Propinsi : Nusa Tenggara Timur Kabupaten : Ende Kecamatan KOTA BARU Tahun : 2020
Upah Fee Dan Total Biaya
NO TENAGA KERJA Kode Tenaga Over Head Upah & Tenaga NO PERALATAN KODE Sewa Alat
Kerja 10 % Kerja Per- Jam
(Rp.7Jam/hari) (Rp) (Rp./Hari) (Rp)
1 Pekerja L.01 75,000.00 7,500.00 82,500.00 1 Harga Sewa Concrete Mixer 0,3 - 0,6 M3 E.07 40,075.41 40,075.41
2 Tukang L.02 100,000.00 10,000.00 110,000.00 2 Harga Sewa Alat Dump Truck 3-4 M3 E.08 275,464.37 275,464.37
3 Kepala Tukang L.03 110,000.00 11,000.00 121,000.00
4 Mandor L.04 120,000.00 12,000.00 132,000.00
5 Operator L.05 80,000.00 8,000.00 88,000.00
6 Pembantu Operator L.06 60,000.00 6,000.00 66,000.00
7 Sopir L.07 75,000.00 7,500.00 82,500.00
8 Pembantu Sopir L.08 50,000.00 5,000.00 55,000.00
9 Mekanik L.09 80,000.00 8,000.00 88,000.00
10 Pembantu Mekanik L.10 50,000.00 5,000.00 55,000.00
Harga Diquary / Jarak Ongkos Jumlah Harga Pajak Gal. Fee & Over Pajak Jumlah Harga Jumlah Harga
NO MATERIAL UNIT KODE Sumber Angkut Angkut Tanpa Pajak Gol. C Head (PPn) Tidak Termasuk Termasuk
(Tanpa Pajak) Rata ² Per- Unit 10 % 10 % PPN PPN
(Rp) (KM) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8 9 10 11 12 13
1 m³ M.010 30,000.00 8.00 47,212.65 77,212.65 6,000.00 7,721.27 8,921.30 89,213.00 99,855.00
2 Kerikil dari Galian Bukit m³ M.011 22,500.00 8.00 47,212.65 69,712.65 4,500.00 6,971.27 7,421.30 74,213.00 88,605.00
3 kerikil Sungai (Tdk disaring) m³ K.012 10,000.00 8.00 32,052.64 42,052.64 4,205.26 4,205.30 42,053.00 50,463.00
4 kerikil Sungai tersaring m³ K.016 0.00 9.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
5 Batu Kali m³ M.013 30,000.00 8.00 47,212.65 77,212.65 6,000.00 7,721.27 8,321.30 83,213.00 99,255.00
6 Kerikil Pecah disaring m³ K.017 0.00 6.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
7 Batu belah 10 - 15 cm m³ M.020 30,000.00 8.00 47,212.65 77,212.65 6,000.00 7,721.27 8,321.30 83,213.00 99,255.00
8 Batu Belah 7 - 10 cm m³ M.021 36,000.00 8.00 47,212.65 83,212.65 7,200.00 8,321.27 9,041.30 90,413.00 107,775.00
9 Batu Pecah 5 - 7 cm m³ M.022 43,200.00 8.00 47,212.65 90,412.65 8,640.00 9,041.27 9,905.30 99,053.00 117,999.00
10 Batu Pecah 3 - 5 cm m³ M.023 0.00 8.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
11 Batu Pecah 2 - 3 cm m³ M.024 0.00 8.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
12 Batu Pecah 1 - 2 cm m³ M.025 0.00 8.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
13 Batu Pecah 0,5 - 1 cm m³ M.026 0.00 8.00 28,491.23 28,491.23 2,849.12 2,849.10 28,491.00 34,189.00
14 Filler m³ M. 0.00 8.00 71,228.08 71,228.08 7,122.81 7,122.80 71,228.00 85,474.00
15 Gorong2 armco d = 60 cm m M.031 750,000.00 20.00 161.83 750,161.83 75,016.18 75,016.20 750,162.00 900,194.00
16 Gorong2 armco d = 80 cm m M.033 950,000.00 20.00 194.20 950,194.20 95,019.42 95,019.40 950,194.00 1,140,233.00
17 Gorong2 armco d = 100 cm m M.035 1,300,000.00 20.00 233.04 1,300,233.04 130,023.30 130,023.30 1,300,233.00 1,560,280.00
18 Tanah Urug/Timbun biasa m³ M.040 4,000.00 2.00 11,803.16 15,803.16 800.00 1,580.32 1,660.30 16,603.00 19,844.00
19 Pasir ayak untuk beton m³ M.041 20,000.00 6.00 35,409.49 55,409.49 4,000.00 5,540.95 5,940.90 59,409.00 70,891.00
20 Sirtu (tak diayak) m³ M.042 10,000.00 5.00 14,753.95 24,753.95 2,000.00 2,475.40 2,675.40 26,754.00 31,905.00
21 Bahan Timbunan pilihan m³ M.050 7,500.00 5.00 14,753.95 22,253.95 1,500.00 2,225.40 2,375.40 23,754.00 28,355.00
22 Aspal Bitumen kg M.061 3,700.00 20.00 32.37 3,732.37 373.24 373.20 3,732.00 4,479.00
23 Aspal Buton Tonne M.062 450,000.00 20.00 20,229.29 470,229.29 47,022.93 47,022.90 470,229.00 564,275.00
24 Minyak Flux Ltr M.063 2,200.00 20.00 33.72 2,233.72 223.37 223.40 2,234.00 2,680.00
25 Minyak Tanah Ltr M.065 600.00 20.00 33.72 633.72 63.37 63.40 634.00 760.00
26 Kayu Bakar m³ M.070 20,000.00 10.00 40,458.57 60,458.57 6,045.86 6,045.90 60,459.00 72,550.00
27 Semen PC 50/kg M.080 26,500.00 20.00 161.83 26,661.83 2,666.18 2,666.20 26,662.00 31,994.00
28 Kapur Bakar m³ M.081 105,000.00 15.00 30,343.93 135,343.93 21,000.00 13,534.39 15,634.40 156,344.00 185,513.00
29 Batu Kapur m³ M.082 95,000.00 15.00 30,343.93 125,343.93 19,000.00 12,534.39 14,434.40 144,344.00 171,313.00
30 Cat Jembatan kg M.090 12,500.00 20.00 33.72 12,533.72 1,253.37 1,253.40 12,534.00 15,040.00
31 Baja Tralls kg M.161 4,000.00 20.00 33.72 4,033.72 403.37 403.40 4,034.00 4,840.00
32 Kawat Bronjong kg M.162 3,500.00 20.00 33.72 3,533.72 353.37 353.40 3,534.00 4,240.00
33 Baut Baja kg M.163 7,500.00 20.00 33.72 7,533.72 753.37 753.40 7,534.00 9,040.00
34 Paku Jembatan kg M.166 4,500.00 20.00 33.72 4,533.72 453.37 453.40 4,534.00 5,440.00
35 Baja Tulangan Beton kg M.167 5,000.00 20.00 33.72 5,033.72 503.37 503.40 5,034.00 6,040.00
36 Alat-alat Bantu )** Set M.170 27,500.00 20.00 33.72 27,533.72 2,753.37 2,753.40 27,534.00 33,040.00
37 Kayu untuk Perancah m³ M.180 650,000.00 20.00 12,946.74 662,946.74 66,294.67 66,294.70 662,947.00 795,536.00
38 Kayu untuk Konstruksi Jbt. m³ M.181 1,500,000.00 20.00 12,946.74 1,512,946.74 151,294.67 151,294.70 1,512,947.00 1,815,536.00
39 Minyak Diesel/Solar Ltr M.183 1,400.00 20.00 33.72 1,433.72 143.37 143.40 1,434.00 1,720.00
40 Bensin/Premlum Ltr M.184 1,750.00 20.00 33.72 1,783.72 178.37 178.40 1,784.00 2,140.00
41 Minyak Pelumas Ltr M.185 17,500.00 20.00 33.72 17,533.72 1,753.37 1,753.40 17,534.00 21,040.00
42 Bronjong Macafery Unit 175,000.00 20.00 842.89 175,842.89 17,584.29 17,584.30 175,843.00 211,011.00
LOKASI :
** = 1 Cangkul + 1 Skop + 1 Pikulan *** Upah tenaga kerja sudah termasuk Pajak dan Fee Over head
Mengetahui :
Bupati Ende,
PAULINUS DOMI
DAFTAR HARGA BAHAN BANGUNAN
Tahun Angaran 2010
TOKO ………………………….
HARGA JARAK
No. URAIAN KODE SATUANSTANDAR/DASAR QUARRY KET.
(Rp) ( Km )
1 2 3 4 5 6
HARGA JARAK
No. URAIAN KODE SATUANSTANDAR/DASAR QUARRY KET.
