83
Excess soil in the street light foundation must be Action T4 8-Dec-21 Open
removed
86 Debris from the SST-2 North side needs jack hammer ` Action NSH 8-Dec-21 Open
87 Porta cabins not operational Action T4 8-Dec-21 Open
88 APR nominations Action General 8-Dec-21 Open
Removal of Empty Cable drums and cables and place
89 Action T4 15-Dec-21 Open
hard barricade
90
Unusable material near Catch pit and foundation storage Action NSH 15-Dec-21 Open
(planks, Plywoods and etc.)
91
Al Batin office foundation needs to be change (Unsafe Action Al Batin 15-Dec-21 Open
for human occupancy)
92 SAS no garbage bin Action SAS 15-Dec-21 Open
93 SAS office needs to rectify the stair Action SAS 15-Dec-21 Open
94 Office tags for SAS must be in placed Action SAS 15-Dec-21 Open
Parking area for table 4 needs to be with proper isolation
95 Action T4 15-Dec-21 Open
and sign boards
96 Toilet as requested to be near the generator Action T4 15-Dec-21 Open
97 Exhaust fan must be installed in AJYAL storage room Action AJYAL 15-Dec-21 Open
98 Garbage disposal must be manage properly Action Takanah 15-Dec-21 Open
Zone 5 risk assesment for thrust block is with Marafiq for
100 Action NSH 15-Dec-21 Open
approval
To complete the concrete trench from RSF to Aeration
101 Action NSH 15-Dec-21 25-Dec-21 Open
tank
102 Excavation fire water line between SSt 11 and RSf Action NSH 15-Dec-21 Open
103 Manhole near RAS-2 and 3 Action NSH 15-Dec-21 22-Dec-21 Open
104 Splitter box material removal Action NSH 15-Dec-21 Open
106 NIC cabins and materials must be remove from the site. Action Wabag 15-Dec-21 Open
107 Hard Barricade for Amaco portable cabin Action Amaco 15-Dec-21 Open
108 Unwanted HDPE liners must be removed on site. Action Fanar 15-Dec-21 Open
SWTP-9 L4 SCHEDULE
2/27/2022 7:49
Activity ID Activity Name WBS WBS-1 Original Duration
BL Project Start BL Project Finish Start Finish Float Status No
MARAFIQ COMM SWTP 9 PROJECT - L4 PREC COM AND COMM SCHEDULE 167 9-Sep-21 1-May-22 9-Sep-21 1-May-22 63 On schedule
MARAFIQ COMM.1 MILESTONES 167 9-Sep-21 1-May-22 9-Sep-21 1-May-22 63 On schedule
MARAFIQ COMM.1.1 UTILITY DATES 42 21-Nov-21 8-Jan-22 21-Nov-21 8-Jan-22 (50) Behind Schedule
STPPCC15480 Availability of Fiber Optic System 3 5-Jan-22 8-Jan-22 5-Jan-22 8-Jan-22 (50) Behind Schedule
STPSMC1000 Availability of Power from Owner 3 21-Nov-21 23-Nov-21 21-Nov-21 23-Nov-21 (96) Behind Schedule
Availability of Utility from Owner - PW / FW
STPSMC1010 3 30-Dec-21 2-Jan-22 30-Dec-21 2-Jan-22 (56) Behind Schedule
MARAFIQ COMM.1.2 CONSTRUCTION COMPLETION 132 9-Sep-21 13-Mar-22 9-Sep-21 13-Mar-22 14 Very Critical
MARAFIQ COMM.1.2.7 GREENFIELD 122 9-Sep-21 30-Jan-22 9-Sep-21 30-Jan-22 (28) Behind Schedule
MARAFIQ COMM.1.2.7.1 TRAIN1 93 9-Sep-21 28-Dec-21 9-Sep-21 28-Dec-21 (61) Behind Schedule
MARAFIQ COMM.1.2.7.1.1 TRAIN1 PRETREATMENT AREA TRAIN1 PRETREATMENT AREA 23 30-Nov-21 28-Dec-21 30-Nov-21 28-Dec-21 (61) Behind Schedule
Civil completion - Pre treatment area -
Train1(Inlet con, splitterbox, Flowmsmt, Inlet TRAIN1 PRETREATMENT AREA
STPSMC1020 chamber, FIne scr, GG1A/1B,DC) 0 30-Nov-21 30-Nov-21 (89) Behind Schedule
Mech completion - Pre treatment area -
Train1(Inlet con, splitterbox, Flow msmt, Inlet TRAIN1 PRETREATMENT AREA
