TUV SUD MIDDLE EAST LLC
Office No.: $¥36-C101, 1st Floor Block 36, Bullding Type-Sayer
Barwa Commercial Avenue
yy
pd Cu) Saye agg
pbb degul YEE: ay Gato
P.O Box: 24240, Doha - Catar oF FAVEE OTT: GSI HAVER: OTe sale,
Tel:-+974 40052000 | Fax: +974 0082000 secon
Sean cS samen,
‘Share Capital : QAR 300,000.00 tive ‘Choose cortalty. QD-ZS-23-79405/99757/1-WA
eer =
Timesheet Wo: 1144787
16-04-2023 12:57:50 - VERIFY CERTIFICATES @ htps://verfytuvsudme.com
CERTIFICATE
Of Thorough Examination of Skid Steer Loader
Date of Inspection: 15-04-2023,
Name and Address of Owner
RAY PROJECTS ENGINEERS & CONTRACTORS WLL
DOHA- QATAR
Name and Address of the Manufacturer: Relevant Standard
JCB OSHA ,BS EN 474
Moder Location:
435HD IND'L AREA
Serial No. Year of Manufacture:
RAJ135WSPM3042677 2022
TD Nos Validity of Certificate:
- 12 Months
Ticense Plate No. = Date of Next Examination:
75528 QATAR 14-04-2024
‘Comments
+ Fitfor use at the time of inspection,
+ Authorized trained and certified operator only.
‘THIS IS TO CERTIFY THAT the undersigned, a competent inspector, did, attond the site for functional testing to examine and ascertain
that this EARTH MOVING MACHINE, its machinery, ears, appliances, structural supportsifixturos and associate apparatus nave withstood
the functional testing, without injury or permanent deformation to the EARTH MOVING MACHINE: and no adverse defects that would
impair the safo use of this EARTH MOVING MACHINE was observed. This EARTH MOVING MACHINE Is safe for its intended use within,
the limits specified providing there is continuous maintenance and qualified operators employed.
MUHANNAD DEEB
Surveyor’s Name: ZAHER SHABAN
f
Authorized Signatur Surveyor's Signature:
“The corteate is issued subject to the condition that I is understood to alive any
manufacturer, seller supplier, repaler or operator of any warranty, dor implied, and TUV SUD Middle East, LLC shall be limiad tothe aes oF
‘missions ofits employees, agents and subcontractors. Under no circumstances whatsoever shall TUV SUD Middle East, LLC be lable or ary iy oF
‘damage to any person, or occurring by reason of negligent operation or any defect in materials, machinery, equpment rather ems other tan such defects
‘secertainable by normally accepted testing standards and onl those ems inapected by TUV SUD Middle East, LLC and which ae covered ty this cortete
Page t of 2
DOC NO : GF/DC-EMC-02(Rev2)Certificate No.: QD-2S-23-79405/99757/1-WA
Annex to Certificate of Thorough Examination of Skid Steer Loader
Date of Inspection: 14-04-2023
DESCRIPTION CONDITION / REMARKS RE.INSPECTION
Gauges in Cab SATISFACTORY
Breaker/bucket/blade drum SATISFACTORY
Booms SATISFACTORY
Rollover cage SATISFACTORY
Hydraulic Cylinders
SATISFACTORY
Hydraulic System
SATISFACTORY
Electrics / Lights! Hom SATISFACTORY
Engine Components SATISFACTORY
Exhaust System SATISFACTORY
Cooling System/ Steering SATISFACTORY
Operational Controls SATISFACTORY
‘Spark Arrester SATISFACTORY
Fire Extinguisher SATISFACTORY
Warning Rotary Light SATISFACTORY
Reverse Alam SATISFACTORY
Wheels/crawler SATISFACTORY
Brake SATISFACTORY
Machine quard SATISFACTORY
General Condition SATISFACTORY _|
Maintenance SATISFACTORY
COMMENTS:
+ A Thorough Examination & Functional Test carried-out and was found Satisfactory atthe Time of Examination,
Page 20f2
Surveyor’
Signature
's Name:
ZAHER ma ED
ng co
Date of Issue: 2023-04-16
DOC NO : AFIDC-EMC-02(Rev:State of Qatar hi Uy.
