CHECKLIST FOR ABOVEGROUND CABLE

LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0415 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-EDP-0003-1, 36-EDP-0003-2, 36-EC-0079, 36-EC-0078, 36-ELP-0082, 36-EDP-0001-1, 36-EDP-0001-


CABLE TAG NUMBER 2, 36-EC-0069, 36-EC-0070, 36-ELP-0063, 36-ELP-0002, 36-ELP-0006, 36-ELP-0009, 36-ELP-0012, 36-
ELP-0021, 36-ELP-0022
CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.
HV Cables pulling with winch operation shall be not more than maximum
2.9 allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Page 1 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0415 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-EDP-0003-1, 36-EDP-0003-2, 36-EC-0079, 36-EC-0078, 36-ELP-0082, 36-EDP-0001-1, 36-EDP-0001-


CABLE TAG NUMBER 2, 36-EC-0069, 36-EC-0070, 36-ELP-0063, 36-ELP-0002, 36-ELP-0006, 36-ELP-0009, 36-ELP-0012, 36-
ELP-0021, 36-ELP-0022
CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 2 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0415 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-EDP-0003-1, 36-EDP-0003-2, 36-EC-0079, 36-EC-0078, 36-ELP-0082, 36-EDP-0001-1, 36-EDP-0001-


CABLE TAG NUMBER 2, 36-EC-0069, 36-EC-0070, 36-ELP-0063, 36-ELP-0002, 36-ELP-0006, 36-ELP-0009, 36-ELP-0012, 36-
ELP-0021, 36-ELP-0022
CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21
maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

Page 3 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0415 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-EDP-0003-1, 36-EDP-0003-2, 36-EC-0079, 36-EC-0078, 36-ELP-0082, 36-EDP-0001-1, 36-EDP-0001-


CABLE TAG NUMBER 2, 36-EC-0069, 36-EC-0070, 36-ELP-0063, 36-ELP-0002, 36-ELP-0006, 36-ELP-0009, 36-ELP-0012, 36-
ELP-0021, 36-ELP-0022
CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 4 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0462 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION Car Park Shed (JCWF) DISCIPLINE Electrical

CABLE TAG NUMBER 36-EL-0014/3, 36-EL-0014/4, 36-EL-0034/4, 36-EL-0034/5 & 36-EL-0034/6

CABLE SIZE / TYPE (3C+E) x 2.5 SQ.MM. /B7 & (2C+E) x 2.5 SQ.MM. /B3

DRAWING NO. JCWF-2-67--0002, Rev.A

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 5 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0462 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION Car Park Shed (JCWF) DISCIPLINE Electrical

CABLE TAG NUMBER 36-EL-0014/3, 36-EL-0014/4, 36-EL-0034/4, 36-EL-0034/5 & 36-EL-0034/6

CABLE SIZE / TYPE (3C+E) x 2.5 SQ.MM. /B7 & (2C+E) x 2.5 SQ.MM. /B3

DRAWING NO. JCWF-2-67--0002, Rev.A

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the
3.3 final cable laying.

Page 6 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0462 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION Car Park Shed (JCWF) DISCIPLINE Electrical

CABLE TAG NUMBER 36-EL-0014/3, 36-EL-0014/4, 36-EL-0034/4, 36-EL-0034/5 & 36-EL-0034/6

CABLE SIZE / TYPE (3C+E) x 2.5 SQ.MM. /B7 & (2C+E) x 2.5 SQ.MM. /B3

DRAWING NO. JCWF-2-67--0002, Rev.A

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 7 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0470 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

CABLE TAG NUMBER As per attached highlighted cable schedule

CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 8 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0470 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

CABLE TAG NUMBER As per attached highlighted cable schedule

CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the
3.3 final cable laying.

Page 9 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0470 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

CABLE TAG NUMBER As per attached highlighted cable schedule

CABLE SIZE / TYPE As per attached highlighted cable schedule

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Lighting and Control

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 10 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0490 SYSTEM JCWF-202 /JCWF-203

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-202-01 /JCWF-203-01

LOCATION JCWF Substation (Transformer Room to RMU DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EHD-0001 (R, Y, B)

CABLE SIZE / TYPE 3Rx1Cx240 /A1 (18/30kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE 33kV Ring Main Unit (36-RMU-1001) to 33/0.42kV Distribution Transformer (36-TR-1001)

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the direct
contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 11 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0490 SYSTEM JCWF-202 /JCWF-203

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-202-01 /JCWF-203-01

LOCATION JCWF Substation (Transformer Room to RMU DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EHD-0001 (R, Y, B)

CABLE SIZE / TYPE 3Rx1Cx240 /A1 (18/30kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE 33kV Ring Main Unit (36-RMU-1001) to 33/0.42kV Distribution Transformer (36-TR-1001)

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of moisture
after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way / maintenance
2.21 access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the final
3.3 cable laying.

Page 12 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0490 SYSTEM JCWF-202 /JCWF-203

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-202-01 /JCWF-203-01

LOCATION JCWF Substation (Transformer Room to RMU DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EHD-0001 (R, Y, B)

CABLE SIZE / TYPE 3Rx1Cx240 /A1 (18/30kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE 33kV Ring Main Unit (36-RMU-1001) to 33/0.42kV Distribution Transformer (36-TR-1001)

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 13 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0506 SYSTEM JCWF-206

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-206-01

LOCATION JCWF Substation (LV Switchgear Room to Battery DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EDP-0004-1, 36-EDP-0004-2, 36-EDP-0002-1 & 36-EDP-0002-2

CABLE SIZE / TYPE 1Cx120 SQ.MM. / Flexible (0.6/1kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Battery Isolation Box A & B To Battery Bank A & B

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

Check and confirm installation of cable tray / ladder / trunking / conduit


1.2 completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the direct
contact with concrete.
HV Cables pulling with winch operation shall be not more than maximum
2.9 allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Check the cable passing through the MCT cable shall perpendicular to the frame
2.11
for a minimum distance of 100mm either side of the frame.

Page 14 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0506 SYSTEM JCWF-206

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-206-01

LOCATION JCWF Substation (LV Switchgear Room to Battery DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EDP-0004-1, 36-EDP-0004-2, 36-EDP-0002-1 & 36-EDP-0002-2

CABLE SIZE / TYPE 1Cx120 SQ.MM. / Flexible (0.6/1kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Battery Isolation Box A & B To Battery Bank A & B

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of moisture
after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way / maintenance
2.21 access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the final
cable laying.

Page 15 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0506 SYSTEM JCWF-206

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-206-01

LOCATION JCWF Substation (LV Switchgear Room to Battery DISCIPLINE Electrical


Room)
CABLE TAG NUMBER 36-EDP-0004-1, 36-EDP-0004-2, 36-EDP-0002-1 & 36-EDP-0002-2

CABLE SIZE / TYPE 1Cx120 SQ.MM. / Flexible (0.6/1kV)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Battery Isolation Box A & B To Battery Bank A & B

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 16 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0539 SYSTEM JALM-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JALM-201-02

LOCATION JMDS Main Control Building DISCIPLINE Electrical

CABLE TAG NUMBER 31-EMP-1822 & 31-EMP-1825

CABLE SIZE / TYPE 2Cx6 SQ.MM. / B5

DRAWING NO. 4172-JALM-4-53-0002,Rev. A

CABLE SCHEDULE 4172-JALM-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Existing 240V AC UPS DB (31-DB-0064), Feeder 64 & 65 To Operator Workstation PDU-4
& PDU-5

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

Check and confirm installation of cable tray / ladder / trunking / conduit


1.2 completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the direct
contact with concrete.
HV Cables pulling with winch operation shall be not more than maximum
2.9 allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Page 17 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0539 SYSTEM JALM-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JALM-201-02

LOCATION JMDS Main Control Building DISCIPLINE Electrical

CABLE TAG NUMBER 31-EMP-1822 & 31-EMP-1825

CABLE SIZE / TYPE 2Cx6 SQ.MM. / B5

DRAWING NO. 4172-JALM-4-53-0002,Rev. A

CABLE SCHEDULE 4172-JALM-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Existing 240V AC UPS DB (31-DB-0064), Feeder 64 & 65 To Operator Workstation PDU-4
& PDU-5

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 18 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0539 SYSTEM JALM-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JALM-201-02

LOCATION JMDS Main Control Building DISCIPLINE Electrical

CABLE TAG NUMBER 31-EMP-1822 & 31-EMP-1825

CABLE SIZE / TYPE 2Cx6 SQ.MM. / B5

DRAWING NO. 4172-JALM-4-53-0002,Rev. A

CABLE SCHEDULE 4172-JALM-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Existing 240V AC UPS DB (31-DB-0064), Feeder 64 & 65 To Operator Workstation PDU-4
& PDU-5

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of moisture
after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way / maintenance
2.21
access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the final
cable laying.

