You are on page 1of 1

0.

20
0.20

GENERAL NOTES:
40mm Clear Distance
(minimum)

A.MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE


REQUIREMENTS OF THE FOLLOWING BUILDING CODES: 2-16 MM∅ TOP BARS &
1.AC1 318 TOP BAR 4-16 MM∅ TOP BARS & TOP BAR
1. AISC 1997 40mm clear Dist.
For Beam & Girder
30mm clear dist. for
stiffeners

2-16 MM∅ BOT BARS 4-16 MM∅ BOT BARS


2. NSCP 1992 EDITION DETAIL - 1
W/ 10∅ DIA STIRRUPS

0.40

0.40
B.ALL DRAWING SHALL NOT BE SCALED FOR
CONSTRUCTION PURPOSES UNLESS OTHERWISE 6. UNLESS OTHERWISE NOTED IN PLANS OR SPACED AS 5 @ 0.05, 3
INDICATED. SPECIFICATIONS CAMBER ALL BEAMS AND GIRDERS AT
C.FOR ALL OTHER REQUIREMENTS REFERS TO LEAST 6.3MM FOR EVERY 300MM OF SPAN EXCEPT IN @ 0.10, REST@ 0.20 M. O.C.
ARCHITECTURAL, SANITARY, AND ELECTRICAL PLANS OR AS ORDERED BY THE DESIGN, BUT IN NO CASE BOTTOM BAR BOTTOM BAR
DRAWINGS. LESS THAN 19MM FOR EVERY 30MM FOR FREE SPAN.
FOOTINGS: CONCRETE SLAB @ MIDSPAN
1. FOOTINGS ARE DESIGN TO REST ON SOIL WITH @ SUPPORT
MINIMUM BEARING CAPACITY.........Q=120KPA
2. NO FOOTING SHALL REST ON FILL.
1. ALL REINFORCEMENT SHALL BE 19MM CLEAR MINIMUM
FROM TOP AND BOTTOM SLAB.
S BEAM - 1 DETAIL
SCALE 1 : 10 M
3. MINIMUM CONCRETE PROTECTION FOR REINFORCE 1 4
CONCRETE SHALL BE 75MM FOR CONCRETE DEPOSITED 2. FOR TWO WAY SLAB, BARS ALONG TOGETHER SPAN
AGAINST THE GROUND AND 50MM FOR CONCRETE DEPOSITED SHALL BE PLACED BELOW THOSE ALONG THE LONGER SPAN
AGAINST FORMWORK. AT CENTER AND OVER THE LONGER SPAN. BARS NEAR THE
SUPPORT UNLESS OTHERWISE INDICATED OR SHOWN IN
CONCRETE MIXES AND PLACINGS: DETAILS. THE SPACING OF THE BARS AT THE COLUMN 0.20
0.20
1. UNLESS OTHERWISE SPECIFIED THE MINIMUM 28 DAY STRIPS CAN BE APPROXIMATELY 1 13 OF THE STRIP BUT
CYLINDER COMPRESSIVE STRENGTH ARE AS FOLLOWS: NO GREATER THAN 2 32 TIMES THAN SLAB THICKNESS.
A.FOOTINGS AND BEAMS ON GRADE.20.7Mpa
B.COLUMNS.....................20.7Mpa 3. UNLESS OTHERWISE DETAILED IN CONDITIONS, SLABS
C.SLABS, BEAMS AND GIRDERS....20.7Mpa HAVING SAME REINFORCEMENTS RUNNING IN ONE TOP BAR 3-16 MM∅ TOP BARS & 2-16 MM∅ TOP BARS & TOP BAR
D.BEARING AND RETAINING WALLS..20.7Mpa DIRECTIONS REINFORCING BARS SHALL BE BENT EXTENDED
E.PARTITIONS AND PARAPET WALLS.20.7Mpa OR CUT AS SHOWN IN DETAIL 2. 2-16 MM∅ BOT BARS 3-16 MM∅ BOT BARS
F.BEEDED SLABS, CATCH BASINS W/ 10∅ DIA STIRRUPS

