Professional Documents
Culture Documents
Iiiiiiiiiiiiiiiiiiiil
Iiiiiiiiiiiiiiiiiiiil
OVERVIEW:
TRENCH CROSSING
TRC 02
REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:
70
DN300
70
10
A
FLANGE ADAPTOR DN 300 FLANGE ADAPTOR DN 300
30
30
REVISIONS
Engineer:
Contractor:
2 500
2 Adresa: Zona industriale Patos, Fier
Tel: ++355 385 40900
Fax: ++355 385 40062
e-mail: infofr@albstar.com
FFpiece,DCI,PN16 DN300 L=6m CONCRETE C20/25 2.1m³
A Client:
1 Financier:
Sh.A Ujesjelles Kanalizime Fier
Kreditanstalt für Wiederaufbau and European Union
L=6m
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
Project No: ALB-ST-SW-1004-INT-STP-2013-FR
FIE-DRW-TRC-W-DET002
GENERAL KEYPLAN
OVERVIEW:
TRENCH CROSSING
TRC 01
REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:
70
DN300
70
10
A
FLANGE ADAPTOR DN 300 FLANGE ADAPTOR DN 300
30
REVISIONS
Engineer:
Contractor:
2 500
2
Fax: ++355 385 40062
e-mail: infofr@albstar.com
Client:
1 Financier:
Kreditanstalt für Wiederaufbau and European Union
L=6m
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
Project No: ALB-ST-SW-1004-INT-STP-2013-FR
FIE-DRW-TRC-W-DET001