Page 19 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0539 SYSTEM JALM-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JALM-201-02

LOCATION JMDS Main Control Building DISCIPLINE Electrical

CABLE TAG NUMBER 31-EMP-1822 & 31-EMP-1825

CABLE SIZE / TYPE 2Cx6 SQ.MM. / B5

DRAWING NO. 4172-JALM-4-53-0002,Rev. A

CABLE SCHEDULE 4172-JALM-2-37-0001,Rev. B

APPLICATION / SERVICE Cable from Existing 240V AC UPS DB (31-DB-0064), Feeder 64 & 65 To Operator Workstation PDU-4
& PDU-5

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 20 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0543 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-ELP-0013-1, 36-ELP-0013-2, 36-ELP-0021, 36-ELP-0026, 36-ELP-0066, 36-ELP-0086, 36-ELP-0132,


CABLE TAG NUMBER 36-EC-0003, 36-EC-0030, 36-EC-0033, 36-EC-0038, 36-EC-0039, 36-EC-0043
3C X 185 SQMM/B2, 4C X 185 SQMM/B2, 4C X 16 SQMM/B2, 2Cx6 SQMM/B5, 2Cx4 SQMM/B6,
CABLE SIZE / TYPE 4Cx2.5 SQMM/B3,4Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B3, 3Cx2.5 SQMM/B3,
4C X 4 SQMM/B3
DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

Check and confirm installation of cable tray / ladder / trunking / conduit


1.2 completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Page 21 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0543 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-ELP-0013-1, 36-ELP-0013-2, 36-ELP-0021, 36-ELP-0026, 36-ELP-0066, 36-ELP-0086, 36-ELP-0132,


CABLE TAG NUMBER 36-EC-0003, 36-EC-0030, 36-EC-0033, 36-EC-0038, 36-EC-0039, 36-EC-0043
3C X 185 SQMM/B2, 4C X 185 SQMM/B2, 4C X 16 SQMM/B2, 2Cx6 SQMM/B5, 2Cx4 SQMM/B6,
CABLE SIZE / TYPE 4Cx2.5 SQMM/B3,4Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B3, 3Cx2.5 SQMM/B3,
4C X 4 SQMM/B3
DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 22 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0543 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-ELP-0013-1, 36-ELP-0013-2, 36-ELP-0021, 36-ELP-0026, 36-ELP-0066, 36-ELP-0086, 36-ELP-0132,


CABLE TAG NUMBER 36-EC-0003, 36-EC-0030, 36-EC-0033, 36-EC-0038, 36-EC-0039, 36-EC-0043
3C X 185 SQMM/B2, 4C X 185 SQMM/B2, 4C X 16 SQMM/B2, 2Cx6 SQMM/B5, 2Cx4 SQMM/B6,
CABLE SIZE / TYPE 4Cx2.5 SQMM/B3,4Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B3, 3Cx2.5 SQMM/B3,
4C X 4 SQMM/B3
DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check
laying
and record cable continuity and insulation resistance test after cable

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

Page 23 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0543 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-01

LOCATION JCWF Substation DISCIPLINE Electrical

36-ELP-0013-1, 36-ELP-0013-2, 36-ELP-0021, 36-ELP-0026, 36-ELP-0066, 36-ELP-0086, 36-ELP-0132,


CABLE TAG NUMBER 36-EC-0003, 36-EC-0030, 36-EC-0033, 36-EC-0038, 36-EC-0039, 36-EC-0043
3C X 185 SQMM/B2, 4C X 185 SQMM/B2, 4C X 16 SQMM/B2, 2Cx6 SQMM/B5, 2Cx4 SQMM/B6,
CABLE SIZE / TYPE 4Cx2.5 SQMM/B3,4Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B5, 7Cx2.5 SQMM/B3, 3Cx2.5 SQMM/B3,
4C X 4 SQMM/B3
DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE LV Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 24 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0553 SYSTEM DK960-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM DK960-201-02

LOCATION DK960 RTU Station DISCIPLINE Electrical

CABLE TAG NUMBER DK960-EL-001/3, DK960-EL-001/4, DK960-EL-001/5 , DK960-EL-001/6

CABLE SIZE / TYPE (2C+E )X 2.5 SQ. MM. / B3

DRAWING NO. DK960-2-64-0001, Rev. C

CABLE SCHEDULE 4172-WLHDT-2-37-0001, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected
Ensure cable tray / ladder / trunking / conduit is clean and free from physical
1.3 damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8 direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Check the cable passing through the MCT cable shall perpendicular to the frame
2.11 for a minimum distance of 100mm either side of the frame.

Page 25 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0553 SYSTEM DK960-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM DK960-201-02

LOCATION DK960 RTU Station DISCIPLINE Electrical

CABLE TAG NUMBER DK960-EL-001/3, DK960-EL-001/4, DK960-EL-001/5 , DK960-EL-001/6

CABLE SIZE / TYPE (2C+E )X 2.5 SQ. MM. / B3

DRAWING NO. DK960-2-64-0001, Rev. C

CABLE SCHEDULE 4172-WLHDT-2-37-0001, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

Page 26 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0553 SYSTEM DK960-201

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM DK960-201-02

LOCATION DK960 RTU Station DISCIPLINE Electrical

CABLE TAG NUMBER DK960-EL-001/3, DK960-EL-001/4, DK960-EL-001/5 , DK960-EL-001/6

CABLE SIZE / TYPE (2C+E )X 2.5 SQ. MM. / B3

DRAWING NO. DK960-2-64-0001, Rev. C

CABLE SCHEDULE 4172-WLHDT-2-37-0001, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 27 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF LV Switchgear Room DISCIPLINE ELECTRICAL

CABLE TAG NUMBER


36-ELP-0062 ( 2C X 16 Sq. mm. / B4), 36-ELP-0065 (2C x 6 Sq. mm. / B5), 36-ELP-0067 (2C x 6 Sq.
mm. / B5), 36-ELP-0068 (2C x 6 Sq. mm. / B5), 36-ELP-0081 ( 2C X 16 Sq. mm. / B4), 36-ELP-0084
(2C x 6 Sq. mm. / B5), 36-ELP-0086 (2C x 6 Sq. mm. / B5), 36-ELP-0087 (2C x 6 Sq. mm. / B5), 36-
ELP-0133 (2C x 4 Sq. mm. / B6), 36-ELP-0134 (2C x 4 Sq. mm. / B6), 36-EC-0066 (4Cx2.5 Sq.
mm./B5), 36-EC-0067 (4Cx2.5 Sq. mm./B5), 36-EC-0071 (7Cx2.5 Sq. mm./B5), 36-EC-0068 (12Cx2.5
CABLE SIZE / TYPE Sq. mm./B3), 36-EC-0078 (12Cx2.5 Sq. mm./B3), 36-EC-0081 (7Cx2.5 Sq. mm./B5), 36-EC-
0082(4Cx2.5 Sq. mm./B5), 36-EC-0077 (4Cx2.5 Sq. mm./B5), 36-EC-0134 (12Cx2.5 Sq. mm./B5), 36-
EC-0096 (RS485 CABLE), 36-EC-0101 (RS485 CABLE), 36-EC-0105 (RS485 CABLE)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE UPS System Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.
Check and confirm installation of cable tray / ladder / trunking / conduit
1.2 completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

