Professional Documents
Culture Documents
heightdynamics.com.au
PRE-HANDOVER INSPECTION
PREVENTS A POTENTIAL
WORKPLACE TRAGEDY
A major infrastructure project was nearing completion and Height Dynamics was commissioned to
undertake an independent third-party audit on new installations to make sure they met Australian
Standard requirements for ‘working at heights’ and installed according to manufacturer specifications.
Mishandling of wire rope causing Strop hangs over edge of roof and allows users
Incorrect cable used at termination jaw
a permanent weak spot to fall a distance greater than 2m to ground level