater
than 450 mm dia with other services shall be provided, while a minimum vertical clearance of 0.5m below the water
pipeline up to 450 mm dia and 2.00m below water pipeline greater than 450 mm dia with other services.
W6 . • Existing valve chambers should be accessible at all times and should not be buried during construction activity.
Existing valve/ meter chambers are to be relocated or raised/lowered as per the proposed final level and offsets.
W7 . • M/S client/consultant/contractor should guarantee the access for DEWA to carryout maintenance on pipeline, in
case of any damage to existing water line DEWA will repair the pipe line and M/S. client/consultant/contractor should
reinstate the road/parking/ other services without any reinstatement cost to DEWA.
Page 5 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
W8 . • 24/7 access will be provided to DEWA WD reservation to carryout emergency maintenance / repair / proposed work
for DEWA WD services without prior notice .
W9 . • No machinery allowed over DEWA WD pipe line / corridor
W10 . • Manual excavation is only allowed above / near water network & corridor .
W11 . • For Machinery : Horizontal clearance of 4.00 m from the water pipeline shall be provided .
W12 . • Pipeline with inadequate cover shall be relocated at proper depth in the appropriate corridor as diversion work
(Minimum cover to be maintained 1.20m for pipes up to 450mm dia & 1.50m for pipes above 450mm dia ).
W13 . • All the diversion and protection works should be carried out without any financial cost recharged to DEWA. No
rechargeable development betterment works shall be carried out without obtaining written approval from W-P&E
dept. prior to commencement of work.
W14 . • All the water scada system /control unit/RTU should be protected as per DEWA water standard & specifications,
and separate approval shall be obtained.
W15 . • No Barriers ( concrete / plastic ) / bollard / Embankment work are allowed over DEWA WD pipe line / corridor
W16 . • No trees/ shrubs /hedges/pots / water feature / curb edges / curb stone /heal curbs /landscape furniture / etc are
allowed over the existing Water networks / Water corridor.
W17 . • The landscaping contractor should not carry out any massive excessive cutting/filling over the water networks
reservation, and allowable cutting and filling should not be more than 0.50m.
W18 . • DEWA reserve rights to excavate the landscaped area over water networks for any emergency work.
W19 . • Reinstatement of landscaping under the above mentioned circumstances shall be carried out by the Client/
Consultant/Contractor without recharging any cost to DEWA.
W20 . • provide a root barrier ( Mandatory ) if the horizontal clearance from existing water line is less than 1.50m
W21 . • No sand dunes / raising ground on water corridor or water network.
W22 . Written intimation should be given to DEWA Water Project & Engineering and New Connection Department 3 days in
advance prior to start the works close to existing waterline. (For contact details, please refer to annexure sheet)
Page 6 of 7
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100526573 E-NOC No : NOC-27072023-2309
DEWA Revision No. : Revision 1 Date : 05.10.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works at Dubai Land Residence Complex (DLRC)
for Zone 06
The Conditions / Precautions stated on the attached GIS sheet(s) & Annexure are to be adhere to :
For any further clarifications / queries , please contact Infrastructure Information & Permits Department
Tel : 04 -3221614
Notes : 1 This approval valid for six months from the date of approval
2 An unauthorized amendment to the document / approved drawings will shall void this NOC , and will be
liable to prosecute as per relevant Government of Dubai Law.