Confirm aboveground cable entry from stub-up and Crossing shall not
2.7 obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 28 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF LV Switchgear Room DISCIPLINE ELECTRICAL

CABLE TAG NUMBER


36-ELP-0062 ( 2C X 16 Sq. mm. / B4), 36-ELP-0065 (2C x 6 Sq. mm. / B5), 36-ELP-0067 (2C x 6 Sq.
mm. / B5), 36-ELP-0068 (2C x 6 Sq. mm. / B5), 36-ELP-0081 ( 2C X 16 Sq. mm. / B4), 36-ELP-0084
(2C x 6 Sq. mm. / B5), 36-ELP-0086 (2C x 6 Sq. mm. / B5), 36-ELP-0087 (2C x 6 Sq. mm. / B5), 36-
ELP-0133 (2C x 4 Sq. mm. / B6), 36-ELP-0134 (2C x 4 Sq. mm. / B6), 36-EC-0066 (4Cx2.5 Sq.
mm./B5), 36-EC-0067 (4Cx2.5 Sq. mm./B5), 36-EC-0071 (7Cx2.5 Sq. mm./B5), 36-EC-0068 (12Cx2.5
CABLE SIZE / TYPE Sq. mm./B3), 36-EC-0078 (12Cx2.5 Sq. mm./B3), 36-EC-0081 (7Cx2.5 Sq. mm./B5), 36-EC-
0082(4Cx2.5 Sq. mm./B5), 36-EC-0077 (4Cx2.5 Sq. mm./B5), 36-EC-0134 (12Cx2.5 Sq. mm./B5), 36-
EC-0096 (RS485 CABLE), 36-EC-0101 (RS485 CABLE), 36-EC-0105 (RS485 CABLE)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE UPS System Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

Page 29 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF LV Switchgear Room DISCIPLINE ELECTRICAL

CABLE TAG NUMBER


36-ELP-0062 ( 2C X 16 Sq. mm. / B4), 36-ELP-0065 (2C x 6 Sq. mm. / B5), 36-ELP-0067 (2C x 6 Sq.
mm. / B5), 36-ELP-0068 (2C x 6 Sq. mm. / B5), 36-ELP-0081 ( 2C X 16 Sq. mm. / B4), 36-ELP-0084
(2C x 6 Sq. mm. / B5), 36-ELP-0086 (2C x 6 Sq. mm. / B5), 36-ELP-0087 (2C x 6 Sq. mm. / B5), 36-
ELP-0133 (2C x 4 Sq. mm. / B6), 36-ELP-0134 (2C x 4 Sq. mm. / B6), 36-EC-0066 (4Cx2.5 Sq.
mm./B5), 36-EC-0067 (4Cx2.5 Sq. mm./B5), 36-EC-0071 (7Cx2.5 Sq. mm./B5), 36-EC-0068 (12Cx2.5
CABLE SIZE / TYPE Sq. mm./B3), 36-EC-0078 (12Cx2.5 Sq. mm./B3), 36-EC-0081 (7Cx2.5 Sq. mm./B5), 36-EC-
0082(4Cx2.5 Sq. mm./B5), 36-EC-0077 (4Cx2.5 Sq. mm./B5), 36-EC-0134 (12Cx2.5 Sq. mm./B5), 36-
EC-0096 (RS485 CABLE), 36-EC-0101 (RS485 CABLE), 36-EC-0105 (RS485 CABLE)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE UPS System Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the
3.3 final cable laying.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

Page 30 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF LV Switchgear Room DISCIPLINE ELECTRICAL

CABLE TAG NUMBER


36-ELP-0062 ( 2C X 16 Sq. mm. / B4), 36-ELP-0065 (2C x 6 Sq. mm. / B5), 36-ELP-0067 (2C x 6 Sq.
mm. / B5), 36-ELP-0068 (2C x 6 Sq. mm. / B5), 36-ELP-0081 ( 2C X 16 Sq. mm. / B4), 36-ELP-0084
(2C x 6 Sq. mm. / B5), 36-ELP-0086 (2C x 6 Sq. mm. / B5), 36-ELP-0087 (2C x 6 Sq. mm. / B5), 36-
ELP-0133 (2C x 4 Sq. mm. / B6), 36-ELP-0134 (2C x 4 Sq. mm. / B6), 36-EC-0066 (4Cx2.5 Sq.
mm./B5), 36-EC-0067 (4Cx2.5 Sq. mm./B5), 36-EC-0071 (7Cx2.5 Sq. mm./B5), 36-EC-0068 (12Cx2.5
CABLE SIZE / TYPE Sq. mm./B3), 36-EC-0078 (12Cx2.5 Sq. mm./B3), 36-EC-0081 (7Cx2.5 Sq. mm./B5), 36-EC-
0082(4Cx2.5 Sq. mm./B5), 36-EC-0077 (4Cx2.5 Sq. mm./B5), 36-EC-0134 (12Cx2.5 Sq. mm./B5), 36-
EC-0096 (RS485 CABLE), 36-EC-0101 (RS485 CABLE), 36-EC-0105 (RS485 CABLE)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE UPS System Power & Control cables

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

DATE

Page 31 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-204 & JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-2 & JCWF-205-02

LOCATION JCWF Substation & Plant Area DISCIPLINE Electrical

36-EL-0013 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0015 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0017 ((3C+E) x 6
CABLE TAG NUMBER Sq. mm. / B9), 36-EL-0018 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0034 ((2C+E) x 6 Sq. mm. / B3), 36-EL-
0035 ((2C+E) x 6 Sq. mm. / B6), 36-ELP-0119 ((4C+E) x 10 Sq. mm. / B6), 36-ELP-0128 ((2C+E) x 6 Sq.
mm. / B3), 36-ELP-0129 ((2C+E) x 6 Sq. mm. / B2), 36-ELP-0129/2 ((2C+E) x 4 Sq. mm. / B3) 36-ELP-
0147 ((2C+E) x 6 Sq. mm. / B3), 36-EL-0037 ((2C+E) x 6 Sq. mm. / B3) & 36-EL-0038 ((2C+E) x 6 Sq.
CABLE SIZE / TYPE mm. / B3)

DRAWING NO. JCWF-2-64-0001-C


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting & Small Power Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected
Ensure cable tray / ladder / trunking / conduit is clean and free from physical
1.3 damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8 direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 32 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-204 & JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-2 & JCWF-205-02

LOCATION JCWF Substation & Plant Area DISCIPLINE Electrical

36-EL-0013 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0015 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0017 ((3C+E) x 6
CABLE TAG NUMBER Sq. mm. / B9), 36-EL-0018 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0034 ((2C+E) x 6 Sq. mm. / B3), 36-EL-
0035 ((2C+E) x 6 Sq. mm. / B6), 36-ELP-0119 ((4C+E) x 10 Sq. mm. / B6), 36-ELP-0128 ((2C+E) x 6 Sq.
mm. / B3), 36-ELP-0129 ((2C+E) x 6 Sq. mm. / B2), 36-ELP-0129/2 ((2C+E) x 4 Sq. mm. / B3) 36-ELP-
0147 ((2C+E) x 6 Sq. mm. / B3), 36-EL-0037 ((2C+E) x 6 Sq. mm. / B3) & 36-EL-0038 ((2C+E) x 6 Sq.
CABLE SIZE / TYPE mm. / B3)

DRAWING NO. JCWF-2-64-0001-C


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting & Small Power Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

Check end caps shall be provided at both the ends to prevent ingress of
2.12 moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

Check segregation from power cable, control cable, IS & non IS cables shall be
2.17
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

2.21 Check cables laying in trays / conduit shall not block any walk way /
maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Page 33 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0568 SYSTEM JCWF-204 & JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-2 & JCWF-205-02