(Rp) ( Km )
1 2 3 4 5 6
1 Gorong-gorong armco d = 60 cm M
2 Gorong-gorong armco d = 80 cm M
3 Gorong-gorong armco d = 100 cm M
4 Bahan Timbunan pilihan M3
5 Semen abu-abu @ 50 kg Zak
6 Semen abu-abu @ 40 kg Zak
7 Semen putih @ 50 kg Zak
8 Semen putih @ 40 kg Zak
9 Semen Tonasa @ 50 kg Zak
10 Semen Tonasa @ 40 kg Zak
11 Semen Kupang @ 40 kg Zak
12 Semen Gresik @ 50 kg Zak
13 Semen Gresik @ 40 kg Zak
14 Semen Bosowa @ 50 kg Zak
15 Besi beton polos 5 mm panjang 12 m' Batang
16 Besi beton polos 6 mm panjang 12 m' Batang
17 Besi beton polos 8 mm panjang 12 m' Batang
18 Besi beton polos 10 mm panjang 12 m' Batang
19 Besi beton polos 12 mm panjang 12 m' Batang
20 Besi beton polos 14 mm panjang 12 m' Batang
21 Besi beton polos 16 mm panjang 12 m' Batang
22 Kawat beton / bendral Kg
23 Porselint uk. 11 cm x 11 cm Doz
24 Porselint uk. 10 cm x 15 cm Doz
25 Porselint uk. 15 cm x 15 cm Doz
26 Porselint uk. 20 cm x 20 cm Doz
27 Porselint uk. 30 cm x 30 cm Doz
28 Plint keramik uk. 30 cm x 10 cm Doz
29 Keramik 20 cm x 20 cm Doz
30 Keramik 20 cm x 25 cm Doz
31 Ubin abu-abu 15 cm x 20 cm Doz
32 Plint ubin berwarna 15 cm x 20 cm Doz
33 Ubin wafel abu-abu 20 cm x 20 cm Buah
34 Ubin wafel berwarna 20 cm x 20 cm Doz
35 Kaca bening 3 mm M2
36 Kaca bening 5 mm M2
37 Kaca reyben 3 mm M2
38 Kaca reyben 5 mm M2
39 Genteng (setara genteng kodok ) Buah
40 Karpus genteng (setara genteng kodok ) Buah
41 Seng gelombang Bjls uk. 0,30 Lembar
42 Seng gelombang Bjls uk. 0,20 Lembar
43 Nok seng Bjls 0,20 - 30 cm Lembar
44 Nok seng Bjls 0,30 Lembar
45 Seng plat Bjls 0,20 Lembar
46 Seng plat Bjls 0,20 - 40 cm Lembar
47 Paku biasa 1-3 cm Kg
48 Paku biasa 5-12 cm Kg
49 Paku beton 1-3 cm Kg
50 Paku beton 5-15 cm Kg
51 Paku kayu 1-3 cm Kg
52 Paku kayu 5-7 cm Kg
53 Paku kayu 7-15 cm Kg
54 Paku seng Kg
55 Paku asbes Kg
56 Pipa PVC dia 1/2 " Batang
57 Pipa PVC dia 3/4 " Batang
58 Pipa PVC dia 1 " Batang
59 Pipa PVC dia 2 " Batang
60 Pipa PVC dia 3 " Batang
61 Pipa PVC dia 4 " Batang
Hal : 2
1 2 3 4 5
62 Pipa GIP Medium A dia 2,5 " MN.64 Batang 589,300.00 590,000.00 8.00
63 Pipa GIP Medium A dia 2 " MN.65 Batang 495,150.00 345,000.00 8.00
64 Pipa GIP Medium A dia 1" MN.66 Batang 134,750.00 165,000.00 8.00
65 Pipa GIP Medium A dia 3/4 " MN.67 Batang 163,150.00 130,000.00 8.00
66 Pipa GIP Medium A dia 1/2 " MN.68 Batang 151,600.00 110,000.00 8.00
67 Pipa GIP Medium B dia 2,5 " MN.70 Batang 294,800.00 415,000.00 8.00 BI
68 Pipa GIP Medium B dia 2 " MN.71 Batang 273,150.00 285,000.00 8.00 BI
69 Pipa GIP Medium B dia 1 " MN.72 Batang 143,000.00 135,000.00 8.00 BI
70 Pipa GIP Medium B dia 3/4 " MN.73 Batang 114,400.00 110,000.00 8.00 BI
71 Pipa GIP Medium B dia 1/2 " MN.74 Batang 92,650.00 88,000.00 8.00 BI
72 Buis beton 20 f cm MN.81 Buah 613,050.00 8.00
73 Buis beton 10 f cm MN.82 Buah 471,500.00 8.00
74 Water muur GIP dia 4 " MN.83 Buah 260,975.00 300,000.00 250,000.00 8.00
75 Water muur GIP dia 3 " MN.84 Buah 168,300.00 160,000.00 140,000.00 8.00
76 Water muur GIP dia 2 " MN.85 Buah 67,350.00 60,000.00 45,000.00 8.00
77 Water muur GIP dia 1,5 " MN.86 Buah 40,500.00 32,000.00 8.00
78 Water muur GIP dia 1 " MN.87 Buah 23,650.00 22,000.00 18,000.00 8.00
79 Water muur GIP dia 3/4 " MN.88 Buah 16,900.00 18,000.00 15,000.00 8.00
80 Water muur GIP dia 1/2 " MN.89 Buah 109,450.00 14,000.00 12,000.00 8.00
81 Shocet PVC dia 6 " MN.90 Buah 11,800.00 25,000.00 8.00
82 Shocet PVC dia 4 " MN.91 Buah 13,450.00 7,000.00 8,500.00 8.00
83 Shocet PVC dia 3 " MN.92 Buah 16,150.00 6,000.00 6,000.00 8.00
84 Shocet PVC dia 2,5 " MN.93 Buah 7,600.00 5,000.00 6,000.00 8.00
85 Shocet PVC dia 2 " MN.94 Buah 10,150.00 4,000.00 5,000.00 8.00
86 Shocet PVC dia 1,5 " MN.95 Buah 11,800.00 3,000.00 5,000.00 8.00
87 Shocet PVC dia 1 " MN.96 Buah 6,900.00 2,000.00 2,500.00 8.00
88 Shocet PVC dia 3/4 " MN.97 Buah 5,350.00 2,000.00 2,000.00 8.00
89 Shocet PVC dia 1/2 " MN.98 Buah 3,800.00 1,000.00 1,500.00 8.00
90 Shocet GIP dia 4 " MN.99 Buah 84,150.00 90,000.00 75,000.00 8.00
91 Shocet GIP dia 3 " MN.100 Buah 50,600.00 55,000.00 45,000.00 8.00
92 Shocet GIP dia 2 " MN.101 Buah 23,800.00 20,000.00 17,000.00 8.00
93 Shocet GIP dia 1,5 " MN.102 Buah 18,500.00 15,000.00 12,000.00 8.00
94 Shocet GIP dia 1 1/4 " MN.103 Buah 13,450.00 13,000.00 11,000.00 8.00
95 Shocet GIP dia 1 " MN.104 Buah 10,150.00 8,000.00 6,000.00 8.00
96 Shocet GIP dia 3/4 " MN.105 Buah 6,900.00 6,000.00 4,000.00 8.00
97 Shocet GIP dia 1/2 " MN.106 Buah 5,350.00 5,000.00 3,500.00 8.00
98 Shok Nepel dia 1/2 " MN.113 Buah 6,850.00 5,000.00 3,000.00 8.00
99 Shok Nepel dia 3/4 " MN.114 Buah 8,400.00 8,000.00 4,000.00 8.00
100 Nepel GIP dia 4 " MN.115 Buah 7,600.00 150,000.00 65,000.00 8.00
101 Nepel GIP dia 3 " MN.116 Buah 67,350.00 85,000.00 45,000.00 8.00
102 Nepel GIP dia 2 " MN.117 Buah 25,300.00 27,000.00 17,500.00 8.00
103 Nepel GIP dia 1,5 " MN.118 Buah 16,850.00 12,500.00 8.00
104 Nepel GIP dia 1 " MN.119 Buah 10,150.00 9,000.00 6,500.00 8.00
105 Nepel GIP dia 3/4 " MN.120 Buah 9,850.00 8,500.00 5,000.00 8.00
106 Nepel GIP dia 1/2 " MN.121 Buah 5,350.00 5,000.00 4,000.00 8.00
107 Lem PVC MN.122 Kg 59,000.00 25,000.00 8.00
108 Klem sadle GIP dia 2 " x 0,5 " MN.123 Buah 50,600.00 30,000.00 8.00
109 Knee GIP dia 4 " MN.124 Buah 117,950.00 140,000.00 110,000.00 8.00
110 Knee GIP dia 3 " MN.125 Buah 67,350.00 75,000.00 65,000.00 8.00
111 Knee GIP dia 2 " MN.126 Buah 33,700.00 26,000.00 23,000.00 8.00
112 Knee GIP dia 1,5 " MN.127 Buah 25,300.00 15,000.00 8.00
113 Knee GIP dia 1 " MN.128 Buah 11,800.00 10,000.00 7,500.00 8.00
114 Knee GIP dia 3/4 " MN.129 Buah 8,450.00 6,000.00 5,000.00 8.00
115 Knee GIP dia 1/2 " MN.130 Buah 5,350.00 5,000.00 4,500.00 8.00
116 Elbow GIP dia 4 " MN.131 Buah 210,500.00 260,000.00 8.00