3 This is a computer generated document and may not require any signature.
Page 7 of 7
Infrastructure Information & Permits
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
DUBAI, U.A.E. Web: www.dewa.gov.ae
DL
6488686
MN
6489143
ND
H
6488679 813-2799
(P
RE
D-
6489144 6488687
ilo
SS
10
SD
t
x6
Ca
5
11
- 2 n
-
2776300
2776300
-S
1E
V ratio
ble
- 4
93
6488678
S1
V ation k
11
11 Ope
)-2
2A
6488680
47
k
6-
MN airs
11 per
0P
-
In
SS
7-
PK
O 6481197
H D (M
11
In
16
86
6489147
11
-1 N H
88
2 x6
36
6488681
0 6 D-
6488683 V-
1A
k
n
A
11 k peratio
-S S W
11
6488668
11
Ab
S4 N
In O
k
an
kV
6489149
82 S)
V
do
In
64886826489109
4
In
6488665
11 In
2776200
2776200
O
Op
ed
pe
kV Op
-
er
r
- 1
ati
Ab era
6488675 kV ion
tio
6488662 6489232
on
11 perat 6489265
an tion
6488676
MN
n
SS
6488666 n
tio
do
O 6489227
In
115
era
ne
6488667
D-
p
SS
813-0459
d
O
5
11
In
4A
123
2-
6488663 kV 6488671 COMMUNITY : AL ROWAIYAH SECOND
SS1
-SS
SS
1
A1
59-
39 6488670 2
46
23
-
113
3 d
6488664 LV ose
SS
19
11
2776100
2776100
59-
SS 6488672 p
39A
105
11
6489150 A- Pr
SS1
8
16
k
1
V
11
12 6488669
7A
6482152
Ab
SS
In
5
LV era
k
MNH D-1
325
VI
Op
an
11
11
6488673 -PK5359
- tion
11
do
kV Aban
nO
6
d oned
VA
ne
6489183
11 k
per
d
6488677
ban
o s 1 x6
a
In O
6488674
ed
(F b e rO
tion
11 k ration
G
In O
don
VL
Pr V -
ibe
Laid
(F
2776000
2776000
As G
pe
ction
V-
k
op
i
rO ptic
e
-M
per
6489108
SS1
tru
11
d
Cons
pt
NH
11 kV
icD uct
4
atio
6488653 -3
W
6489113
uc )- (S
3
D
kV
19A
AH
32kV
t)-
2 33
LV - tion SD 1 /G)
AD In
(D S15
a E kV
Oper
-S
6489184 6489112 D R U
-D L N tion (
LN 86
LN O
6488652 In Ab
S17
TJTN In Opera an
D- per
DR 9A
6488602 6488654
d
DL at
on
820
ES -SS
6489114
ND ion
ed
PK
D-
2775900
2775900
A 11
R E (U
6488603
71
1E 487
6489194 6488651
SD /G)
91
- 2x12
10 0A
6488605
1
11 kV ation
kV
-P
8-
13
r 6489221
S S - Co
In Ope 11 kV - 2x6
K0
2k
In O
6489219
15
6488604
61
V
Proposed
)
SS 6489224
kV
6488650
86 stru
7
pera
6488606 13
9A cti
11
61
n
2x12 1A 6489222
)-
kV
11 kV - tion
tion
- PK
Co n As
6488607 6483740 13
In
6489193 6489191 In Ope ra
ns
72 6489223
o
O
6488587 6488609 4A
tru Laid
2775800
2775800
pe
11
6488656 6488659
cti
k 6489225
ra
6489258 VI
on
In Opera D 132kV kV
nO
tio
6488608
x6
As
6488588 6489008 pe
n
11 kV -
6488611 6489195
rat
In Opera 3 - 2 ed
La
6489192 ion V
)
6489009 k s
tion (U/G
tion 11 ropo
id
NDRE S
6488612 6489189 6489217 V sed COMMUNITY : AL ROWAIYAH THIRD
6489186 6489188 k
11 ropo
2775700
2775700
(FiberOpticDuct)- ()- P
SS
TJTN-DL
DLNDR ESD-2E109-PK17748A 11 kV In Operation
11
6489215
SS
6489190 64891876489185
13
.
6488641
62
2k po
6489206
2
V se
6
- 2x
-
11
6488644 11 kV osed
1x
6488645 11 kV - 2x12
k
o s 2 x6
p
12
Pro
2775600
2775600
6489017 6489015 6489014 6489214
d
6489211
In
In Operation
ed
6488621 6488638 6488642 6489220
Pr V -
Op
6489205
op
k
er
6488613 6489201 6488647 (FiberOpticDuct)-6 Pair (DLNDRESD)- Construction COMMUNITY : MADINAT HIND 1
11
6488625
n
A3
NOC TYPE : Construction NOC ELECTRICITY/WATER NETWORK IS
PREPARED BY : SYEDISHAQ ALHASHMI SHOWN WITHIN YOUR SCOPE OF WORK.
