Weekly Meeting W-39
Weekly Meeting W-39
Safety Talk
Fit to Work Program Pre-Start Briefing at Laydown Area Pre-Start Briefing at Barge
Safety Talk Fit to Work Program Pre-Start Briefing at Laydown Area Pre-Start Briefing at Trestle Area
• The achievement progress this week (1,55%) contributed from Civil &
Concrete (0,54%) and Mechanical Equipment (0,90%).
10 1
0 0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
W-42
W-43
W-44
W-45
W-46
W-47
W-48
W-49
W-50
W-51
W-52
W-53
W-54
W-55
W-56
W-57
W-58
W-59
W-60
W-61
W-62
W-63
W-64
W-65
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24
30 Actual
Week-39 3
20
2
10
1
0
0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23
100 10
Baseline vs Actual REMAINING (31,03%)
Last Period Up to This Period
90 - Mechanical Equipment = 19,59% - Safety Equipment = 0,59% 9
- Civil & Concrete = 2,33% - Instrument Cable = 0,25%
Baseline Actual Deviation Baseline Actual Deviation - Electrical Equipment = 2,21% - Instrument Equipment = 0,32%
- Electrical Bulks = 2,00% - Telecom Equipment = 0,12%
67,03% 68,01% 1,05% 67,97% 68,96% 0,99% 8
80 - Steel Structure = 1,19%
- Piping & Accessories = 1,91%
- CCTV Cable = 0,11%
- CCTV Equipment = 0,09%
Recovery vs Actual - Site Painting Works = 0,20% - Telecom Cable = 0,07%
20 Actual 2
Week-39
10 1
0 0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
W-42
W-43
W-44
W-45
W-46
W-47
W-48
W-49
W-50
W-51
W-52
W-53
W-54
W-55
W-56
W-57
W-58
W-59
W-60
W-61
W-62
W-63
W-64
W-65
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24
40 4
30 3
Actual
20 Week-39
2
10 1
0 0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23
1 Portal Crane China 13-Jan-23 13-Jan-23 17-Jan-24 Est 17-Jan-24 07-Feb-24 ETA. 07-Feb-24 08-Feb-24 EID. 08-Feb-24 Overall Total Progress 34.3%
2 Hopper China 13-Jan-23 13-Jan-23 10-Jan-24 Est 11-Nov-23 31-Jan-24 ETA. 02-Feb-24 08-Feb-24 EID. 08-Feb-24 Production Design Progress
3 MV Panel Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 Finalize PO, Waiting SWI
4 LV Panel Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 Finalize PO, Waiting SWI
5 Transformer Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 Finalize PO, Waiting MV Design
6 Cable & Tray Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 Cable Design, Waiting SWI
7 PLC Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 COO-17 Need Resubmit
8 Field Instrument Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 COO-17 Need Resubmit
9 PLC Cable Indonesia 15-Aug-23 Est 15-Sept-23 28-Nov-23 Est 28-Nov-23 16-Dec-23 ETA. 16-Dec-23 23-Nov-23 EID. 23-Nov-23 Design On Progress
10 Drainage Pump Indonesia 15-Aug-23 Est 15-Sept-23 23-Dec-23 Est 23-Dec-23 20-Jan-24 ETA. 20-Jan-24 1-Dec-23 EID. 1-Dec-23 Pump design still on progress by manufacturer
11 SBNP Indonesia 02-Sep-23 Est 15-Sept-23 01-Dec-23 Est 01-Dec-23 10-Dec-23 ETA. 10-Dec-23 11-Dec-23 EID. 11-Dec-23 SBNP design on process
12 Fender Bollard Indonesia 02-May-23 03-Mar-23 20-Jul-23 08-Jul-23 09-Aug-23 09-Aug-23 21-Aug-23 EID 21-Aug-23 Arrived on site
13 Anode Indonesia 29-Mar-23 29-Mar-23 10-Jun-23 06-Jun-23 10-Jul-23 15-Jun-23 23-Aug-23 EID 23 Aug-23 Estimated Install on 23 August 2023
14 HDPE Indonesia 30-Mar-23 16-Mar-23 15-Jul-23 15 Jul-23 30-Jul-23 30-Jul-23 10-Sep-23 EID 10-Sep-23 Arrived on site
