CABLE TRAY / LADDER / TRUNKING

INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0379 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION JCWF Substation (EDG Room) DISCIPLINE Electrical

DRAWING NO. JCWF-2-51-0001, Rev. D

APPLICATION / SERVICE LV Power Cables - EDG, Rolling Shutter, Small power

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1 Check and ensure that the installed material is approved by QP

2 Check and ensure that the installed material is in good condition and free from
any physical damage / defect

3 Check tray / ladder / trunking routing layout is as per approved drawing

Check for correct orientation, alignment & levelling of tray / ladder / trunking as
4 per approved drawing

5 Check proper opening is made in the wall for tray / ladder / trunking to bring it
to the next room / area as per approved drawing

6 Check sufficient distance is maintained from the other services

Check for the provision of suitable supports for tray / ladder / trunking as per
7 approved drawing.

8 Check the support sizes and ensure that the supports are sufficient for the
specified tray / ladder / trunking sizes

9 Check and ensure provision of appropriate earthing to the metallic supports for
the installed tray / ladder / trunking throughout its length

10 Check provision of suitable PVC end cap for the unistrut channel supports

11 Check and verify bend, tee and risers are installed properly

Ensure that the cable trays / ladders / trunkings are connected with necessary
12
coupler / fish plates, as applicable

13 Check and ensure that the cutting edge of tray / ladder / trunking is smooth, i.e.,
free from the sharpness

14 Check proper close-out / sealing of all unused / unwanted holes on tray /


ladder / trunking

15 Check for proper fitment of suitable tray / ladder / trunking cover as applicable

16 Check cleanliness inside and outside of tray / ladder / trunking

17 Check that the spacing between electrical and instrument trays are 300mm

18 Check that bonding jumpers are installed at joints.

Page 1 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0379 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION JCWF Substation (EDG Room) DISCIPLINE Electrical

DRAWING NO. JCWF-2-51-0001, Rev. D

APPLICATION / SERVICE LV Power Cables - EDG, Rolling Shutter, Small power

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

19 Check that stainless steel or GRP cable trays shall be used in high corrosion areas
such as battery room .

20 Confirm all bends, tees, etc. shall be of the type made by the proprietary tray or
rack manufacturer.

21 Confirm all stainless steel-tray/ladders supports shall be of the same grade steel.

Ensure the cut or drill ladder rack the raw edges shall be ground smooth and
22 treated with ‘galvafroid’.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME J. Rajesh Suresh P R

DESIGNATION Engineer QC-Electrical

DATE 20-04-2023 20-04-2023

Page 2 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0552 SYSTEM DK960-201

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM DK960-201-02

LOCATION DK960 RTU Station DISCIPLINE Electrical

DRAWING NO. DK960-2-64-0001, Rev. C

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1 Check and ensure that the installed material is approved by QP

2 Check and ensure that the installed material is in good condition and free from
any physical damage / defect

3 Check tray / ladder / trunking routing layout is as per approved drawing

Check for correct orientation, alignment & levelling of tray / ladder / trunking as
4 per approved drawing

5 Check proper opening is made in the wall for tray / ladder / trunking to bring it
to the next room / area as per approved drawing

6 Check sufficient distance is maintained from the other services

Check for the provision of suitable supports for tray / ladder / trunking as per
7 approved drawing.

8 Check the support sizes and ensure that the supports are sufficient for the
specified tray / ladder / trunking sizes

9 Check and ensure provision of appropriate earthing to the metallic supports for
the installed tray / ladder / trunking throughout its length

10 Check provision of suitable PVC end cap for the unistrut channel supports

11 Check and verify bend, tee and risers are installed properly

Ensure that the cable trays / ladders / trunkings are connected with necessary
12
coupler / fish plates, as applicable

13 Check and ensure that the cutting edge of tray / ladder / trunking is smooth, i.e.,
free from the sharpness

14 Check proper close-out / sealing of all unused / unwanted holes on tray /


ladder / trunking

15 Check for proper fitment of suitable tray / ladder / trunking cover as applicable

16 Check cleanliness inside and outside of tray / ladder / trunking

17 Check that the spacing between electrical and instrument trays are 300mm

18 Check that bonding jumpers are installed at joints.

Page 3 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0552 SYSTEM DK960-201