0.40

0.40
AND SIDEWALKS................20.7Mpa 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY
PLACED NEAR THE TENSION FORCE AND SHALL NOT BE SPACED AS 5 @ 0.05, 3
2. ALL CONCRETE MUST BE DEPOSITED, VIBRATED AND LESS THAN 0.0025BT. @ 0.10, REST@ 0.20 M. O.C.
CURED IN ACCORDANCE WITH THE STANDARD OF ACI
318-89 5. UNLESS OTHERWISE NOTED ALL BEDDED SLAB BE BOTTOM BAR BOTTOM BAR
REINFORCED WITH 10MMØ AT 254MMO.C.E.W AT CENTER OF
3. STRIPPING OF FORM SAND, SHORES SHALL BE AS SLAB CONSTRUCTION JOINTS FOR SAME SHALL NOT BE
FOLLOWS: MORE THAN 3000MM APART. @ SUPPORT @ MIDSPAN
A.FOUNDATIONS.........................1 DAY
B.COLUMNS AND WALLS...................3 DAYS 6. PROVIDE EXTRA REINFORCEMENTS AT CORNER SLABS S BEAM - 2 DETAIL
C.BEAMS AND GIRDERS...................21 DAYS SCALE 1 : 10 M
TWO ADJACENT DISCONTINUOUS EDGES AS SHOWN IN 2 4
D.SLABS...............................17 DAYS DETAIL-3.
3-10MM Bars
spaced @ 200mm.o.c.

4. CONCRETE SHALL BE DEPOSITED IN ITS FINAL


POSITION WITHOUT SEGREGATION, REHANDLING OR Reinfocing Bar
(verify)
5-10MM Bars
spaced @ 200mm.o.c.

0.20
FLOWING, PLACING SHALL BE DONE PREFERABLY WITH
BUGGIES, BUCKET OR WHEELBARROWS. NO CHUTES WILL BE Beam Line
RB-1
ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS,
TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE DETAIL - 3

0.25
THE SHALL NOT EXCEED 6.0M IN AGGREGATE LENGTH. NO
DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT 7. PROVIDE SUPPLEMENTARY REINFORCEMENT AT SMALL
THE USE OF VIBRATORS, UNLESS AUTHORIZED IN WRITING UNFRAMED OPENINGS IN FLOOR SLABS AS SHOWN DETAIL 2-12mm Ø RSB
BY THE DESIGNERS AND ONLY FOR USUAL CONDITIONS 4.
WHERE VIBRATORS ARE EXTREMELY DIFFICULT TO 2-12mm Ø RSB
ACCOMPLISH.
Opening
2-16mm dia.

BEAMS AND GIRDERS @each corner

1. CAMBER ALL BEAMS AND GIRDERS BARS AT LEAST 0.80


S ROOF BEAM - 1 DETAIL
SCALE 1 : 20 M
6.2MM FOR EVERY 300MM OF SPAN. DETAIL - 4
3 4
CONCRETE HOLLOW BLOCKS
2. FOR TWO OR MORE LAYERS OF REINFORCING BARS, USE
SEPARATORS SPACES AT 9MM O.C. AND INCASE BE LESS REINFORCEMENT AS TABULED IN SCHEDULE BE PROVIDED
THAN TWO SEPARATORS. UNLESS OTHERWISE SPECIFIED IN THE PLAN. SEE 0.15

3. NO SPLICE SHALL BE PERMITTED ON BEAMS AND


SCHEDULE-1. RB-2
CONCRETE HOLLOW BLOCKS REINFORCEMENTS
GIRDERS WHERE CRITICAL BENDING STRESS OCCUR.

0.25
REINFORCEMENTS NOTES
BLOCK
TENSION SPLICE SO PERMITTED SHALL BE 48 X BAR THK
HORIZONTAL VERTICAL A. Min. splice at lap 300mm.

DIAMETER FOR PLAIN BARS AND LAP SPLICES SHALL BE 75 mm

100mm
10mm dia. @ 600mm.o.c.

10mm dia. @ 600mm.o.c.


