Professional Documents
Culture Documents
HA-HA-021011-002
E
P
D
1. THE SOURCE OF WATER FOR IRRIGATION IS FROM RAW WATER VIA A CONNECTION FROM EXISTING
-H
MAIN RAW WATER NETWORK IN THE MUNIRAH ROAD.
LUP
-B
-L
E
IR
2. PROPOSED IRRIGATION MAINLINE, MANIFOLDS AND LATERALS SHALL BE HDPE UNLESS OTHERWISE
P
"-
E
D
INDICATED. ALL MAINLINE PIPES SHALL BE CLASS 16 BARS. MANIFOLDS AND LATERALS PIPES
.0
-H
D
2
SHALL BE CLASS 10 BARS.
-B
-H
-L
-B
IR
-L
P
3. GROUND COVERS SHALL BE IRRIGATED WITH PRESSURE COMPENSATING DRIPLINE AS FOLLOWS:
"-
IR
-H
FOR LOW WATER DEMAND GROUND COVERS:
5
"-
1.
-B
FLOW PER EMITTER: 0.5 GPH
5
1.
-L
SPACING BETWEEN EMITTERS: 30 cm.
E
I
P
SPACING BETWEEN DRIPLINES: 35 cm.
"-
P
D
D
5
-H
OPERATING PRESSURE: 1.5 TO 3.5 BARS.
-H
1.
-B
-B
FOR MEDIUM WATER DEMAND GROUND COVERS:
LU
-L
-L
E
FLOW PER EMITTER: 0.5 GPH
IR
IR
D
SPACING BETWEEN EMITTERS: 30 cm.
"-
-H
"-
5
5
SPACING BETWEEN DRIPLINES: 30 cm.
-B
1.
1.
-M
OPERATING PRESSURE: 1.5 TO 3.5 BARS.
IR
FOR HIGH WATER DEMAND GROUND COVERS:
"-
FLOW PER EMITTER: 1.0 GPH
.0
2
SPACING BETWEEN EMITTERS: 40 cm.
SPACING BETWEEN DRIPLINES: 30 cm.
OPERATING PRESSURE: 1.5 TO 3.5 BARS.
E
P
3.5''- 4. LAWN SHALL BE IRRIGATED WITH PRESSURE COMPENSATING SUBSURFACE DRIPLINE AS FOLLOWS:
D
IR-HD
-H
PE FLOW PER EMITTER: 1.0 GPH
-B
QC
SPACING BETWEEN EMITTERS: 40 cm.
-M
P
SPACING BETWEEN DRIPLINES: 30 cm.
LUP
I R
E
LU
"-
OPERATING PRESSURE: 1.5 TO 3.5 BARS.
.0
D
2
-H
5. TREES SHALL BE IRRIGATED AS FOLLOWS:
-B
FOR LOW WATER REQUIRING TREES: ONE TYPE 1 PRESSURE COMPENSATING BUBBLERS.
-L
IR
FOR MEDIUM WATER REQUIRING TREES: THREE TYPE II PRESSURE COMPENSATING BUBBLERS.
E
"-
P
FLOW PER TYPE 1 BUBBLER: 0.50 GPM
D
5
-H
1.
FLOW PER TYPE 2 BUBBLER: 0.25 GPM
-B
OPERATING PRESSURE: 1.5 TO 6.0 BARS
LU
-M
IR
P
"-
6. SHRUBS SHALL BE IRRIGATED AS FOLLOWS:
.0
P
P
FOR LOW WATER REQUIRING SHRUBS: ONE TYPE 1 PRESSURE COMPENSATING ONLINE EMITTER EACH.
2
-H
U
FOR MEDIUM WATER REQUIRING SHRUBS: ONE TYPE 2 PRESSURE COMPENSATING ONLINE EMITTER
-B
L
E
EACH.
-L
P
D
FOR HIGH WATER REQUIRING SHRUBS: TWO TYPE 1 PRESSURE COMPENSATING ONLINE EMITTER
-H
I
"-
EACH.
-B
5
1.
-L
IR
FLOW PER TYPE 1 ONLINE EMITTER: 7.0 GPH
"-
FLOW PER TYPE 2 ONLINE EMITTER: 10.0 GPH
5
1.
OPERATING PRESSURE: 1.0 TO 3.5 BARS
P
LU
7. THE DAILY OPERATING TIME OF SOLENOID VALVES AT PEAK IS AS FOLLOWS:
30 MINUTES FOR BUBBLERS
15 MINUTES FOR DRIP
P
8. TREES SHALL BE IRRIGATED USING 1.5" LATERALS.
U
L
9. MAXIMUM LENGTH OF LATERALS FOR TREES AND SHRUBS SHALL BE 100M.
11. LATERAL LINES FOR TREES SHALL FOLLOW BUBBLER TYPICAL DETAILS.
E
12. DRIPLINES LAYOUT SHALL FOLLOW GROUND COVER TYPICAL DRIP IRRIGATION DETAIL.
P
E
D
T
-H
A
G
-B
13. FOR TYPICAL LAYOUT OF IRRIGATORS REFER TO DRAWING HA-14864-001.
G
IN
-L
ID
L
S
IR
14. EXACT LOCATION, LAYOUT, AND DEPTH OF LATERALS, MANIFOLDS, VALVES, FITTINGS AND
"-
P
5
IRRIGATORS SHALL BE ADJUSTED ON SITE TO THE APPROVAL OF THE ENGINEER.
