Building

How the
Overlay works
Code language is presented

Decarbonization wholistically as an overlay to


the 2021 IECC and ASHRAE
90.1-2019 in two options for

Code
jurisdictions

To meet a 1.5 degree C target as outlined in the Paris Agreement, all


1
A LL-ELECTRIC
new construction must be all-electric by 2025. The Decarbonization These provisions provide a
Overlay is a necessary tool for cities and states that adopt the I-Codes. building that operates only on
Where adopted, the overlay will future proof new construction projects electric power (with limited
making them zero-carbon ready and creating buildings that can exceptions for hard-to-electrify
effectively interact with a fully renewable and clean electric grid. end uses).

Why Electrify?
Building electrification and decarbonization policies are being discussed
by states and cities across the country. These policies address the
2
transition away from onsite fossil fuel combustion in buildings, as the
MIX ED -FUEL
electricity grid (including renewable energy sources) move towards 100 These provisions provide electric-
percent carbon-free. Many of these jurisdictions have climate-related ready construction that allows
goals that require electrification of the building stock: over 200 cities for simple, low-cost all-electric
have made pledges to achieve 100 percent clean energy or “net zero” appliance and equipment
emissions. Ensuring that new buildings emit little—or no—carbon is the replacement in the future.
foundational component of meeting these goals.
Jurisdictions may use any section
of the overlay in its entirety or
use portions of these sections
to amend the 2021 IECC and/
Learn more: For questions, or ASHRAE 90.1 to a code that
newbuildings.org/resource/ technical assistance, is right for adoption to meet the
building-decarbonization-code and more information: needs of their communities and
codesforclimate.org Contact Kim Cheslak supports their climate goals,
kim@newbuildings.org including selecting to focus on
The Decarbonization Code supports the
goals of the Codes for Climate Initiative.
priority areas (those using the
most fossil fuels) of space and
water heating in the near term to
gain the necessary momentum
needed to fully remove fossil fuels
from their buildings.
3

1
6
5 8
4

7 8

Heating. Where gas heating is Solar Ready. Each home is designed Clothes Drying. Where a gas
1 installed, a dedicated circuit, panel 3 to have 300 sqft of solar access on 7 clothes dryer is installed, a dedicated
space, and location for condensate roof, junction box and dedicated circuit and panel space for electric
drainage for heat pump replacement pathway for wiring from electrical panel replacement is provided.
is provided. to roof for future solar installation.
Energy Storage Ready. Homes are
Water Heating. Where gas water Electric Vehicle Ready. Each home 8 provided with physical space to install
2 heating is installed, a dedicated circuit, 4 is provided with a dedicated circuit, a future energy storage system, along
panel space, location for condensate panel space and junction box near with necessary electric infrastructure
drainage, physical space and air parking space to accommodate an to accommodate the addition.
flow for heat pump replacement is EV charger.
provided.
Responsive Thermostat Controls.
Responsive Water Heating 5 Thermostats are required to be
Controls. Water heaters are required capable of increasing or decreasing
to have controls meeting CTA 2045B set point by 4 degrees F with a
to receive and respond to signals from demand signal from the utility.
the grid that can preheat water during
peak renewable production times, Cooking. Where a gas stove is
making every water heater an energy 6 installed, a dedicated circuit and
storage device. panel space for electric replacement
is provided.