STPSMC1030 chamber, FIne scr, GG1A/1B,DC) 0 23-Dec-21 23-Dec-21 (66) Behind Schedule
Piiping Completion - Pre treatment area -
Train1 (Inlet con, splitterbox,Flow msmt, Inlet TRAIN1 PRETREATMENT AREA
STPSMC1040 chamber, FIne scr, GG1A/1B,DC) 0 15-Dec-21 15-Dec-21 (74) Behind Schedule
Elect completion - Pre treatment area -
Train1 (Inlet con, splitterbox, Flow msmt, TRAIN1 PRETREATMENT AREA
STPSMC1050 Inlet chamber, FIne scr, GG1A/1B,DC) 0 25-Dec-21 25-Dec-21 (64) Behind Schedule
Instrument completion - Pre treat area -
Train1(Inlet con, splitterbox,Flow msmt, Inlet TRAIN1 PRETREATMENT AREA
STPSMC1060 chamber, FIne scr, GG1A/1B,DC) 0 28-Dec-21 28-Dec-21 (61) Behind Schedule
TRAIN1 SECONDARY
MARAFIQ COMM.1.2.7.1.2 TRAIN1 SECONDARY TREATMENT A TREATMENT AREA 25 30-Sep-21 30-Oct-21 30-Sep-21 30-Oct-21 (120) Behind Schedule
Civil completion Train1 - Secondary
Treatment area (AST1,SST 1to 4, RAS1, TRAIN1 SECONDARY
TREATMENT AREA
STPSMC1150 Pumps,CCT tank1,Blowers, CDS,TSE Ps, ) 0 23-Dec-21 23-Dec-21 (66) Behind Schedule 1
Inst completion - Tertiary treatment area
Traiin1 (RSF 1,2,3 & 4 , BW Tank/ Pumps,CCT TRAIN1 TERTIARY TREATMENT
AREA
dsg 1/2/6/7)
STPSMC1170 0 30-Oct-21 30-Oct-21 (120) Behind Schedule 1
Mech completion - Sludge trt area -
Train1(Sludge thickener 130-1/2, Decan140- TRAIN1 SLUDGE TREATMENT
AREA
STPSMC1180 1/2/7,Lime dosing,CS, Poly dsg 1/2/6/7) 0 30-Nov-21 30-Nov-21 (89) Behind Schedule 1
Piiping Completion - Sludge trt area- Train1
(Sludge thickener 130-1/2, Decan140- TRAIN1 SLUDGE TREATMENT
AREA
STPSMC1190 1/2/7,Lime dosing,CS, Poly dsg 1/2/6/7) 0 30-Nov-21 30-Nov-21 (89) Behind Schedule 1
Electcompletion - Sludge trt area - Train1
(Sludge thickener 130-1/2, Decan140- TRAIN1 SLUDGE TREATMENT
AREA
STPPCC14760 Main interface 3 1-Jan-22 3-Jan-22 1-Jan-22 3-Jan-22 (55) Behind Schedule 1
Interface tie in from the inlet flow splitting chamber to BROWNFIELD Train 1 Tie In
STPPCC14770 emergency lagoons - Emergency Lagoons( channel) 3 28-Dec-21 30-Dec-21 28-Dec-21 30-Dec-21 (59) Behind Schedule 1
Interface tie in with the existing fire water and potable BROWNFIELD Train 1 Tie In
STPPCC14790 water network - Building and other areas 4 26-Dec-21 29-Dec-21 26-Dec-21 29-Dec-21 (60) Behind Schedule 1
Interface tie in with the existing SWTP control room for BROWNFIELD Train 1 Tie In
STPPCC14800 monitoring purposes - Control room 4 1-Jan-22 4-Jan-22 1-Jan-22 4-Jan-22 (54) Behind Schedule 1
Interface tie in with the existing telecommunication BROWNFIELD Train 1 Tie In
STPPCC14810 network - Buildings 4 1-Jan-22 4-Jan-22 1-Jan-22 4-Jan-22 (54) Behind Schedule 1
Interface Tie in with existing substation for Power BROWNFIELD Train 1 Tie In
STPPCC14840 Supply. 4 16-Nov-21 20-Nov-21 16-Nov-21 20-Nov-21 (99) Behind Schedule 1
MARAFIQ COMM.1.2.12.3 TRAIN2 BROWNFIELD Train 2 128 15-Sep-21 13-Mar-22 15-Sep-21 13-Mar-22 14 Very Critical 1
MARAFIQ COMM.1.2.12.3.2 TRAIN2 ANCIALLRY WORKS - LAGOON BROWNFIELD Train 2 143 15-Sep-21 2-Mar-22 15-Sep-21 2-Mar-22 3 Very Critical 1
MARAFIQ COMM.1.2.12.3.2.1 LOT 2 BROWNFIELD Train 2 LAGOON 130 15-Sep-21 15-Feb-22 15-Sep-21 15-Feb-22 (12) Behind Schedule 1
STPPCC14690 Civil completion - Ancillary Works (SHL3, AL1/2) BROWNFIELD Train 2 LAGOON 0 15-Dec-21 15-Dec-21 (74) Behind Schedule 1