LOCATION JCWF Substation & Plant Area DISCIPLINE Electrical

36-EL-0013 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0015 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0017 ((3C+E) x 6
CABLE TAG NUMBER Sq. mm. / B9), 36-EL-0018 ((3C+E) x 6 Sq. mm. / B9), 36-EL-0034 ((2C+E) x 6 Sq. mm. / B3), 36-EL-
0035 ((2C+E) x 6 Sq. mm. / B6), 36-ELP-0119 ((4C+E) x 10 Sq. mm. / B6), 36-ELP-0128 ((2C+E) x 6 Sq.
mm. / B3), 36-ELP-0129 ((2C+E) x 6 Sq. mm. / B2), 36-ELP-0129/2 ((2C+E) x 4 Sq. mm. / B3) 36-ELP-
0147 ((2C+E) x 6 Sq. mm. / B3), 36-EL-0037 ((2C+E) x 6 Sq. mm. / B3) & 36-EL-0038 ((2C+E) x 6 Sq.
CABLE SIZE / TYPE mm. / B3)

DRAWING NO. JCWF-2-64-0001-C


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting & Small Power Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 34 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0571 SYSTEM JCWF-204 & JCWF-202

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-4 & JCWF-202-01

LOCATION JCWF substation DISCIPLINE Electrical


(36-RMU-1001 to 36-SCA-1001-01)
CABLE TAG NUMBER 36-EC-0001 (12Cx2.5 Sq. mm./B3), 36-EC-0004(12Cx2.5 Sq. mm./B3), 36-EC-0005 (12Cx2.5 Sq.
mm./B3), 36-ELP-0135 (2Cx4 Sq. mm./B6), 36-EC-0140 (2Cx4 Sq. mm./B6), 36-EC-0111 (7Cx2.5 Sq.
CABLE SIZE / TYPE mm./B3) & 36-EC-0112 (7Cx2.5 Sq. mm./B3)

DRAWING NO. JCWF-2-51-0001-D


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Aux. Supply & Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.
Check and confirm installation of cable tray / ladder / trunking / conduit
1.2 completed and inspected
Ensure cable tray / ladder / trunking / conduit is clean and free from physical
1.3 damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

Confirm aboveground cable entry from stub-up and Crossing shall not
2.7 obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 35 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0571 SYSTEM JCWF-204 & JCWF-202

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-4 & JCWF-202-01

LOCATION JCWF substation DISCIPLINE Electrical


(36-RMU-1001 to 36-SCA-1001-01)
CABLE TAG NUMBER 36-EC-0001 (12Cx2.5 Sq. mm./B3), 36-EC-0004(12Cx2.5 Sq. mm./B3), 36-EC-0005 (12Cx2.5 Sq.
mm./B3), 36-ELP-0135 (2Cx4 Sq. mm./B6), 36-EC-0140 (2Cx4 Sq. mm./B6), 36-EC-0111 (7Cx2.5 Sq.
CABLE SIZE / TYPE mm./B3) & 36-EC-0112 (7Cx2.5 Sq. mm./B3)

DRAWING NO. JCWF-2-51-0001-D


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Aux. Supply & Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

Check end caps shall be provided at both the ends to prevent ingress of
2.12 moisture after cable laying.

Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.
2.15 Check and confirm all cables are laid as per cable schedule / layout.
2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

2.21 Check cables laying in trays / conduit shall not block any walk way /
maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

REMARKS / COMMENTS :

Page 36 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0571 SYSTEM JCWF-204 & JCWF-202

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-4 & JCWF-202-01

LOCATION JCWF substation DISCIPLINE Electrical


(36-RMU-1001 to 36-SCA-1001-01)
CABLE TAG NUMBER 36-EC-0001 (12Cx2.5 Sq. mm./B3), 36-EC-0004(12Cx2.5 Sq. mm./B3), 36-EC-0005 (12Cx2.5 Sq.
mm./B3), 36-ELP-0135 (2Cx4 Sq. mm./B6), 36-EC-0140 (2Cx4 Sq. mm./B6), 36-EC-0111 (7Cx2.5 Sq.
CABLE SIZE / TYPE mm./B3) & 36-EC-0112 (7Cx2.5 Sq. mm./B3)

DRAWING NO. JCWF-2-51-0001-D


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Aux. Supply & Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 37 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0573 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF substation JCWF substation LV Switchgear DISCIPLINE Electrical


Room
CABLE TAG NUMBER 36-EC-0025 (12Cx2.5 Sq. mm./B5), 36-EC-0013 (4Cx2.5 Sq. mm./B5), 36-EC-0018 (7Cx2.5 Sq.
mm./B5), 36-EC-0095 (RS485 CABLE), 36-EC-0019 (RS485 CABLE), 36-EC-0020 (RS485 CABLE), 36-
EC-0021 (RS485 CABLE), 36-EC-0097(RS485 CABLE), 36-EC-0100 (RS485 CABLE), 36-EC-0102 (RS485
CABLE SIZE / TYPE CABLE),
DRAWING NO. JCWF-2-51-0001-D
CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.
Check and confirm installation of cable tray / ladder / trunking / conduit
1.2 completed and inspected
Ensure cable tray / ladder / trunking / conduit is clean and free from physical
1.3 damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

Confirm aboveground cable entry from stub-up and Crossing shall not
2.7 obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 38 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0573 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF substation JCWF substation LV Switchgear DISCIPLINE Electrical


Room
CABLE TAG NUMBER 36-EC-0025 (12Cx2.5 Sq. mm./B5), 36-EC-0013 (4Cx2.5 Sq. mm./B5), 36-EC-0018 (7Cx2.5 Sq.
mm./B5), 36-EC-0095 (RS485 CABLE), 36-EC-0019 (RS485 CABLE), 36-EC-0020 (RS485 CABLE), 36-
EC-0021 (RS485 CABLE), 36-EC-0097(RS485 CABLE), 36-EC-0100 (RS485 CABLE), 36-EC-0102 (RS485
CABLE SIZE / TYPE CABLE),
DRAWING NO. JCWF-2-51-0001-D
CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

Check end caps shall be provided at both the ends to prevent ingress of
2.12 moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

2.21 Check cables laying in trays / conduit shall not block any walk way /
maintenance access of any process area.
Check and record cable continuity and insulation resistance test after cable
2.22 laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

Page 39 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0573 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF substation JCWF substation LV Switchgear DISCIPLINE Electrical


Room
CABLE TAG NUMBER 36-EC-0025 (12Cx2.5 Sq. mm./B5), 36-EC-0013 (4Cx2.5 Sq. mm./B5), 36-EC-0018 (7Cx2.5 Sq.
mm./B5), 36-EC-0095 (RS485 CABLE), 36-EC-0019 (RS485 CABLE), 36-EC-0020 (RS485 CABLE), 36-
EC-0021 (RS485 CABLE), 36-EC-0097(RS485 CABLE), 36-EC-0100 (RS485 CABLE), 36-EC-0102 (RS485
CABLE SIZE / TYPE CABLE),
DRAWING NO. JCWF-2-51-0001-D
CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Control cables as per the attached highlighted drawing

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 40 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0575 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF substation (Transformer Room & DISCIPLINE Electrical


EDG Room)

