ESTADO SITUACIONAL DE UBS


ITEM COMPONENTES
1 46
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 32 33 34 35 36 37 38 39 40 41 42 43 44 45 48 49 50 51 52 53 54 55
IE P IE I

01 Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

02 Zanja de Percolación X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

03 Caja de Distribuición X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

04 Tapa de Caja de Distribuición X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

05 Techo ü ü ü ü ü X ü ü X X ü ü ü X ü ü ü X ü ü ü ü ü ü ü X ü X ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü X ü ü X ü
06 Tubo de ventilación 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

07 Sombrero de Ventilación 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

08 Tubo de ventilación 4" ü ü ü ü ü ü ü ü ü 50% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü


09 Sombrero de Ventilación 4" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

10 Llave de paso de UBS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

11 Taza con tapa X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

12 Taza sin tapa X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

13 Lavamano X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

14 Urinario X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

15 Ducha X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

16 Sumidero de bronce de 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

17 Zardinel de Ducha X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

18 Trampa de Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

19 Grifo para Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

20 Vereda de Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Puerta para desinstalar ü ü ü ü ü X ü ü X X ü ü ü X ü ü ü X ü ü ü ü ü ü ü X ü X ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü X ü ü X ü


21 Puerta de Madera X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

22 Ventana de Madera 1 ü ü ü- ü ü X ü- ü- X X X ü- ü- ü- ü- X ü- X X ü- X X ü- X X X ü X ü X X ü ü ü ü- ü ü X ü- X X X X ü- ü- X X ü X X

23 Ventana de Madera 2 ü ü ü- ü ü X ü- ü- X X X ü- X ü- ü- ü- ü- X X ü- X X ü- X X X ü X ü X ü ü ü ü X X X X ü- X X X X ü- ü- X X X X X

24 Ventana de Madera 3 ü ü ü- ü X X ü- ü- X X X ü- ü- X ü- ü- ü- X X ü- ü X ü- X X X ü X ü X ü ü ü X ü- ü ü X ü- X X X X ü- ü- X X ü X X

25 Tapa Metálica Compostera 1 X X ü ü ü X ü- ü X X X X X X X X X X X X X X ü X X X X X ü X X ü ü ü ü ü X X X X X X X X X X X X X X

26 Tapa Metálica Compostera 2 X X ü ü ü X ü X X X X X X X X X X X X X X X ü X X X X X ü X X ü ü ü ü ü X X X X X X X X X X X X X X

27 Conexiones Intradomiciliarias X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

28 Caja de Registro de Agua X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

29 Valvulas y Accesorios / Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

30 Losa de Cimentación ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü
31 Columnas ü ü ü ü ü 25% ü ü 25% 25% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü 25% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü
32 Vigas ü ü ü ü ü 50% ü ü 50% 50% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü 50% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü 50% ü ü X ü
33 Sobrecimiento ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü
34 Losa Maciza ü ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- X ü- ü- ü- ü- ü- ü- X ü-
35 Muro compostera ü ü ü ü ü ü ü ü 80% 90% ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü 60% ü ü ü 80% ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü
36 Muro exterior ü ü ü ü ü X ü ü X X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü X ü
37 Escalera construido / sin tarrajear ü- ü- ü- ü- ü- X ü- ü- X X X ü- ü- ü- ü- ü- X ü- ü- ü- ü- ü- ü- X X X ü- X ü- X ü- ü- ü- ü- ü- ü- ü- ü- X ü- X X ü- X X X X X X X

38 Escalera ü- ü- ü- ü- ü- X ü- ü- X X X ü- ü- ü- ü- ü- X ü- ü- ü- ü- ü- ü- X X X ü- X ü- X ü- ü- ü- ü- ü- ü- ü- ü- X ü- X X ü- X X X X X X X

39 Pintura en ladrillos X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

40 Pintura en vigas, columnas y muros X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

41 Lavadero con ocre X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

42 Tarrajeo en muro compostera 90% 80% 40% 30% 80% X 90% 80% X X 80% 80% 10% 10% 80% 90% 40% 70% 40% 20% 10% 20% 60% 30% 80% X 80% X 40% 60% 80% 30% 80% ü 80% 70% 40% 20% 80% 60% 30% X 70% X 30% X 30% 50% X X

43 Tarrajeo en muro exterior 50% 40% 30% 20% 40% X 90% 20% X X 50% 80% 20% 10% 90% 50% 80% 70% 20% 20% 10% 10% 60% 30% 50% X 80% X 40% 50% 70% 30% 50% 50% 60% 80% 20% X 30% 60% X X 30% 40% 20% X 30% 20% X X

44 Tarrajeo en derrames 50% 50% 30% 20% 20% X 90% 40% X X 60% 90% 60% 30% ü ü 60% 80% 60% ü 50% 50% 60% 30% 50% X 80% X 50% X ü 20% 90% 50% 90% 90% 90% X ü 80% X X 30% ü ü X X 90% X X
INVENTARIO - UNIDAD BASICA DE SANEAMIENTO FAMILIAR

"MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE AGUA POTABLE E INSTALACIÓN DE LA DISPOSICIÓN SANITARIA DE EüCRETAS Y DE LAS AGUAS GRISES EN LA COMUNIDAD NATIVA DE NUEVO BELÉN, DISTRITO DE IMAZA, PROVINCIA DE
OBRA:
BAGUA, DEPARTAMENTO DE AMAZONAS"
ENTIDAD: PROGRAMA NACIONAL DE SANEAMIENTO RURAL
CONTRATISTA: CONSORCIO ALHBA
RESIDENTE DE OBRA: OSMAN E. SAPAICO VARGAS

ESTADO SITUACIONAL DE UBS


ITEM COMPONENTES
60 85 86 87 88 89 90 91 92 94 95 96 97 98 99 100 101 103 105 106 107 108 109
56 57 58 59 61 62 63 65 66 68 69 70 71 72 73 74 75 76 77 78 79 82 83
P.S. P P P P P P P P P P P P P P P P P P P IE S P P

01 Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

02 Zanja de Percolación X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

03 Caja de Distribuición X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

04 Tapa de Caja de Distribuición X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

05 Techo ü ü ü X ü X ü- ü- ü- ü X X X X ü X X ü X X X X X X X ü X X ü X X X ü X X ü X X ü X X X ü X X

06 Tubo de ventilación 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

07 Sombrero de Ventilación 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

08 Tubo de ventilación 4" ü ü ü X ü X ü ü ü ü X ü ü ü ü X X ü ü X ü ü X 50% ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü


