You are on page 1of 2

GENERAL KEYPLAN

OVERVIEW:

TRENCH CROSSING
TRC 02

REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:

A-A L E G E N D & NOTES:

70

DN300

70
10
A
FLANGE ADAPTOR DN 300 FLANGE ADAPTOR DN 300
30
30

B Second Issue AsBuilt Drawing 12-04-2017

HDPE OD315 HDPE OD315 A First Issue AsBuilt Drawing 23-03-2017


No.
Rev DESCRIPTION DATE

REVISIONS
Engineer:

SETEC Engineering GMBH & CO. KG


10

Contractor:

2 500
2 Adresa: Zona industriale Patos, Fier
Tel: ++355 385 40900
Fax: ++355 385 40062
e-mail: infofr@albstar.com
FFpiece,DCI,PN16 DN300 L=6m CONCRETE C20/25 2.1m³
A Client:

1 Financier:
Sh.A Ujesjelles Kanalizime Fier

Kreditanstalt für Wiederaufbau and European Union

L=6m

Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
Project No: ALB-ST-SW-1004-INT-STP-2013-FR

Designed by: Drawing title: Date:

J.Ndrio LOT 2-TRANSMISSION MAIN April 2017


Checked by:
Kafaraj well field - Komuna of Levan
L.Peti Detail construction
Approval date:
Approved by:
TRENCH CROSSING 02

Project area: Engineer's Approval: Scale: Format:


N/A A3
Sheet:

FIER DRAWING No:


1 of 1

FIE-DRW-TRC-W-DET002
GENERAL KEYPLAN
OVERVIEW:

TRENCH CROSSING
TRC 01

REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:

LOT 2-TRANSMISSION MAIN Kafaraj well field - Komuna of Levan


Detail layout drawing - part #17
Detail layout drawing in Kafaraj well field
FIE-DRW-TRA-W-LAY17 1

A-A L E G E N D & NOTES:

70

DN300

70
10
A
FLANGE ADAPTOR DN 300 FLANGE ADAPTOR DN 300
30

B Second Issue AsBuilt Drawing 12-04-2017


30

A First Issue AsBuilt Drawing 23-03-2017


No.
DESCRIPTION DATE
HDPE OD315 HDPE OD315 Rev

REVISIONS
Engineer:

SETEC Engineering GMBH & CO. KG


10

Contractor:

Adresa: Zona industriale Patos, Fier


Tel: ++355 385 40900

2 500
2
Fax: ++355 385 40062
e-mail: infofr@albstar.com

Client:

FFpiece,DCI,PN16 DN300 L=6m CONCRETE C20/25 2.1m³


A Sh.A Ujesjelles Kanalizime Fier

1 Financier:
Kreditanstalt für Wiederaufbau and European Union

L=6m
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
Project No: ALB-ST-SW-1004-INT-STP-2013-FR

Designed by: Drawing title: Date:

J.Ndrio LOT 2-TRANSMISSION MAIN April 2017


Checked by:
Kafaraj well field - Komuna of Levan
L.Peti Detail construction
Approval date:
Approved by:
TRENCH CROSSING 01

Project area: Engineer's Approval: Scale: Format:


N/A A3
Sheet:

FIER DRAWING No:


1 of 1

FIE-DRW-TRC-W-DET001