117 Elbow GIP dia 3 " MN.132 Buah 126,300.00 125,000.00 8.00
118 Elbow GIP dia 2 " MN.133 Buah 50,600.00 45,000.00 8.00
119 Elbow GIP dia 1,5 " MN.134 Buah 33,700.00 19,000.00 8.00
120 Elbow GIP dia 1 " MN.135 Buah 16,850.00 12,500.00 8.00
121 Elbow GIP dia 3/4 " MN.136 Buah 13,050.00 9,000.00 8.00
122 Elbow GIP dia 1/2 " MN.137 Buah 8,450.00 7,000.00 8.00
123 Stop kran GIP dia 4 " MN.146 Buah 589,300.00 250,000.00 8.00
124 Stop kran GIP dia 3 " MN.147 Buah 420,950.00 200,000.00 8.00
125 Stop kran GIP dia 2 " MN.148 Buah 218,900.00 500,000.00 50,000.00 8.00
Hal : 4
1 2 3 4 5 6
126 Stop kran GIP dia 1,5 " MN.149 Buah 134,750.00 35,000.00 8.00
127 Stop kran GIP dia 1 " MN.150 Buah 109,450.00 200,000.00 30,000.00 8.00
128 Stop kran GIP dia 3/4" MN.151 Buah 67,350.00 35,000.00 20,000.00 8.00
129 Stop kran GIP dia 1/2 " MN.152 Buah 50,600.00 45,000.00 12,500.00 8.00
130 Dop GIP dia 3 " MN.153 Buah 43,800.00 40,000.00 8.00
131 Dop GIP dia 2 " MN.154 Buah 18,500.00 15,000.00 8.00
132 Dop GIP dia 1,5 " MN.155 Buah 13,450.00 11,000.00 8.00
133 Dop GIP dia 1 " MN.156 Buah 8,450.00 6,500.00 8.00
134 Dop GIP dia 3/4 " MN.157 Buah 4,250.00 4,500.00 8.00
135 Dop GIP dia 1/2 " MN.158 Buah 5,400.00 5,000.00 3,500.00 8.00
136 Kran GIP dia 1 " MN.159 Buah 31,350.00 8.00
137 Kran GIP dia 3/4 " MN.160 Buah 37,400.00 25,000.00 25,000.00 8.00
138 Kran GIP dia 1/2 " MN.161 Buah 33,750.00 30,000.00 15,000.00 8.00
139 Tee GIP dia 4" x 4" MN.162 Buah 135,100.00 145,000.00 8.00 Verlop Tee
140 Tee GIP dia 4" x 3" MN.163 Buah 84,150.00 8.00
141 Tee GIP dia 4" x 2" MN.164 Buah 135,150.00 8.00
142 Tee GIP dia 4" x 1,5" MN.165 Buah 135,150.00 8.00
143 Tee GIP dia 4" x 1" MN.166 Buah 135,150.00 8.00
144 Tee GIP dia 4" x 3/4" MN.167 Buah 135,150.00 8.00
145 Tee GIP dia 4" x 1/2" MN.168 Buah 135,150.00 8.00
146 Tee GIP dia 3" x 3" MN.169 Buah 84,150.00 85,000.00 8.00
147 Tee GIP dia 3" x 2" MN.170 Buah 84,150.00 95,000.00 8.00 Verlop Tee
148 Tee GIP dia 3" x 1,5" MN.171 Buah 84,150.00 80,000.00 8.00 Verlop Tee
149 Tee GIP dia 3" x 1" MN.172 Buah 84,150.00 95,000.00 8.00 Verlop Tee
150 Tee GIP dia 3" x 3/4" MN.173 Buah 84,150.00 8.00
151 Tee GIP dia 3" x 1/2" MN.174 Buah 84,150.00 8.00
152 Tee GIP dia 2" x 2" MN.175 Buah 25,200.00 26,000.00 8.00 Verlop Tee
153 Tee GIP dia 2" x 1,5" MN.176 Buah 56,650.00 21,000.00 8.00 Verlop Tee
154 Tee GIP dia 2" x 1" MN.177 Buah 25,200.00 18,000.00 8.00 Verlop Tee
155 Tee GIP dia 2" x 3/4" MN.178 Buah 25,300.00 17,000.00 8.00 Verlop Tee
156 Tee GIP dia 2" x 1/2" MN.179 Buah 56,700.00 15,000.00 8.00 Verlop Tee
157 Tee GIP dia 1,5" x 1,5" MN.180 Buah 16,900.00 18,000.00 8.00 Verlop Tee
158 Tee GIP dia 1,5" x 1" MN.181 Buah 14,550.00 15,000.00 8.00 Verlop Tee
159 Tee GIP dia 1,5" x 3/4" MN.182 Buah 13,050.00 10,000.00 8.00 Verlop Tee
160 Tee GIP dia 1,5" x 1/2" MN.183 Buah 15,300.00 7,500.00 8.00 Verlop Tee
161 Tee GIP dia 1" x 1" MN.184 Buah 15,300.00 10,000.00 8.00 Verlop Tee
162 Tee GIP dia 1" x 3/4" MN.185 Buah 9,350.00 7,500.00 8.00 Verlop Tee
163 Tee GIP dia 1" x 1/2" MN.186 Buah 10,150.00 6,000.00 8.00 Verlop Tee
164 Tee GIP dia 3/4" x 3/4" MN.187 Buah 9,250.00 6,000.00 8.00 Verlop Tee
165 Tee GIP dia 3/4" x 1/2" MN.188 Buah 122,450.00 5,000.00 8.00 Verlop Tee
166 Tee GIP dia 1/2" x 1/2" MN.189 Buah 122,450.00 5,000.00 8.00 Verlop Tee
167 Reducer GIP / over chok dia 4" x 3" MN.190 Buah 122,450.00 65,000.00 8.00
168 Reducer GIP / over chok dia 4" x 2" MN.191 Buah 122,450.00 8.00
169 Reducer GIP / over chok dia 4" x 1,5" MN.192 Buah 122,450.00 8.00
170 Reducer GIP / over chok dia 4" x 1" MN.193 Buah 122,450.00 8.00
171 Reducer GIP / over chok dia 4" x 3/4" MN.194 Buah 73,950.00 8.00
172 Reducer GIP / over chok dia 4" x 1/2" MN.195 Buah 73,950.00 8.00
173 Reducer GIP / over chok dia 3" x 2" MN.196 Buah 100,250.00 37,000.00 8.00
174 Reducer GIP / over chok dia 3" x 1,5" MN.197 Buah 100,250.00 8.00
175 Reducer GIP / over chok dia 3" x 1" MN.198 Buah 100,250.00 8.00
176 Reducer GIP / over chok dia 3" x 3/4" MN.199 Buah 100,250.00 8.00
177 Reducer GIP / over chok dia 3" x 1/2" MN.200 Buah 29,500.00 8.00
178 Reducer GIP / over chok dia 2" x 1,5" MN.201 Buah 29,500.00 17,500.00 8.00
179 Reducer GIP / over chok dia 2" x 1" MN.202 Buah 29,500.00 17,000.00 8.00
180 Reducer GIP / over chok dia 2" x 3/4" MN.203 Buah 29,500.00 16,000.00 8.00
181 Reducer GIP / over chok dia 2" x 1/2" MN.204 Buah 29,500.00 13,000.00 8.00
182 Reducer GIP / over chok dia 1,5" x 1" MN.205 Buah 16,850.00 14,000.00 8.00
183 Reducer GIP / over chok dia 1,5" x 3/4" MN.206 Buah 11,800.00 10,000.00 8.00
184 Reducer GIP / over chok dia 1,5" x 1/2" MN.207 Buah 11,800.00 10,000.00 8.00
185 Reducer GIP / over chok dia 1" x 3/4" MN.208 Buah 11,800.00 8,500.00 8.00
186 Reducer GIP / over chok dia 1" x 1/2" MN.209 Buah 7,700.00 8,000.00 8.00
187 Reducer GIP / over chok dia 3/4" x 1/2" MN.210 Buah 7,700.00 6,500.00 8.00
188 Klem sadle GIP dia 4" x 2" MN.216 Buah 126,300.00 8.00
189 Klem sadle GIP dia 4" x 1" MN.217 Buah 126,300.00 40,000.00 8.00
190 Klem sadle GIP dia 4" x 3/4" MN.218 Buah 84,150.00 8.00
Hal : 5
1 2 3 4 5 6
191 Klem sadle GIP dia 4" x 1/2" MN.219 Buah 84,150.00 8.00
192 Tripleks 3 mm MN.222 Lembar 96,250.00 43,000.00 42,000.00 43,000.00 8.00
193 Tripleks 4 mm MN.223 Lembar 148,500.00 55,000.00 54,000.00 55,000.00 8.00
194 Tripleks 6 mm MN.224 Lembar 203,500.00 70,000.00 70,000.00 72,000.00 8.00
195 Tripleks 9 mm MN.225 Lembar 308,000.00 120,000.00 109,000.00 ### 8.00
196 Seng baja deck polos BD. 0,20 MN.226 Lembar 52,250.00 60,000.00 8.00
197 Seng baja deck polos BD. 0,30 MN.227 Lembar 82,750.00 8.00
198 Seng baja deck polos berwarna BD.0,2 MN.228 Lembar 44,275.00 8.00
199 Seng baja deck polos berwarna BD.0,3 MN.229 Lembar 51,700.00 8.00