09 Sombrero de Ventilación 4" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

10 Llave de paso de UBS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

11 Taza con tapa X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

12 Taza sin tapa X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

13 Lavamano X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

14 Urinario X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

15 Ducha X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

16 Sumidero de bronce de 2" X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

17 Zardinel de Ducha X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

18 Trampa de Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

19 Grifo para Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

20 Vereda de Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

Puerta para desinstalar ü ü ü X ü X ü ü ü ü X X X X ü X X ü X X X X X X X ü X X ü X X X ü X X ü X X ü X X X ü X X

21 Puerta de Madera X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

22 Ventana de Madera 1 X X ü X X X ü- ü- X ü- X X X X X X X ü X X X X X X X ü X X X X X X ü X ü ü X X ü X X X ü- X X

23 Ventana de Madera 2 X X ü X ü- X ü- ü- X ü- X X X X X X X ü X X X X X X X ü X X X X X X ü X X X X X ü X X X ü- X X

24 Ventana de Madera 3 X X ü X ü- X ü- ü ü ü- X X X X X X X X X X X X X X X ü X X ü X X X ü X ü ü X X ü X X X ü- X X

25 Tapa Metálica Compostera 1 X X X X X X ü ü X X X X X X X X X X X X X X X X X X X X X ü ü- X ü ü- ü- X X X ü- ü- ü- ü- X X X

26 Tapa Metálica Compostera 2 X X X X X X ü ü X X X X X X X X X X X X X X X X X X X X X ü ü- X ü ü- ü- X X X ü- ü- ü- ü- X X X

27 Conexiones Intradomiciliarias X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

28 Caja de Registro de Agua X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

29 Valvulas y Accesorios / Lavadero X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

30 Losa de Cimentación ü ü ü X ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü
31 Columnas ü ü ü X ü X ü ü ü ü X ü ü 30% ü X X ü ü 25% 20% 25% X 25% ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü
32 Vigas ü ü ü X ü X ü ü ü ü X ü ü 50% ü 20% 50% ü ü 50% 50% X X X ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü
33 Sobrecimiento ü ü ü X ü X ü ü ü ü X ü ü ü ü ü ü ü ü ü ü ü 80% ü ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü
34 Losa Maciza ü- ü- ü- X ü- X ü- ü- ü- ü- X ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- X X X ü- ü- X ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü- ü ü- ü- ü- ü- ü- ü
35 Muro compostera ü ü 80% X ü X ü ü ü ü 30% 80% ü ü ü 70% ü ü 80% 30% 70% 80% 60% 80% ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü 95% ü
36 Muro exterior ü ü ü X ü X ü ü ü ü X ü ü ü ü X X ü ü X X X X X ü ü X ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü ü
37 Escalera construido / sin tarrajear X X ü- X X X ü- ü- ü- ü- X X X X X X X ü- X X X X X X X X X X X ü- X X ü- X ü- ü- X X ü- ü- ü- ü- ü- X X

38 Escalera X X ü- X X X ü- ü- ü- ü- X X X X X X X ü- X X X X X X X X X X X ü- X X ü- X ü- ü- X X ü- ü- ü- ü- ü- X X

39 Pintura en ladrillos X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

40 Pintura en vigas, columnas y muros X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

41 Lavadero con ocre X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

42 Tarrajeo en muro compostera 30% X 70% X 70% X 50% ü 80% 50% X X X X X X X 60% X X X X X X 20% 95% X 70% 50% 80% 80% 60% 70% 50% 40% 70% 80% 40% 60% 80% 50% X X

43 Tarrajeo en muro exterior 30% X 60% X 80% X 50% 50% ü 40% X X X X X X X 60% X X X X X X 60% 60% X 60% 50% 80% 80% 50% 60% 70% 40% 50% 70% 70% 60% 70% 80% X X

44 Tarrajeo en derrames X X 70% X ü X ü ü 60% ü X X X X X X X 50% X X X X X X 30% 80% X 70% 40% 80% 80% 50% 80% 60% 80% 90% 80% 40% 80% 80% 80% X X
ANEXO Nro 03
COMPATIBILIDAD DEL SALDO DE LA OBRA

: MEJ. Y AMPL. DE LOS SERVICIOS DE AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGU
OBRA
EN LA COMUNIDAD NATIVA DE YUPICUSA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

SUB PRESUPUESTO : SISTEMA DE UBS. INSTITUCIONES EDUCATIVAS


ENTIDAD : UGR AMAZONAS. PROGRAMA DE AGUA POTABLE Y SANEAMIENTO PARA LA AMAZONIA RURAL
COTRATISTA : CONSORCIO INKAS GOLD
TIEMPO EJECUCION : 05/10/2021 al 04/12/2021
ING. RESIDENTE : ING. JOHANNA FIGUEROA POZO
ING. INSPECTOR : ING.

TOTAL COMPONENTES
ITEM DESCRIPCION / COMPONENTE UND
UBS EXISTENTES x EJECUTAR OFERTADA COMPATIBLE

1 Lavadero II.EE (Inic., prim. y Secund.) Und. 3 - 3.00 - - 3.00


2 Escalera Und. 0 - - - -
3 Zanja de Percolación Und. 3 - 3.00 - - 3.00

4 Caja de Distribuición Und. 3 - 3.00 - - 3.00

5 Techo con Calamina / Madera (Vivienda) Und. 3 - 3.00 - - 3.00

6 Tubo de ventilación Und. 3 - 3.00 - - 3.00


7 Sardinel de Ducha Und. 0 - - - -
8 Aapartos y Accesorios Sanitarios Und. 15 - - - -
9 Trampa de Lavadero Und. 15 - 15.00 - 15.00

10 Grifo para Lavadero Und. 15 - 15.00 - 15.00

11 Vereda de Lavadero Und. 9 - 9.00 - 9.00


COMPATIBILIDAD DEL SALDO DE LA OBRA

: MEJ. Y AMPL. DE LOS SERVICIOS DE AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGU
OBRA
EN LA COMUNIDAD NATIVA DE YUPICUSA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

SUB PRESUPUESTO : SISTEMA DE UBS. INSTITUCIONES EDUCATIVAS


ENTIDAD : UGR AMAZONAS. PROGRAMA DE AGUA POTABLE Y SANEAMIENTO PARA LA AMAZONIA RURAL
COTRATISTA : CONSORCIO INKAS GOLD
TIEMPO EJECUCION : 05/10/2021 al 04/12/2021
ING. RESIDENTE : ING. JOHANNA FIGUEROA POZO
ING. INSPECTOR : ING.

