You are on page 1of 1

Doka Climbing System

Climbing formwork
Automatic climbing formwork
GCS Xclimb60
Climbing formwork K Climbing formwork MF 240 Automatic climbing formwork SKE 50 Automatic climbing formwork SKE 50 plus Automatic climbing formwork SKE 100 Platform SCP
Climbing formwork GCS Windshield GCS Guided climbing formwork Xclimb 60 Automatic climbing formwork Xclimb 60 Protection screen Xclimb 60

The crane-lifted climbing formwork Guided directly on structure, so is firmly Crane-independent automatic climbing Crane-independent automatic climbing formwork –
The climbing formwork for low Protects entire crew from all weather The profile-guided climbing formwork for non- The low-cost automatic climbing formwork with The crane-independent automatic climbing The self-climbing forming and working
Core positioning for structures of any shape and attached to structure throughout all Unbeatably safe protection for the entire crew formwork – regular working cycles and regular working cycles and outstanding efficiency
structure heights conditions weather-dependent repositioning portable hydraulic system formwork for tall scaffolds and heavy loads platform for high-rise cores
inclination operations outstanding efficiency for any structure for any structure
Building-facades High-rise cores Straightforward high-rise cores Building-facades Straightforward high-rise cores Change in inclination Building-facades High-rise cores High-rise cores High-rise cores High-rise cores with a large cross-sectional
up to 10 casting sections Bridge piers Building-facades, punctuated facades 15 casting sections and above Building-facades, punctuated facades 15 casting sections and above Building-facades Building-facades Bridge piers (inclined by up to 15°) area
Bridge pylons Bridge piers without – or with only small and Bridge piers without – or with only small and Bridge piers (inclined by up to 15°) Bridge piers (inclined by up to 15°) Bridge pylons (inclined by up to 15°) 30 casting sections and above
5-20 casting sections constant – inclinations constant – inclinations (up to 7°). Bridge pylons (inclined by up to 15°) Bridge pylons (inclined by up to 15°) Repositioning many platforms at the same time
Main field of use 15-40 casting sections 10-40 casting sections Repositioning many platforms at the same Repositioning many platforms at the same time Simultaneous lifting of heavy loads (e.g.:
time 20 casting sections and above concrete placing booms, tall scaffolds,...)
20 casting sections and above 30 casting sections and above

Fast and easy to assemble thanks Ingenious modular system makes Optimised cycle times, as loads can be Maximum safety, as the entire unit is Optimised infrastructure thanks to the
Huge flexibility thanks to its modular Protects entire crew from falls and climatic Maximum safety, due to repositioning of large
to use of standard Folding for optimum adaptation to any transferred into either the current or previous repositioned hydraulically with no need for a integration of containers, equipment,
"construction-kit" system influences formwork gangs
platform K construction project casting section crane concrete placing booms, …

Huge flexibility, thanks to the option of Huge flexibility, thanks to the option of Very high standard of safety thanks to
Main customer-benefit Rapid working, thanks to easy Fast, safe working on broad, Fast working, as the entire unit is repositioned in
repositioning the system using portable hydraulic repositioning the system using portable hydraulic
Fast, safe working thanks to the generous platform Very high load-bearing capacity for maximum
complete, all-round enclosure of the work-
handling 2.40m wide platforms just one crane cycle widths cost efficiency
appliances when craneage is limited appliances when craneage is limited deck

Highly cost-efficient, saving time Easy to operate – cuts down on High degree of safety, as the system is Improved logistics and site-erection thanks to Improved logistics and site-erection thanks to the Huge flexibility thanks to its modular "construction- Fast, safe working thanks to the completely Very easy to use and operate, as formwork
and money crane time anchored to the structure at all times the high degree of pre-assembly high degree of pre-assembly kit" system enclosable platform system is suspended from rollers
Priority 1: Southeast Asia (Malaysia,
Priority 1: UK, Ireland Priority 1: UK, Ireland, Southeast Asia Priority 1: Europe, USA Priority 1: Middle East, USA Priority 1: Europe, Middle East
Main target markets Worldwide Worldwide
Priority 2: Worldwide
Worldwide
Priority 2: Worldwide
Korea,...) Worldwide Middle East
Priority 2: Worldwide Priority 2: Worldwide Priority 2: Worldwide
Priority 2: Worldwide

Price per vertically parallel unit (DI Priority 1: UK, Ireland 2631 EUR / 2963 EUR (with hydraulic No price per vertically parallel unit - only a
607 EUR 1.441 EUR Worldwide 3.394 EUR 4.141 EUR Middle East 5.625 EUR 13.594 EUR
charge-rate as at 01.07.08)* Priority 2: Worldwide components) project price

* ... for a 3.50 m high casting section, without formwork, platform beams, decking and handrail planks, or bracing; on the self-climbing systems: incl. hydraulic components for 30 vertically parallel units

Price overview
Product positioning Doka climbing systems

3
Doka climbing systems
Price per vertically parallel unit
262%
2,5 Price for specimen project

Structure complexity

193%
2
175%

SKE 100
1,5
High casting sections 7

MF240 SKE 50 plus


Change in inclination 6 100% 100%
1
78%
Inclination 5 69% 72%
55%
Change in walls 4 Xclimb
Xclimb 60 60 0,5
24% 29% 30%
Discontinuous walls 3 K SCP
12%
0
Change in width of wall 2 K Guided
MF240 Geführtes Xclimb Self-climbing
Selbstkl.
60 Xclimb 60SKE50 plus SKE100 SCP
Xclimb 60 Xclimb 60
Structure follows a 1
constant upward course 0 5 10 15 20 25 30 35 40 45 50 55 60 price for specimen project: Price for realising a notional project with each system, incl. platform
beams, bracing, without formwork and without platform decking and guard-rail boards
Number of casting sections

You might also like