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM DK960-201-02

LOCATION DK960 RTU Station DISCIPLINE Electrical

DRAWING NO. DK960-2-64-0001, Rev. C

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

19 Check that stainless steel or GRP cable trays shall be used in high corrosion areas
such as battery room .

20 Confirm all bends, tees, etc. shall be of the type made by the proprietary tray or
rack manufacturer.

21 Confirm all stainless steel-tray/ladders supports shall be of the same grade steel.

Ensure the cut or drill ladder rack the raw edges shall be ground smooth and
22 treated with ‘galvafroid’.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME J. Rajesh Suresh P R

DESIGNATION Engineer QC-Electrical

DATE

Page 4 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0583 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION Shelter for Instument Air Package (36-A-0001) DISCIPLINE Electrical

DRAWING NO. JCWF-2-67-0002, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1 Check and ensure that the installed material is approved by QP

2 Check and ensure that the installed material is in good condition and free from
any physical damage / defect

3 Check tray / ladder / trunking routing layout is as per approved drawing

Check for correct orientation, alignment & levelling of tray / ladder / trunking as
4 per approved drawing

5 Check proper opening is made in the wall for tray / ladder / trunking to bring it
to the next room / area as per approved drawing

6 Check sufficient distance is maintained from the other services

Check for the provision of suitable supports for tray / ladder / trunking as per
7 approved drawing.

8 Check the support sizes and ensure that the supports are sufficient for the
specified tray / ladder / trunking sizes

9 Check and ensure provision of appropriate earthing to the metallic supports for
the installed tray / ladder / trunking throughout its length

10 Check provision of suitable PVC end cap for the unistrut channel supports

11 Check and verify bend, tee and risers are installed properly

Ensure that the cable trays / ladders / trunkings are connected with necessary
12
coupler / fish plates, as applicable

13 Check and ensure that the cutting edge of tray / ladder / trunking is smooth, i.e.,
free from the sharpness

14 Check proper close-out / sealing of all unused / unwanted holes on tray /


ladder / trunking

15 Check for proper fitment of suitable tray / ladder / trunking cover as applicable

16 Check cleanliness inside and outside of tray / ladder / trunking

17 Check that the spacing between electrical and instrument trays are 300mm

18 Check that bonding jumpers are installed at joints.

Page 5 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0583 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION Shelter for Instument Air Package (36-A-0001) DISCIPLINE Electrical

DRAWING NO. JCWF-2-67-0002, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

19 Check that stainless steel or GRP cable trays shall be used in high corrosion areas
such as battery room .

20 Confirm all bends, tees, etc. shall be of the type made by the proprietary tray or
rack manufacturer.

21 Confirm all stainless steel-tray/ladders supports shall be of the same grade steel.

Ensure the cut or drill ladder rack the raw edges shall be ground smooth and
22 treated with ‘galvafroid’.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-Electrical

DATE

Page 6 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0583 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION Nitrogen Shelter (36-A-6103) DISCIPLINE Electrical

DRAWING NO. JCWF-2-67-0002, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1 Check and ensure that the installed material is approved by QP

2 Check and ensure that the installed material is in good condition and free from
any physical damage / defect

3 Check tray / ladder / trunking routing layout is as per approved drawing

Check for correct orientation, alignment & levelling of tray / ladder / trunking as
4 per approved drawing

5 Check proper opening is made in the wall for tray / ladder / trunking to bring it
to the next room / area as per approved drawing

6 Check sufficient distance is maintained from the other services

Check for the provision of suitable supports for tray / ladder / trunking as per
7 approved drawing.

8 Check the support sizes and ensure that the supports are sufficient for the
specified tray / ladder / trunking sizes

9 Check and ensure provision of appropriate earthing to the metallic supports for
the installed tray / ladder / trunking throughout its length

10 Check provision of suitable PVC end cap for the unistrut channel supports

11 Check and verify bend, tee and risers are installed properly

Ensure that the cable trays / ladders / trunkings are connected with necessary
12
coupler / fish plates, as applicable