TOTAL COMPONENTES
ITEM DESCRIPCION / COMPONENTE UND
UBS EXISTENTES x EJECUTAR OFERTADA COMPATIBLE

12 Puerta de Madera Und. 15 - 15.00 - - 15.00

13 Ventana de Madera 1 Und. 15 - 15.00 - - 15.00

14 Ventana de Madera 2 Und. 15 - 15.00 - - 15.00

15 Ventana de Madera 3 Und. 15 - 15.00 - - 15.00

16 Tapa Metálica Compostera Und. 30 - 30.00 - - 30.00

17 Pintura Und. 6 - 6.00 - 6.00

18 Conecciones Intradomiliarias Und. 12 - 12.00 - - 12.00


COMPATIBILIDAD DEL SALDO DE LA OBRA

: MEJ. Y AMPL. DE LOS SERVICIOS DE AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGU
OBRA
EN LA COMUNIDAD NATIVA DE YUPICUSA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

SUB PRESUPUESTO : SISTEMA DE UBS. INSTITUCIONES EDUCATIVAS


ENTIDAD : UGR AMAZONAS. PROGRAMA DE AGUA POTABLE Y SANEAMIENTO PARA LA AMAZONIA RURAL
COTRATISTA : CONSORCIO INKAS GOLD
TIEMPO EJECUCION : 05/10/2021 al 04/12/2021
ING. RESIDENTE : ING. JOHANNA FIGUEROA POZO
ING. INSPECTOR : ING.

TOTAL COMPONENTES
ITEM DESCRIPCION / COMPONENTE UND
UBS EXISTENTES x EJECUTAR OFERTADA COMPATIBLE

19 Caja de Registro de Agua Und. 12 - 12.00 - 12.00


COMPATIBILIDAD DEL SALDO DE LA OBRA

: MEJ. Y AMPL. DE LOS SERVICIOS DE AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGU
OBRA
EN LA COMUNIDAD NATIVA DE YUPICUSA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

SUB PRESUPUESTO : SISTEMA DE UBS. INSTITUCIONES EDUCATIVAS


ENTIDAD : UGR AMAZONAS. PROGRAMA DE AGUA POTABLE Y SANEAMIENTO PARA LA AMAZONIA RURAL
COTRATISTA : CONSORCIO INKAS GOLD
TIEMPO EJECUCION : 05/10/2021 al 04/12/2021
ING. RESIDENTE : ING. JOHANNA FIGUEROA POZO
ING. INSPECTOR : ING.

TOTAL COMPONENTES
ITEM DESCRIPCION / COMPONENTE UND
UBS EXISTENTES x EJECUTAR OFERTADA COMPATIBLE

20 Valvulas y Accesorios / Lavadero Und. 12 - 12.00 - 12.00

21 Sombrero de Ventilación und. 30 - 30.00 - - 30.00


MPATIBILIDAD DEL SALDO DE LA OBRA

AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGUAS GRISES
USA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

RECOMENDACIONES / OBSERVACIONES

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.

No está instalada, para la funcionabiliad del sistema


se requiere instalación.
La Mayoría de los grifos de los lavaderos se
encuentran deterioradas. Sugerimos que se cambie en
su totalidad.

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere la pintura.
MPATIBILIDAD DEL SALDO DE LA OBRA

AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGUAS GRISES
USA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

RECOMENDACIONES / OBSERVACIONES

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.
Falta esta cantidad para la funcionabilidad del
sistema. Recomendamos que se considere.

En el Item, 04.01.05.06. INSTALACION DE TAPA


METALICA F°G° e=3 /16" CON 0,85m x 0,60m,
EXISTENTE, en los Análisis de Precios Unitarios
solamente indica la Instalación mas no el suministro.
Por tanto, recomendamos considerar mayores
prestaciones y/o adiciones de los insumos.

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.
MPATIBILIDAD DEL SALDO DE LA OBRA

AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGUAS GRISES
USA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

RECOMENDACIONES / OBSERVACIONES

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.
MPATIBILIDAD DEL SALDO DE LA OBRA

AGUA POTABLE, E INSTALACIÓN DE LOS SERVICIOS DE DISPOSICION SANITARIA DE EXCRETAS Y DE AGUAS GRISES
USA, DISTRITO DE IMAZA, PROVINCIA DE BAGUA, DEPARTAMENTO DE AMAZONAS

RECOMENDACIONES / OBSERVACIONES

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.

Falta esta cantidad para la funcionabilidad del


sistema. Recomendamos que se considere.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Luego de la revisión detallada del expediente técnico (presupuesto, planos, especificaciones técnicas), oferta del
contratista se puedo apreciar discrepancia en la partida 02.11 LAVADERO MULTIUSO FAMILIAR (21 UND). Cuál
es el tipo de lavadero que se ejecutara en el proyecto.
Se puede apreciar que el presupuesto del expediente nos proyecta, INSTALACIÓN DE LAVADEROS DE ACERO
INOXIDABLE CON ACCESORIOS Y SU RESPECTIVO SOPORTE METÁLICO, además de ellos solamente el Al realizar el análisis en campo se pudo apreciar que las cantidades
suministro de 21 unidades de lavaderos de acero inoxidable y accesorios, soporte metálico para 84 unidades. y/o metrados del presupuesto no se ajustan a la realidad, por lo que
Cabe indicar que estas cantidades no son las adecuadas, ya que desde el año 2015 (año de la paralización de se requiere aumentar los metrados a un total de 105 unidades de Realizar un expediente adicional
Solicito opinión a la supervisión de obra respecto al componente 03
obra) los lavaderos existentes (30 und aprox.), están completamente deterioradas, dobladas, etc. Y no son lavaderos, incluyendo accesorios y demás componentes necesarios Folio Nº 1-14 de la CARTA donde se puedan contemplar los
REHABILITACION DE UNIDADES BASICAS DE SANEAMIENTO TIPO
1 adecuadas y/o útiles para poder instalarlas. para su viabilidad, lo cual representaría un trabajo adicional, que se Nº013-2023/CONSORCIO trabajos que no fueron
COMPOSTERAS de la partida 03.01 CONSTRUCCION DE UBS
Se puede apreciar que en los planos del expediente técnico (S-02) nos muestra, LAVADEROS DE CONCRETO vería reflejado en la necesidad de un expediente de adicional de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
DOMICILIARIAS - TIPO COMPOSTERA (3 UND)
ARMADO, además de ello, estos están reforzados con mallas de acero de 1/4" @ 0.15m. obra, adicional a esto se recomendaría la fabricación de lavaderos de tecnico.
Se puede apreciar que las especificaciones técnicas del expediente técnico nos muestran, LAVADEROS DE concreto armado que garantizarían un mayor tiempo de vida útil, en
CONCRETO ARMADO, además partidas de encofrado y desencofrado, acero de refuerzo, y revoques, enlucidos y beneficio de los usuarios del proyecto.
moldaduras.
En la propuesta u oferta del contratista para la licitación, se oferto con referencia a las cantidades y partidas del
presupuesto de la obra, por lo que esta se encuentra con INSTALACIÓN DE LAVADEROS DE ACERO
INOXIDABLE CON ACCESORIOS Y SU RESPECTIVO SOPORTE METÁLICO.

