DH0008. Dubai Land Residence Complex (DLRC)-Phase 2 & 3
Landscaping Work Park-05
19-DEC-2023 & 6 am
19-JAN-2023 & 6 am
KTC-DH-0008-SK-KP-PL-01
SUBIN GANESAN
0581092530
YASIR
05556494400
Save As Reset
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
Reference to the above subject , we are hereby have NO OBJECTION for your proposed work subject to the following
conditions and attached Drawings / Documents.
General Conditions :
G1 . NOC is issued for Landscaping work within plot limit only. Separate NOC to be obtained for Irrigation / power supply
work.
G2 . DEWA approved NOC documents to be downloaded from DEWA Infrastructure NOC Customer Portal at https://
crm.dewa.gov.ae/irj/portal/anonymous
G3 . No Trees/Long Planting to be installed over existing DEWA ED & WD services / corridors. Otherwise, the same have
to be relocated on client cost.
G4 . During any emergency maintenance work DEWA will not be responsible for reinstatement of the landscaping etc.
G5 . Trees pit to be installed minimum 4.0 M away from existing DEWA Electrical/Water services / corridors.
G6 . Existing ground level not to be raised / lowered more than 30 cm.
G7 . No Heavy Vehicles / Equipment movement / Parking / Material storage are permitted over existing DEWA-
Electrical/Water services / corridors and Valve Chambers.
G8 . DEWA reserves all the rights to lay future services in DEWA Electrical/Water corridor, reinstatement for the
landscaping to be carried out by concerned party.
G9 . Contractor to ensure the implementation of all precautionary measures to ensure safety and integrity of existing
DEWA services within the project limits. Damage to any existing Services/Plant/Structure/SCADA system/ Control
Unit and RTU due to the proposed work, will be charged against contractor as per DEWA regulations.
G10 . All DEWA NOC conditions should be maintained and any violation; NOC will be suspended and action will be taken as
per Law (6)/2015 of Dubai Government.
G11 . Completion certificate to be obtained from DEWA within one month from the date of completion of Project.
G12 . Access to DEWA Corridors/Sub-Stations/Plants should not be blocked by the proposed work at all time until/unless
approved by DEWA. In case existing access is affected, an alternative access with proper direction signs to be provided
without any financial cost to DEWA.
Electricity Conditions :
Page 1 of 3
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
E1 . All existing HV/LV cables to be lowered/raised to 0.9 M from the proposed ground level without any financial cost to
DEWA.
E2 . Cable joints locations to be avoided from the Landscaping and Irrigation lines.
E3 . Link box areas to be protected from the Landscaping and Water accumulation from the Irrigation lines / sprayers /
sprinkler.
Water Conditions :
W1 . Written intimation should be given to DEWA Water Project & Engineering and New Connection Department 3 days in
advance prior to start the works close to existing waterline. (For contact details, please refer to annexure sheet)
Page 2 of 3
NO OBJECTION CERTIFICATE
INFRASTRUCTURE - ELECTRICITY & WATER
DEWA Ref. No : 100518619 E-NOC No : NOC-22062023-2359
DEWA Revision No. : Date : 03.07.2023
NOC Type : Construction NOC
This NOC issued to : KTC International Contracting LLC
Project : Dubai Land Residence Complex (DLRC) - Phase 2 and 3
Subject : Construction NOC for Landscape and Hardscape Works inside Dubai Land Residence Complex (DL
RC) Plot No. 6489127
The Conditions / Precautions stated on the attached GIS sheet(s) & Annexure are to be adhere to :
For any further clarifications / queries , please contact Infrastructure Information & Permits Department
Tel : 04 -3221614
Notes : 1 This approval valid for six months from the date of approval
2 An unauthorized amendment to the document / approved drawings will shall void this NOC , and will be
liable to prosecute as per relevant Government of Dubai Law.
3 This is a computer generated document and may not require any signature.
Page 3 of 3
Infrastructure Information & Permits
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
DUBAI, U.A.E. Web: www.dewa.gov.ae
11 k
V
In O - 2x12
pera
tion
ion
at
er 6489268
Op
2777100
2777100
6488524 In
k V
11
5A
7 26
6489122
S1
-S
85A 6489116
PK0
7
13 14
aid
101
PK A -LVD
As L
B1-F
01 4
00 V
tion
In O
pera
tion
truc
6489121
aid
ons
As L
8)- C
6489119
tion
8
168
truc
(SS
ons
-
uct)
8)- C
6488526
8
ptic
168
SS
e rO
6489126
01
(SS
COMMUNITY : WADI AL SAFA 5
72
(Fib
6489127
-
65
uct)
A -L
D
VD
ptic
B
e rO
1-F
03
(Fib
4
6489128
00
V
LV
In
In O - 2
pera
O
tion
pe
ra
tio
SS17265A-SS19458A 11 kV In Operation
132kV - 1x11
n
Proposed
In Operation
11 kV - 2x6
tion
2777000
2777000
pera
In O
132k
V
In Op - 1x11
kV
eratio
In Opera 6
tion
In Operation
11 kV - 2x6
2x
A 11
11 kV -
848
.
PK15928A S16
-S
-SS17503A 132
k
01A
11 kV In O In O V - 1x1
In Op - 2x6
n
peration
eratio
pera 1
41
tion
PK1
11 kV
6488532 6489019 504200 504300 504400
6488534
A3
NOC TYPE : Construction NOC ELECTRICITY/WATER NETWORK IS
PREPARED BY : ADNAN ALHAMMADI SHOWN WITHIN YOUR SCOPE OF WORK.
APPROVED BY : ENG. AMINA ALI HASHEM
DATE : 03-07-2023
ANY DAMAGE TO THE NETWORK SHALL Electricity Map
BE CHARGED AS PER DEWA'S
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
SCALE : 1:725
RULES AND REGULATIONS.
Infrastructure Information & Permits
P.O.BOX : 564, Tel: 04-3221262, Fax: 04-3245545
DUBAI, U.A.E. Web: www.dewa.gov.ae
Û
RT U
B
504200 504300 504400
t
6488525
B
Z c e
150MM
In Service 150
M MI
e rv i nSe
rvic
InS e
M
5M
22
6489268
2777100
2777100
6488524
ce
r vi
Se e
In r vic
M Se 6489122
5M In
22 M 6489116
0M
15
ce
vi
6489121
r
Se
In
M
0M
6489119
15
6488526
6489126
COMMUNITY : WADI AL SAFA 5
6489127
d
6489128
Z
Z
450MM In
Service
450M
M In
Serv
2777000
2777000
rvice
ic e
InSe
m
32 m
225MM InService
6488532 6489019
NOC NO : 100518619
504200
225MM In
6488534
Service 504300
A3
NOC TYPE : Construction NOC ELECTRICITY/WATER NETWORK IS
PREPARED BY : ADNAN ALHAMMADI SHOWN WITHIN YOUR SCOPE OF WORK.
APPROVED BY : ENG. AMINA ALI HASHEM
DATE : 03-07-2023
ANY DAMAGE TO THE NETWORK SHALL Water Map
BE CHARGED AS PER DEWA'S
VALIDITY: 6 MONTHS ONLY FROM THE DATE OF ISSUE
SCALE : 1:725
RULES AND REGULATIONS.
03/Jul/2023
100518619