Name: Upgrading of Barangay Hall for Temporary Isolation Facility

Location: Purok 2, Barangay Tagongon, Tagbina, Surigao Del Sur


Duration: 90 Calendar Days
BACK-UP COMPUTATION

SPL-1 SUB-PROJECT BILLBOARD


Materials
Marine Plywood( 3/16" 4'x8')
Common Nail Assorted
4'x'8Tarpulin
Lumber Good

801(1) Removal of Structure and Obstruction


Length Height No. of Units Area
Existing Walls 8.55 2.75 2 47.03
Windows Grills 1.2 1.2 4 5.76
Ceiling 4.5 8.3573 2 75.22
Total Area 128.00

803 Structure Excavation


Excavation Length Width Height No. of Units
Footing 1.2 1.2 2 5.00
2nd Floor Beam 15.9 0.2 0.35 1.00
Wall Footing 12.55 0.4 0.9 1.00
Total Area

804 Embankment
Embankment Length Width Height No. of Units
Footing 1.2 1.2 1.37 5.00
Wall Footing 12.55 0.4 0.6 1.00
Total Area

414 Forms and Falseworks


Forms and Falseworks Length Width Height No. of Units
Column 0.3 0.3 1.37 5.00
Wall Footing 12.55 0.4 0.6 1.00
Total Area
olation Facility

Quantity Units
4.00 pcs
5.00 kgs
2.00 pcs
100.00 bd.ft

on
Units
sq.m
sq.m
sq.m
sqm

Volume Units
14.40 cu.m
1.11 cu.m
4.52 cu.m
20.03 cu.m

Volume Units
9.86 cu.m
3.01 cu.m
12.87 cu.m

Volume Units
0.62 cu.m
3.01 cu.m
3.63 cu.m