APPROVED BY : ENG. AMINA ALI HASHEM
DATE : 02-08-2023
ANY DAMAGE TO THE NETWORK SHALL Electricity Map
BE CHARGED AS PER DEWA'S
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
SCALE : 1:3,657
RULES AND REGULATIONS.
!
Infrastructure Information & Permits
!
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
!
DUBAI, U.A.E. Web: www.dewa.gov.ae
!
6481056 504900 6489142 505000 6489140
505100 505200 505300 505400 505500 505600 505700 505800 505900 506000 506100 506200
Û
6488686 FT
SC
6489143
AD
6489144 6488679 813-2799
e 6488687
A
r vic
Ca
22
Se
2776300
2776300
5M
15
In
ble
M 6488678
0M
6481197 M
Du
0 6488680
M
45
InS
ct
In
e rv
Se
6489147
30
r
ice
0M
vic
6488681 6488683
M
e
45
In
6488668
0M
Se
6489149
r
M
vic
64886826489109
90
6488665
InS
e
2776200
2776200
0M
!
12
M
e rv
30
In
00
0M
6488675
ice
6488662
Se
!
6489232
M
6488666
M
6488676
r
vic
6489227
In
In
e
6488667
Se
Se
6489265
r
rv
!
vic
ice
6488663 6488671 813-0459
!
e
COMMUNITY : AL ROWAIYAH SECOND
6488670
6488664
2776100
2776100
6489150 6488672
6488669
!
6482152
!
6489173 300MM
6488673
!
In Service
!
6489183
!
!
300MM
!
6488677
450
In
!
Service
!
!
!
225
M
!
6488599 6488674
M In
2776000
2776000
M
!
6489108
M In
Ser
!
6488655 6489226 6489230
Ser
vice
6488601 6489113
!
6488653
vice
300
Service
6489112
!
6488652 M MA
!
6488602 ban
!
6488654 d one
15
6489114
!
6489184 d
In
0M
!
2775900
2775900
6488603
!
300MM
!
M
6488651
!
6488605
In
! !
!
Se
6489221
!
6489194
r
!
vic
!
6489219
90
6488604
! !
e
6489224
0M
6488606 6488650
!
!
15
M
15
0M
In
0M 6489222
!
Se
15
t
6488607 15
able Duc
6483740
r
6489193 0M InS
In
0M
vic
6489191 e 6489223
!
Se
6488609 M
InS rvice
e
M
2775800
ned2775800
15
6488656 6488659
vic
In
e rv 6489225
0M
!
6489258
Se
ice
e
6488608
M
C
6489192
r
6489008
vic
In
!
SCADA
6488611
e
6488588 6489195
Se
6489009
15
r
300MM Abando
!
vic
0M!
6488657 6488658
M
!
6488589 Se
A!b
M 6489188
!
5M
do
2775700
2775700
22
ne!
e
InServic
!
!
d
!
o M Re
d m ov e 6489215
6489190 an ! d 150MM InService
64891876489185
1200MM
Ab!
!
6488637 6488639 6488640
.
6488641 M M Re
In
45
0M ! move 6489206
d
150MM
0M
15
5
1!
15
0M InS
M
6488644
0M
6488638 6488645
M
InS
SCADA C
2775600
6489211
In rvic
er
6488642
Se
6488621 6489220
vic
6489205
rv
e
150MM InService
e
ice
!
NOC NO : 100526573
!
!
!
NOTE: APPROXIMATE POSITION OF
!
!
A3
!
!
!
!
APPROVED BY : ENG. AMINA ALI HASHEM
!
!
!
DATE : 02-08-2023
BE CHARGED AS PER DEWA'S
!
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
RULES AND REGULATIONS.
!
SCALE : 1:3,657
!
!
KEY PLAN:
05/Oct/2023
01 02 03 04 05 06 07 08 09 10 11
100526573 23 22 21 20 19 18 17 16 15 14 13 12
SEATED CHEST
75 74 73 72 71 70 69 68 67 66 65 64 63
BIKE 97 96 95 94 93 92 91 90 89
SHIP LARGE
LEG PRESS
TENT NOTES:
10 EXERCISE STATION 1. ALL DIMENSIONS ARE IN METERS UNLESS
EPDM RUBBER SURFACE OTHERWISE NOTED.