36-EL-0005 ((2C+E) x 4/B7), 36-EL-0005/1 ((3C+E) x 2.5/B7), 36-EL-0005/2 ((3C+E) x 2.5/B7),


36-EL-0005/3 ((3C+E) x 2.5/B7), 36-EL-0005/4 ((3C+E) x 2.5/B7), 36-EL-0005/5 ((3C+E) x 2.5/B7),
CABLE TAG NUMBER 36-EL-0006 ( (2C+E) x 4/B7), 36-EL-0006/1 ((3C+E) x 2.5 /B7), 36-EL-0006/2 ((3C+E) x 2.5 /B7),
36-EL-0006/3 ((3C+E) x 2.5 /B7), 36-EL-0006/4 ((3C+E) x 2.5 /B7), 36-EL-0006/5 ((3C+E) x 2.5 /B7),
36-EL-0006/6((3C+E) x 2.5 /B7), 36-EL-0006/7 ((3C+E) x 2.5 /B7), 36-EL-0026 ((2C+E) x 4/B6),
36-EL-0026/1 ((2C+E) x 2.5/B6), 36-EL-0026/2((2C+E) x 2.5/B6), 36-EL-0026/3((2C+E) x 2.5/B6),
36-EL-0026/4((2C+E) x 2.5/B6), 36-EL-0026/5((2C+E) x 2.5/B6), 36-EL-0027/5 ( (2C+E) x 4/B6),
36-EL-0027/6 ( (3C+E) x 2.5/B6), 36-EL-0027/7 ((3C+E) x 2.5/B6), 36-EL-0027/8 ((2C+E) x 2.5/B6),
CABLE SIZE / TYPE 36-EL-0027/9 ((2C+E) x 2.5/B6), 36-EL-0027/10 ((2C+E) x 2.5/B6) & 36-EL-0027/11 ((2C+E) x
2.5/B6),

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected
Ensure cable tray / ladder / trunking / conduit is clean and free from physical
1.3 damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8 direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 41 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0575 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF substation (Transformer Room & DISCIPLINE Electrical


EDG Room)

36-EL-0005 ((2C+E) x 4/B7), 36-EL-0005/1 ((3C+E) x 2.5/B7), 36-EL-0005/2 ((3C+E) x 2.5/B7),


36-EL-0005/3 ((3C+E) x 2.5/B7), 36-EL-0005/4 ((3C+E) x 2.5/B7), 36-EL-0005/5 ((3C+E) x 2.5/B7),
CABLE TAG NUMBER 36-EL-0006 ( (2C+E) x 4/B7), 36-EL-0006/1 ((3C+E) x 2.5 /B7), 36-EL-0006/2 ((3C+E) x 2.5 /B7),
36-EL-0006/3 ((3C+E) x 2.5 /B7), 36-EL-0006/4 ((3C+E) x 2.5 /B7), 36-EL-0006/5 ((3C+E) x 2.5 /B7),
36-EL-0006/6((3C+E) x 2.5 /B7), 36-EL-0006/7 ((3C+E) x 2.5 /B7), 36-EL-0026 ((2C+E) x 4/B6),
36-EL-0026/1 ((2C+E) x 2.5/B6), 36-EL-0026/2((2C+E) x 2.5/B6), 36-EL-0026/3((2C+E) x 2.5/B6),
36-EL-0026/4((2C+E) x 2.5/B6), 36-EL-0026/5((2C+E) x 2.5/B6), 36-EL-0027/5 ( (2C+E) x 4/B6),
36-EL-0027/6 ( (3C+E) x 2.5/B6), 36-EL-0027/7 ((3C+E) x 2.5/B6), 36-EL-0027/8 ((2C+E) x 2.5/B6),
CABLE SIZE / TYPE 36-EL-0027/9 ((2C+E) x 2.5/B6), 36-EL-0027/10 ((2C+E) x 2.5/B6) & 36-EL-0027/11 ((2C+E) x
2.5/B6),

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

Check segregation from power cable, control cable, IS & non IS cables shall be
2.17
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

2.21 Check cables laying in trays / conduit shall not block any walk way /
maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

Page 42 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0575 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF substation (Transformer Room & DISCIPLINE Electrical


EDG Room)

36-EL-0005 ((2C+E) x 4/B7), 36-EL-0005/1 ((3C+E) x 2.5/B7), 36-EL-0005/2 ((3C+E) x 2.5/B7),


36-EL-0005/3 ((3C+E) x 2.5/B7), 36-EL-0005/4 ((3C+E) x 2.5/B7), 36-EL-0005/5 ((3C+E) x 2.5/B7),
CABLE TAG NUMBER 36-EL-0006 ( (2C+E) x 4/B7), 36-EL-0006/1 ((3C+E) x 2.5 /B7), 36-EL-0006/2 ((3C+E) x 2.5 /B7),
36-EL-0006/3 ((3C+E) x 2.5 /B7), 36-EL-0006/4 ((3C+E) x 2.5 /B7), 36-EL-0006/5 ((3C+E) x 2.5 /B7),
36-EL-0006/6((3C+E) x 2.5 /B7), 36-EL-0006/7 ((3C+E) x 2.5 /B7), 36-EL-0026 ((2C+E) x 4/B6),
36-EL-0026/1 ((2C+E) x 2.5/B6), 36-EL-0026/2((2C+E) x 2.5/B6), 36-EL-0026/3((2C+E) x 2.5/B6),
36-EL-0026/4((2C+E) x 2.5/B6), 36-EL-0026/5((2C+E) x 2.5/B6), 36-EL-0027/5 ( (2C+E) x 4/B6),
36-EL-0027/6 ( (3C+E) x 2.5/B6), 36-EL-0027/7 ((3C+E) x 2.5/B6), 36-EL-0027/8 ((2C+E) x 2.5/B6),
CABLE SIZE / TYPE 36-EL-0027/9 ((2C+E) x 2.5/B6), 36-EL-0027/10 ((2C+E) x 2.5/B6) & 36-EL-0027/11 ((2C+E) x
2.5/B6),

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the
3.3 final cable laying.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

DESIGNATION Engineer QC-E

Page 43 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0575 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF substation (Transformer Room & DISCIPLINE Electrical


EDG Room)

36-EL-0005 ((2C+E) x 4/B7), 36-EL-0005/1 ((3C+E) x 2.5/B7), 36-EL-0005/2 ((3C+E) x 2.5/B7),


36-EL-0005/3 ((3C+E) x 2.5/B7), 36-EL-0005/4 ((3C+E) x 2.5/B7), 36-EL-0005/5 ((3C+E) x 2.5/B7),
CABLE TAG NUMBER 36-EL-0006 ( (2C+E) x 4/B7), 36-EL-0006/1 ((3C+E) x 2.5 /B7), 36-EL-0006/2 ((3C+E) x 2.5 /B7),
36-EL-0006/3 ((3C+E) x 2.5 /B7), 36-EL-0006/4 ((3C+E) x 2.5 /B7), 36-EL-0006/5 ((3C+E) x 2.5 /B7),
36-EL-0006/6((3C+E) x 2.5 /B7), 36-EL-0006/7 ((3C+E) x 2.5 /B7), 36-EL-0026 ((2C+E) x 4/B6),
36-EL-0026/1 ((2C+E) x 2.5/B6), 36-EL-0026/2((2C+E) x 2.5/B6), 36-EL-0026/3((2C+E) x 2.5/B6),
36-EL-0026/4((2C+E) x 2.5/B6), 36-EL-0026/5((2C+E) x 2.5/B6), 36-EL-0027/5 ( (2C+E) x 4/B6),
36-EL-0027/6 ( (3C+E) x 2.5/B6), 36-EL-0027/7 ((3C+E) x 2.5/B6), 36-EL-0027/8 ((2C+E) x 2.5/B6),
CABLE SIZE / TYPE 36-EL-0027/9 ((2C+E) x 2.5/B6), 36-EL-0027/10 ((2C+E) x 2.5/B6) & 36-EL-0027/11 ((2C+E) x
2.5/B6),

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

DATE

Page 44 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0587 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-02