UBS beneficiarias en donde se ejecutara la partida:


 03.02.04.16 Concreto F'c=210 Kg/Cm2 P/Escaleras (03 Und Nuevos) Y
(79 Und Por Culminar)
 03.02.04.17 Encofrado Y Desencofrado P/Escaleras (03 Und Nuevos) Y
(79 Und Por Culminar)
 03.02.04.18 Acero De refuerzo Fy=4200 Kg/Cm2 P/Escaleras (03 Und
Nuevos) Y (69 Und Por Culminar)
 03.02.06.01 Rasqueteo, Limpieza Y Lavado De Muros Con Moho Interior Y
Exterior (50 Und Exist)
 03.02.06.03 Tarrajeo Muros Int. Pulido M=1:3 C:A E=1" (03 Und Nuevos)
Y (50 Und Por Culminar) Luego de realizar el análisis con la información en campo recabada,
 03.02.06.04 Tarrajeo Muros Int. Frotach. C/Mort 1:4 X E=1" (03 Und se puede apreciar que existe déficit de metas en el expediente Realizar un expediente adicional
Luego de la constatacion en campo con el presidente de la JASS y APU del centro poblado se pudo apreciar que
Nuevos) (45 Und Muros Por Culminar Y 105 Escaleras) técnico. Esta residencia propone a fin de evitar problemas y Folio Nº 1-14 de la CARTA donde se puedan contemplar los
la mayoria de las UBS carecen de trabajos de tarrajeo, asimismo los techos colocados en el 2015, debido a la
2  03.02.06.05 Vestidura De Derrames En Vanos E=0.15m, M=1.3 (03 Und conflictos sociales, ya que las autoridades solicitan el cambio total de Nº013-2023/CONSORCIO trabajos que no fueron
falta de calamina se han deteriorado y podrido, no existen aparatos sanitarios en buen estado, todo esto sse
Nuevos) Y (45 Und Por Culminar) ciertas partidas por el desgaste que han sufrido a la actualidad y se ALHBA/RC-RCJF-CHICAIS considerados en el expediente
levanto en un acta que se adjunta en el informe de consultas.
 03.02.07.01 Techo C/ Calamina Galvanizada 0.83x1.80 E=0.25mm Para encuentran en mal estado, la realización de un expediente con tecnico.
Techo De 4 Baterias (03 Und Nuevos) Y (40 Und Por Culminar) trabajos adicionales.
 03.02.07.03 Suministro E Instalacion De Puerta Madera De 0.70mx1.80x
C/Marco 2"X4" (03 Und Nuevos) Y (88 Und Por Culminar)
 03.02.08.01 Aparatos Y Accesorios Sanitarios P/Ubs-Familiar (42 Und
Nuevos)
 03.02.08.02 Instalacion De Aparatos Y Accesorios Sanitarios P/Ubs-
Familiar (63 Und Existente)
 03.02.09.05 Suministro E Instalacion De Sumidero De Bronce 2" (3 Und)
 03.02.09.09 Suministro E Instalacion De Trampa Pvc Sal 2" (6 Und),
debido a que se necesita trabajos adicionales para cubrir la demanda de los
105 UBSs.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Al realizar el análisis en campo se pudo apreciar que las cantidades


y/o metrados del presupuesto no se ajustan a la realidad, por lo que
Luego de la revisión en el campo, se pudo apreciar que, la partida 02.02.10 CULMINACION DE CERCO se requiere aumentar los metrados a 39 und la partida
PERIMETRICO PARA EL SEDIMENTADOR (L=57m). 02.02.10.01.02 ROLLIZO DE DIAMETRO 4" X L=2.60 M
Es inconsistente con lo que se pudo hallar en campo tal como detalla el cuaderno de obra en el Asiento Nº 020; TRATADOS, asi como adicionar la partida de malla cocada por una Realizar un expediente adicional
Solicito instrucción debido a incongruencias en documentos que conforman Del residente de Obra. longitud de 57 metros. Ya que en campo no existe dicho material Folio Nº 12 de la CARTA donde se puedan contemplar los
3 el contrato en la partida 02.02.10 CULMINACION DE CERCO Luego de la revision del contrato, se advierte que no existe y/o no precisa este tipo de ejecuciones por lo cual se para su colocación. Esta residencia recomienda llevar acabo los Nº016-2023/CONSORCIO trabajos que no fueron
PERIMETRICO PARA EL SEDIMENTADOR (L=57m). realiza la respectiva consulta al supervisor de la obra, para que nos indique y de las instrucciones necesarias para procedimientos correspondientes para aprobar un presupuesto ALHBA/RC-RCJF-CHICAIS considerados en el expediente
ejecutar dicha partida, y las acciones correspondientes. Para cumplir con la finalidad del proyecto. adicional y una reformulación de los planos y metrados, similar a un tecnico.
Asimismo se realiza la consulta del tipo y/o aditivo que se utilizara para el tratamiento de la madera rollizo expediente adicional de obra, con la finalidad de construir
existente, ya que no se encuentra especificado en ningun documento del expediente tecnico. adecuadamente la protección para la estructura del sedimentador y
no permitir el paso de animales y/o personas ajenas al
mantenimiento del sistema de agua potable.

Luego de la revisión detallada del expediente técnico, se pudo apreciar que en ninguno de los documentos del
expediente técnico y/o contrato figura los tramos y/o el lugar donde se ejecutaran las siguientes partidas:
02.03 CULMINACION DE LINEA DE CONDUCCION (L=457.60m)
02.03.01 MOVIMIENTO DE TIERRAS
02.03.01.01 RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.50, H=0.25 EN TERR.ARCILL. Realizar un expediente adicional
Solicito instrucción para la ejecución de las partidas 02.03.01 MOVIMIENTO P/TUBERIA < 4" m 158.00 Folio Nº 1-5 de la CARTA donde se puedan contemplar los
Se propone solicitar al proyectista del expediente técnico los tramos
4 DE TIERRAS, 02.03.02 ANCLAJE DE TUBERIA 2" EN ROCA L=20m. y 02.03.02 ANCLAJE DE TUBERIA 2" EN ROCA L=20m Nº016-2023/CONSORCIO trabajos que no fueron
en donde se formuló realizar dichas partidas.
lugar donde se realizara estos trabajos. 02.03.02.01 EXCAVACION MANUAL EN ROCA SUELTA A MANO m3 0.54 ALHBA/RC-RCJF-CHICAIS considerados en el expediente
02.03.02.02 CONCRETO FC= 175 KG/CM2 S/MEZLADORA m3 0.54 tecnico.
02.03.02.03 SUMINISTRO E INSTALACION DE BRAZADERA DE METAL P/ANCLAJE und 12.00
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
corresponde al Ingeniero las instrucciones debidas para la ejecución de dichas partidas.

