You are on page 1of 6
Tntemal Timber, touchup primer, 1 undercoat, 1 coat gloss Tnternal Timber, polyurethane varnish, 2 coats |Extemal Timber, 3 coats polyurethane varnish [Internal Walls, 2 coats emulsion to plaster Internal Walls, 2 coats emulsion to brick/blockwork [Internal Walls, I mist, 2 coats emulsion to plaster [ Internal Walls, gloss to door frame ‘Internal Walls, undercoat to door primer, 2 undercoats, I gloss Guiterng Steelwork, 1 Slow ‘Ave fen Units | 09 | 16 [20 mir | +i 17 a ue et [3 25 [26 | m/hr 25 | 26 135 | m/hr | 06 | 08 | 1.2) myhr | | Walls, Construct Kickers | Wal, ‘Fully Framed Formwork/Struts,1.0-2.0m" ‘Walls, Fully Framed Formwork/Struts, 2.0-5.0mr° (Walls, StoriForm ) Shutters, 3.0-5.0m" |Walls, StoriForm Shutters, 5.0-10.0m_ Walls, StoriForm Shutters, 10.0-15.0m? ‘Walls, StoriForm Shutters, over 15.0m7 (Ground Slabs t Kickers, direct to slab : 3t Kickers, suspended from soffit slab Columns, Square Sides, Vimber Glamp/Prop, esa 0.1-0 4a? ‘Columns, Square Sides, Timber Clamp/Prop, esa over 0.4m" Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high ‘Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high Staircases, Stair Soffit, Sloping Staircases, Stair Soffit, Flat Landing Staircases, Wall Strings Staircases, Open Strings Production Rates (Shaft Slip Forming __ [Table [Table Form, H-Fi ‘orm, Aluminum System, 400m" bays “Tunnel Forms, Wall and Slab poured as one Hollorib Decking, shear connecting studs [Stop Ends, no perforations | Stop Ends, minor perforations (Dummy Frames, under 3.0m" Dummy Frames, over 3.0m _ Floor Finishes {Linolium/Thermo-Plastic Flooring _ |Themmo-Plastic Floor Tiles | Wood Block Flooring, lay blocks [Wood Block Flooring, sand and polish | Hardboard Shooting Coverings, small arcas | Hardboard Sheeting Coverings, large areas Production Rates [37 [41 |_ mar 166 | 72 | m/hr | ightweight Concrete Bl Conerete Blockwork, rk, under 100mm thick ___ Task / Description c , lorry based pump |Hollorib Decking, concrete topping [Placing Direct From Readymix Lorry, Ground Beams [Placing Direct From Readymix Lorry, Pile Caps _ Placing Direct From Readymix Lorry, Duct Walls = 08 | 11) mvhr | ‘Tower Crane, Stairs and Landings Placing From Tower Crane, Blind i vais) mye 04 05 | 06 | mvhr | Placing From Tower Crane, Columns Production Rates Mixing Conerete, Double Drum Paddle Mixer [315.0 | 370, [Mixing Concrete, Single Drum Plant Pan Mixer I [Mixing Concrete, Dry Mix Plant _ Conerete Finishing Surface Finishing, Steel Float By Hand ‘Surface Finishing, Wood Float By Hand Surface Finishing, Power Float Surface Finishing, Light Brush on Trowel | Surface Finishing, Brush on Trowel Margin (Surface Finishing, Sprayed By Pump, expose aggregate | Surface Finishing, Wire Brush, expose aggregate | Making Good Walls, prepare, shutter, pour Making ‘Good Columns, prepare, shutter, pour 2 Sides of Beams, prepare, shutter, pour _Making Good Slab Soffits, prepare, shut Ave | Fast | Units 39 | 250) mr “(172 | 294 | mehr | “208 | 37.0 | m/hr | 901 (1700 m/hr [288 | 485 [850 | mr | [eso | 950 [aso [15.0 | 250 35 rae 69 | t Rule of Thumb [Task / Deses [Stow | Ave [Fast [Units [Site Investigation Pre Drilling if : [7 so, 40[ _3.0| days/no | Ground Excavation, Hydraulic Backhoe z =| 50.0| =| m'/day [100/80 6.0/ daysino [=] 20] [Ceramic Wall Tiling Production Rates

You might also like