1.
U
L
15. ALL IRRIGATION PIPES AND FITTINGS MUST BE FULLY COMPATIBLE TO USE WITH NON-POTABLE
WATER (RAW WATER), AND SHALL COMPLY WITH AUTHORITIES REQUIREMENTS.
P
U
2"-IR-M-B-HDPE 16. PRESSURE REDUCING MODULES ON SOLENOID VALVES SHALL BE SET TO GIVE A CONSTANT
L
DOWNSTREAM PRESSURE OF 2.1 BARS.
17. EXACT LOCATION OF SOLENOID VALVES AND QUICK COUPLINGS SHALL BE DETERMINED ON SITE
TO THE APPROVAL OF THE ENGINEER.
PARKING AREA 1.5"-IR-L-B-HDPE
18. ALL SOLENOID VALVES AND QUICK COUPLINGS SHOULD BE PLACED IN EASILY ACCESSIBLE
LOCATIONS FOR MAINTENANCE PURPOSES, PREFERABLY IN PLANTED AREAS.
P
19. PRIOR TO ANY CONSTRUCTION WORKS THE CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL
U
EXISTING SERVICES THROUGH PHYSICAL CHECKS AND TRIAL TRENCHES.
L
1.5"-IR-L-B-HDPE
P
1.5"-IR-L-B-HDPE 20. THE CONTRACTOR SHALL COORDINATE IRRIGATION PIPE CROSSING OTHER UTILITIES AND SEEK
U
THE APPROVAL OF THE ENGINEER PRIOR TO PROCEEDING WITH WORK.
L
21. IRRIGATION DRAWINGS SHALL BE READ IN CONJUNCTION WITH LANDSCAPE DRAWINGS.
2"-IR-M-B-HDPE
3.5''-
IR-HD
PE
P
U
L
D
R
A
L
L
O
B
D
E
IX
F
2"-IR-M-B-HDPE 1.5"-IR-L-B-HDPE
DPE
-B-H
IR-L
1.5"-
P
U
P
L
U
L
2"-IR-M-B-HDPE
DPE
-B-H
IR-L
1.5"-
1.5"-IR-L-B-HDPE 2"-IR-M-B-HDPE
1.5"-IR-L-B-HDPE
L
U
P
1.5"-IR-L-B-HDPE L
U
P
TRUE
NORTH
P
U
1.5"-IR-M-B-HDPE
L
1.5''-IR-HDPE
LU
P
QC
DPE
-B-H
IR-L
1.5"-
LUP MAKKAH
LU
P
1.5"-IR-L-B-HDPE
B
F&
1.5"-IR-L-B-HDPE
LU
P
P
B
2"-IR-M-B-HDPE
F&
U
L
LU
02
P
B
F&
P
U
L
B
F&
1.5"-IR-L-B-HDPE 01
E
P
1.5"-IR-L-B-HDPE
C
D
Q
-H
-B
-M
IR
LUP
E
"-
D
P
R
.0
D
A
E
-H
2
T
L
A
QC
O
1.5"-IR-L-B-HDPE
R
G
-I
G
D BLE
IN
''
E
.5
T
-H OVA
P
IS
3
X
E
-B EM
3.5''-IR-HDPE
R
2"-IR-M-B-HDPE E
-L
P
B-HD
IR-L-
R
D
1.5"-
I
R
"-
A
L
5
L
1.
O
B
E
1.5"-IR-L-B-HDPE
L
1.5"-IR-L-B-HDPE
B
A
P
V
O
M
LU
E
R
LUP
2"-IR-M-B-HDPE
1.5"-IR-L-B-HDPE
P
1.5"-IR-L-B-HDPE
LU
2.5"-IR-M-B-HDPE
00
QC
1.5"-IR-L-B-HDPE
3.5''-IR-HDPE
P
1. PE U
5
"-
IR 1.5"-
IR-L
-B-H
D
2.5"-IR-M-B-HDPE
L
-L
DPE
-B -B-H
-H IR-L
1.5"-
D
P
E
LEGEND
HDPE COMBINED IRR/FIRE NETWORK ∅ 110 mm YAA RA MAQ MMO
3.
5'
'-
IR
2.5"-IR-M-B-HDPE HDPE COMBINED IRR/FIRE NETWORK ∅ 160 mm
-H
DP
E HDPE COMBINED IRR/FIRE NETWORK ∅ 200 mm
1.5"-IR-L-B-HDPE HDPE COMBINED IRR/FIRE NETWORK ∅ 250 mm 00
1.
5
"-
QC 1.5"-IR-L-B-HDPE HDPE COMBINED IRR/FIRE NETWORK ∅ 315 mm
I R
P
-L
IR IRRIGATION HDPE PIPE SIZE (INCHES)
U
-B
-H
L
D
P
E IR-L-B LATERAL PIPE FOR BUBBLER
1.5"-IR-L-B-HDPE
U
1.5"-IR-L-B-HDPE CONTROLLER
L
LU
P PVC SLEEVES ∅ 100 mm
P
021011 001
U
DRAWING LIMIT
L