Mechanical completion - Ancillary Works (SHL3, AL1/2) BROWNFIELD Train 2 LAGOON
STPPCC14700 0 23-Dec-21 23-Dec-21 (66) Behind Schedule 1
STPPCC14720 Electrical completion - Ancillary Works (SHL3, AL1/2) BROWNFIELD Train 2 LAGOON 0 15-Feb-22 15-Feb-22 (12) Behind Schedule 1
STPPCC14950 Handing over of Lagioon 2 (SHL3, AL1/2) BROWNFIELD Train 2 LAGOON 0 15-Sep-21 15-Sep-21* 1
MARAFIQ COMM.1.2.12.3.2.2 LOT 3 BROWNFIELD Train 2 LAGOON 104 1-Nov-21 2-Mar-22 1-Nov-21 2-Mar-22 3 Very Critical 1
Handing over of Lagoon Lot 3 (AL3/4, SD,HL, BROWNFIELD Train 2 LAGOON
STPPCC14970 SP2,BP2,DTS 4) 0 1-Nov-21 01-Nov-21* 1
Civil Completion - Ancillay works Lot 3 (AL3/4, SD,HL, BROWNFIELD Train 2 LAGOON
STPPCC14980 SP2,BP2, DTS4) 0 31-Jan-22 31-Jan-22 (27) Behind Schedule 1
Mechanical completion - Ancillary Works(AL3/4, SD,HL, BROWNFIELD Train 2 LAGOON
STPPCC14990 SP2,BP2, DTS4) 0 28-Feb-22 28-Feb-22 1 Very Critical 1
Electrical completion - Ancillary Works (AL3/4, SD,HL, BROWNFIELD Train 2 LAGOON
STPPCC15010 SP2,BP2, DTS4) 0 2-Mar-22 2-Mar-22 3 Very Critical 1
MARAFIQ COMM.1.2.12.3.1 TIE INS BROWNFIELD Train 2 Tie In 15 20-Feb-22 13-Mar-22 20-Feb-22 13-Mar-22 14 Very Critical 1
MARAFIQ COMM.1.2.12.3.1.1 Civil BROWNFIELD Train 2 Tie In 4 20-Feb-22 24-Feb-22 20-Feb-22 24-Feb-22 (3) Behind Schedule 1
STPPCC14830 Interface tie in with existing roads BROWNFIELD Train 2 Tie In 4 21-Feb-22 24-Feb-22 21-Feb-22 24-Feb-22 (3) Behind Schedule 1
STPPCC14940 Road laying completion BROWNFIELD Train 2 Tie In 0 20-Feb-22 20-Feb-22 (7) Behind Schedule 1
MARAFIQ COMM.1.2.12.3.1.2 Piping BROWNFIELD Train 2 Tie In 3 10-Mar-22 13-Mar-22 10-Mar-22 13-Mar-22 14 Very Critical 1
Interface tie in from the emergency lagoons pump
house to the new plant - Emergency Lagoons (500 dia / BROWNFIELD Train 2 Tie In
Commisioning Pre-Commissioning
As of: 27-Feb-22 8-Mar-22 13-Dec-21
Completion date Completion Date
Free
Activity Description Location Structure Discipline No. Start Finish Total Float
Float
STPCP Precomm of Chlorination and Air treatment PRECOMMISSIONING TERTIARY TREATMENT TERTIARY TREATMENT 1 4-Sep-21 (176) 19-Sep-21 (161)
STPCPM Energise / Commissioning - Electrical PRECOMMISSIONING BUILDINGS Substation 1 25-Aug-21 (186) 4-Sep-21 (176)
10160 Substation Building S/s 220
STPCPM Energise / Commissioning - Transformer PRECOMMISSIONING BUILDINGS Substation 1 24-Aug-21 (187) 3-Sep-21 (177)
10200 station S/s 222
STPCPM Energise / Commissioning - Transformer PRECOMMISSIONING BUILDINGS Substation 1 4-Sep-21 (176) 14-Sep-21 (166)
10210 station S/s 221
Status
Delayed
Delayed
Delayed
Delayed
PERMIT STATUS
SN Description Discipline Date Raise
2 Road cutting for fire Brown area Piping 06-Sep-21
3 Road cutting for Potable Water Brown area Piping 06-Sep-21
5 Existing Pump Station to Splitter Box Works General 08-Sep-21
6 Permit from ISD in By-pass Line Civil 18-Sep-21
10 Inlet Splitter Box Civil 11-Oct-21
11 Electrical Panel Civil Foundation for DTS 4 Civil 21-Nov-21
13 RA for Thrust block Zone 5 Tie in. Civil 21-Nov-21
14 Bypass line fence relocation permit Civil 05-Dec-21
Truck offloading conrete slab (Relocation of FENCE,
15 Civil 06-Dec-21
Permits and etc.)