200 Seng nok baja deck L 45 polos BD. 0,20MN.230 M' 26,050.00 8.00
201 Seng nok baja deck L 45 polos BD. 0,30MN.231 M' 34,100.00 8.00
202 Seng Leisplang berwarna BD. 0,30 x 30 MN.232 Lembar 22,250.00 40,000.00 8.00
203 Seng Leisplang berwarna BD. 0,20 MN.233 M' 16,850.00 8.00
204 Plat streep 30 x 3 mm MN.234 Batang 69,050.00 30,000.00 8.00
205 Plat streep 50 x 3 mm MN.235 Batang 82,750.00 40,000.00 8.00
206 Besi siku 30 x 30 x 3 MN.236 Batang 67,400.00 42,500.00 8.00
207 Besi siku 40 x 50 x 5 MN.237 Batang 67,400.00 65,000.00 8.00
208 Besi siku 50 x 50 x 5 MN.238 Batang 84,150.00 97,500.00 8.00
209 Lampu pijar 40 watt MN.239 Buah 8,450.00 5,000.00 8.00
210 Lampu TL 20 watt MN.240 Buah 20,650.00 14,000.00 5,000.00 8.00
211 Lampu TL 40 watt MN.241 Buah 23,750.00 15,000.00 9,000.00 8.00
212 Lampu TL 20 watt complit MN.242 Buah 126,300.00 110,000.00 22,500.00 8.00
213 Lampu TL 40 watt complit MN.243 Buah 141,900.00 120,000.00 30,000.00 8.00
214 Lampu taman MN.244 Buah 269,500.00 8.00
215 Fitting gantung MN.245 Buah 6,900.00 5,000.00 5,000.00 8.00
216 Fitting tempel MN.246 Buah 8,450.00 5,000.00 5,000.00 8.00
217 Stop kontak MN.247 Buah 25,300.00 15,000.00 12,500.00 8.00
218 Saklar Engkle MN.248 Buah 29,500.00 15,000.00 12,500.00 8.00
219 Kabel 2,5 mm (Fokus) MN.249 Roll 271,150.00 250,000.00 250,000.00 8.00
220 Sirap MN.250 Lembar 1,800.00 8.00
221 Kawat duri MN.251 Roll 126,300.00 90,000.00 77,500.00 8.00
222 Politur MN.252 Kg 58,950.00 30,000.00 8.00
223 Amplas MN.253 Lembar 3,050.00 4,000.00 2,500.00 8.00
224 Lem aica aibon MN.254 Kg 4,600.00 50,000.00 37,500.00 8.00
225 Paku kait MN.255 Kg 23,800.00 8.00
226 Paku sumbat MN.256 Kg 119,600.00 8.00
227 Paku tripleks MN.257 Kg 101,200.00 19,000.00 20,000.00 8.00
228 Teakwood 4 x 8 MN.258 Lembar 108,700.00 85,000.00 8.00
229 Teakwood pintu MN.259 Lembar 2,700.00 65,000.00 70,000.00 65,000.00 8.00 3x7
230 Reservoir air rangka baja 1 m3 MN.260 Buah 101,200.00 8.00
231 Sumur pompa air terpasang MN.261 Buah 106,150.00 8.00
232 Titik lampu + instalasi MN.262 Titik 31,150.00 8.00
233 Stop kontak + instalasi MN.263 Titik 105,150.00 1,000.00 8.00
234 Zekering Cash lokal 1 Group MN.264 Unit 28,600.00 5,000.00 15,000.00 8.00
235 Zekering Cash lokal 2 Group MN.265 Unit 42,100.00 6,000.00 25,000.00 8.00
236 Zekering Cash lokal 3 Group MN.266 Unit 67,350.00 35,000.00 8.00
237 Cat tembok 5 kg MN.267 Kg 92,550.00 65,000.00 64,000.00 65,000.00 8.00
238 Cat tembok 1 kg MN.268 Kg 84,150.00 17,500.00 15,000.00 8.00
239 Plamur tembok 5 kg MN.269 Kg 67,350.00 55,000.00 37,500.00 35,000.00 8.00
240 Plamur kayu MN.270 Kg 44,000.00 90,000.00 20,000.00 19,000.00 8.00
241 Cat kayu mengkilap MN.271 Kg 53,900.00 33,000.00 35,000.00 8.00
242 Dempul kayu MN.272 Kg 27,500.00 90,000.00 20,000.00 19,000.00 8.00
243 Cat menie MN.273 Kg 27,500.00 20,000.00 8.00
244 Cat kayu dasar MN.274 Kg 59,000.00 90,000.00 8.00
245 Tiner MN.275 Liter 42,100.00 33,000.00 20,000.00 18,000.00 8.00
246 Sirlak MN.276 Liter 109,450.00 60,000.00 70,000.00 8.00
247 Oker MN.277 Liter 25,300.00 25,000.00 8.00
248 Lem kayu MN.278 Kg 50,600.00 25,000.00 30,000.00 8.00 Fox
249 Kwas 2 Inc MN.279 Bh 26,700.00 10,000.00 3,000.00 8.00
250 Minyak cat MN.280 Kg 23,750.00 15,000.00 8.00
251 Minyak flux MN.281 Liter 4,600.00 8.00
Hal : 6
1 2 3 4 5 6
252 Minyak tanah MN.282 Liter 4,200.00 8.00
253 Minyak diesel / solar MN.283 Liter 5,900.00 8.00
254 Minyak bensin / premium MN.284 Liter 6,350.00 8.00
255 Minyak pelumas MN.285 Liter 38,300.00 8.00
256 Residu MN.286 Kg 134,750.00 8.00
257 Kawat kasa logam / kawat nyamuk MN.287 M 21,450.00 12,500.00 8.00
258 Besi beton ulir 12mm MN.288 Btg 8,450.00 120,000.00 8.00
259 Baja tulangan ulir MN.289 Kg 7,600.00 8.00
260 Kawat baja MN.290 Kg 20,250.00 8.00
261 Baut baja MN.291 Kg 8,450.00 8.00
262 Paku jembatan MN.292 Kg 8,450.00 8.00
263 Baja tulangan polos MN.293 Kg 7,000.00 8.00
264 Kawat bronjong Lokal MN.294 Unit 535,700.00 600,000.00 8.00
265 Kawat bronjong jangkar MN.295 Unit 382,800.00 8.00
266 Kawat bronjong bofananda MN.296 Unit 497,200.00 8.00
267 Aspal bitumen MN.297 Kg 6,900.00 8.00
268 Aspal buton MN.298 Ton 1,150,000.00 8.00
269 Gemuk MN.299 Kg 16,850.00 8.00
270 Olie drum MN.300 Liter 22,700.00 8.00
271 Besi beugel / baut ( pengikat kuda-kuda MN.301 Buah 19,150.00 20,000.00 8.00
272 Engsel lokal MN.302 Pasang 16,850.00 2,500.00 8.00
273 Grendel lokal MN.303 Buah 23,650.00 2,500.00 8.00
274 Kunci tanam kwalitas biasa 2 x putar MN.304 Buah 67,350.00 25,000.00 40,000.00 8.00
275 Kunci tanam kwalitas sedang 2 x putar MN.305 Buah 109,450.00 40,000.00 60,000.00 75,000.00 8.00
276 Kunci tanam kwalitas baik 2 x putar MN.306 Buah 169,000.00 150,000.00 90,000.00 ### 8.00
277 Espagnoglet MN.307 Pasang 33,700.00 8.00
278 Hak angin MN.308 Pasang 30,250.00 1,500.00 3,000.00 8.00
279 Naco (rangka + daun ) 8 sisir MN.309 Lmbr 174,900.00 75,000.00 8.00
280 Bak mandi fiber glass MN.310 Unit 294,800.00 250,000.00 8.00
281 Kloset jongkok keramik ( setara KIA ) MN.311 Unit 150,700.00 300,000.00 ### 8.00
282 Kloset duduk keramik ( setara KIA ) MN.312 Unit 1,262,000.00 ### ### 8.00
283 Urinoir keramik ( setara KIA ) MN.313 Unit 589,300.00 750,000.00 8.00
284 Flour drain MN.314 Buah 25,300.00 15,000.00 10,000.00 8.00
285 Bak cuci tangan wastafel (setara keramiMN.315 Unit 539,000.00 350,000.00 750,000.00 ### 8.00
286 Bak cuci piring teraso MN.316 Unit 416,350.00 8.00
287 Bak cuci piring logam MN.317 Unit 463,000.00 210,000.00 ### 8.00
0
Mengetahui : 0
#REF! Kepala Bidang Cipta Karya
#REF! Dinas Pekerjaan Umum Kabupaten Ende,
No. Nama Barang 1/2" 3/4" 1" 1 1/4" 1 1/2" 2" 2 1/2" 3" 4" 5" 6" Keterangan
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
1. 2. 3. 4. 5. 6.
