REBOUND HAMMER TEST FORM v2

Site ID: Test Date:

Sitename: Casting Date:

Tower Type: Age Days:


Subcon: Concrete Mix Type:

Observed Rebound Number (RN) on Different points on the column. Average Rebound Number
Specimen Rejecting 6 Distant Values
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Column 1 Side A
Column 1 Side B
Column 2 Side A
Column 2 Side B
Column 3 Side A
Column 3 Side B
Column 4 Side A
Column 4 Side B

Ave. Column Rebound Ave. Column Rebound TOTAL Ave. Mpa Equivalent to Estimated Compressive
Calculation Rebound Number Strength
RESULT (PASS OR FAIL) Remarks
Number (Side A) Number (Side B) Rebound Number
(Mpa)
Column 1
Column 2
Column 3
Column 4

Notes:
1) Take two perpendicular sides to test each column. Test all 4 columns.
2) Average Rebound Number by Rejecting 6 distant values. Reject value of the 3 highest and 3 lowest in the 16 testing values.
3) Average RN of two perpendicular sides to get the Average Column Rebound Number.
4) Get the Equivalent Mpa value by using the instrument graph. (refer to instrument graph or illustration on the left).
5) Get the Estimated Compressive Strength
6) Input Test Result (PASS OR FAIL) for each column compressive strength based on the passing criteria below.

Passing Criteria: Concrete Strength


28 days > 20 Mpa >K225
14 days > 17 Mpa >K198
7 days > 14 Mpa >K147

Signed by:
Subcon Site Engineer: ZTE CW Site Engineer:
Name: Name:
Position: Position:

Signature: Signature:
Date: Date: