You are on page 1of 1

Drawing No Drawing Title

ARCHITECTURAL DRAWING
1 ZNZ (A) 2017-04 / SHOP / SP / 01 - 12 PELAN SUSUNATUR
PELAN KUNCI
PELAN LOKASI
2 ZNZ (A) 2017-04 / SHOP / WD / 02 - 12 PELAN ARAS BAWAH
3 ZNZ (A) 2017-04 / SHOP / WD / 03 - 12 PELAN ARAS SATU
PELAN BUMBUNG
4 ZNZ (A) 2017-04 / SHOP / WD / 04 - 12 KERATAN A - A
KERATAN B - B
KERATAN C - C
5 ZNZ (A) 2017-04 / SHOP / WD / 05 - 12 PANDANGAN HADAPAN
PANDANGAN SISI KANAN
PANDANGAN SISI KIRI
6 ZNZ (A) 2017-04 / SHOP / WD / 06 - 12 PANDANGAN BELAKANG
7 ZNZ (A) 2017-04 / SHOP / WD / 07 - 12 TNB DOUBLE CHAMBER SUB-STATION
PERINCIAN PAGAR TNB
8 ZNZ (A) 2017-04 / SHOP / WD / 08 - 12 PERINCIAN "RAILING" TANGGA
PERINCIAN TEMPAT LETAK KERETA OKU
PERINCIAN TEMPAT LETAK MOTOSIKAL
PERINCIAN "RAMP"
9 ZNZ (A) 2017-04 / SHOP / WD / 09 - 12 MECHANICAL SERVICES
COLD WATER PLUMBING SYSTEM
TYPICAL DIAGRAMMATIC PIPING LAYOUT
10 ZNZ (A) 2017-04 / SHOP / WD / 10 - 12 MECHANICAL SERVICES
RAIN WATER HARVESTING SYSTEM (RWHS)
DIAGRAMMATIC PIPING LAYOUT - PART 1
11 ZNZ (A) 2017-04 / SHOP / WD / 11 - 12 MECHANICAL SERVICES
RAIN WATER HARVESTING SYSTEM (RWHS)
DIAGRAMMATIC PIPING LAYOUT - PART 2
12 ZNZ (A) 2017-04 / SHOP / WD / 12 - 12 MECHANICAL SERVICES
SANITARY PLUMBING SYSTEM
DIAGRAMMATIC PIPING LAYOUT

Appendix I / 1