Se propone solicitar al proyectista del expediente técnico y/o entidad


Luego de la revisión detallada de la Lamina TIP -02 para la ejecución de la partida 02.03.04 PASE AEREO DE
el detalle especifico o reformulado de los planos, que sea
L=20.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia en los siguientes puntos:
concordante con los metrados, que fueron ofertados por el
contratista a fin de que este no tenga un perjuicio económico.
Discrepancia en secciones y materiales del pase aéreo:
Altura de la columna según plano: 3.30m
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
Altura de la columna según metrado : 2.50m
que no se encuentra presupuestado, a comparación del FºGº el
HDPE es un material más liviano y flexible, lo que facilita su
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sección del dado anclaje metrado: 1.20x1.20m
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 11 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman
5 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.03.04 PASE AEREO DE L=20.00m (1 UND) Aceros de refuerzo según plano: 4 var de 5/8 y 4 var de 1/2 (discrepancia en la lámina)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
Aceros de refuerzo según metrado: 4 var de 1/2
presión en comparación con el fierro galvanizado, lo que significa tecnico.
que puede transportar agua a mayores distancias con menos
Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
energía. También es más resistente a las fugas y roturas, lo que
reduce los costos de mantenimiento y reparación. Por lo que se
Material de la tubería s/ plano: Tubería de D=315mm y tubería HDPE 2’ (discrepancia en la lámina).
deberá seguir el procedimiento adecuado bajo las directivas y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
finalidad de viabilizar el adecuado funcionamiento del sistema de
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
agua potable y la sustitución de la misma.
corresponde al Ingeniero las instrucciones y el plano corregido para la ejecución de dicha partida.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=15m) para la ejecución de la partida 02.03.05
concordante con los metrados, que fueron ofertados por el
PASE AEREO DE L=15.00m (3 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
contratista a fin de que este no tenga un perjuicio económico.
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
planos y metrados, que son detallados a continuación:
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
que no se encuentra presupuestado, a comparación del FºGº el
Discrepancia en secciones y materiales del pase aéreo:
HDPE es un material más liviano y flexible, lo que facilita su
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sección del dado anclaje metrado: 1.25x1.25m
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 8 - 10 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman
6 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.03.05 PASE AEREO DE L=15.00m (3 UND). Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
presión en comparación con el fierro galvanizado, lo que significa tecnico.
Material de la tubería s/ plano: Tubería de D=315mm y tubería de FºGº de 2’ (discrepancia en la lámina).
que puede transportar agua a mayores distancias con menos
energía. También es más resistente a las fugas y roturas, lo que
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
reduce los costos de mantenimiento y reparación. Por lo que se
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
deberá seguir el procedimiento adecuado bajo las directivas y
corresponde al Ingeniero las instrucciones y los planos debidos para la ejecución de dicha partida, asimismo luego
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
de la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado
finalidad de viabilizar el adecuado funcionamiento del sistema de
y no podrá ser repuesto el mismo tubo.
agua potable y la sustitución de la misma.

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
concordante con los metrados, que fueron ofertados por el
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=30m) para la ejecución de la partida 02.08.01
contratista a fin de que este no tenga un perjuicio económico.
PASE AEREO DE L=30.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
planos y metrados, que son detallados a continuación:
que no se encuentra presupuestado, a comparación del FºGº el
HDPE es un material más liviano y flexible, lo que facilita su
Discrepancia en secciones y materiales del pase aéreo:
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 7 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman Sección del dado anclaje metrado: 1.25x1.25m
7 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.08.01 PASE AEREO DE L=30.00m (1 UND)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
presión en comparación con el fierro galvanizado, lo que significa tecnico.
que puede transportar agua a mayores distancias con menos
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
energía. También es más resistente a las fugas y roturas, lo que
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
reduce los costos de mantenimiento y reparación. Por lo que se
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de dicha partida, asimismo luego de
deberá seguir el procedimiento adecuado bajo las directivas y
la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
no podrá ser repuesto el mismo tubo, no existe partida de suministro e instalación de tubería.
finalidad de viabilizar el adecuado funcionamiento del sistema de
agua potable y la sustitución de la misma.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
concordante con los metrados, que fueron ofertados por el
contratista a fin de que este no tenga un perjuicio económico.
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=60m) para la ejecución de la partida 02.09.01
PASE AEREO DE L=60.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
Asimismo, esta residencia propone la instalación de tubería HDPE 1’,
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
que no se encuentra presupuestado, a comparación del FºGº el
planos y metrados, que son detallados a continuación:
HDPE es un material más liviano y flexible, lo que facilita su
Realizar un expediente adicional
instalación y reduce los costos de transporte y manipulación.
Discrepancia en secciones y materiales del pase aéreo: Folio Nº 6 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman Además, el HDPE es más resistente a la corrosión y al desgaste que
8 Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina) Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.09.01 PASE AEREO DE L=60.00m (1 UND) el fierro galvanizado, lo que significa que tiene una vida útil más
ALHBA/RC-RCJF-CHICAIS considerados en el expediente
larga. Otro beneficio del HDPE es que tiene una menor pérdida de
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones tecnico.
presión en comparación con el fierro galvanizado, lo que significa
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
que puede transportar agua a mayores distancias con menos
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de dicha partida, asimismo luego de
energía. También es más resistente a las fugas y roturas, lo que
la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado y
reduce los costos de mantenimiento y reparación. Por lo que se
no podrá ser repuesto el mismo tubo, no existe partida de suministro e instalación de tubería.
deberá seguir el procedimiento adecuado bajo las directivas y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
finalidad de viabilizar el adecuado funcionamiento del sistema de
agua potable y la sustitución de la misma.