PERMIT STATUS
Orginal Forecast
Re-Schedule Status Level
Completion Date
Open
Open
Open
Open
Open
Open
Open
Open
Open
Remarks
Material and Submittal Statu
SN Description Discipline Type Date Raise
11 Water Heater E and I Material 06-Sep-21
12 Water Tanks Civil Material 06-Sep-21
Page 43 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 44 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 45 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 46 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 47 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 48 of 66
2/27/2022 7:49
Completion Dates
No. STRUCTURE NAME Duration Start Finish Float Status
Page 49 of 66
CONTRACTOR'S ISSUES STATUS
Orginal Forecast
SN Description Discipline Date Raise
Completion Date
SST Area RCC Works Including Stairs and DC
1 Civil 15-Jul-21 31-Jul-21
Completion
2 SST ZONE 1 Completion Civil 15-Jul-21 31-Jul-21
3 CDS Completion General 15-Jul-21 15-Jul-21
4 SS1 E and I Completion E and I 15-Jul-21 31-Jul-21
5 SS2 E and I Completion E and I 15-Jul-21 31-Jul-21
6 SS4 E and I Completion E and I 15-Jul-21 31-Jul-21
7 SS3 Civil Works Completion Civil 15-Jul-21 31-Aug-21
8 ES Tanks No manpower allocated Civil 01-Aug-21
9 TSE Building Slow Progress Civil 01-Aug-21
10 Splitter Box Completion due to lack of manpower Civil 01-Aug-21
11 Fine Screen Slow progress due to lack of manpower Civil 01-Aug-21
10-Oct-21 Closed
Closed Contractor Informed
10-Oct-21 Closed Contractor Informed
10-Oct-21 Closed Daily Reminder Sent
Closed Contractor Informed
Closed Contractor Informed
Closed Contractor Informed
Closed Contractor Informed
7-Oct-21 Closed Contractor Informed
Closed Contractor Informed
Closed
Closed
Closed
Closed Raised to Management Level
Closed Raised to Management Level
Closed
Closed
Closed
Closed
Closed For NCR-Contractor to take action Today
Affects the traffic plan and increase th risk of
Closed
accident on site due to congestion
Closed Verified
Closed
Open
Closed
Closed
Closed
Closed To start
Closed
Closed To verify with HCIS/Engineering
Closed Engineering
Closed
Closed
Open Spedification prohibits Combined flow
Closed
Closed
Closed
Open
Open
Open
Closed
Closed
Open
Closed
Closed
Closed
Open
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed Wabag will supply 1 more
Closed
Closed
Closed Lack of manpower
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed NIC Removed from Site
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Open
Open
Closed
Open
Closed
Closed
Open
Open
Open
Open
Open No manpower allocated
Open No manpower allocated
Open
Open
Open
SWTP-9 OPEN FRONTS
Orginal Forecast
SN Description Discipline Date Raise
Completion Date
Excavation Up To Tie In And Pipe Laying Zone
5 Civil 19-Aug-21
4
17 Eye wash station Civil 19-Aug-21
18 Exhaust Vents Mechanical 19-Aug-21
19 Emergency Shower CDS Mechanical 19-Aug-21
20 Cage ladders Civil 19-Aug-21
21 Fire fighting lines 19-Aug-21
22 OCU-1 Slow progress Mechanical 19-Aug-21
26 Tile works COR Civil 21-Aug-21
27 Ceiling COR Civil 21-Aug-21
29 Guard House Tile Works Civil 21-Aug-21
30 TOL Control Room Tiles Civil 21-Aug-21
31 TOL Control Room Electrical Works E&I 21-Aug-21
35 Pipe Support at Blower Room Mechanical 22-Aug-21
36 Potable Water Tie-in Excavation Piping 23-Aug-21 29-Aug-21