2. COORDINATES ARE AS PER DLTM.
ELLIPTICAL
CROSS-TRAINER
LEGEND:
EXISTING:
PHASE 1 EXISTING LANSCAPING
AND HARDSCAPING
Millingtonia Delonix regia Plumeria obtusa EXISTING ROAD/PARKING & ENTRANCE
SHRUBS
SUCCULENTS
GROUND COVER
GRASS
DIRT
PROPOSED HARDSCAPE
PLOT 6489219 AND SITE FURNITURES:
BOUNDARY PAVING
PEBBLES
SHEET-11
R.O.W R.O.W ACRYLIC SURFACE
SHEET-09
R.O.W
R.O.W CRUSHED GRAVEL
B1 B1 B1 B1 B1 B1 B1 B1
BENCHES
B1 B1 B1
6489232
68
B1
B1 BICYCLE RACKS
Park & Open Space P1
.
18
B1
P1
AR6_01 P1 P1 B1 LITTER BINS
AR6_02A FL P1
B1
R
SCL FL
B1
P1
FL B1
ALUMINUM EDGING
FL P1
FL
AR6_02 RS B1
SCL FL
FL
FL
B1
P1
TABLE AND SEATS
6489231 .05 B1
FL
FL
P1
B1
0 P1
FL FL
Police Station FL
FL
FL
B1
PROPOSED LIGHT FIXTURES:
SCL FL P1 P1
B1 B1
R.O.
W AR6_03 B1
FL
FL
B1 P1
P1
B1
B1
P1 POLE LIGHTS
6489229 AR6_04 AR6_05 SCL FL
P1 P1
FL
6489230
B1
B1 BOLLARD LIGHTS
Civil Defense Center Irrigation Tank
B1 B1
B1
P1 FL B1
5
.3
B1 FL
P1 FL
FL TENT FLOOD LIGHTS
14
B1
B1 W1 FL
SCL FL
B1 W1
B1
B1 W1
B1
B1
SP1 PALM & TREE UPLIGHTS
W1
W1 B1 P1 B1
e
W1 P1
W1 RECESSED WALL LIGHTS
ac
SCL B1
SP1
O 89 06
B1 W1
n 9
P1
Sp
SP1
R.O W1
SCL
pe 21
P1
& 64 6_
.W B1 B1 W1
SP1 W1
B1
B1 SPORTS COURT LIGHTS
AR
B1 P1
W1 W1
W1 B1
rk
B1
B1
EXISTING DUCT
Pa
P1
SP1
B1 B1
R.O B1 P1
. W RC-A-054
B1
P1
6489246
6489113 P1
POP Room B1
B1 P1 SP1
01 02-10-2023 Revised as per comments AM AA AA
6489245 P1
B1
SP1
0 19-07-2023 FOR APPROVAL AF AA AA
P1 P1
B1
B1
AR6_12 SP1 REV DATE DESCRIPTION BY CHK. APPD.
RC-A-030
P1
B1
6489225 SP1
P1 DRAWING STATUS:
6489247 B1 P1
P1
B1
CNOC DRAWING
SHEET-13
10.27
AR6_11
B1
B1
6489223 P1 CLIENT:
B1
P1
B1
B1
SP1
AR6_10 AR6_13
SP1 6489222 6489209
LANDSCAPE CONSULTANT:
SHEET-14
RC-A-055 AR6_09
6489112 P1 6489224
6489238 ESS Gold and Diamond Park
Building No. 02
6489240
.W
P1
Office 2202 - 2204
SP1 P.O. Box 53363
R.O
Dubai, UAE
ac
AR6_08
1.8 64892en Sp
SP1
Emai: www.bna.ae
& O 6_07
P1
6489221
R.O
.W
26
SP1 R.O
INFRASTRUCTURE CONSULTANT:
p
SP1
AR
6489236 P1
SP1
rk
P1
SP1
4
.W
R.O
P1
0.30 TO 0.40m
CONTRACTOR
HEIGHT
P1 SP1 6489009
HEIGHT
R.O RC-A-057
8
.W
0.20
2.6
6489114
District Cooling Plant
FRL:33.635
SHEET-14 SHEET-13
Project Title:
0.300
0.500
0.872
0.572
1.314
0.543
PROPOSED LANDSCAPE &
.