15 Piling Shipment 4 Indonesia 07-Jan-23 24-Dec-22 08-Jul-23 08-Jul-23 01-Sep-23 ETA 01-Sep-23 12-Sep-23 Est 12-Sep-23 ETD from Surabaya 14-Aug-23
16 Pipe Carbon Steel Indonesia 15-Aug-23 Est 15-Sept-23 29-Oct-23 Est 29-Oct-23 16-Nov-23 ETA 16-Nov-23 20-Aug-23 EID. 20-Aug-23 Quantification Piping
17 Pipe HDPE Indonesia 15-Aug-23 Est 15-Sept-23 29-Oct-23 Est 29-Oct-23 16-Nov-23 ETA 16-Nov-23 20-Aug-23 EID. 20-Aug-23 Quantification Piping
18 Rail Crane Indonesia 20-Mar-23 20-Mar-23 08-Aug-23 08-Aug-23 20-Sep-23 ETA 20-Sep-23 08-Nov-23 EID 08-Nov-23 Soleplate on site
19 Steel Structure Indonesia 30-Jul-23 30-Jul-23 04-Oct-23 Est 04-Oct-23 14-Oct-23 ETA 14-Oct-23 18-Sep-23 EID 18-Sep-23 PO issued
1 Steel Material Stock 100% 100% 2 Main Equipment Purchasing - Reducer 30% 40%
2 Main Structural Parts - Bogie 5% 20% 7 Main Equipment Purchasing – Cable Reel 7% 7%
3 Main Structural Parts - Tower 20% 35% 8 Main Equipment Purchasing – HV Cable 7% 7%
6 Main Structural Parts - Slewing Deck 15% 30% TOTAL 40,80% 49,85%
100 10
Baseline vs Actual REMAINING (58,91%)
Last Period Up to This Period
90
- Civil & Concrete = 50,66%
- Mechanical Equipment = 5,05%
- Instrument Cable = 0,14%
- Instrument Equipment = 0,04%
9
Baseline Actual Deviation Baseline Actual Deviation
- Piping & Accessories = 1,17% - Telecom Equipment = 0,03%
80,21% 41,08% -39,12% - Steel Structure = 0,68% - Telecom Cable = 0,02%
76,93% 39,63% -37,30%
80
- Electrical Bulks = 0,66%
- Site Painting Works = 0,18%
- CCTV Equipment = 0,02%
- Safety Equipment = 0,02%
8
Recovery vs Actual - Electrical Equipment = 0,18% - CCTV Cable = 0,01%
30 3
20 Actual 2
Week-39
10 1
0 0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
W-42
W-43
W-44
W-45
W-46
W-47
W-48
W-49
W-50
W-51
W-52
W-53
W-54
W-55
W-56
W-57
W-58
W-59
W-60
W-61
W-62
W-63
W-64
W-65
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24
30 3
20 2
Legend:
Baseline
10 Actual 1
Recovery
0 0
W-1
W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10
W-11
W-12
W-13
W-14
W-15
W-16
W-17
W-18
W-19
W-20
W-21
W-22
W-23
W-24
W-25
W-26
W-27
W-28
W-29
W-30
W-31
W-32
W-33
W-34
W-35
W-36
W-37
W-38
W-39
W-40
W-41
Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23
Completed
PILECAP
OVERALL Total 61 pcs (100%)
Total 156 pcs (100%)
Completed 61 pcs (100%)
49 48 47 46 45 44 43 42 41 40 39 38 Completed 156 pcs (100%)
Completed Completed
Completed
Insitu Slab
Pile Cutting Jetty 507 Pile Cutting Jetty 512 15 Aug Pile Cutting Jetty 517 14 Aug Pile Driving Sediment Tank Area 13 Aug
Insitu Slab 40-43 C-C’15 Aug Insitu Slab 43-46 C-C’15 Aug
Nov-W49
Jan-W10
May-W27
Aug-W38
May-W24
May-W25
May-W26
Jun-W28
Jun-W29
Jun-W30
Jun-W31
Jun-W32
Jul-W33
Jul-W34
Jul-W35
Jul-W36
Aug-W37
Aug-W39
Aug-W40
Aug-W41
Oct-W45
Oct-W46
Oct-W47
Oct-W48
Feb-W11
Feb-W12
Feb-W13
Feb-W14
Mar-W15
Mar-W16
Mar-W17
Mar-W18
Mar-W19
Apr-W20
Apr-W21
Apr-W22
Apr-W23
Sep-W42
Sep-W43
Sep-W44
Summary Up to This Week
Area Cumulative Total Progress
Trestle 277 277 100%
Platform 24 24 100,0%
LCT Jetty 53 54 98%
Main Jetty 177 312 56,73%
Overall 531 667 79,6%
Recovery 584 667 87,7%
Deviation -53 -8,1%
FINISHED FABRICATION
0.5 330
290
0.4
250
0.3 210
0.2 170
130
0.1
90
Total Recovery Recovery Actual Dev. Dev.