1 Elbow 900 3,960 5,590 8,155 13,050 16,310 25,630 48,930 74,560 135,140 372,800 535,900
2 Elbow 450 4,195 6,290 9,320 15,145 18,640 27,960 58,250 88,540 151,450 442,700 512,600
3 Tee 4,890 7,225 11,420 17,245 21,900 32,620 74,560 97,860 177,080 629,100
4 Bend 90 0
7,920 10,720 15,845 25,630 34,950 53,590 109,510 158,440 326,200
5 Union 13,280 16,310 19,805 27,950 37,280 53,590 93,200 146,790 279,600 629,100
6 Nipple 3,495 4,660 6,525 9,555 13,280 18,175 30,290 51,260 81,550 174,750 302,900
7 Sock 3,260 4,195 6,990 9,790 12,120 18,640 34,950 51,260 83,880 198,050 256,300
8 Plug 2,795 3,495 4,660 6,990 8,155 11,650 23,300 32,620 58,250 174,750
9 Cap 3,260 3,960 5,590 8,155 10,720 14,915 30,290 41,940 69,900 233,000
10 Round Flens 39,610 83,880 128,150 233,000
11 Cross 11,875 16,625 22,565 33,250 45,125 61,750 118,750 166,250 308,760
12 Lock Nut 3,090 3,090 3,800
13 Ext. Price 7,125 8,310 11,875
14 Red Tee 9,550 14,680 22,135 27,960 39,610 81,550 116,500 221,350 807,500
15 Red Sock 5,590 7,455 10,950 13,050 19,805 37,280 58,250 107,180 285,000
16 Bushing 3,960 5,825 9,320 10,950 15,145 25,630 37,280 69,900 199,500
17 Red Elbow 6,755 10,250 16,545 20,505 30,290
18 Red Nipple 5,825 8,390 13,980 17,475 25,630
19 Red T Knee 32,620
20 Sreet Elbow 4,750 6,890 10,215
DAFTAR HARGA ACCESSORIES PIPA
Mengetahui :
Pj. Kepala Dinas Pekerjaan Umum
Kabupaten Ende,
Ir. L. Y. V. MARIO
PEMBINA
NIP. 19620323 199211 1 002
DAFTAR HARGA ACCESSORIES GI
3 End Cap OD 40 mm
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
4 Equa Tee OD 40 mm
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
5 Reducing Coupler OD 40 x 32 mm
OD 50 x 32 mm
OD 50 x 40 mm
OD 63 x 32 mm
OD 63 x 40 mm
OD 63 x 50 mm
OD 75 x 50 mm
OD 75 x 63 mm
OD 90 x 63 mm
OD 90 x 75 mm
OD 110 x 90 mm
6 Reducing Tee OD 40 x 32 mm
OD 50 x 32 mm
OD 50 x 40 mm
OD 63 x 50 mm
OD 110 x 63 mm
OD 110 x 75 mm
OD 110 x 90 mm
DAFTAR HARGA
COMPPRESSION FITTING UNTUK PIPA PE PN 10
PT RUSLI VINILON SAKTI
Tanggal, 24 Nopember 2008
2 Clamp Saddle
OD 63 x 1"
OD 63 x 1 1/4"
OD 75 x 1"
OD 90 x 1" s
OD 90 x 1.1/4"
OD 90 x 2"
OD 110 x 1"
OD 110 x 1/1/4"
OD 110 x 2"
OD 160 x 1"
OD 160 x 1.1/4"
7 Elbow 90c
OD 25 mm
OD 40 mm
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
DAFTAR HARGA
COMPPRESSION FITTING UNTUK PIPA PE PN 10
PT RUSLI VINILON SAKTI
Tanggal, 05 Nopember 2007
2 Clamp Saddle
OD 63 x 1" 22,900
OD 63 x 1 1/4" 29,500
OD 75 x 1" 37,200
OD 90 x 1" s 41,200
OD 90 x 1.1/4" 59,100
OD 90 x 2" 63,200
OD 110 x 1" 76,600
OD 110 x 1/1/4" 76,600
OD 110 x 2" 76,600
OD 160 x 1" 104,700
OD 160 x 1.1/4" 124,600
7 Elbow 90c
OD 25 mm 99,200
OD 40 mm 39,100
OD 50 mm 46,300
OD 63 mm 73,100
OD 75 mm 69,900
OD 90 mm 222,600
OD 110 mm 604,300
DAFTAR HARGA ACCESSORIES PIPA PE
2 Reducing Coupling
HRC 25. 20 20 x 20
HRC 32. 20 25 x 25
HRC 32. 25 32 x 32
3 Equal Elbow
HEE 20 20 x 20
HEE 25 25 x 25
HEE 32 32 x 32
4 Reducer Elbow
HRE 25. 20 25 x 20
HRE 32.25 32 x 25
5 Equal Tee
HET 20 20 x 20 x 20
HET 25 25 x 25 x 25
HET 32 32 x 32 x 32
6 Reducing Tee
HRT 25.20 25 x 25 x 20
HRT 32.20 32 x 32 x 20
HRT 32.25 32 x 32 x 25
11 Cross Tee A B A1 D
HCT 25 1/2 25 1/2
HCT 25 1/2 32 1/2
HCT 32 1/2 32 1/2
No. Kode Size Buah Buah Harga / Keterangan
(MM) Buah
1. 3. 4. 5. 6. 7. 8.
14 Tanc Connector
HTC 25.3/4 25 x 3/4 "
HTC 32.1 32 x 1"
15 Bush
HB 1.3/4 1" x 3/4"
HB 3/4. 1/2 3/4" x 1/2"
16 Extension Paece
HEP 1 1/2 " x 1/2"
18 Cuuter Pipe 40 mm
DAFTAR HARGA
PIPA & FITTING PE
INNOVA by VINILON
PT RUSLI VINILON SAKTI
Tanggal, 28 Pebruari 2008
2 Reducing Coupling
HRC 25. 20 20 x 20 500 100 11,600
HRC 32. 20 25 x 25 320 80 14,100
HRC 32. 25 32 x 32 280 70 14,100
3 Equal Elbow
HEE 20 20 x 20 600 100 11,700
HEE 25 25 x 25 280 70 13,300
HEE 32 32 x 32 160 40 15,900
4 Reducer Elbow
HRE 25. 20 25 x 20 280 70 12,700
HRE 32.25 32 x 25 160 40 15,600
5 Equal Tee
HET 20 20 x 20 x 20 300 50 10,800
HET 25 25 x 25 x 25 200 50 12,000
HET 32 32 x 32 x 32 100 25 24,200
6 Reducing Tee
HRT 25.20 25 x 25 x 20 200 50 12,000
HRT 32.20 32 x 32 x 20 100 25 22,000
HRT 32.25 32 x 32 x 25 100 25 24,200
11 Cross Tee A B A1 D
HCT 25 1/2 25 1/2 200 50 19,900
HCT 25 1/2 32 1/2 200 50 25,300
HCT 32 1/2 32 1/2 200 50 26,000
Hal. 2.
No. Kode Size Buah Buah Harga / Keterangan
(MM) Buah
1. 3. 4. 5. 6. 7. 8.
14 Tanc Connector
HTC 25.3/4 25 x 3/4 " 320 14,300
HTC 32.1 32 x 1" 160 19,900
15 Bush
HB 1.3/4 1" x 3/4" 900 2,500
HB 3/4. 1/2 3/4" x 1/2" 1,800 2,000
16 Extension Paece
HEP 1 1/2 " x 1/2" 900 7,700
S 5. SDR 11 (PN 16) S 6,3. SDR 13,6 (PN 12,5) S 8. SDR 17 (PN 10) S 10. SDR 21 (PN 10) Panjang Pipa Ket.
No. Diameter Tebal Harga/ Harga Harga dari Tebal Harga/ Harga Harga dari Tebal Harga/ Harga Harga dari Tebal Harga/ Harga Harga dari Meter/Roll
Inci MM Meter di Ende Ende-lokasi MM Meter di Ende Ende-lokasi MM Meter di Ende Ende-lokasi MM Meter di Ende Ende-lokasi
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan
Inci MM Meter/Roll Rp Rp
1. 2. 3. 4. 5. 6. 7. 8.
1 1/2 2.3 200 Roll
2 3/4 2.3 200 Roll
3 1 3.0 200 Roll
4 1 1/4 3.7 100 Roll
5 1 1/2 4.6 100 Roll
1 1/2 3.7 100 Roll
1 1/2 3.0 100 Roll
1 1/2 2.4 100 Roll
6 2 5.6 100 Roll
2 4.7 100 Roll
2 3.8 100 Roll
2 3.0 100 Roll
7 2.5 6.8 100 Roll
2.5 5.6 100 Roll
2.5 4.5 100 Roll
2.5 3.6 100 Roll
8 3 8.2 100 Roll
3 6.7 100 Roll
3 5.4 100 Roll
3 4.3 100 Roll
9 4 10.0 100 Roll
4 8.1 100 Roll
4 6.6 100 Roll
4 5.3 100 Roll
9 5 11.4 100 Roll
5 9.2 100 Roll
5 7.4 100 Roll
5 6.0 100 Roll
10 6 14.6 100 Roll
6 11.8 100 Roll
6 9.5 100 Roll
6 7.7 100 Roll
11 7 100 Roll
7 13.3 100 Roll
7 10.7 100 Roll
7 8.6 100 Roll
12 8 18.2 100 Roll
8 14.7 100 Roll
8 11.9 100 Roll
8 9.6 100 Roll
13 9 20.5 100 Roll
9 16.6 100 Roll
9 13.4 100 Roll
9 10.8 100 Roll
14 10 22.7 100 Roll
10 18.4 100 Roll
10 14.8 100 Roll
10 11.9 100 Roll
15 12 28.6 100 Roll
12 23.2 100 Roll
12 18.7 100 Roll
12 15.0 100 Roll
16 14 32.2 100 Roll
14 26.1 100 Roll
14 21.1 100 Roll
14 16.9 100 Roll
Hal. 2.
No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan
Inci MM Meter/Roll Rp Rp
1. 2. 3. 4. 5. 6. 7. 8.
No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan
Inci MM Meter/Roll Rp Rp
1. 2. 3. 4. 5. 6. 7. 8.