Ministry of Interior Tahal By
Traffic Dept. Vehicle Reg. 448 ya jayaid (youd i Joyal Bla}
: Bian) La sith 6.55 | Vehicle No. 75528 Aa sttt y
Aguletl poliall 4s ya atti
Owner _|MANNAI TRADING COMPANY
Owner ID 10-0327-00 ALatl calif)
Nationality| dyson
Exp. Date [2024-03-19] a4. sigzt [Renew Dt. 2023-03-21 vast Gt
(Reg. Date | 2023-03-21 Reg. Date | 2023-03-21 detds' 4)
Bayeall Gohl Se jul dauade 9S TGaguall Gobi ge gual Gaede 92 ; ladle)
i Ihe
)
k2607552
@&)
Hite it ae
Vehicle Information 43S pall ct
135HD | JU joe ES
2022 |e ie ap fears
04 [ouishut ae St ee
2690%o7! cist 2690 |23"| oor] se
alfa ost Bai[ Oo
Chassis No. RAJ135WSPM3042677 peaie
Engine No. 091857GGN82607R Leal A |
al J ist |
2024-03-19 gets +48) ae |
all uo Sl sal gsComets Get Eesti
[a ae!
= oe
INSGRED.
moroit VEHICLE INSURANCE POLICY
THIS Is TO CERTIFY that th sow menioned venice insured
ih out company nacooarce wi mtoal ete na) fe
You 20(O ead we muance ofthe execute region fr he
10032700
ASSIS US ya nl Gy
aa gel i SAS lh
Sa joel 2010 86 (6) sy gals Lily
oh pea ahead aya asia
Faw no (18) forthe year 2007. (19)
[POLICY INFORMATION
Policy No. 2310202708 tats dy
Insurance Period From 20/03/2023 09:13 To 19/03/2024 23:69 oe cli baa
Type Of Cover Third Party Liability 9 2 agi es
Name of Insured MIS MANNAI TRADING COMPANY onal al
Address P.O.Box: 76 Doha, State Of Gater sa
[-VEHICLE INFORMATION
Make and Type Job - Skid Steer Loader - Heavy Equipments Baal est
Year of Manufacture 2022 eae
Registration No. apathy
Plate Type Equipment (4) - Heavy Equipments anes
Chassis No. RAJ135WSPM3042677 Sat
Engine No. 091857GGN82607R Saal
Cylinders 4 tigen 6
[COVERAGES
‘Value of Insured Vehicle 00 ( Only ) Asa Aa
Premium (QAR 960.00 ( Nine Hundred Fifty Only ) ait
Deductibles ah gs
No of Passengers Covered 1 pH nga ISD ae
[APPLICABLE COVERS
Passenger Liability Third Party Labilty
Remarks :
Please refer Poicy Tamms and Condtons for more deta Ste tal
‘Own damage insurance: at po cat
tthe cover under this policy is extended to include tne own damage othe
insured veri, tus adatonal cover shall be subject othe conden ofthe
‘ptonal insurance.
NB: The nswed vehicle wil not be used for hie or reward unless clearly
stated inthe poly schedule
Date and Timo of issue: 20.MAR-2025 09:28:26
Issued by: Alper Castuera
DOHA BRANCH
Ap pn Jad aed
ESOC epee netree em ree
og, on ele 5 8 Sl
ib ines We pod tt te
Bier ED Le le
20.MAR2023 08:28:28. eat ga
gpd Jr PAN ono. 92a lays) #1. ga Lau (SAVE) ERAMOTR, ust 44¥EAW ICA. VE) pad Aagalle NT cay
0.80 646 - Ocha Qatar» 497480000 (800074) + Fax (4978) 44831569 = CRN: 20 - PND UP CAPTAL OMG 180084730
Euitelooeicsasatedcom- Waite: ng nsuedcon
OC a cased O08 crea tn Pero ef Law OCB ns Ragan et
Prana vaasene waaay Low he (1) 202 ang wcentahare OCB pot
rove cout ay lam ado areca mio em
Pb Span pt pod Udy gall Spa nla yasye ys 8 ys
Sept nay CF Althea sas apo stn Spa
lau in Jamis ley igenga gle yl ye Remote gle paEQUIPMENT SALES AGREEMENT
HED/HPA/136
‘THIS EQUIPMENT SALES AGREEMENT is made 19° March 2023, by and among.
