REMAINING CONCRETE AND MANPOWER REQUIREMENT
Based Calculation 05‐Feb‐22
Note:
‐ All engineering drawing is IFC without HOLD
‐ All red dotted box is being reforecasted due to unrealistic target finish based on RFS‐00
‐ Bumi Liputan Pusaka is awarded for civil scope without any Civil TBE evaluation, just contract amendment to piping subcontracctor