PE Pipe - Earthwork and Road Reinstatment Calculation

Demolish of Volume Volume Volume Volume Sub


Length Asphalt
OD Sheating Excavation Bedding Backfilling Base
[m] Surface
[m³] [m³] [m³] [m³]
[m²]

63 yes 154.21 163.925 153.362 36.795 65.128 30.672


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 0.00 0.000 0.00 0.00 0.00 0.00
110 yes 1505.23 1,670.805 1,603.07 428.02 630.54 320.61
160 yes 1320.97 1,532.325 1,505.91 441.63 542.13 301.18
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
3,367.06 3,262.34 906.44 1,237.79 652.47
3,368.00 3,263.00 907.00 1,238.00 653.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Demolish of Volume Volume Volume Volume Sub
Length Asphalt
DN Sheating Excavation Bedding Backfilling Base
[m] Surface [m³] [m³] [m³] [m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
ment Calculation
Volume Volume Volume
Wearing
Base Layer Binder Layer
Layer
[m³] [m³]
[m³]

20.448 9.836 6.557


0.00 0.00 0.00
0.00 0.00 0.00
213.74 100.25 66.83
200.79 91.94 61.29
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
434.98 202.02 134.68
435.00 203.00 135.00

ment Calculation
Volume Volume Volume
Wearing
Base Layer Binder Layer
[m³] [m³] Layer
[m³]

0.000 0.000 0.000


0.000 0.000 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Demolish of Volume Volume Volume Volume Sub
Length Concrete
OD Sheating Excavation Bedding Backfilling Base
[m] Surface
[m³] [m³] [m³] [m³]
[m²]

63 yes 0.00 0.000 0.000 0.000 0.000 0.000


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 0.00 0.000 0.00 0.00 0.00 0.00
110 yes 0.00 0.000 0.00 0.00 0.00 0.00
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Demolish of Volume Volume Volume Volume Sub
Length Concrete Excavation
DN Sheating Bedding Backfilling Base
[m] Surface [m³] [m³] [m³] [m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
nt Calculation
Volume Volume
Base Layer Concrete
[m³] [m³]

0.000 0.000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

nt Calculation
Volume Volume
Base Layer Concrete
[m³] [m³]

0.000 0.000
0.000 0.000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Dismantling
Volume
Area Volume Volume Volume Sub
OD Sheating Length Concrete Excavation Bedding 0/4 Backfilling Base 0/63
[m] 0/63
Tiles [m³] [m³] [m³]
[m²] [m³]

63 yes 0.00 0.000 0.000 0.000 0.000 0.000


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 0.00 0.000 0.00 0.00 0.00 0.00
110 yes 0.00 0.000 0.00 0.00 0.00 0.00
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Dismantling
Volume
Area Volume Volume Volume Sub
Length Backfilling
DN Sheating Concrete Excavation Bedding 0/4 Base 0/63
[m] 0/63
Tiles [m³] [m³] [m³]
[m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
** No overlapping because no cutting is necessary
alculation

Volume
Base Layer
0/32
[m³]

0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

alculation

Volume
Base Layer
0/32
[m³]

0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Dismantling
Volume
Area Volume Volume Volume Sub
OD Sheating Length Cobblestone Excavation Bedding 0/4 Backfilling Base 0/63
[m] 0/63
s [m³] [m³] [m³]
[m²] [m³]

63 yes 0.00 0.000 0.000 0.000 0.000 0.000


75 yes 0.00 0.000 0.00 0.00 0.00 0.00
90 yes 0.00 0.000 0.00 0.00 0.00 0.00
110 yes 0.00 0.000 0.00 0.00 0.00 0.00
160 yes 0.00 0.000 0.00 0.00 0.00 0.00
225 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
315 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Dismantling
Volume
Area Volume Volume Volume Sub
Length Backfilling
DN Sheating Cobblestone Excavation Bedding 0/4 Base 0/63
[m] 0/63
s [m³] [m³] [m³]
[m³]
[m²]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.000 0.00 0.00 0.00 0.00
100 yes 0.00 0.000 0.00 0.00 0.00 0.00
125 yes 0.00 0.000 0.00 0.00 0.00 0.00
150 yes 0.00 0.000 0.00 0.00 0.00 0.00
200 yes 0.00 0.000 0.00 0.00 0.00 0.00
250 yes 0.00 0.000 0.00 0.00 0.00 0.00
300 yes 0.00 0.000 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
** No overlapping because no cutting is necessary
alculation

Volume
Base Layer
0/32
[m³]

0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

alculation

Volume
Base Layer
0/32
[m³]

0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Concrete Tiles at pavements, Cobblestones)


PE Pipe - Earthwork and Road Reinstatment Calculation
Volume Volume Volume Volume Sub Volume
Length
OD Sheating Excavation Bedding Backfilling Base Base Layer
[m]
[m³] [m³] [m³] [m³] [m³]

63 yes 2060.76 2,049.426 491.703 870.323 409.885 273.257


75 yes 0.00 0.00 0.00 0.00 0.00 0.00
90 yes 499.65 517.14 132.26 210.30 103.43 68.95
110 yes 3480.50 3,706.73 989.69 1,457.98 741.35 494.23
160 yes 1740.55 1,984.23 581.90 714.32 396.85 264.56
225 yes 0.00 0.00 0.00 0.00 0.00 0.00
250 yes 0.00 0.00 0.00 0.00 0.00 0.00
315 yes 0.00 0.00 0.00 0.00 0.00 0.00
8,257.52 2,195.56 3,252.93 1,651.50 1,101.00
8,258.00 2,196.00 3,253.00 1,652.00 1,102.00

DI Pipe - Earthwork and Road Reinstatment Calculation


Volume Volume Volume Volume Sub Volume
Length
DN Sheating Excavation Bedding Backfilling Base Base Layer
[m] [m³] [m³] [m³] [m³] [m³]

50 yes 0.00 0.000 0.000 0.000 0.000 0.000


65 yes 0.00 0.000 0.000 0.000 0.000 0.000
80 yes 0.00 0.00 0.00 0.00 0.00 0.00
100 yes 0.00 0.00 0.00 0.00 0.00 0.00
125 yes 0.00 0.00 0.00 0.00 0.00 0.00
150 yes 0.00 0.00 0.00 0.00 0.00 0.00
200 yes 0.00 0.00 0.00 0.00 0.00 0.00
250 yes 0.00 0.00 0.00 0.00 0.00 0.00
300 yes 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

* Excavation Depth = Total Depth - Surface Layer thickness (Concrete, Asphalt, Concrete Tiles at pavements,
Concrete Tiles at pavements, Cobblestones)
Demolish of Asphalt Demolish of Dismantling Area Dismantling Area Volume
Surface Concrete Surface Concrete Tiles Cobblestones Excavation
[m²] [m²] [m²] [m²] [m³]

3,368.00 0.00 0.00 0.00 11,521.00


Volume Volume Volume Sub Volume Base Volume Binder
Volume Wearing Layer
Bedding Backfilling Base Layer Layer
[m³]
[m³] [m³] [m³] [m³] [m³]

3,103.00 4,491.00 2,305.00 1,537.00 203.00 135.00