1 1/2 2.3 200 Roll 5,000 1,000,000 8
2 3/4 2.3 200 Roll 6,000 1,200,000 8
3 1 3.0 200 Roll 10,800 2,160,000 8
4 1 1/4 3.7 100 Roll 19,100 1,910,000 8
5 1 1/2 4.6 100 Roll 28,800 2,880,000 8
1 1/2 3.7 100 Roll 24,400 2,440,000 8
1 1/2 3.0 100 Roll 20,000 2,000,000 8
1 1/2 2.4 100 Roll 16,400 1,640,000 8
6 2 5.6 100 Roll 47,100 4,710,000 8
2 4.7 100 Roll 39,100 3,910,000 8
2 3.8 100 Roll 32,000 3,200,000 8
2 3.0 100 Roll 25,800 2,580,000 8
7 2.5 6.8 100 Roll 65,300 6,530,000 8
2.5 5.6 100 Roll 54,200 5,420,000 8
2.5 4.5 100 Roll 45,300 4,530,000 8
2.5 3.6 100 Roll 36,900 3,690,000 8
8 3 8.2 100 Roll 95,100 9,510,000 8
3 6.7 100 Roll 77,800 7,780,000 8
3 5.4 100 Roll 64,900 6,490,000 8
3 4.3 100 Roll 52,900 5,290,000 8
9 4 10.0 100 Roll 140,800 14,080,000 8
4 8.1 100 Roll 116,900 11,690,000 8
4 6.6 100 Roll 96,900 9,690,000 8
4 5.3 100 Roll 79,100 7,910,000 8
9 5 11.4 100 Roll 182,700 18,270,000 8
5 9.2 100 Roll 150,700 15,070,000 8
5 7.4 100 Roll 123,600 12,360,000 8
5 6.0 100 Roll 100,900 10,090,000 8
10 6 14.6 100 Roll 298,700 29,870,000 8
6 11.8 100 Roll 246,700 24,670,000 8
6 9.5 100 Roll 202,200 20,220,000 8
6 7.7 100 Roll 166,200 16,620,000 8
11 7 100 Roll 377,800 37,780,000 8
7 13.3 100 Roll 312,900 31,290,000 8
7 10.7 100 Roll 255,600 25,560,000 8
7 8.6 100 Roll 208,400 20,840,000 8
12 8 18.2 100 Roll 465,800 46,580,000 8
8 14.7 100 Roll 383,600 38,360,000 8
8 11.9 100 Roll 315,600 31,560,000 8
8 9.6 100 Roll 258,700 25,870,000 8
13 9 20.5 100 Roll 589,300 58,930,000 8
9 16.6 100 Roll 487,100 48,710,000 8
9 13.4 100 Roll 400,400 40,040,000 8
9 10.8 100 Roll 328,700 32,870,000 8
14 10 22.7 100 Roll 724,900 72,490,000 8
10 18.4 100 Roll 600,000 60,000,000 8
10 14.8 100 Roll 490,700 49,070,000 8
10 11.9 100 Roll 399,600 39,960,000 8
15 12 28.6 100 Roll 1,450,700 145,070,000 8
12 23.2 100 Roll 952,900 95,290,000 8
12 18.7 100 Roll 780,400 78,040,000 8
12 15.0 100 Roll 634,200 63,420,000 8
16 14 32.2 100 Roll 1,460,400 146,040,000 8
14 26.1 100 Roll 1,208,000 120,800,000 8
14 21.1 100 Roll 993,300 99,330,000 8
14 16.9 100 Roll 804,900 80,490,000 8
Hal. 2.
No. Diameter Tebal Panjang Pipa Harga / Meter Harga / Roll Jarak Keterangan
Inci MM Meter/Roll Rp Rp
1. 2. 3. 4. 5. 6. 7. 8.
III. PERHITUNGAN
Dimuat dengan tenaga manusia
PEKERJA
Biaya Pekerja / M3 =
{ (5 Jam x P) : Qt } x RpL01 Rp1 5,714.29 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E.06
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 12,300,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 12,300,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 11,428.57 Rp./Jam
3. Upah Pembantu Operator U2 8,571.43 Rp./Jam
4. Bahan Bakar Bensin Mb 6,450.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 50,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
DUMP TRUCK 3-4 M3
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 M3 E.08
2. Tenaga Pw 130.0 HP
3. Kapasitas Cp 3.3 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 509,040,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 509,040,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 10,714.29 Rp./Jam
3. Upah Pembantu Sopir U2 7,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 6,450.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 50,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
HARGA DASAR (BASIC PRICE )
DARI SUMBER BAHAN (QUARRY)
Tahun Anggaran 2020
KECAMATAN KOTA BARU
HARGA JARAK
No. URAIAN SATUAN STANDAR/DASAR QUARRY KET.
(Rp) ( Km )
1 2 3 4 5 6
OK
Kecamatan KOTA BARU
No Material Satuan Harga Satuan Keterangan
(Rp) Pajak
(Rp)
1 2 3 4 5
BAHAN LOKAL
1 Pasir Urug M3 53,900.00 10,780.00
2 Pasir Pasang / Pasir Beton M3 58,300.00 11,660.00
3 Kerikil Koral 5/7 cm M3 113,300.00 22,660.00
4 Kerikil Koral 3/5 cm M3 144,100.00 28,820.00
5 Kerikil Koral 2/3 cm M3 181,500.00 36,300.00
6 Kerikil Koral 1/2 cm M3 360,800.00 72,160.00
7 Koral Beton Split Uk 2-3 cm M3
8 Koral Beton Split Uk 3-5 cm M3
9 Batu Kali / Gunung M3 58,300.00 11,660.00
10 Tanah Urug Biasa M3 46,200.00 9,240.00
11 Tanah Urug Pilihan M3 68,200.00 13,640.00
12 Batu Pecah uk 10 - 15 cm M3 166,100.00 33,220.00
13 Batu Pecah uk 7 - 10 cm M3 324,500.00 64,900.00
14 Batu Pecah uk 5 - 7 cm M3 353,100.00 70,620.00
15 Batu Pecah uk 3 - 5 cm M3 401,500.00 80,300.00
16 Batu Pecah uk 2 - 3 cm M3 293,370.00 58,674.00
17 Batu Pecah uk 1 - 2 cm M3 429,932.00 85,986.00
18 Batu Pecah uk 0,5 - 1 cm M3 429,932.00 85,986.00
19 Kerikil dari galian bukit M3 79,200.00 15,840.00
20 Kerikil sungai ( tidak tersaring ) M3 67,100.00 13,420.00
21 Kerikil sungai (tersaring) M3 111,100.00 22,220.00
22 Kerikil pecah tersaring M3 210,100.00 42,020.00
23 Sirtu M3 67,100.00 13,420.00
24 Filler M3
25 Gamping M3 33,000.00 6,600.00
26 Gamping Jawa M3
HARGA BAHAN DAN UPAH
SURVEY DARI SUMBER BAHAN (QUARRY)
Tahun Anggaran 2020
KECAMATAN KOTA BARU
SURVEY ( HARGA BAHAN LOKAL ) KEPUTUSAN BUPATI ENDE
NOMOR : 435 / KEP / HK / 2019, TGL.05 AGUSTUS 2019 HARGA JARAK
NO. URAIAN KODE SATUAN SAMBA NANGABA RATE / IA ROWOREKE LOKOBOKO TTG. PENETAPAN STANDAR SATUAN HARGA YANG DIPAKAI QUARRY KET.
