SI. No. No. RFI No. Title of Inspection Area Status Discipilne
Pre-installation Inspection of
41 Not Defined A554-G-822-EL-GIR-2748 MV Switchgear prior to final STF Open DEC Construction
Anchoring
Pre-installation Inspection of
42 Not Defined A554-G-822-EL-GIR-2748 MV Switchgear prior to final STF Open DEC Construction
Anchoring
Pre-installation Inspection of
43 Not Defined A554-G-822-EL-GIR-2748 MV Switchgear prior to final STF Open DEC Construction
Anchoring
Pre-installation Inspection of
45 Not Defined A554-G-822-EL-GIR-2749 MV MCC prior to final STF Open DEC Construction
Anchoring
Pre-installation Inspection of
49 Not Defined A554-G-822-EL-GIR-2750 MV MCC prior to final STF Open KSS
Anchoring
Pre-installation Inspection of
50 Not Defined A554-G-822-EL-GIR-2750 MV MCC prior to final STF Open DEC Construction
Anchoring
Pre-installation Inspection of
installed UPS-820R001A 120V
AC Inst. UPS (I/O Cabinet), TR-
UPS820R001A (bypass
77 A554-G-822-EL-GIR-3630 STF Open KSS
transformer for UPS-820R001A)
& TS-UPS820R001A (remote
manual bypass switch for UPS-
820R001A
Pre-installation Inspection of
installed UPS-820R001B 120V
AC Inst. UPS (I/O Cabinet), TR-
UPS820R001B (bypass
78 A554-G-822-EL-GIR-3631 transformer for UPS-820R001B) STF Open KSS
& TS-UPS820R001B (remote
manual bypass switch for UPS-
820R001B
Cathodic Protection DC
127 Not Defined A554-G-822-EL-GIR-6320 Rectifier Pre-Commissioning STF Open KSS
Visual Inspection
Cathodic Protection DC
128 Not Defined A554-G-822-EL-GIR-6320 Rectifier Pre-Commissioning STF Open KSS
Visual Inspection
Cathodic Protection DC
129 Not Defined A554-G-822-EL-GIR-6320 Rectifier Pre-Commissioning STF Open KSS
Visual Inspection
Cathodic Protection Energized
130 Not Defined A554-G-822-EL-GIR-6321 STF Open DEC Construction
ICCP Circuit Testing Inspection
131 Not Defined A554-G-822-EL-GIR-6321 Cathodic Protection Energized STF Open KSS
ICCP Circuit Testing Inspection
PRE-INSTALLATION INSPECTION
142 A554-G-822-EL-GIR-6481 OF BATTERY RACK STF Open KSS
FOR BAT-BC820K001.
INSTALLATION INSPECTION
143 A554-G-822-EL-GIR-6485 OF BATTERY RACK STF Open KSS
FOR BAT-BC820K001.
PRE- INSTALLATION
INSPECTION FOR THE 120V AC
144 A554-G-822-EL-GIR-6508 INST. UPS BATTERY STF Open KSS
FOR BAT-UPS820R001A.
PRE- INSTALLATION
145 A554-G-822-EL-GIR-6508 INSPECTION FOR THE 120V AC STF Open KSS
INST. UPS BATTERY
FOR BAT-UPS820R001A.
PRE- INSTALLATION
148 A554-G-822-EL-GIR-6510 INSPECTION FOR THE 120V AC STF Open KSS
INST. UPS BATTERY
FOR BAT-UPS820R001B.
PRE- INSTALLATION
INSPECTION FOR THE 120V AC
149 A554-G-822-EL-GIR-6510 STF Open KSS
INST. UPS BATTERY
FOR BAT-UPS820R001B.
PRE- INSTALLATION
INSPECTION FOR THE 125V DC
152 A554-G-822-EL-GIR-6512 STF Open KSS
UPS BATTERY
FOR BAT-BC820K001.
PRE- INSTALLATION
153 A554-G-822-EL-GIR-6512 INSPECTION FOR THE 125V DC STF Open KSS
UPS BATTERY
FOR BAT-BC820K001.
PRE- INSTALLATION
157 A554-G-822-EL-GIR-6514 INSPECTION FOR THE 120V AC STF Open KSS
EMER. LTG. UPS BATTERY FOR
BAT-UPS820R002.
Missing bolt etc. EL-2748-5 There is visible gap between SWGR and MCC from the
top dut to uneven flooring
Missing bolt etc. EL-6320-2 Backfill & Compaction not done around TR foundation.
Missing bolt etc. EL-6320-3 AC cable & conduits not installed for the TR unit.
Missing bolt etc. EL-6321-1 Spare SCR & fuses are not available (D7)
Missing bolt etc. EL-6323-4 Backfill and compaction upto GL shall be completed.