You are on page 1of 4

11/2/2022 4:52

Request for Technical Bid


Original
No. Activity ID Qoutation Evaluation PO # P.O DATE Delivery to Site (ETA) NMR 603 ETA Float Status Remarks
Duration
RFQ TBE

CLASS 2: NON ENGINEERED EQUIPMENTS) 62


CIVIL 17
1 CIVIL CONSUMABLE ITEMS (Paint, Epoxy, Rebar grout, Bitu 17 DELIVERED
2 ROOFING MATERIALS 11 DELIVERED
MECHANICAL AND PIPING 31
20-Jun-22
3 PROCESS PIPES AND FITTINGS 31 19-Jun-22 50065560 DELIVERED
24-Jun-22
50065622
4 FIRE WATER PIPES AND FITTINGS 30 24-Jun-22 DELIVERED
50065622 24-Jun-22
ELECTRICAL 60
5 MEDIUM VOLTAGE CABLES MV 18 - - - - DELIVERED ARRANGED FROM SAOMPP
DELIVERED
175-12 18-APR-22
REVISED MTO RECEIVED ON
6 LOW VOLTAGE CABLES LV 55 16-Apr-22 17-Apr-22 175-24 19-APR-22 -44,867 #N/A
11.07.2022, AWAITING DELIVERY
175-36 23-APR-22
SCHEDULE

44 % delivered
175-22 18-Apr-22
rest will be on 18-Jul-22
7 GROUNDING CABLES CABLES 55 16-Apr-22 17-Apr-22 175-44 25-Apr-22 -44,867 #N/A
REVISED MTO RECEIVED ON
50065180 23-May-22
11.07.2022, AWAITING DELIVERY
50065598 22-Jun-22
SCHEDULE
8 ELECTRICAL CONDUITS AND FITTINGS 42 - - - - DELIVERED
9 ELECTRICAL ACCESORIES (Swithces, sockets and etc) 9 - - - - DELIVERED
10 JUNCTION BOX JB 40 - - - - DELIVERED

175-92 (02 NOS) 12-May-22


11 LIGHTING POLE 40 01-May-22 12-May-22 DELIVERED
50065300 (05 NOS) 14-Jun-22

HIGH MAST 40 28-May-22 30-May-22 50065475 44711 7-Aug-22


175-45 25-Apr-22 31-Jul-22
12 LIGHTING FIXTURES 60 23-Apr-22 24-Apr-22 7-Aug-22 -87 #N/A
50065454 13-Jun-22 15-Aug-22
13 INSTRUMENTATION 62 50065367 06-Jun-22 31-Jul-22 -94 #N/A
INSTRUMENTATION CABLES 60 16-Apr-22 18-Apr-22 10-Aug-22
50065394 07-Jun-22
REVISED MTO RECEIVED ON 11.07.2022, AWAITING DELIVERY SCHEDULE
15 INSTRUMENTATION CABLE TRAY AND FITTINGS 59 16-Apr-22 17-Apr-22 175-27
175-13 19-Apr-22
44668 DELIVERED 10-Aug-22 -84 #N/A
8-Jul-22
REVISED (ADDITIONAL QTY TO BE
16 INSTRUMENTATION JUNCTION BOXES 62 28-Apr-22 28-Apr-22 175-56 R01 28-Apr-22 -44,867 #N/A Delivery 2022-07-10
CONSIDERED. AWAITING MTO FROM
JZ).
Request for Technical Bid
Original
No. Activity ID Qoutation Evaluation PO # P.O DATE Delivery to Site (ETA) NMR 603 ETA Float Status Remarks
Duration
RFQ TBE

Delivery to
CLASS 1: ENGINEERED EQUIPMENT 118 RFQ TBE PO NMR 601 NMR 602 Remarks
Site (ETA)
MECHANICAL 32
18 FIRE HYDRANT VALVES AND ACCESSORIES 32 04-Jun-22 11-Jun-22 50065609 23-Jun-22 04-Sep-22 4-Sep-22 -59 #N/A
ELECTRICAL 101
19 TRANSFORMER CATHODIC PROTECTION RECTIFIERS 101 14-Apr-22 26-May-22 175-82 25-May-22 17-Sep-22 17-Sep-22 -46 #N/A
20 LIGHTING PANEL BOARDS LPB 92 30-Apr-22 23-Jun-22 50065597 23-Jun-22 04-Aug-22 4-Aug-22 -90 #N/A
INSTRUMENTATION 118
21 MOV ACTUATORS 99 03-May-22 27-May-22 175-93 23-May-22 29-Aug-22 29-Aug-22 -65 #N/A
22 PRESSURE RELEIF VALVES 116 27-Apr-22 11-Jun-22 50065468 12-Jun-22 14-Aug-22 14-Aug-22 -80 #N/A
23 LEVEL SWITCHES 17 - - - -
24 PIPEWAY INSTRUMENTS( H-FAIL) 103 23-Oct-22 23-Oct-22 -10 Delayed
26 FLAME DETECTORS 83 12-May-22 02-Jun-22 50065362 04-Jun-22 17-Oct-22 17-Oct-22 -16 Delayed

27 TRANSMITTER 74 - - - -

17-Oct-22
28 LEVEL TRANSMITTER 103 28-Apr-22 23-May-22 175-122 25-May-22 14-Sep-22 -49 #N/A
14-Sept-22
UNDER REVIEW WITH JZ
29 CONTROL VALVE 101 23-May-22 51006468 01-Jul-22 24-Jul-22 24-Jul-22 -101 #N/A
SUBMITTED ON 25.06.2022
30 LEVEL GAUGE 103 14-May-22 11-Jun-22 50065480 14-Jun-22 24-Jul-22 14-Sep-22 -49 #N/A
31 PRESSURE GAUGE 117 26-Apr-22 08-May-22 175-74 08-May-22 24-Jul-22 20-Jul-22 -105 #N/A
DP PRESSURE GAUGE 95 26-Apr-22 08-May-22 175-74 08-May-22 23-Oct-22 23-Oct-22
DIFFERENTIAL PRESSURE TRANSMITTER 78 28-Apr-22 13-May-22 175-121 21-May-22 20-Jul-22 20-Jul-22
All Construction Activities must be back-up with Productivity rate calculation with specific manpower trade and discipline.
npower trade and discipline.