R.O
R.O
B1
.W B1
B1
HARDSCAPE LAYOUT
B1
11KV 2WAY
B1
B1
SHEET 09,10,11,13,&14
B1
WITH DEWA 11KV NETWORK
.W
B1 B1
B1
B1
.W B1 DRAWN CHECKED APPROVED CONTRACT NO
B1 B1
SECTION 1-1 B1 B1
B1
AM AA AA
RC-C-009
SCALE: DATE: DRAWING NO:
REV
NTS 02-10-2023 KTC-DH-0008-CNOC-11KV-01-Z6
01
KEY PLAN:
05/Oct/2023
01 02 03 04 05 06 07 08 09 10 11
PROP. SHRUBS PROP. FOOTPATH ACRYLIC SURFACE PROP. SHRUBS PROP. SHRUBS PROP. FOOTPATH ACRYLIC SURFACE PROP. SHRUBS PROP. SHRUBS
(NO SCOPE OF WORK) TREE (NO SCOPE OF WORK) TREE
RD.
2.00 1.50 1.50 2.00 1.50 1.50 1.50 1.00 1.00
14.48 1.00 5.35 1.00 49 48 47 46 45 44 43 42 41 40 39 38 37
2.00 TO 2.50m
2.00 TO 2.50m
50 51 52 53 54 55 56 57 58 59 60 61 62
HEIGHT
HEIGHT
PROP.BOLLARD LIGHT PROP.BOLLARD LIGHT
PLOT LIMIT 6489219
0.260
0.260
0.220
0.220
HEIGHT HEIGHT HEIGHT 76 77 78 79 80 81 82 83 84 85 86 87 88
0.500
0.500
0.500
0.500
0.500
0.684
0.694
0.736
0.960
0.990
1.000
1.000
TL:33.916 0.280
1.060
TL:33.864 TL:33.906
0.236
0.150
2.00 TO 2.50m
ROWING MACHINE & ROW
HEIGHT
PROP.BOLLARD LIGHT
GALAXY ALDEBARAN LAT PULL STATION
PLOT LIMIT 6489219
PROPOSED LANDSCAPE:
0.260
0.220
HEIGHT HEIGHT SEATED CHEST
FRL:34.000 FRL:34.000
0.40m 0.40m
XSCAPE SWING PRESS STATION PALMS
0.353 0.500
0.500
0.500
TREES
0.780
0.790
BIKE
0.853
1.000
TL:33.210 TL:33.220
TL:33.161 TL:33.147 SHIP LARGE SHRUBS
LEG PRESS
SUCCULENTS
132KV 132KV 132KV
TROUGH TROUGH 5.98 1.000 TENT GROUND COVER
TROUGH
10 EXERCISE STATION
2.000 0.30 2.000 2.000
0.300 EPDM RUBBER SURFACE
0.300 GRASS
ELLIPTICAL DIRT
CROSS-TRAINER
SECTION 2-2
PROPOSED HARDSCAPE
AND SITE FURNITURES:
Millingtonia hortensis PAVING
SHEET-09 SHEET-10 SHEET-11 PEBBLES
ACRYLIC SURFACE
CRUSHED GRAVEL
BENCHES
BICYCLE RACKS
LITTER BINS
TYPICAL SEATWALLS
ALUMINUM EDGING
PLOT 6489219 TABLE AND SEATS
SHEET-11
R.O.W R.O.W
2
B1
SHEET-09
AR6_01 P1 P1 B1
SCL SPORTS COURT LIGHTS
AR6_02A
1
B1
P1
5.98
FL
R.O. 6489227 B1
W Ambulance Point
FL
P1 B1
R
SCL FL
B1
P1
FL B1
DEWA 132KV LEGEND:
FL P1
FL
AR6_02 RS FL
B1 EXISTING IN OPERATION
3
B1 FL FL
SCL P1
6489231 .0 50
B1
P1
FL
FL
FL
FL
P1
B1
FL
Police Station FL
FL
B1
SCL FL P1 P1
B1 B1
R.O.