Se propone realizar el cambio correspondiente de dichas partidas


Luego de la revisión detallada en campo y los diversos planos del expediente técnico, la tubería en la línea de
02.03.06.07.01 SUMINISTRO E INST. DE ACCESORIOS
conducción es de PVC-SAP de 2’ y HDPE de diámetro similar,
P/VALVULA AIRE DE DOBLE EFECTO 3/4" y 02.03.07.07.01
Realizar un expediente adicional
Solicito instrucción para la ejecución de la partida 02.03.06.07.01 SUMINISTRO E INST. VALVULA COMPUERTA DE BRONCE D=1
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
SUMINISTRO E INST. DE ACCESORIOS P/VALVULA AIRE DE DOBLE 1/2" PARA PURGA por otras que tienen la misma funcionabilidad,
9 generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, Nº016-2023/CONSORCIO trabajos que no fueron
EFECTO 3/4" y 02.03.07.07.01 SUMINISTRO E INST. VALVULA pero con un diámetro compatible con la línea de conducción de 2’.
corresponde al Ingeniero las instrucciones debidas para la ejecución de la partida 02.03.06.07.01 SUMINISTRO E ALHBA/RC-RCJF-CHICAIS considerados en el expediente
COMPUERTA DE BRONCE D=1 1/2" PARA PURGA Por lo que se deberá seguir el procedimiento adecuado bajo las
INST. DE ACCESORIOS P/VALVULA AIRE DE DOBLE EFECTO 3/4" y 02.03.07.07.01 SUMINISTRO E INST. tecnico.
directivas y lineamientos de la UGR- AMAZONAS, y el contrato de
VALVULA COMPUERTA DE BRONCE D=1 1/2" PARA PURGA, ya dichos diámetros proyectados son
Obra con la finalidad de viabilizar el adecuado funcionamiento del
incongruentes con el diámetro de la tubería de la línea de conducción.
sistema de agua potable y la sustitución de la misma.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone realizar el cambio correspondiente de dicha partida


02.06.03.04 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" de la
Caseta de cloración por el piso pulido, ya que tenemos partidas de
zócalo y contrazolcalo y tendrá un mejor uso cuando se tenga este
tipo de pisos. Además de esto, Un piso de concreto es resistente y
duradero, lo que garantiza que el almacén estará protegido contra
Luego de la revisión detallada en campo, planos del expediente técnico y metrados, no se encuentra detalle de
daños por el tránsito de personas, y carga pesada. El concreto es
donde se ejecutará la partida 02.06.03.04 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" de la Caseta de Realizar un expediente adicional
fácil de limpiar y mantener, lo que facilita la higiene del almacén.
cloración. Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
Solicito instrucción para la ejecución de la partida 02.06.03.04 TARRAJEO Además, no requiere de un mantenimiento constante como otros
10 Nº016-2023/CONSORCIO trabajos que no fueron
MUROS INT. PULIDO M=1:3 C:A e=1" de la Caseta de cloración. tipos de piso. El concreto ayuda a reducir la cantidad de polvo que se
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones ALHBA/RC-RCJF-CHICAIS considerados en el expediente
produce en el almacén, lo que mejora la calidad del aire y la salud de
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, tecnico.
las personas que trabajan en el área. Por ultimo un piso de concreto
corresponde al Ingeniero las instrucciones debidas para la ejecución de la partida.
bien construido proporciona una base estable y uniforme para el
almacenamiento de materiales y equipos pesados, lo que reduce el
riesgo de accidentes y daños. Por lo que se deberá seguir el
procedimiento adecuado bajo las directivas y lineamientos de la
UGR- AMAZONAS, y el contrato de Obra con la finalidad de viabilizar
el adecuado funcionamiento del almacén y caseta de cloración.

Luego de la revisión detallada en campo, planos del expediente técnico y metrados, no se encuentra detalle de
donde se ejecutará, y/o quienes son los beneficiarios de las partidas 02.10 CONEXIONES DOMICILIARIAS DE
AGUA POTABLE (13 UND), así como tampoco se encuentra el detalle de las conexiones domiciliarias en los Realizar un expediente adicional
Solicito que se precise quienes son los beneficiarios a los que se les Planos del Expediente técnico. Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
Se propone solicitar al proyectista del expediente técnico los tramos
11 realizara las conexiones domiciliarias de agua potable. 02.10 CONEXIONES Nº016-2023/CONSORCIO trabajos que no fueron
en donde se formuló realizar dichas partidas.
DOMICILIARIAS DE AGUA POTABLE (13 UND) Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones ALHBA/RC-RCJF-CHICAIS considerados en el expediente
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, tecnico.
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de la partida. Asimismo, solicitamos
indicar los beneficiarios en los que se realizaran dichas instalaciones.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Luego de la revisión detallada del expediente técnico (presupuesto, planos, especificaciones técnicas), oferta del
contratista se puedo apreciar discrepancia en la partida 02.11 LAVADERO MULTIUSO FAMILIAR (21 UND). Cuál
es el tipo de lavadero que se ejecutara en el proyecto.
Se puede apreciar que el presupuesto del expediente nos proyecta, INSTALACIÓN DE LAVADEROS DE ACERO
INOXIDABLE CON ACCESORIOS Y SU RESPECTIVO SOPORTE METÁLICO, además de ellos solamente el Al realizar el análisis en campo se pudo apreciar que las cantidades
suministro de 21 unidades de lavaderos de acero inoxidable y accesorios, soporte metálico para 84 unidades. y/o metrados del presupuesto no se ajustan a la realidad, por lo que
Cabe indicar que estas cantidades no son las adecuadas, ya que desde el año 2015 (año de la paralización de se requiere aumentar los metrados a un total de 105 unidades de Realizar un expediente adicional
Material del cual sera construido el lavadero Multiusos y quienes son los obra) los lavaderos existentes (30 und aprox.), están completamente deterioradas, dobladas, etc. Y no son lavaderos, incluyendo accesorios y demás componentes necesarios Folio Nº 1-14 de la CARTA donde se puedan contemplar los
1 beneficiarios. Debido a que se proyecta 21 lavaderos y existen 105 UBS adecuadas y/o útiles para poder instalarlas. para su viabilidad, lo cual representaría un trabajo adicional, que se Nº013-2023/CONSORCIO trabajos que no fueron
que lo necesitan. Se puede apreciar que en los planos del expediente técnico (S-02) nos muestra, LAVADEROS DE CONCRETO vería reflejado en la necesidad de un expediente de adicional de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
ARMADO, además de ello, estos están reforzados con mallas de acero de 1/4" @ 0.15m. obra, adicional a esto se recomendaría la fabricación de lavaderos de tecnico.
Se puede apreciar que las especificaciones técnicas del expediente técnico nos muestran, LAVADEROS DE concreto armado que garantizarían un mayor tiempo de vida útil, en
CONCRETO ARMADO, además partidas de encofrado y desencofrado, acero de refuerzo, y revoques, enlucidos y beneficio de los usuarios del proyecto.
moldaduras.
En la propuesta u oferta del contratista para la licitación, se oferto con referencia a las cantidades y partidas del
presupuesto de la obra, por lo que esta se encuentra con INSTALACIÓN DE LAVADEROS DE ACERO
INOXIDABLE CON ACCESORIOS Y SU RESPECTIVO SOPORTE METÁLICO.