(Rp) (Rp) (Rp) (Rp) (Rp) PEMERINTAH KABUPATEN ENDE (Rp) ( Km )
TAHUN ANGGARAN 2020
1 2 3 4 5 6 7 8 9 10 11 12 13
219 Klem sadle GIP dia 4" x 1/2" MN. 191 Buah 37,500.00 42,000.00 37,500.00 117.00
220 Klem sadle GIP dia 2" x 3/4" MN. Buah 0.00 117.00
221 Klem sadle GIP dia 2" x 1/2" MN. Buah 30,000.00 30,000.00 117.00
222 Tripleks 3 mm MN. 192 Lembar 60,000.00 65,000.00 66.000,00 65,000.00 117.00
223 Tripleks 4 mm MN. 193 Lembar 78,000.00 80,000.00 70,000.00 86,000.00 80,000.00 117.00
224 Tripleks 6 mm MN. 194 Lembar 90,000.00 95,000.00 100,000.00 110,000.00 100,000.00 117.00
225 Tripleks 9 mm MN. 195 Lembar 130,000.00 130,000.00 145,000.00 154,000.00 145,000.00 117.00
226 Seng baja deck polos BD. 0,20 MN. 196 Lembar 112,000.00 60,000.00 66,000.00 66,000.00 117.00
227 Seng baja deck polos BD. 0,30 MN. 197 Lembar 60,000.00 113,000.00 60,000.00 117.00
228 Seng baja deck polos berwarna BD.0,20) MN. 198 Lembar 50,000.00 50,000.00 117.00
229 Seng baja deck polos berwarna BD.0,30 MN. 199 Lembar 0.00 117.00
230 Seng nok baja deck L 45 polos BD. 0,20 MN. 200 M' 0.00 117.00
231 Seng nok baja deck L 45 polos BD. 0,30 MN. 201 M' 0.00 117.00
232 Seng Leisplang berwarna BD. 0,30 x 30 MN. 202 Lembar 45,000.00 45,000.00 117.00
233 Seng Leisplang berwarna BD. 0,20 MN. 203 M' 0.00 117.00
234 Plat streep 30 x 3 mm MN. 204 Batang 75,000.00 83,000.00 75,000.00 117.00
235 Plat streep 50 x 3 mm MN. 205 Batang 80,000.00 112,000.00 80,000.00 117.00
236 Besi siku 30 x 30 x 3 MN. 206 Batang 80,000.00 80,000.00 50,000.00 88,000.00 80,000.00 117.00
237 Besi siku 40 x 50 x 5 MN. 207 Batang 130,000.00 75,000.00 184,000.00 130,000.00 117.00
238 Besi siku 50 x 50 x 5 MN. 208 Batang 220,000.00 180,000.00 125,000.00 242,000.00 220,000.00 117.00
239 Lampu pijar 40 watt MN. 209 Buah 10,000.00 10,000.00 11,000.00 10,000.00 117.00
240 Lampu TL 20 watt MN. 210 Buah 15,000.00 19,000.00 15,000.00 117.00
241 Lampu TL 40 watt MN. 211 Buah 20,000.00 20,000.00 22,000.00 20,000.00 117.00
242 Lampu TL 20 watt complit MN. 212 Buah 125,000.00 141,000.00 125,000.00 117.00
243 Lampu TL 40 watt complit MN. 213 Buah 150,000.00 165,000.00 150,000.00 117.00
244 Lampu taman MN. 214 Buah 200,000.00 275,000.00 200,000.00 117.00
245 Fitting gantung MN. 215 Buah 5,000.00 10,000.00 5,000.00 20,000.00 10,000.00 117.00
246 Fitting tempel MN. 216 Buah 12,000.00 15,000.00 15,000.00 17,000.00 15,000.00 117.00
247 Stop kontak MN. 217 Buah 16,000.00 17,000.00 20,000.00 22,000.00 20,000.00 117.00
248 Saklar Engkle MN. 218 Buah 15,000.00 17,000.00 20,000.00 22,000.00 20,000.00 117.00
249 Kabel 2,5 mm (Fokus) MN. 219 Roll 350,000.00 380,000.00 424,000.00 380,000.00 117.00
250 Sirap MN. 220 Lembar 0.00 117.00
251 Kawat duri MN. 221 Roll 95,000.00 90,000.00 85,000.00 110,000.00 95,000.00 117.00
252 Politur MN. 222 Kg 70,000.00 65,000.00 70,000.00 77,000.00 70,000.00 117.00
253 Amplas MN. 223 Lembar 5,000.00 6,000.00 7,500.00 9,000.00 7,500.00 117.00
254 Lem aica aibon MN. 224 Kg 65,000.00 45,000.00 75,000.00 72,000.00 72,000.00 117.00
255 Paku kait MN. 225 Kg 40,000.00 40,000.00 117.00
1 2 3 4 5 6 7 8 9 10 11 12 13
256 Paku sumbat MN. 226 Kg 194,000.00 194,000.00 117.00
257 Paku tripleks MN. 227 Kg 22,000.00 25,000.00 23,000.00 28,000.00 25,000.00 117.00
258 Teakwood MN. 228 Lembar 90,000.00 105,000.00 90,000.00 117.00
259 Teakwood pintu pintu MN. 229 Lembar 95,000.00 75,000.00 99,000.00 95,000.00 117.00
260 Reservoir air rangka baja 1 m3 MN. 230 Buah 0.00 117.00
261 Sumur pompa air terpasang MN. 231 Buah 850,000.00 750,000.00 850,000.00 117.00
262 Titik lampu + instalasi MN. 232 Titik 0.00 117.00
263 Stop kontak + instalasi MN. 233 Titik 0.00 117.00
264 Zekering Cash lokal 1 Group MN. 234 Unit 30,000.00 48,000.00 30,000.00 117.00
265 Zekering Cash lokal 2 Group MN. 235 Unit 0.00 117.00
266 Zekering Cash lokal 3 Group MN. 236 Unit 0.00 117.00
267 Cat tembok 5 kg MN. 237 Kg 110,000.00 160,000.00 110,000.00 121,000.00 121,000.00 117.00
268 Cat tembok 1 kg MN. 238 Kg 30,000.00 30,000.00 30,000.00 33,000.00 30,000.00 117.00
269 Plamur tembok 5 kg MN. 239 Kg 90,000.00 60,000.00 150,000.00 165,000.00 150,000.00 117.00
270 Plamur tembok 1 kg MN. 240 Kg 28,000.00 30,000.00 33,000.00 30,000.00 117.00
271 Plamur kayu MN. 241 Kg 40,000.00 35,000.00 40,000.00 44,000.00 40,000.00 117.00
272 Cat kayu mengkilap MN. 242 Kg 65,000.00 65,000.00 60,000.00 72,000.00 65,000.00 117.00
273 Dempul kayu MN. 243 Kg 40,000.00 35,000.00 40,000.00 44,000.00 40,000.00 117.00
274 Cat menie MN. 244 Kg 40,000.00 35,000.00 60,000.00 44,000.00 44,000.00 117.00
275 Cat kayu dasar MN. 245 Kg 60,000.00 66,000.00 60,000.00 117.00
276 Tiner MN. 246 Liter 30,000.00 40,000.00 45,000.00 50,000.00 45,000.00 117.00
277 Sirlak MN. 247 Kg 70,000.00 61,000.00 61,000.00 117.00
278 Oker MN. 248 kg 0.00 117.00
279 Lem kayu MN. 249 Kg 35,000.00 50,000.00 20,000.00 39,000.00 39,000.00 117.00
280 Kwas 2 Inc MN. 250 Bh 5,000.00 7,000.00 8,000.00 17,000.00 8,000.00 117.00
281 Minyak cat MN. 251 Kg 60,000.00 55,000.00 55,000.00 117.00
282 Minyak flux MN. 252 Liter 0.00 117.00
283 Minyak tanah MN. 253 Liter 4,000.00 4,000.00 117.00
284 Minyak diesel / solar MN. 254 Liter 5,150.00 6,000.00 5,150.00 117.00
285 Minyak bensin / premium MN. 255 Liter 6,450.00 8,000.00 6,450.00 117.00
1 2 3 4 5 6 7 8 9 10 11 12 13
286 Minyak pelumas (Mesran) MN. 256 Liter 50,000.00 50,000.00 117.00
287 Residu MN. 257 Kg 5,000.00 Oli Kotor 5,000.00 117.00
288 Kawat kasa logam / kawat nyamuk MN. 258 M 25,000.00 35,000.00 39,000.00 35,000.00 117.00
289 Besi beton ulir 12mm MN. 259 Btg 0.00 117.00
290 Baja tulangan ulir MN. 260 Kg 15,000.00 15,000.00 117.00
291 Kawat baja MN. 261 Kg 25,000.00 35,000.00 25,000.00 117.00
292 Baut baja MN. 262 Kg 248,000.00 248,000.00 117.00
293 Paku jembatan MN. 263 Kg 24,000.00 24,000.00 117.00
294 Baja tulangan polos MN. 264 Kg 13,000.00 13,000.00 117.00
295 Kawat bronjong Lokal MN. 265 Unit 0.00 117.00
296 Kawat bronjong jangkar MN. 266 Unit 591,000.00 591,000.00 117.00
297 Kawat bronjong bofananda MN. 267 Unit 759,000.00 759,000.00 117.00
298 Aspal bitumen MN. 268 Kg 0.00 117.00
299 Aspal buton MN. 269 Ton 0.00 117.00
300 Gemuk MN. 270 Kg 50,000.00 50,000.00 117.00
301 Olie drum MN. 271 Liter 0.00 117.00
302 Besi beugel / baut ( pengikat kuda-kuda ) MN. 272 Buah 50,000.00 25,000.00 33,000.00 33,000.00 117.00
303 Engsel lokal MN. 273 Pasang 22,000.00 30,000.00 20.000,00 25,000.00 25,000.00 117.00
304 Grendel lokal MN. 274 Buah 5,000.00 10,000.00 20,000.00 22,000.00 20,000.00 117.00
305 Kunci tanam kwalitas biasa 2 x putar MN. 275 Buah 150,000.00 165,000.00 150,000.00 117.00
306 Kunci tanam kwalitas sedang 2 x putar MN. 276 Buah 145,000.00 250,000.00 165,000.00 165,000.00 117.00
307 Kunci tanam kwalitas baik 2 x putar MN. 277 Buah 300,000.00 300,000.00 275,000.00 275,000.00 117.00
308 Espagnoglet MN. 278 Buah 43,000.00 43,000.00 117.00