W AR6_03 B1 FL
P1
3
FL B1 B1
P1 B1
01 02-10-2023 Revised as per comments AM AA AA
6489229 AR6_04 AR6_05 SCL FL
P1 P1
FL
7 8
5.
B1
Irrigation Tank
B1
B1
B1
P1
FL
FL B1 0 19-07-2023 FOR APPROVAL AF AA AA
P1 FL
B1
B1 W1 FL
SCL FL
B1
W1
W1
B1
2 REV DATE DESCRIPTION BY CHK. APPD.
B1
3
1 3.
B1 B1
W1
83
W1 B1 P1 B1
e
W1 P1
DRAWING STATUS:
3. .38
ac
SCL B1
SP1
O 89 06
B1 W1
n 9
P1
Sp
CNOC DRAWING
W1 SP1
R.O 1
pe 21
P1
& 64 6_
B1
SP1 B1
.W B1 B1 W1 W1
AR
B1 P1
W1 W1
W1 B1
P1 SP1 CLIENT:
B1 B1
W1
6489244 B1 B1 W1 W1 B1 P1
SHEET-09
k
B1
r
B1
5.6
Pa
P1
SP1
5 B1 B1
R.O B1 P1
.W RC-A-054
B1
P1
6489246
6489113 P1
POP Room B1
B1 P1 SP1
LANDSCAPE CONSULTANT:
6489245 P1 SP1
B1
SHEET-13
AR6_11
B1
B1
6489223 P1 INFRASTRUCTURE CONSULTANT:
B1
P1
B1
B1
SP1 AR6_10 AR6_13
SP1 6489222 6489209
3.2 CONTRACTOR
6
SHEET-14
RC-A-055 AR6_09
6489112 P1 6489224
6489238 ESS
6489240
.W
P1
SP1
R.O
e
22 Spac
.W
SP1
AR6_08
& O 6_07
P1
6489221
R.O
.W Project Title:
6
64 pen
SP1
SP1
R.O
AR
P1
SP1
DUBAI, UNITED ARAB EMIRATES
rk
P1
SP1
AR7_01
Pa
DRAWING TITLE:
6489217
.W PROPOSED LANDSCAPE &
R.O
P1
HARDSCAPE LAYOUT
P1 SP1 6489009
R.O
SHEET 09,10,11,13,&14
RC-A-057
. W WITH DEWA 132KV NETWORK
6489114
District Cooling Plant
AM AA AA
100526573 23 22 21 20 19 18 17 16 15 14 13 12
24 25 26 27 28 29 30 31 32 33 34 35 36
CL 49 48 47 46 45 44 43 42 41 40 39 38 37
CORRIDOR WIDTH15.25m(50') 50 51 52 53 54 55 56 57 58 59 60 61 62
75 74 73 72 71 70 69 68 67 66 65 64 63
0.90
0.90
1.00
0.80
1.0
0.40 0.80
0.80
1.20
0.90
0.45
1.40
1.50
1.50
0.40
1.00
1.00 1.00
1.20 1.60
0.60 0.70 0.70 1.20
1.50 1.00 0.87 0.60 0.70 0.60
STREET LIGHTING
SEWERAGE(H.C)
SEWERAGE(H.C)
SEWERAGE MH.
DEWA(WD)
DEWA(WD)
DEWA(HV)
DEWA(LV)
DEWA(LV)
ETISALAT
ETISALAT
EITC-Du
S.W.D
RTA TYPICAL SERVICES RESERVATION CROSS SECTION
FOR CORRIDOR WIDTH OF 15.25m
CL
9.20 6.00 7.98
EX.DEWA(11KV) EX.DEWA(LV)
(TO BE RELOACTED) EX. 200 Ø
EX. EITC-DU
IRRIGATION
EX. SEWERAGE
(H.C)
EX. STREET
EX. STREET LIGHTING
LIGHTING 0 19-07-2023 FOR APPROVAL AF AA AA
R EXISTING UTILITY SERVICES RESERVATION CROSS SECTION FOR 23.18m R.O.W REV DATE DESCRIPTION BY CHK. APPD.