LOCATION JCWF substation DISCIPLINE Electrical

36-ELP-0115((4C+ E) x 25/B6), 36-ELP-0116 ((2C+ E) x6 /B6), 36-ELP-0116/1((2C+ E) x 4/B6),


36-ELP-0116/2 ((2C+ E) x 4/B6), 36-ELP-0117((2C+ E) x6 /B6), 36-ELP-0117/1 ((2C+ E) x6 /B6),
CABLE TAG NUMBER 36-ELP-0117/2((2C+ E) x 4/B6), 36-ELP-0118((2C+ E) x6 /B6), 36-ELP-0118/1 ((2C+ E) x6 /B6),
36-ELP-0118/2((2C+ E) x6 /B6), 36-ELP-0118/3((2C+ E) x 4/B6), 36-ELP-0118/4((2C+ E) x 4/B6),
36-ELP-0119((4C+ E) x10/B6), 36-ELP-0120 ((2C+ E) x6 /B6), 36-ELP-0120/1((2C+ E) x 4/B6),
36-ELP-0120/2 ((2C+ E) x 4/B6), 36-ELP-0121 ((2C+ E) x6 /B6), 36-ELP-0121/1((2C+ E) x 4/B6),
36-ELP-0121/2 ((2C+ E) x 4/B6), 36-ELP-0122 ((2C+ E) x6 /B6), 36-ELP-0122/1((2C+ E) x 4/B6),
36-ELP-0122/2 ((2C+ E) x 4/B6), 36-ELP-0123 ((2C+ E) x6 /B6), 36-ELP-0123/1((2C+ E) x 4/B6),
36-ELP-0123/2 ((2C+ E) x 4/B6), 36-ELP-0124 ((2C+ E) x6 /B6), 36-ELP-0124/1((2C+ E) x 4/B6),
36-ELP-0124/2 ((2C+ E) x 4/B6), 36-ELP-00122/3 ((2C+ E) x 4/B6), 36-ELP-0125 ((2C+ E) x6 /B6),
36-ELP-0125/1((2C+ E) x 4/B6), 36-ELP-0125/2 ((2C+ E) x 4/B6), 36-ELP-0126((4C+ E) x10/B6),
36-ELP-0127((2C+ E) x 4/B6), 36-ELP-0130((4C+ E) x10/B6), 36-ELP-0131((4C+E) x 25/B6), 36-ELP-
CABLE SIZE / TYPE 0141 (2C x 4/B6), 36-ELP-0143 (2C x 4/B6), 36-ELP-0144 (2C x 4/B6), 36-ELP-00127/1 ((2C+ E) x
4/B6),
36-ELP-00127/2 ((2C+ E) x 4/B6), 36-ELP-0136 ((2C+ E) x6 /B6), 36-ELP-0137 ((2C+ E) x6 /B6),
36-ELP-00138 (2C x 4/B6), 36-ELP-0139 ((2C+ E) x 4/B6)

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

1.0 PRE-INSTALLATION INSPECTION


1.1 Check & verify cable route as per AFC drawing.
Check and confirm installation of cable tray / ladder / trunking / conduit
1.2 completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge
1.4 Check cable drum placing shall be on solid flat surface
2.0 ABOVEGROUND CABLE LAYING INSPECTION
2.1 Check and confirm material inspection of cables are completed
2.2 Check for any physical damage of cables
2.3 Check and verify laying arrangement of cables
2.4 Check cables shall be laid in parallel with no twists or crossovers.
2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.
2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8 direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.
2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Page 45 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0587 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-02

LOCATION JCWF substation DISCIPLINE Electrical

36-ELP-0115((4C+ E) x 25/B6), 36-ELP-0116 ((2C+ E) x6 /B6), 36-ELP-0116/1((2C+ E) x 4/B6),


36-ELP-0116/2 ((2C+ E) x 4/B6), 36-ELP-0117((2C+ E) x6 /B6), 36-ELP-0117/1 ((2C+ E) x6 /B6),
CABLE TAG NUMBER 36-ELP-0117/2((2C+ E) x 4/B6), 36-ELP-0118((2C+ E) x6 /B6), 36-ELP-0118/1 ((2C+ E) x6 /B6),
36-ELP-0118/2((2C+ E) x6 /B6), 36-ELP-0118/3((2C+ E) x 4/B6), 36-ELP-0118/4((2C+ E) x 4/B6),
36-ELP-0119((4C+ E) x10/B6), 36-ELP-0120 ((2C+ E) x6 /B6), 36-ELP-0120/1((2C+ E) x 4/B6),
36-ELP-0120/2 ((2C+ E) x 4/B6), 36-ELP-0121 ((2C+ E) x6 /B6), 36-ELP-0121/1((2C+ E) x 4/B6),
36-ELP-0121/2 ((2C+ E) x 4/B6), 36-ELP-0122 ((2C+ E) x6 /B6), 36-ELP-0122/1((2C+ E) x 4/B6),
36-ELP-0122/2 ((2C+ E) x 4/B6), 36-ELP-0123 ((2C+ E) x6 /B6), 36-ELP-0123/1((2C+ E) x 4/B6),
36-ELP-0123/2 ((2C+ E) x 4/B6), 36-ELP-0124 ((2C+ E) x6 /B6), 36-ELP-0124/1((2C+ E) x 4/B6),
36-ELP-0124/2 ((2C+ E) x 4/B6), 36-ELP-00122/3 ((2C+ E) x 4/B6), 36-ELP-0125 ((2C+ E) x6 /B6),
36-ELP-0125/1((2C+ E) x 4/B6), 36-ELP-0125/2 ((2C+ E) x 4/B6), 36-ELP-0126((4C+ E) x10/B6),
36-ELP-0127((2C+ E) x 4/B6), 36-ELP-0130((4C+ E) x10/B6), 36-ELP-0131((4C+E) x 25/B6), 36-ELP-
CABLE SIZE / TYPE 0141 (2C x 4/B6), 36-ELP-0143 (2C x 4/B6), 36-ELP-0144 (2C x 4/B6), 36-ELP-00127/1 ((2C+ E) x
4/B6),
36-ELP-00127/2 ((2C+ E) x 4/B6), 36-ELP-0136 ((2C+ E) x6 /B6), 36-ELP-0137 ((2C+ E) x6 /B6),
36-ELP-00138 (2C x 4/B6), 36-ELP-0139 ((2C+ E) x 4/B6)

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 46 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0587 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-02

LOCATION JCWF substation DISCIPLINE Electrical

36-ELP-0115((4C+ E) x 25/B6), 36-ELP-0116 ((2C+ E) x6 /B6), 36-ELP-0116/1((2C+ E) x 4/B6),


36-ELP-0116/2 ((2C+ E) x 4/B6), 36-ELP-0117((2C+ E) x6 /B6), 36-ELP-0117/1 ((2C+ E) x6 /B6),
CABLE TAG NUMBER 36-ELP-0117/2((2C+ E) x 4/B6), 36-ELP-0118((2C+ E) x6 /B6), 36-ELP-0118/1 ((2C+ E) x6 /B6),
36-ELP-0118/2((2C+ E) x6 /B6), 36-ELP-0118/3((2C+ E) x 4/B6), 36-ELP-0118/4((2C+ E) x 4/B6),
36-ELP-0119((4C+ E) x10/B6), 36-ELP-0120 ((2C+ E) x6 /B6), 36-ELP-0120/1((2C+ E) x 4/B6),
36-ELP-0120/2 ((2C+ E) x 4/B6), 36-ELP-0121 ((2C+ E) x6 /B6), 36-ELP-0121/1((2C+ E) x 4/B6),
36-ELP-0121/2 ((2C+ E) x 4/B6), 36-ELP-0122 ((2C+ E) x6 /B6), 36-ELP-0122/1((2C+ E) x 4/B6),
36-ELP-0122/2 ((2C+ E) x 4/B6), 36-ELP-0123 ((2C+ E) x6 /B6), 36-ELP-0123/1((2C+ E) x 4/B6),
36-ELP-0123/2 ((2C+ E) x 4/B6), 36-ELP-0124 ((2C+ E) x6 /B6), 36-ELP-0124/1((2C+ E) x 4/B6),
36-ELP-0124/2 ((2C+ E) x 4/B6), 36-ELP-00122/3 ((2C+ E) x 4/B6), 36-ELP-0125 ((2C+ E) x6 /B6),
36-ELP-0125/1((2C+ E) x 4/B6), 36-ELP-0125/2 ((2C+ E) x 4/B6), 36-ELP-0126((4C+ E) x10/B6),
36-ELP-0127((2C+ E) x 4/B6), 36-ELP-0130((4C+ E) x10/B6), 36-ELP-0131((4C+E) x 25/B6), 36-ELP-
CABLE SIZE / TYPE 0141 (2C x 4/B6), 36-ELP-0143 (2C x 4/B6), 36-ELP-0144 (2C x 4/B6), 36-ELP-00127/1 ((2C+ E) x
4/B6),
36-ELP-00127/2 ((2C+ E) x 4/B6), 36-ELP-0136 ((2C+ E) x6 /B6), 36-ELP-0137 ((2C+ E) x6 /B6),
36-ELP-00138 (2C x 4/B6), 36-ELP-0139 ((2C+ E) x 4/B6)

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.
2.14 Check and verify size, type and rating of laid cables.
2.15 Check and confirm all cables are laid as per cable schedule / layout.
2.16 Confirm the bending radius of cables correct.