First Party
Mannai Trading Company W.LL. registered under CR # 8191 with its principal place of
business at Street No.5, Salwa Industrial Area, Bldg. No. 72, Zone No, 57 East Industrial Street
100 P.0. Box 76, Qatar (hereinafter known as “Seller”) represented by
Mr. Elhadi Bakhit, Senior General Manager ~ Credit Control
Second Party:
RAY PROJECTS ENGINEERING & CONTRACTORS WLL, A company organized and existing
under the Qatari laws, registered under CR No. 45071 with its principal place of business at
Building No. 27, Street No. 709, Zone 90, °.0. Box. 82984, Doha, Qatar (the “Buyer”),
represented in this agreement by Mr. Valllyil Shajy
BACKGROUND
WHEREAS, Seller desires to sell the equipment described below, known herein as the
“Acquired Equipment’, under the terms and conditions set forth belo
WHEREAS, Buyer desires to purchase the Acquired Equipment offered for sale by Seller
under the terms and conditions set forth below; and, therefore,
"TERMS AND CONDITIONS
IN CONSIDERATION of the mutual promises and other valuable consideration exchanged by
the Parties as set forth herein, the Parties, intending to be legally bound, hereby agree as
follows:
‘A. Description of Acquired Equipment.
Schedule 1
B. Consideration.
1. Purchase Price The total purchase price tobe paid by Buyer to Seller for the
Aquied spn a
MMMM) (Hereinafeer “Purchase Price") consisting of the following
‘components:
1. Down-payment: QARIIEEEIINM (Due to Seller on or before execution
of thisagreement}-
ii. Payment Due to Seller upon Delivery of Equipment to Buyer: QAR
—
iii, Modes of Payments, instalments and each instalment.time specified
‘Schedule Z
‘The “down-payment” and "payment due upon delivery” are to be made by
[Buyer to Seller in cash, by certified cheque, or through another instrument
acceptable to Seller. Buyer must receive permission in advance from Seller for,
use of a non-certfied instrument of payment of the Purchase Price.
2. Buyer hereby acknowledges that timely payment Is the essence of this
‘Agreement and any breach of the same shall cause irrevocable damage to
Seller so the Seller may enter the property of Buyer at any time to confiscate
the Equipment without any court order ifthe following occurs:
a) Any payment is unpaid for 21 days after becoming payable whether ithas beat
formally demanded or not: 3
‘Mannaiegav200 Page 1 ofEQUIPMENT SALES AGREEME!
b) Any substantial material breach or any condition of a Buyer of this Agreement;
) Anact of insolvency or broke, or subject of liquidation of part orall ofits assets
or business ora decision to iguidate,
4) Buyer attempts to sell or encumber the Acquired Equipment or any part
thereof without the written approval of the Seller, before the full payment of
the Purehase Price.
C. Delivery of Acquired Equipment and Conveyance of Title
1, Delivery of Acquires! Equipment Seller shall deliver the Acquired Equipment,
and Buyer shall take possession of same, at Seller's premises (either In person
or through a third party) on or before 31 Mar 2023("Delivery Date"). If
delivery isto be made ata date after the execution ofthis contract it is Seller's
duty to ensure that the Acquired Equipment is delivered in the same condition
as when last inspected by the Buyer (or, ifno Buyer inspection, the execution
date ofthis agreement). Itis Buyer's duty, either in person or through a third
party to appear at Seller's premises during standard business hours on or
before the Delivery Date to remove the Acquired Equipment from Seller's
premises. However, if the Buyer falls to appear at Seller's premises on or
before the Delivery Date to accept possession of the Acquired Equipment, then.
the risk of loss passes to the Buyer on the Delivery Date.
2. Title and Risk. Throughout the period of this Agreement the Title/equipment
‘registration in the Acquired Equipment will not pass to the Buyer until (a) all,
‘money payable by the Buyer pursuant to this Agreement has been paid, and (b)
all the Buyer's other obligations pursuant to this Agreement have been satisfied
in full Allrisk in the Acquired Equipment i to pass to the Buyer on signing this,
Agreement, The Buyer agrees to indemnily the Seller against destruction or loss
‘of the Acquired Equipment (including legal forfeiture) and from all liabilities or
claims arising out ofthe possession or use of the Acquired Equipment.
D, Representations, Warranties, and Disclosures
4. Warranties. This equipment is sold "AS IS", and Seller does not in any way,
expressly or impliedly, give any warranties to Buyer other than the
‘manufacturer warranty. Seller expressly disclaims any implied warranties of
merchantability or of fitness for a particular purpose.
2. Buyer Representation, The individual signing this agreement on behalf of
“Buyer hereby represents to Seller that he or she has te power andawthowey
‘to do so on behalf of Buyer.
B, Buyer's Responsibility —- Insurance and Tags.
Buyer acknowledges that unless prohibited by applicable law, any insurance
coverage, license, tags, plates or registration maintained by Seller on the Acquired
Equipment shall be cancelled upon complete payment of the Purchase Price to the
Seller, and the acceptance of, by Seller
Buyeragrees thatthe Seller shall at all times during the validity ofthis Agreement
‘maintain the appropriate and adequate insurance coverage required to full its
obligation and liabilities set forth in this Agreement in accordance with the law of
the State of Qatar.