39 Blower Building Mechanical 29-Aug-21
41 Silo Installation Mechanical 29-Aug-21
44 Site Development plan (Hardscape and Civil 31-Aug-21
Landscape) COR Area
Precast Pipe Support for Splitter to OCU
51 Civil 08-Sep-21
Suction Line
52 Existing Pump Station to Splitter Box Works Piping 08-Sep-21
53 RSF Lighting and power E&I 08-Sep-21
56 Raised floor system Mockup Civil 08-Sep-21
63 Scum Manhole installation Zone 1 Civil 18-Sep-21
70 Pneumatic Testing for Ast-1 Diffusers Mechanical 19-Sep-21
71 Sample Penstock Mechanical 19-Sep-21
80 OCU-1 Slow progress Mechanical 25-Sep-21
85 Penstock Functionality Mechanical 26-Sep-21
Sludge Dewatering Mechanical Equipment
87 Mechanical 26-Sep-21
installation
90 Underground pipe for OCU Mechanical 27-Sep-21
Pre-cast hollow core slabs for sludge building
93 Civil 27-Sep-21
building
95 Fire hydrant mock-up Mechanical 27-Sep-21
96 Aeration Pipe installation at AST-2 South Side Mechanical 29-Sep-21
101 TSE Pipeline above ground start date Piping 02-Oct-21
104 TOL Control room to Guard House E&I 03-Oct-21
109 Grit and Grease blower pipe fabrication Civil 03-Oct-21
115 SS4 to RSF LV E&I 07-Oct-21
116 SS4 to CCT LV E&I 07-Oct-21
120 AST-3 Will be finish This month Mechanical 11-Oct-21
121 HDPE liner installation for Aeration 2 Civil 11-Oct-21
122 Sanitary drain from control building to PDPS Piping 11-Oct-21
136 Dewatering building SS piping works Mechanical 17-Oct-21
Distribution chamber for Activated tanks
141 20-Nov-21
Distribution Chamber epoxy coating
PDPS Mechanical, Electrical and Coating
142 20-Nov-21
resumption
143 Ceiling finish for Blower building 20-Nov-21
Grit and Grease RCC to be completed by 5th
144 20-Nov-21
December
145 Skylar Arabia General Contracting Est 20-Nov-21
Open
Open
Open
Open
Open
Open Next Week
Open Next week
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open To be verified
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
SWTP-9 PROJECT ACTION ISSUE TRACKER
As of: 27-Feb-22
SN Description No. Type Discipline Latest Date Action date Date Closed Status Remarks (Marafiq) Wabag Response
Raised
335 Sample of new counter top/ Wash basin 1 Action Civil 27-Oct-21 Open
372 OCU-2 completion 1 Action Mechanical 17-Oct-21 4-Nov-21 20-Dec-21 Open
386 Pump station at brown area 1 Action Piping 19-Oct-21 19-Dec-21 Open Gate pass in process
Existing Pump station to splitter box pipeline and
392 supports 1 Action Piping 9-Nov-21 20-Dec-21 Open APR Issue
393 TOS Potable water and service water line 1 Action Piping 9-Nov-21 postponed Open
400 DC-2 leak test 1 Action Civil 20-Nov-21 13-Dec-21 Open Not Possible
413 Door Installation Status and Master Key Log 1 Action Civil 20-Nov-21 14-Dec-21 Open After installation of all doors
420 Manhole Storm water Cover shape issue 1 Action Piping 20-Nov-21 Engineering Open
425 Crew for closing punch list 1 Action General 21-Nov-21 Open Poor progress
429 Balance material for FAT partial 1 Action Electrical 21-Nov-21 21-Dec-21 Open
430 LOTO for Electrical Energization Flow Chart 1 Action General 21-Nov-21 18-Dec-21 Open
439 Encasing of HDPE pipes 1 Action Piping 21-Nov-21 Engineering Open Mani to respond
Zone 5 Thrust block at Tie in (RA must be