Check segregation from power cable, control cable, IS & non IS cables shall be
2.17 provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.
2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.
2.20 Ensure cables are dressed / clipped with regard to neatness.
Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Page 47 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0587 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-02

LOCATION JCWF substation DISCIPLINE Electrical

36-ELP-0115((4C+ E) x 25/B6), 36-ELP-0116 ((2C+ E) x6 /B6), 36-ELP-0116/1((2C+ E) x 4/B6),


36-ELP-0116/2 ((2C+ E) x 4/B6), 36-ELP-0117((2C+ E) x6 /B6), 36-ELP-0117/1 ((2C+ E) x6 /B6),
CABLE TAG NUMBER 36-ELP-0117/2((2C+ E) x 4/B6), 36-ELP-0118((2C+ E) x6 /B6), 36-ELP-0118/1 ((2C+ E) x6 /B6),
36-ELP-0118/2((2C+ E) x6 /B6), 36-ELP-0118/3((2C+ E) x 4/B6), 36-ELP-0118/4((2C+ E) x 4/B6),
36-ELP-0119((4C+ E) x10/B6), 36-ELP-0120 ((2C+ E) x6 /B6), 36-ELP-0120/1((2C+ E) x 4/B6),
36-ELP-0120/2 ((2C+ E) x 4/B6), 36-ELP-0121 ((2C+ E) x6 /B6), 36-ELP-0121/1((2C+ E) x 4/B6),
36-ELP-0121/2 ((2C+ E) x 4/B6), 36-ELP-0122 ((2C+ E) x6 /B6), 36-ELP-0122/1((2C+ E) x 4/B6),
36-ELP-0122/2 ((2C+ E) x 4/B6), 36-ELP-0123 ((2C+ E) x6 /B6), 36-ELP-0123/1((2C+ E) x 4/B6),
36-ELP-0123/2 ((2C+ E) x 4/B6), 36-ELP-0124 ((2C+ E) x6 /B6), 36-ELP-0124/1((2C+ E) x 4/B6),
36-ELP-0124/2 ((2C+ E) x 4/B6), 36-ELP-00122/3 ((2C+ E) x 4/B6), 36-ELP-0125 ((2C+ E) x6 /B6),
36-ELP-0125/1((2C+ E) x 4/B6), 36-ELP-0125/2 ((2C+ E) x 4/B6), 36-ELP-0126((4C+ E) x10/B6),
36-ELP-0127((2C+ E) x 4/B6), 36-ELP-0130((4C+ E) x10/B6), 36-ELP-0131((4C+E) x 25/B6), 36-ELP-
CABLE SIZE / TYPE 0141 (2C x 4/B6), 36-ELP-0143 (2C x 4/B6), 36-ELP-0144 (2C x 4/B6), 36-ELP-00127/1 ((2C+ E) x
4/B6),
36-ELP-00127/2 ((2C+ E) x 4/B6), 36-ELP-0136 ((2C+ E) x6 /B6), 36-ELP-0137 ((2C+ E) x6 /B6),
36-ELP-00138 (2C x 4/B6), 36-ELP-0139 ((2C+ E) x 4/B6)

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Rajesh J Suresh P R

Page 48 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0587 SYSTEM JCWF-204

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-204-02

LOCATION JCWF substation DISCIPLINE Electrical

36-ELP-0115((4C+ E) x 25/B6), 36-ELP-0116 ((2C+ E) x6 /B6), 36-ELP-0116/1((2C+ E) x 4/B6),


36-ELP-0116/2 ((2C+ E) x 4/B6), 36-ELP-0117((2C+ E) x6 /B6), 36-ELP-0117/1 ((2C+ E) x6 /B6),
CABLE TAG NUMBER 36-ELP-0117/2((2C+ E) x 4/B6), 36-ELP-0118((2C+ E) x6 /B6), 36-ELP-0118/1 ((2C+ E) x6 /B6),
36-ELP-0118/2((2C+ E) x6 /B6), 36-ELP-0118/3((2C+ E) x 4/B6), 36-ELP-0118/4((2C+ E) x 4/B6),
36-ELP-0119((4C+ E) x10/B6), 36-ELP-0120 ((2C+ E) x6 /B6), 36-ELP-0120/1((2C+ E) x 4/B6),
36-ELP-0120/2 ((2C+ E) x 4/B6), 36-ELP-0121 ((2C+ E) x6 /B6), 36-ELP-0121/1((2C+ E) x 4/B6),
36-ELP-0121/2 ((2C+ E) x 4/B6), 36-ELP-0122 ((2C+ E) x6 /B6), 36-ELP-0122/1((2C+ E) x 4/B6),
36-ELP-0122/2 ((2C+ E) x 4/B6), 36-ELP-0123 ((2C+ E) x6 /B6), 36-ELP-0123/1((2C+ E) x 4/B6),
36-ELP-0123/2 ((2C+ E) x 4/B6), 36-ELP-0124 ((2C+ E) x6 /B6), 36-ELP-0124/1((2C+ E) x 4/B6),
36-ELP-0124/2 ((2C+ E) x 4/B6), 36-ELP-00122/3 ((2C+ E) x 4/B6), 36-ELP-0125 ((2C+ E) x6 /B6),
36-ELP-0125/1((2C+ E) x 4/B6), 36-ELP-0125/2 ((2C+ E) x 4/B6), 36-ELP-0126((4C+ E) x10/B6),
36-ELP-0127((2C+ E) x 4/B6), 36-ELP-0130((4C+ E) x10/B6), 36-ELP-0131((4C+E) x 25/B6), 36-ELP-
CABLE SIZE / TYPE 0141 (2C x 4/B6), 36-ELP-0143 (2C x 4/B6), 36-ELP-0144 (2C x 4/B6), 36-ELP-00127/1 ((2C+ E) x
4/B6),
36-ELP-00127/2 ((2C+ E) x 4/B6), 36-ELP-0136 ((2C+ E) x6 /B6), 36-ELP-0137 ((2C+ E) x6 /B6),
36-ELP-00138 (2C x 4/B6), 36-ELP-0139 ((2C+ E) x 4/B6)

DRAWING NO. JCWF-2-67-0001-B


CABLE SCHEDULE JCWF-2-37-0001-B
APPLICATION / SERVICE Lighting circuit cables as per the attached highlighted drawing

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

DESIGNATION Engineer QC-E

DATE

Page 49 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0582 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF Plant Area (Nitrogen Shelter and Shelter for DISCIPLINE Electrical
Instrument Air Package)

CABLE TAG NUMBER 36-EL-0014/1, 36-EL-0015/4, 36-EL-0015/5, 36-EL-0015/6, 36-EL-0015/7, 36-EL-0015/8, 36-EL-
0015/9 ((3C+E) x 2.5 Sq.mm.) &
36-EL-0034/3, 36-EL-0034/4, 36-EL-0035/6, 36-EL-0035/7, 36-EL-0035/8, 36-EL-0035/9 ((2C+E) x
CABLE SIZE / TYPE 2.52.5 Sq.mm.)

DRAWING NO. JCWF-2-52--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

Confirm aboveground cable entry from stub-up and Crossing shall not
2.7
obstruct/block the maintenance access way.