Buyer undertakes to inform the Seller of any accident or incident that occurs and
rmiay result in claims under any ofthe Insurance provisions.
Buyer undertakes that it will not commit any act which shall violate any of the
y mtn Page 20fREQUIPMENT SALES AGREEMENT
provisions of insurance policy that may cause the insurance company to cancel or
reduce the amount of the Acquired Equipment.
F. Continuation of Representations and Warranties. All representations and
warranties contained in this Agreement (if any) shall continue in full force and effect
after execution of this agreement. If either party later learns that a warranty or
representation that it made is untrue, it is under a duty to promptly disclose this
information to the other party in writing. No representation or warranty contained
herein shall be deemed to have been waived or impaired by any investigation made
by or knowledge ofthe other party to this Agreement.
G. Indemnification and out-of-pocket costs. Should any party materially breach this
agreement (including representations and warranties made to the other side), the
non: breaching party shall be indemnified by the breaching party for Its reasonable
attarneys' fees and out-of pocket costs which in any way relate to or were precipitated
by, the breach ofthis contract (including the breach of representations or warranties).
‘This provision shall not limit in any way the remedies either party may have
otherwise possessed in law or equity relative to a breach of this contract. The term
“out-of-pocket costs’, as used in this contract, shall nat include lost profits
Buyer agrees to indemnify the Seller and clear it from any obligations, oss, damage,
claims, costs, expenses, traffic Fines and penalties or expenditure whatsoever under
this Agreement, particularly after delivery of the equipment to the Buyer upon
Delivery Date and after the Equipment becomes in Buyer's possession.
Soller shall be relieved of any claims, loss (resulting from an accident or otherwise),
damage or expense, trafic Fines and penalties, oss of profit, or for any consequential,
incidental, exemplary, special, or punitive damages of whatsoever of nature resulting
directly or indirectly from the usage or operation of Equipment by the Buyer in a
condition contravening the standard instruction as per the manufacturer guideline,
Warranty terms, Insurance Terms and Conditions including any rules, law or
regulation of State of Qatar.
H, Integration. This Agreement, including the attachments mentioned in the body as
Incorporated by reference, sets forth the entire agreement between the Parties with
regard to the subject matter hereof. All prior agreements, representations, and
-warranties, express-or implied; oral or written with respect to the subject matter
hereof, are hereby superseded by this agreement. This ian integrated agreement.
Severability. In the event any provision of this Agreement is deemed to be void,
invalid, or unenforceable, that provision shall be severed from the remainder of this
‘Agreement so as not to cause the invalidity or unenforceability of the remainder of
this Agreement. All remaining provisions ofthis Agreement shall then continue in full
force and effect. If any provision shall be deemed invalid due to Its scope or coverage,
such provision shall be deemed valid to the extent ofthe scope and breadth permitted
bylaw.
J. Modification. Bxceptas otherwise provided in this document, this agreement may be
modified, superseded, or voided only upon the written and signed agreement of the
Parties. Further, the physical destruction or loss of this document shall not be
construed as a modification or termination of the agreement contained herein,
K. Transfer: Unless the complete Purchase Price is paid to the Seller the Buyer shall not
have the right to transfer this Agreement or its benefits except upon prior written
x apiop2i Page 30f'3EQUIPMENT SALES AGREEMENT
consent of the Seller.
L. Acknowledgements. Each party acknowledges that he or she has had an adequate
‘opportunity to read and study this Agreement, to consider It,to consult with attorneys,
ithe or she has so desired.
M. Exclusive Jurisdiction for Suit in Case of Breach, The Parties, by entering into this
agreement, submitto jurisdiction in the State of Qatar for adjudication of any disputes
‘and/or claims between the parties under this agreement. Furthermore, the parties
hhereby agrec that the courts of the State of Qatar shall have exclusive jurisdietion
over any disputes between the parties relative to this agreement, whether sald
disputes sound in contract, tort, or other areas of the law.
IN. State Law. This Agreement shall be interpreted under, and governed by, the laws of
the state of Qatar,
IX WITNESS WHEREOF and acknowledging acceptance and agreement ofthe foregoing,
Seller and Buyer affix their signatures hereto,
For and on behalf of Mannai Trading For and on behalf of M/s RAY PROJECTS
Company W.LL ENGINEERING & CONTRACTORS WLL
Valiyil Shajy
Authorized Signatory
Date:
Schedule 1
Description of Acquired Equipment.
ww CHASSIS l
01 _|_ JCB 135HD SKID STHER LOADER [_RA}135WSPM3042677
Page dof S