DRAWING STATUS:
CL NOC DRAWING
23.18 CLIENT:
0.26
0.90
0.90
0.90
CONTRACTOR
1.00
0.60 1.00 0.70 0.60
EX. SEWERAGE 0.80
(H.C)
DEWA(11KV)
EX. EITC-DU
EX. STREET
DEWA (LV)
RELOCATED
DEWA(11KV)
Project Title:
DEWA (WD)
LIGHTING DEWA (LV)
ETISALAT
AF AA AA
RD.
100526573 23 22 21 20 19 18 17 16 15 14 13 12
24 25 26 27 28 29 30 31 32 33 34 35 36
SEATED CHEST
75 74 73 72 71 70 69 68 67 66 65 64 63
BIKE 97 96 95 94 93 92 91 90 89
SHIP LARGE
LEG PRESS
TENT NOTES:
10 EXERCISE STATION 1. ALL DIMENSIONS ARE IN METERS UNLESS
PROPOSED HARDSCAPE
SHEET-09 SHEET-10 SHEET-11 AND SITE FURNITURES:
PAVING
PEBBLES
ACRYLIC SURFACE
CRUSHED GRAVEL
BENCHES
BICYCLE RACKS
LITTER BINS
PLOT 6489219 TYPICAL SEATWALLS
BOUNDARY ALUMINUM EDGING
SHEET-11
R.O.W R.O.W PROPOSED LIGHT FIXTURES:
SHEET-09
R.O.W
R.O.W
P1 POLE LIGHTS
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 BOLLARD LIGHTS
6489232 B1
B1
8 FL TENT FLOOD LIGHTS
Park & Open Space .2
P1
B1
AR6_02A AR6_01 P1 P1
P1
B1
1 9
B1 SP1 PALM & TREE UPLIGHTS
FL P1
R.O. 6489227 B1
W Ambulance Point
FL
P1 B1 W1 RECESSED WALL LIGHTS
R
SCL FL
P1
B1 FL B1
FL P1 SCL SPORTS COURT LIGHTS
24
FL
AR6_02 RS FL
B1
9.
B1 FL FL
SCL P1
6489231 .05 B1
FL
FL
P1
B1
0 P1
FL
FL
FL 1
Police Station FL
FL
B1
SCL FL P1 P1
B1 B1
R.O.
W AR6_03 B1
FL
FL
B1 P1
P1
B1
B1
89
B1 P1 FL B1
Irrigation Tank B1
B1 FL
FL .
14
P1
B1
SCL
B1 W1 FL
FL
01 02-10-2023 Revised as per comments AM AA AA
B1 W1
B1 W1 B1
B1 B1
W1
W1 B1 P1 B1 0 19-07-2023 FOR APPROVAL AF AA AA
e
W1 P1
ac
SCL B1
SP1
O 89 06
B1 W1
n 9
P1
Sp
SP1
R.O W1
pe 21
P1
REV DATE DESCRIPTION BY CHK. APPD.
& 64 6_
B1
SP1 B1
.W B1 B1 W1 W1
AR
B1 P1
W1 W1
W1 B1
rk
B1
B1
Pa
P1
B1 B1
SP1
CLIENT:
R.O B1 P1
.W RC-A-054
B1
P1
6489246
6489113 P1
POP Room B1
B1 P1 SP1
6489245 P1 SP1
B1
P1 P1
B1
B1
AR6_12 SP1 LANDSCAPE CONSULTANT:
RC-A-030
P1
B1
6489225 SP1
SHEET-13
AR6_11 Dubai, UAE
B1 Tel.: 9714 3791883
B1 6489223 P1
Fax: 9714 3791884
P1
B1 Emai: www.bna.ae
SHEET-14
B1
B1
SP1 AR6_10 AR6_13 INFRASTRUCTURE CONSULTANT:
SP1 6489222 6489209
RC-A-055 AR6_09
6489112 P1 6489224
6489238 ESS
CONTRACTOR
6489240
.W
P1
SP1
R.O
e
22 Spac
.W
SP1
AR6_08
& O 6_07
P1
6489221
R.O
.W
6
64 pen
SP1
SP1
R.O
AR
6489236
89
P1
SP1
P1
Project Title:
rk
SP1
AR7_01
Pa
RC-A-057
.W
6489114 HARDSCAPE LAYOUT
15.