2.8 Check cables shall be laid in cable trays inside the control room to avoid the
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Page 50 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0582 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF Plant Area (Nitrogen Shelter and Shelter for DISCIPLINE Electrical
Instrument Air Package)

CABLE TAG NUMBER 36-EL-0014/1, 36-EL-0015/4, 36-EL-0015/5, 36-EL-0015/6, 36-EL-0015/7, 36-EL-0015/8, 36-EL-
0015/9 ((3C+E) x 2.5 Sq.mm.) &
36-EL-0034/3, 36-EL-0034/4, 36-EL-0035/6, 36-EL-0035/7, 36-EL-0035/8, 36-EL-0035/9 ((2C+E) x
CABLE SIZE / TYPE 2.52.5 Sq.mm.)

DRAWING NO. JCWF-2-52--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

2.11 Check the cable passing through the MCT cable shall perpendicular to the frame
for a minimum distance of 100mm either side of the frame.

Page 51 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0582 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF Plant Area (Nitrogen Shelter and Shelter for DISCIPLINE Electrical
Instrument Air Package)

CABLE TAG NUMBER 36-EL-0014/1, 36-EL-0015/4, 36-EL-0015/5, 36-EL-0015/6, 36-EL-0015/7, 36-EL-0015/8, 36-EL-
0015/9 ((3C+E) x 2.5 Sq.mm.) &
36-EL-0034/3, 36-EL-0034/4, 36-EL-0035/6, 36-EL-0035/7, 36-EL-0035/8, 36-EL-0035/9 ((2C+E) x
CABLE SIZE / TYPE 2.52.5 Sq.mm.)

DRAWING NO. JCWF-2-52--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.

2.13 Check and confirm cable tag numbers are correct and provided at the specified
interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

Check segregation from power cable, control cable, IS & non IS cables shall be
2.17 provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

2.21 Check cables laying in trays / conduit shall not block any walk way /
maintenance access of any process area.

2.22 Check and record cable continuity and insulation resistance test after cable
laying

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

Check MCT installation and Cable transits (MCT) shall be reinstated after the
3.3 final cable laying.

Page 52 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0582 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-205-02

LOCATION JCWF Plant Area (Nitrogen Shelter and Shelter for DISCIPLINE Electrical
Instrument Air Package)

CABLE TAG NUMBER 36-EL-0014/1, 36-EL-0015/4, 36-EL-0015/5, 36-EL-0015/6, 36-EL-0015/7, 36-EL-0015/8, 36-EL-
0015/9 ((3C+E) x 2.5 Sq.mm.) &
36-EL-0034/3, 36-EL-0034/4, 36-EL-0035/6, 36-EL-0035/7, 36-EL-0035/8, 36-EL-0035/9 ((2C+E) x
CABLE SIZE / TYPE 2.52.5 Sq.mm.)

DRAWING NO. JCWF-2-52--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Lighting Circuit Cables

NOT
SI NO DESCRIPTION OK OK N/A REMARKS

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 53 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0589 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF Substation (EDG Room) DISCIPLINE Electrical

CABLE TAG NUMBER 36-ELD-0001/R1, 36-ELD-0001/Y1, 36-ELD-0001/B1, 36-ELD-0001/R2, 36-ELD-0001/Y2,


36-ELD-0001/B2, 36-ELD-0001/R3, 36-ELD-0001/Y3, 36-ELD-0001/B3, 36-ELD-0001/N1,
CABLE SIZE / TYPE 36-ELD-0001/N2, 36-ELD-0001/N3 (1Cx300 Sq. mm./B1)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cables from 36-A-7001-G-01 To 36-CB-1001-73 at JCWF Substation EDG Room

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

1.0 PRE-INSTALLATION INSPECTION

1.1 Check & verify cable route as per AFC drawing.

1.2 Check and confirm installation of cable tray / ladder / trunking / conduit
completed and inspected

1.3 Ensure cable tray / ladder / trunking / conduit is clean and free from physical
damage, sharp edge

1.4 Check cable drum placing shall be on solid flat surface

2.0 ABOVEGROUND CABLE LAYING INSPECTION

2.1 Check and confirm material inspection of cables are completed

2.2 Check for any physical damage of cables

2.3 Check and verify laying arrangement of cables

2.4 Check cables shall be laid in parallel with no twists or crossovers.

2.5 Check single core cable laid in trefoil formation with non-magnetic clamps.

2.6 Check the cleats for single core cables are being spaced not more than 650mm.

2.7 Confirm aboveground cable entry from stub-up and Crossing shall not
obstruct/block the maintenance access way.
Check cables shall be laid in cable trays inside the control room to avoid the
2.8
direct contact with concrete.

2.9 HV Cables pulling with winch operation shall be not more than maximum
allowable tension in line with cable manufacturer recommendation.

2.10 Check the cable ends shall be protected against ingress of moisture / dust.

Check the cable passing through the MCT cable shall perpendicular to the frame
2.11 for a minimum distance of 100mm either side of the frame.

Page 54 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0589 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF Substation (EDG Room) DISCIPLINE Electrical

CABLE TAG NUMBER 36-ELD-0001/R1, 36-ELD-0001/Y1, 36-ELD-0001/B1, 36-ELD-0001/R2, 36-ELD-0001/Y2,


36-ELD-0001/B2, 36-ELD-0001/R3, 36-ELD-0001/Y3, 36-ELD-0001/B3, 36-ELD-0001/N1,
CABLE SIZE / TYPE 36-ELD-0001/N2, 36-ELD-0001/N3 (1Cx300 Sq. mm./B1)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cables from 36-A-7001-G-01 To 36-CB-1001-73 at JCWF Substation EDG Room

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

2.12 Check end caps shall be provided at both the ends to prevent ingress of
moisture after cable laying.
Check and confirm cable tag numbers are correct and provided at the specified
2.13 interval.

2.14 Check and verify size, type and rating of laid cables.

2.15 Check and confirm all cables are laid as per cable schedule / layout.

2.16 Confirm the bending radius of cables correct.

2.17 Check segregation from power cable, control cable, IS & non IS cables shall be
provided properly.

2.18 Check and ensure cable clamp / cleat installed as per AFC drawing.

2.19 Check PVC coated SS tie is used for cable dressing in outdoor areas.

2.20 Ensure cables are dressed / clipped with regard to neatness.

Check cables laying in trays / conduit shall not block any walk way /
2.21 maintenance access of any process area.

2.22 Check
laying
and record cable continuity and insulation resistance test after cable

3.0 POST-INSTALLATION INSPECTION

3.1 Check and ensure duct / wall openings have been sealed properly

3.2 Check openings in stub-ups are sealed with proper sealant

3.3 Check MCT installation and Cable transits (MCT) shall be reinstated after the
final cable laying.

Page 55 of 56 GF-4172-QC-EI-FM-0006, Rev. 1


CHECKLIST FOR ABOVEGROUND CABLE
LAYING WORKS
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-4-RFI-F-0589 SYSTEM JCWF-701

REPORT NO. GF-4172-QC-EI-FM-0006/ SUB-SYSTEM JCWF-701-01

LOCATION JCWF Substation (EDG Room) DISCIPLINE Electrical

CABLE TAG NUMBER 36-ELD-0001/R1, 36-ELD-0001/Y1, 36-ELD-0001/B1, 36-ELD-0001/R2, 36-ELD-0001/Y2,


36-ELD-0001/B2, 36-ELD-0001/R3, 36-ELD-0001/Y3, 36-ELD-0001/B3, 36-ELD-0001/N1,
CABLE SIZE / TYPE 36-ELD-0001/N2, 36-ELD-0001/N3 (1Cx300 Sq. mm./B1)

DRAWING NO. JCWF-2-51--0001, Rev.D

CABLE SCHEDULE JCWF-2-37-0001,Rev. B

APPLICATION / SERVICE Cables from 36-A-7001-G-01 To 36-CB-1001-73 at JCWF Substation EDG Room

SI NO DESCRIPTION OK NOT N/A REMARKS


OK

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-E

DATE

Page 56 of 56 GF-4172-QC-EI-FM-0006, Rev. 1