Professional Documents
Culture Documents
Pages From Testing and Commissioning Specification R0
Pages From Testing and Commissioning Specification R0
contact@merits.mu
• Use record sheets as detailed in BSRIA Guide BG 2/2010 Commissioning Water Systems.
3110 BMS COMMISSIONING - CONTROL SYSTEM SPECIFICATION DETAILS REQUIRED FOR COMMISSION-
ING:
• Schematics of the systems to be controlled indicating the location of sensors and actuators.
• Set-points and other control settings such as initial default parameters for control loops relating to the
control strategies.
• BMS operator workstation graphics and associated point data displaying monitored conditions.
• The scope of operational and specified functionality of management software, e.g. utility monitoring and
targeting software.
• Functionality and scope of data to be transferred over any gateway for use as part of an integrated system.