13 Check and ensure that the cutting edge of tray / ladder / trunking is smooth, i.e.,
free from the sharpness

14 Check proper close-out / sealing of all unused / unwanted holes on tray /


ladder / trunking

15 Check for proper fitment of suitable tray / ladder / trunking cover as applicable

16 Check cleanliness inside and outside of tray / ladder / trunking

17 Check that the spacing between electrical and instrument trays are 300mm

18 Check that bonding jumpers are installed at joints.

Page 7 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0583 SYSTEM JCWF-205

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM JCWF-205-02

LOCATION Nitrogen Shelter (36-A-6103) DISCIPLINE Electrical

DRAWING NO. JCWF-2-67-0002, Rev. A

APPLICATION / SERVICE Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

19 Check that stainless steel or GRP cable trays shall be used in high corrosion areas
such as battery room .

20 Confirm all bends, tees, etc. shall be of the type made by the proprietary tray or
rack manufacturer.

21 Confirm all stainless steel-tray/ladders supports shall be of the same grade steel.

Ensure the cut or drill ladder rack the raw edges shall be ground smooth and
22 treated with ‘galvafroid’.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME Shanif Abdulla Suresh P R

DESIGNATION Engineer QC-Electrical

DATE

Page 8 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0637 SYSTEM DK962-201

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM DK962-201-02

LOCATION DK962/DK963 RTU Station DISCIPLINE Electrical

DRAWING NO. DK962-2-67-0001, Rev. B

APPLICATION / SERVICE Cable Tray for Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

1 Check and ensure that the installed material is approved by QP

2 Check and ensure that the installed material is in good condition and free from
any physical damage / defect

3 Check tray / ladder / trunking routing layout is as per approved drawing

Check for correct orientation, alignment & levelling of tray / ladder / trunking as
4 per approved drawing

5 Check proper opening is made in the wall for tray / ladder / trunking to bring it
to the next room / area as per approved drawing

6 Check sufficient distance is maintained from the other services

Check for the provision of suitable supports for tray / ladder / trunking as per
7 approved drawing.

8 Check the support sizes and ensure that the supports are sufficient for the
specified tray / ladder / trunking sizes

9 Check and ensure provision of appropriate earthing to the metallic supports for
the installed tray / ladder / trunking throughout its length

10 Check provision of suitable PVC end cap for the unistrut channel supports

11 Check and verify bend, tee and risers are installed properly

Ensure that the cable trays / ladders / trunkings are connected with necessary
12
coupler / fish plates, as applicable

13 Check and ensure that the cutting edge of tray / ladder / trunking is smooth, i.e.,
free from the sharpness

14 Check proper close-out / sealing of all unused / unwanted holes on tray /


ladder / trunking

15 Check for proper fitment of suitable tray / ladder / trunking cover as applicable

16 Check cleanliness inside and outside of tray / ladder / trunking

17 Check that the spacing between electrical and instrument trays are 300mm

18 Check that bonding jumpers are installed at joints.

Page 9 of 10 GF-4172-QC-EI-FM-0003, Rev. 1


CABLE TRAY / LADDER / TRUNKING
INSTALLATION CHECKLIST
CONTRACT NO.: CONTRACT TITLE: EPIC FOR CO2 WATER ALTERNATING GAS
GC19108100 (WAG) INJECTION PILOT PROJECT AT DUKHAN PROJECT NO.: 4172

RFI NO. 4172-2-RFI-F-0637 SYSTEM DK962-201

REPORT NO. GF-4172-QC-EI-FM-0003 SUB-SYSTEM DK962-201-02

LOCATION DK962/DK963 RTU Station DISCIPLINE Electrical

DRAWING NO. DK962-2-67-0001, Rev. B

APPLICATION / SERVICE Cable Tray for Lighting Cables

NOT
SI NO DESCRIPTION OK N/A REMARKS
OK

19 Check that stainless steel or GRP cable trays shall be used in high corrosion areas
such as battery room .

20 Confirm all bends, tees, etc. shall be of the type made by the proprietary tray or
rack manufacturer.

21 Confirm all stainless steel-tray/ladders supports shall be of the same grade steel.

Ensure the cut or drill ladder rack the raw edges shall be ground smooth and
22 treated with ‘galvafroid’.

REMARKS / COMMENTS :

ACCEPTED BY GALFAR CONSTR GALFAR QA/QC TPI QATAR PETROLEUM

SIGNATURE

NAME J. Rajesh Suresh P R

DESIGNATION Engineer QC-Electrical

DATE

Page 10 of 10 GF-4172-QC-EI-FM-0003, Rev. 1