UBS beneficiarias en donde se ejecutara la partida:


 03.02.04.16 Concreto F'c=210 Kg/Cm2 P/Escaleras (03 Und Nuevos) Y
(79 Und Por Culminar)
 03.02.04.17 Encofrado Y Desencofrado P/Escaleras (03 Und Nuevos) Y
(79 Und Por Culminar)
 03.02.04.18 Acero De refuerzo Fy=4200 Kg/Cm2 P/Escaleras (03 Und
Nuevos) Y (69 Und Por Culminar)
 03.02.06.01 Rasqueteo, Limpieza Y Lavado De Muros Con Moho Interior Y
Exterior (50 Und Exist)
 03.02.06.03 Tarrajeo Muros Int. Pulido M=1:3 C:A E=1" (03 Und Nuevos)
Y (50 Und Por Culminar) Luego de realizar el análisis con la información en campo recabada,
 03.02.06.04 Tarrajeo Muros Int. Frotach. C/Mort 1:4 X E=1" (03 Und se puede apreciar que existe déficit de metas en el expediente Realizar un expediente adicional
Luego de la constatacion en campo con el presidente de la JASS y APU del centro poblado se pudo apreciar que
Nuevos) (45 Und Muros Por Culminar Y 105 Escaleras) técnico. Esta residencia propone a fin de evitar problemas y Folio Nº 1-14 de la CARTA donde se puedan contemplar los
la mayoria de las UBS carecen de trabajos de tarrajeo, asimismo los techos colocados en el 2015, debido a la
2  03.02.06.05 Vestidura De Derrames En Vanos E=0.15m, M=1.3 (03 Und conflictos sociales, ya que las autoridades solicitan el cambio total de Nº013-2023/CONSORCIO trabajos que no fueron
falta de calamina se han deteriorado y podrido, no existen aparatos sanitarios en buen estado, todo esto sse
Nuevos) Y (45 Und Por Culminar) ciertas partidas por el desgaste que han sufrido a la actualidad y se ALHBA/RC-RCJF-CHICAIS considerados en el expediente
levanto en un acta que se adjunta en el informe de consultas.
 03.02.07.01 Techo C/ Calamina Galvanizada 0.83x1.80 E=0.25mm Para encuentran en mal estado, la realización de un expediente con tecnico.
Techo De 4 Baterias (03 Und Nuevos) Y (40 Und Por Culminar) trabajos adicionales.
 03.02.07.03 Suministro E Instalacion De Puerta Madera De 0.70mx1.80x
C/Marco 2"X4" (03 Und Nuevos) Y (88 Und Por Culminar)
 03.02.08.01 Aparatos Y Accesorios Sanitarios P/Ubs-Familiar (42 Und
Nuevos)
 03.02.08.02 Instalacion De Aparatos Y Accesorios Sanitarios P/Ubs-
Familiar (63 Und Existente)
 03.02.09.05 Suministro E Instalacion De Sumidero De Bronce 2" (3 Und)
 03.02.09.09 Suministro E Instalacion De Trampa Pvc Sal 2" (6 Und),
debido a que se necesita trabajos adicionales para cubrir la demanda de los
105 UBSs.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Al realizar el análisis en campo se pudo apreciar que las cantidades


y/o metrados del presupuesto no se ajustan a la realidad, por lo que
Luego de la revisión en el campo, se pudo apreciar que, la partida 02.02.10 CULMINACION DE CERCO se requiere aumentar los metrados a 39 und la partida
PERIMETRICO PARA EL SEDIMENTADOR (L=57m). 02.02.10.01.02 ROLLIZO DE DIAMETRO 4" X L=2.60 M
Es inconsistente con lo que se pudo hallar en campo tal como detalla el cuaderno de obra en el Asiento Nº 020; TRATADOS, asi como adicionar la partida de malla cocada por una Realizar un expediente adicional
Solicito instrucción debido a incongruencias en documentos que conforman Del residente de Obra. longitud de 57 metros. Ya que en campo no existe dicho material Folio Nº 12 de la CARTA donde se puedan contemplar los
3 el contrato en la partida 02.02.10 CULMINACION DE CERCO Luego de la revision del contrato, se advierte que no existe y/o no precisa este tipo de ejecuciones por lo cual se para su colocación. Esta residencia recomienda llevar acabo los Nº016-2023/CONSORCIO trabajos que no fueron
PERIMETRICO PARA EL SEDIMENTADOR (L=57m). realiza la respectiva consulta al supervisor de la obra, para que nos indique y de las instrucciones necesarias para procedimientos correspondientes para aprobar un presupuesto ALHBA/RC-RCJF-CHICAIS considerados en el expediente
ejecutar dicha partida, y las acciones correspondientes. Para cumplir con la finalidad del proyecto. adicional y una reformulación de los planos y metrados, similar a un tecnico.
Asimismo se realiza la consulta del tipo y/o aditivo que se utilizara para el tratamiento de la madera rollizo expediente adicional de obra, con la finalidad de construir
existente, ya que no se encuentra especificado en ningun documento del expediente tecnico. adecuadamente la protección para la estructura del sedimentador y
no permitir el paso de animales y/o personas ajenas al
mantenimiento del sistema de agua potable.

Luego de la revisión detallada del expediente técnico, se pudo apreciar que en ninguno de los documentos del
expediente técnico y/o contrato figura los tramos y/o el lugar donde se ejecutaran las siguientes partidas:
02.03 CULMINACION DE LINEA DE CONDUCCION (L=457.60m)
02.03.01 MOVIMIENTO DE TIERRAS
02.03.01.01 RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.50, H=0.25 EN TERR.ARCILL. Realizar un expediente adicional
Solicito instrucción para la ejecución de las partidas 02.03.01 MOVIMIENTO P/TUBERIA < 4" m 158.00 Folio Nº 1-5 de la CARTA donde se puedan contemplar los
Se propone solicitar al proyectista del expediente técnico los tramos
4 DE TIERRAS, 02.03.02 ANCLAJE DE TUBERIA 2" EN ROCA L=20m. y 02.03.02 ANCLAJE DE TUBERIA 2" EN ROCA L=20m Nº016-2023/CONSORCIO trabajos que no fueron
en donde se formuló realizar dichas partidas.
lugar donde se realizara estos trabajos. 02.03.02.01 EXCAVACION MANUAL EN ROCA SUELTA A MANO m3 0.54 ALHBA/RC-RCJF-CHICAIS considerados en el expediente
02.03.02.02 CONCRETO FC= 175 KG/CM2 S/MEZLADORA m3 0.54 tecnico.
02.03.02.03 SUMINISTRO E INSTALACION DE BRAZADERA DE METAL P/ANCLAJE und 12.00
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
corresponde al Ingeniero las instrucciones debidas para la ejecución de dichas partidas.