441 submitted) 1 Action Civil 23-Nov-21 1-Dec-21 2-Dec-21 Open Submitted MA
442 Manhole benching and leak test 1 Action Piping 24-Nov-21 Open
445 Silo Installation preparation 1 Action Mechanical 25-Nov-21 20-Dec-21 Open
448 AST-1 Northt side excavation closure 1 Action Civil 25-Nov-21 Not possible Open
449 Cage ladder Installation 1 Action Civil 27-Nov-21 16-Dec-21 Open
452 Guard House completion 1 Action Civil 27-Nov-21 Open
453 RAS-1 and RAS-3 Coating 1 Action Civil 27-Nov-21 Open
458 Clamps for TSE zone 1 1 Action Piping 27-Nov-21 16-Dec-21 Open
December 10 all manholes and catchpits must be
460 1 Action Piping 27-Nov-21 Open
done
467 Lifting to be done on diffuser this week 1 Action Mechanical 28-Nov-21 12-Dec-21 Open
496 RAS Mechanical works in the Valve chamber 1 Action Mechanical 30-Nov-21 Open
502 Lagoon Proposal for Panel foundation Action Civil 1-Dec-21 15-Dec-21 Open
503 Lagoon Emergency push button Action Electrical 1-Dec-21 Open
504 Grader not on site holding the road works Action Civil 1-Dec-21 Open
507 Grit and grease leak test Action Civil 4-Dec-21 Open
509 ES-8 WATER FILLING Action Civil 4-Dec-21 Open
517 SSt-8 Mechanical Works Completion 1 Action Mechanical 5-Dec-21 24-Dec-21 Open
527 RAS 2 and 3 Scaffolding affecting electrical Works 1 Action Electrical 5-Dec-21 Open
528 SS3 Civil clearance for electrical panel rooms 1 Action Civil 5-Dec-21 18-Dec-21 Open
529 Transformer installation at SS3 1 Action Electrical 5-Dec-21 18-Dec-21 Open
538 Options for COR workstations (Phani) 1 Action E&I 6-Dec-21 Open
543 Scada Room completion 1 Action E&I 6-Dec-21 On-going Open
Incomer cable to COR needs conduits to be
544 installed 1 Action E&I 6-Dec-21 Open
545 RAS handrail 1 and 3 1 Action Civil 6-Dec-21 Open
DT-MFQ-5369-NCR # PMC-024-Bellow spools seem
549 welds Crack 1 Action Mechanical 6-Dec-21 Open
552 Quantity and open Fronts Weekly meeting 1 Action General 7-Dec-21 Open
553 3D Model lay-out (Navisworks) 1 Action Engineering 8-Dec-21 Open
556 Fine Screen hollow core 1 Action Civil 8-Dec-21 Open After Beam casting for dimension
557 TSE Plastering 1 Action Civil 11-Dec-21 Open
562 Completion of OCU-1 Roof Sheeting 1 Action Civil 11-Dec-21 Open
563 TOL Control Room Toilet and Kitchen works 1 Action Civil 11-Dec-21 Open
565 Threshold for Epoxy flooring 1 Action Civil 11-Dec-21 Open
566 Screed proposal for site mixing 1 Action Civil 11-Dec-21 19-Dec-21 Open
Sealant linewhite color paint applicable for all
567 building 1 Action Civil 11-Dec-21 Open
568 Ramps and Landings 1 Action Civil 11-Dec-21 Open
569 SDB SS pipe 1 Action Mechanical 12-Dec-21 18-Dec-21 Open
575 Submersible pump at RAS 3 1 Action Mechanical 13-Dec-21 19-Dec-21 Open
Progress for SS pipes must be submitted with spool
576 1 Action Mechanical 13-Dec-21 16-Dec-21 Open
number for tracking
Battery system must be ready before
577 commissioning 1 Action Electrical 14-Dec-21 Open
1 Delay in Handing over and construction of Lagoon Lot 2 and Lot 3
contributing to overall back log of 2 % rolling up near to 1% in overall Project.
2 Sourcing of Manpower for construction is delayed due to nonavailabi of
skilled Manpower in Market.
Environmental
Scope of Work
SECTION 15160
This are stocked and run-off storm water to be possibly contaminated but
not from a sanitary line.