309 Hak angin MN. 279 Buah 12,000.00 20,000.00 15,000.00 17,000.00 17,000.00 117.00
310 Naco (rangka + daun ) 8 sisir MN. 280 Lbr 150,000.00 170,000.00 150,000.00 117.00
311 Bak mandi fiber glass MN. 281 Unit 500,000.00 450,000.00 300,000.00 550,000.00 500,000.00 117.00
312 Kloset jongkok keramik ( setara KIA ) MN. 282 Unit 175,000.00 INA 500,000.00 200,000.00 220,000.00 220,000.00 117.00
313 Kloset duduk keramik ( setara KIA ) MN. 283 Unit 2,000,000.00 770,000.00 770,000.00 117.00
314 Urinoir keramik ( setara KIA ) MN. 284 Unit 1,500,000.00 904,000.00 904,000.00 117.00
315 Flour drain MN. 285 Buah 15,000.00 25,000.00 22,000.00 22,000.00 117.00
316 Bak cuci tangan wastafel (setara keramik) MN. 286 Unit 400,000.00 350,000.00 1,595,000.00 400,000.00 117.00
317 Bak cuci piring teraso MN. 287 Unit 500,000.00 250,000.00 605,000.00 500,000.00 117.00
318 Bak cuci piring logam MN. 288 Unit 650,000.00 450,000.00 715,000.00 650,000.00 117.00
319 Pipa PE dia 4 " Tebal 10 mm SDR 11 (PN. 16) MN. 289 M' 0.00 117.00
320 Pipa PE dia 3 " Tebal 8,2 mm SDR 11 (PN. 16) MN. 290 M' 220,000.00 220,000.00 117.00
321 Pipa PE dia 2,5 " Tebal 6,8 mm SDR 11 (PN. 16) MN. 291 M' 49,000.00 49,000.00 117.00
322 Pipa PE dia 2 " Tebal 5,8 mm SDR 11 (PN. 16) MN. 292 M' 110,000.00 110,000.00 117.00
323 Pipa PE dia 1,5 " Tebal 4,6 mm SDR 11 (PN. 16) MN. 293 M' 55,000.00 55,000.00 117.00
324 Pipa PE dia 1,25 " Tebal 3,7 mm SDR 11 (PN. 16) MN. 294 M' 21,000.00 21,000.00 117.00
325 Pipa PE dia 1 " Tebal 3,0 mm SDR 11 (PN. 16) MN. 295 M' 22,000.00 25,000.00 22,000.00 117.00
326 Pipa PE dia 3/4 " Tebal 2,3 mm SDR 11 (PN. 16) MN. 296 M' 15,000.00 17,000.00 15,000.00 117.00
327 Pipa PE dia 1/2 " Tebal 2,3 mm SDR 11 (PN. 16) MN. 297 M' 10,000.00 11,000.00 10,000.00 117.00
328 Coupler PE Mechanical Joint dia 4" MN. 298 Buah 0.00 117.00
329 Coupler PE Mechanical Joint dia 3" MN. 299 Buah 400,000.00 400,000.00 117.00
330 Coupler PE Mechanical Joint dia 2,5" MN. 300 Buah 214,000.00 214,000.00 117.00
331 Coupler PE Mechanical Joint dia 2" MN. 301 Buah 400,000.00 400,000.00 117.00
332 Coupler PE Mechanical Joint dia 1,5" MN. 302 Buah 267,000.00 267,000.00 117.00
hal, 9
1 2 3 4 5 6 7 8 9 10 11 12 13
333 Coupler PE Mechanical Joint dia 1,25" MN. 303 Buah 786,000.00 786,000.00 117.00
334 Coupler PE Mechanical Joint dia 1" MN. 304 Buah 39,000.00 39,000.00 117.00
335 Coupler PE Mechanical Joint dia 3/4" MN. 305 Buah 37,000.00 37,000.00 117.00
336 Coupler PE Mechanical Joint dia 1/2" MN. 306 Buah 33,000.00 33,000.00 117.00
337 Tee 900 PE Mechanical Joint dia 4" MN. 307 Buah 0.00 117.00
338 Tee 900 PE Mechanical Joint dia 3" MN. 308 Buah 0.00 117.00
339 Tee 900 PE Mechanical Joint dia 2,5" MN. 309 Buah 0.00 117.00
340 Tee 900 PE Mechanical Joint dia 2" MN. 310 Buah 0.00 117.00
341 Tee 900 PE Mechanical Joint dia 1,5" MN. 311 Buah 0.00 117.00
342 Tee 900 PE Mechanical Joint dia 1" MN. 312 Buah 0.00 117.00
343 Tee 900 PE Mechanical Joint dia 3/4" MN. 313 Buah 0.00 117.00
344 Tee 900 PE Mechanical Joint dia 1/2" MN. 314 Buah 0.00 117.00
345 Elbow PE 900 Mechanical Joint dia 4" MN. 315 Buah 0.00 117.00
346 Elbow PE 900 Mechanical Joint dia 3" MN. 316 Buah 0.00 117.00
347 Elbow PE 900 Mechanical Joint dia 2,5" MN. 317 Buah 0.00 117.00
348 Elbow PE 900 Mechanical Joint dia 2" MN. 318 Buah 0.00 117.00
349 Elbow PE 900 Mechanical Joint dia 1,5" MN. 319 Buah 0.00 117.00
350 Elbow PE 90 Mechanical Joint dia 1,25"
0
MN. 320 Buah 0.00 117.00
351 Elbow PE 900 Mechanical Joint dia 1" MN. 321 Buah 0.00 117.00
352 Elbow PE 90 Mechanical Joint dia 3/4"
0
MN. 322 Buah 0.00 117.00
353 Elbow PE 900 Mechanical Joint dia 1/2" MN. 323 Buah 0.00 117.00
354 PVC Clamp Saddle dia 3 x 1,5 " MN. 324 Buah 0.00 117.00
355 PVC Clamp Saddle dia 3 x 1,25 " MN. 325 Buah 0.00 117.00
356 PVC Clamp Saddle dia 3 x 1 " MN. 326 Buah 0.00 117.00
357 PVC Clamp Saddle dia 3 x 3/4 " MN. 327 Buah 0.00 117.00
358 PVC Clamp Saddle dia 3 x 1/2 " MN. 328 Buah 0.00 117.00
359 PVC Clamp Saddle dia 2 x 1,5 " MN. 329 Buah 0.00 117.00
360 PVC Clamp Saddle dia 2 x 1,25 " MN. 330 Buah 0.00 117.00
361 PVC Clamp Saddle dia 2 x 1 " MN. 331 Buah 0.00 117.00
362 PVC Clamp Saddle dia 2 x 3/4 " MN. 332 Buah 0.00 117.00
363 PVC Clamp Saddle dia 2 x 1/2 " MN. 333 Buah 0.00 117.00
364 PVC Clamp Saddle dia 1,5 x 1,25 " MN. 334 Buah 0.00 117.00
365 PVC Clamp Saddle dia 1,5 x 1 " MN. 335 Buah 0.00 117.00
366 PVC Clamp Saddle dia 1,5 x 3/4 " MN. 336 Buah 0.00 117.00
367 PVC Clamp Saddle dia 1,5 x 1/2 " MN. 337 Buah 0.00 117.00
368 Reducer Mechanical Joint GIP Dia 4 x 3 " MN. 338 Buah 132,000.00 132,000.00 117.00
369 Reducer Mechanical Joint GIP Dia 3 x 2 " MN. 339 Buah 157,000.00 157,000.00 117.00
370 Reducer Mechanical Joint GIP Dia 2,5 x 2 " MN. 340 Buah 157,000.00 157,000.00 117.00
371 Reducer Mechanical Joint GIP Dia 2 x 1,5 " MN. 341 Buah 157,000.00 157,000.00 117.00
372 Reducer Mechanical Joint GIP Dia 2 x 1 " MN. 342 Buah 0.00 117.00
373 Reducer Mechanical Joint GIP Dia 1,5 x 1 " MN. 343 Buah 157,000.00 157,000.00 117.00
374 Reducer Mechanical JointGIP Dia 1,25 x 1 " MN. 344 Buah 157,000.00 157,000.00 117.00
375 Reducer Mechanical Joint GIP Dia 1,25 x 3/4 " MN. 345 Buah 94,000.00 94,000.00 117.00
376 Reducer Mechanical Joint GIP Dia 1 x 3/4 " MN. 346 Buah 17,000.00 17,000.00 117.00
377 Reducer Mechanical Joint GIP Dia 3/4 x 1/2 " MN. 347 Buah 17,000.00 17,000.00 117.00
hal. 10
III. UPAH KERJA PERATURAN BUPATI ENDE NO.36 TH 2019 ( ttg. Penetapan Standar Biaya T. A. 2020 )
1 Pekerja L.01 1 O/H 75,000.00 75,000.00 7 Jam Kerja / Hari
2 Tukang L.02 2 O/H 100,000.00 100,000.00
3 Kepala Tukang L.03 3 O/H 110,000.00 110,000.00
4 Mandor L.04 4 O/H 120,000.00 120,000.00
5 Operator L.05 5 O/H 80,000.00 80,000.00
6 Pembantu Operator L.06 6 O/H 60,000.00 60,000.00
7 Sopir L.07 7 O/H 75,000.00 75,000.00
8 Pembantu Sopir L.08 8 O/H 50,000.00 50,000.00
9 Mekanik L.09 9 O/H 80,000.00 80,000.00
10 Pembantu Mekanik L.10 10 O/H 50,000.00 50,000.00
hal. 11
hal -hal yang perluh diperhatikan
A. SURVEY
1. Harga Bahan lokal disurvey pada 4 kecamatan dalam Kota
2. Harga bahan non lokal disurvey pada 3 toko bangunan yang ada di wilayah kabupaten d
3. Jarak angkut untuk bahan lokal diambil yg terjauh yaitu 9km (nangaba)
4. Jarak angkut untuk bahan lnon lokal diambil dari jarak ke ibu kota kecamatan masing2
5. Tidak berlaku untuk kec.pulau ende dan sebagian kec. Ndona timur (nila Dll)
6. Peraturan Bupati ende yg sedang berlaku
A. ANALISIS
1. Memakai metode pendekatan K9
2. Jarak Angkut Disesuaikan dengan Lokasi Masing2 tergantung tim survey
3. Semua harga sudah dianalisis lebih rendah atau sama dengan harga yg tertera pada BE
4. Harga tersebut sudah termasuk galian C
5 Perubahan jarak angkut pada sheet harga survey 2020 kolom jarak Quary Km
KOTA BARU
TUSAN BUPATI ENDE
NOMOR 7 TAHUN 2009
NGGAL 19 JANUARI 2009
29 9
33 9
52 9
72 9
65 9
8 9
45 9
87 9
57 9
57 9
117 9
97 9
84 9
92 9
53 9
9 9