10mm dia. @ 600mm.o.c.

10mm dia. @ 600mm.o.c.


B. Provide right angle reinforcement at
corners 900mm long.

C. Where CHB walls adjoining columns

WIRED TOGETHER. SPLICE TOP BARS AT SUPPORT. BEND 150mm 12mm dia. @ 600mm.o.c. 12mm dia. @ 600mm.o.c.
R.C. beams, walls- dowels w/ same
size as vertical or horizontal
reinfocement shall be provided.

BARS AT END POINTS IN SUPERSTRUCTURES. WELDED 200mm 12mm dia. @ 600mm.o.c. 12mm dia. @ 600mm.o.c.
2-12mm Ø RSB
SPLICES SHALL BE DEVELOP IN TENSION AT LEAST 125% SCHEDULE - 1

OF THE SPECIFIES YIELD STRENGTH OF NOT MORE THAN CONCRETE WALLS 2-12mm Ø RSB
50% OF THE BARS AT ANY ONE SECTION SHALL BE
PERMITTED TO BE SPLICED. UNLESS OTHERWISE INDICATED I THE PLANS WALL
4. IF THE BEAM REINFORCING BARS IN WALL, THE CLEAR REINFORCEMENT SHALL BE FOLLOWED AS TABULATED IN S ROOF BEAM - 2 DETAIL
SCHEDULE. SEE SCHEDULE-2. SCALE 1 : 20 M
DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE 4 4
WALL SHALL NOT BE 50MM MINIMUM EMBEDMENT LENGTH CONCRETE WALLS REINFORCEMENT
SHALL BE 40 X BAR DIAMETER FOR TENSION BARS AND 20
X BAR DIAMETER FOR COMPRESSION BARS. WALL
THK
HORIZONTAL
REINFORCEMENTS

VERTICAL
REMARKS
VERTICAL
SECTION

100mm 10mm dia. @ 250mm.o.c. 10mm dia. @ 300mm.o.c.


Horizontal & Center Vertical
Bars staggered outside

5. MINIMUM CONCRETE PROTECTION OF REINFORCING BARS 125mm

150mm
10mm dia. @ 250mm.o.c.

12mm dia. @ 250mm.o.c.


10mm dia. @ 250mm.o.c.

12mm dia. @ 300mm.o.c.


Both Faces Horizontal

ARE SHAPE SHALL BE 40MM AND 30MM. 175mm 12mm dia. @ 200mm.o.c. 12mm dia. @ 250mm.o.c.
shall be inside

200mm 12mm dia. @ 300mm.o.c. e.f. 12mm dia. @ 300mm.o.c. e.f.


Both Faces Horizontal
shall be outside
225mm 12mm dia. @ 200mm.o.c. e.f. 12mm dia. @ 250mm.o.c. e.f.

250mm 12mm dia. @ 300mm.o.c. e.f. 12mm dia. @ 300mm.o.c. e.f.

SCHEDULE - 2

FROM THE OFFICE OF ARCHITECT ENGINEER R.A. 9266. 33 Architecture Act of 2004 PROJECT TITLE OWNER DRAWN BY: NO. REVISIONS DATE. SHEET CONTENTS SHEET NO. S
Drawing and specification duly signed, stamped, or sealed as A PROPOSED 2 STOREY

4
instrument of service are the property and documents of the RESIDENTIAL BUILDING MS. JEANETH RAMIREZ AURELIO SUMEGUIN JR.
architect, whether the object for which they are made is
PRC NO. PRC NO. executed or not. It shall be unlawful for any person, without the
written consent of the architect or author of the said
LOCATION: ADDRESS: CHECKED BY:
PTR NO. PTR NO. documents to duplicate for use in the repetition and for other
BLK 14 LOT 3 PHASE 1 TIERRA
TIN NO. DATE. TIN NO. projects or builders whether executed partly or in whole. GEN. TRIAS CAVITE
NEVADA SAN FRANCISCO GEN.
IAPOA NO. PLACE. DATE/PLACE. TRIAS CAVITE 4107

You might also like