0 50 Trestle Actual (%)
Drawing (n) (%) (n) (n) (%)
Mar Week 17
Mar Week 18
Mar Week 19
Apr Week-20
Apr Week-21
Apr Week-22
Apr Week-23
May Week-24
May Week-25
May Week-26
May Week-27
Jun Week-28
Jun Week-29
Jun Week-30
Jun Week-31
Jun Week-32
Jul Week-33
Jul Week-34
Jul Week-35
Jul Week-36
Pile Cap 52 52 100,0% 52 100,0% 0 0,0%
Beam 289 289 100,0% 289 100,0% 0 0,0%
Drainage 54 54 100% 54 100,0% 0 0%
Half Slab 232 232 100,0% 232 100,0% 0 0,0%
Overall 627 627 100% 627 100% 0 0%
Jun Week-28
Jun Week-29
Jun Week-30
Jun Week-31
Jun Week-32
Jul Week-33
Jul Week-34
Jul Week-35
Jul Week-36
Aug Week-37
Aug Week-38
Drainage 4 4 100% 2 50% -2 -50%
Half Slab 50 50 100% 50 100% 0 0%
Overall 221 221 100% 216 97,7% -5 -2,3%
240
210
180
150
120
90
60
30
0
Aug Week-38
Aug Week-37
Beam
41,501
Jul Week-36
Jul Week-35
Jul Week-34
Jul Week-33
Jun Week-32
Jun Week-31
Jun Week-30
Jun Week-29
Jun Week-28
May Week-27
May Week-26
Total Of
May Week-25
289
56
May Week-24
Apr Week-23
Recovery
Apr Week-22
Actual
Recovery Recovery
Apr Week-21
(%)
Apr Week-20
Legend:
Mar Week 19
FINISHED
Mar Week 18
CONSTRUCTION
Mar Week 17
289
Up to This Week
(n)
56
1
0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
289
56
Jul Week-36
Jul Week-35
Pilecap
Jul Week-34
Jul Week-33
S-Curved W-04 (December 12, 2022 –
Jun Week-32
Summary
Jun Week-31
Pile Cap
Trestle
Beam
Jun Week-30
December 18, 2022)
Upper Structure Installation
Jun Week-29
Jun Week-28
May Week-27
May Week-26
May Week-25
May Week-24
Apr Week-23
Apr Week-22
Recovery
Apr Week-21
Actual
Apr Week-20
Mar Week 19
Legend:
Mar Week 18
Mar Week 17
70%
100%
90%
80%
60%
50%
40%
30%
20%
10%
0%
240
220
200
180
160
140
120
100
80
60
40
20
0
Aug Week-39
Aug Week-38
41,501
Aug Week-37
Slab
Jul Week-36
Jul Week-35
Jul Week-34
Jul Week-33
Jun Week-32
Jun Week-31
Jun Week-30
Jun Week-29
Jun Week-28
May Week-27
Total Of
May Week-26
232
54
May Week-25
Recovery
May Week-24
Actual
Apr Week-23
100%
100%
(%)
Apr Week-22
Legend:
Apr Week-21
Apr Week-20
CONSTRUCTION
Mar Week 19
212
Up to This Week
(n)
54
1
0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
35
30
25
20
15
10
5
0
Aug Week-38
232
54
41,501
Drainage
Aug Week-37
S-Curved W-04 (December 12, 2022 – 41,501
Jul Week-36
Jul Week-35
Jul Week-34
Jul Week-33
Summary
Jun Week-32
Drainage
Half Slab
Trestle
Jun Week-31
December 18, 2022)
Upper Structure Installation
Jun Week-30
Jun Week-29
Jun Week-28
May Week-27
May Week-26
May Week-25
May Week-24
Apr Week-23
Recovery Apr Week-22
Apr Week-21
Actual
Apr Week-20
Mar Week 19
Legend:
Mar Week 18
Mar Week 17
0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
CONSTRUCTION
Jetty Head Installation
Pile Cap Beam
1 Legend: S-Curved W-04 (December 12, 2022 – 50 1 Legend:
240
220
Recovery 45 Recovery
0.9 Actual December 18, 2022)
41,501 40
0.9 Actual 200
0.8 0.8 180
35 0.7 160
0.7 41,501 30 0.6 140
0.6 120
25 41,501
0.5 0.5 100
20
0.4 0.4 80
15
0.3 0.3 60
10 40
0.2 0.2
5 20
0.1 0.1
0 0
0 0
Jun Week-32
Jul Week-33
Jul Week-34
Jul Week-35
Jul Week-36
Aug Week-37
Aug Week-38
Aug Week-39
Jun Week-32
Jul Week-33
Jul Week-34
Jul Week-35
Jul Week-36
Aug Week-37
JETTY HEAD
JETTY HEAD
26Joint Beam As C & D 11 pcs 1 pcs PC.10 PC.10 PC.9C PC10 PC10, PC10, PC13 PC9A PC9B PC9CPC9 PC9D
PC.10 PC.10 PC.9A PC10 PC10
PC.9B
29Install Slab As E-D 4 pcs 0 pcs Task Done S.4C S.4C S10, S4C S4C, S4C
PC7C
S.4C
PC6
S.4C
30Install Slab As D-C 4 pcs 0 pcs S.2A S.9 S.2B S9, S2A S2B, S2B
S.2B
31Install Slab As B-C 4 pcs 0 pcs S.1E S.8 S8, S1E S1F, S1F
S.1F
S.1F
32Install Slab As A-B 2 pcs 2 pcs S7, S1B
33Insitu Slab As E-D 1 As Huruf 1 As Huruf S.10 S.10
S.4C S.4C
S.4C S.4C
34Insitu Slab As D-C 1 As Huruf 1 As Huruf S.9
S.2A
S.2B