Se propone solicitar al proyectista del expediente técnico y/o entidad


Luego de la revisión detallada de la Lamina TIP -02 para la ejecución de la partida 02.03.04 PASE AEREO DE
el detalle especifico o reformulado de los planos, que sea
L=20.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia en los siguientes puntos:
concordante con los metrados, que fueron ofertados por el
contratista a fin de que este no tenga un perjuicio económico.
Discrepancia en secciones y materiales del pase aéreo:
Altura de la columna según plano: 3.30m
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
Altura de la columna según metrado : 2.50m
que no se encuentra presupuestado, a comparación del FºGº el
HDPE es un material más liviano y flexible, lo que facilita su
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sección del dado anclaje metrado: 1.20x1.20m
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 11 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman
5 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.03.04 PASE AEREO DE L=20.00m (1 UND) Aceros de refuerzo según plano: 4 var de 5/8 y 4 var de 1/2 (discrepancia en la lámina)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
Aceros de refuerzo según metrado: 4 var de 1/2
presión en comparación con el fierro galvanizado, lo que significa tecnico.
que puede transportar agua a mayores distancias con menos
Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
energía. También es más resistente a las fugas y roturas, lo que
reduce los costos de mantenimiento y reparación. Por lo que se
Material de la tubería s/ plano: Tubería de D=315mm y tubería HDPE 2’ (discrepancia en la lámina).
deberá seguir el procedimiento adecuado bajo las directivas y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
finalidad de viabilizar el adecuado funcionamiento del sistema de
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
agua potable y la sustitución de la misma.
corresponde al Ingeniero las instrucciones y el plano corregido para la ejecución de dicha partida.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=15m) para la ejecución de la partida 02.03.05
concordante con los metrados, que fueron ofertados por el
PASE AEREO DE L=15.00m (3 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
contratista a fin de que este no tenga un perjuicio económico.
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
planos y metrados, que son detallados a continuación:
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
que no se encuentra presupuestado, a comparación del FºGº el
Discrepancia en secciones y materiales del pase aéreo:
HDPE es un material más liviano y flexible, lo que facilita su
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sección del dado anclaje metrado: 1.25x1.25m
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 8 - 10 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman
6 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.03.05 PASE AEREO DE L=15.00m (3 UND). Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
presión en comparación con el fierro galvanizado, lo que significa tecnico.
Material de la tubería s/ plano: Tubería de D=315mm y tubería de FºGº de 2’ (discrepancia en la lámina).
que puede transportar agua a mayores distancias con menos
energía. También es más resistente a las fugas y roturas, lo que
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
reduce los costos de mantenimiento y reparación. Por lo que se
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
deberá seguir el procedimiento adecuado bajo las directivas y
corresponde al Ingeniero las instrucciones y los planos debidos para la ejecución de dicha partida, asimismo luego
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
de la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado
finalidad de viabilizar el adecuado funcionamiento del sistema de
y no podrá ser repuesto el mismo tubo.
agua potable y la sustitución de la misma.

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
concordante con los metrados, que fueron ofertados por el
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=30m) para la ejecución de la partida 02.08.01
contratista a fin de que este no tenga un perjuicio económico.
PASE AEREO DE L=30.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
Asimismo, esta residencia propone la instalación de tubería HDPE 2’,
planos y metrados, que son detallados a continuación:
que no se encuentra presupuestado, a comparación del FºGº el
HDPE es un material más liviano y flexible, lo que facilita su
Discrepancia en secciones y materiales del pase aéreo:
instalación y reduce los costos de transporte y manipulación. Realizar un expediente adicional
Sec. del dado anclaje s/ plano: 1.40x1.40m y 1.40x1.80m (discrepancia en la lámina)
Además, el HDPE es más resistente a la corrosión y al desgaste que Folio Nº 7 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman Sección del dado anclaje metrado: 1.25x1.25m
7 el fierro galvanizado, lo que significa que tiene una vida útil más Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.08.01 PASE AEREO DE L=30.00m (1 UND)
larga. Otro beneficio del HDPE es que tiene una menor pérdida de ALHBA/RC-RCJF-CHICAIS considerados en el expediente
Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina)
presión en comparación con el fierro galvanizado, lo que significa tecnico.
que puede transportar agua a mayores distancias con menos
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones
energía. También es más resistente a las fugas y roturas, lo que
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
reduce los costos de mantenimiento y reparación. Por lo que se
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de dicha partida, asimismo luego de
deberá seguir el procedimiento adecuado bajo las directivas y
la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
no podrá ser repuesto el mismo tubo, no existe partida de suministro e instalación de tubería.
finalidad de viabilizar el adecuado funcionamiento del sistema de
agua potable y la sustitución de la misma.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone solicitar al proyectista del expediente técnico y/o entidad


el detalle especifico o reformulado de los planos, que sea
concordante con los metrados, que fueron ofertados por el
contratista a fin de que este no tenga un perjuicio económico.
Luego de la revisión detallada de la Lamina TIP -02 (pase aéreo L=60m) para la ejecución de la partida 02.09.01
PASE AEREO DE L=60.00m (1 UND), así como el metrado de dicha partida se encuentra incongruencia, si bien
Asimismo, esta residencia propone la instalación de tubería HDPE 1’,
es cierto que la ejecución de las partidas es sobre estructuras existentes, existen diversas incongruencias en los
que no se encuentra presupuestado, a comparación del FºGº el
planos y metrados, que son detallados a continuación:
HDPE es un material más liviano y flexible, lo que facilita su
Realizar un expediente adicional
instalación y reduce los costos de transporte y manipulación.
Discrepancia en secciones y materiales del pase aéreo: Folio Nº 6 de la CARTA donde se puedan contemplar los
Solicito instrucción debido a incongruencias en documentos que conforman Además, el HDPE es más resistente a la corrosión y al desgaste que
8 Material de péndolas s/ plano: Fierro liso de 1/4 y alambre Nº 8 (discrepancia en la lámina) Nº016-2023/CONSORCIO trabajos que no fueron
el contrato en la partida 02.09.01 PASE AEREO DE L=60.00m (1 UND) el fierro galvanizado, lo que significa que tiene una vida útil más
ALHBA/RC-RCJF-CHICAIS considerados en el expediente
larga. Otro beneficio del HDPE es que tiene una menor pérdida de
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones tecnico.
presión en comparación con el fierro galvanizado, lo que significa
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL,
que puede transportar agua a mayores distancias con menos
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de dicha partida, asimismo luego de
energía. También es más resistente a las fugas y roturas, lo que
la revisión de la tubería existente, se puede apreciar que es tubería FºGº de 2’, que se encuentra en mal estado y
reduce los costos de mantenimiento y reparación. Por lo que se
no podrá ser repuesto el mismo tubo, no existe partida de suministro e instalación de tubería.
deberá seguir el procedimiento adecuado bajo las directivas y
lineamientos de la UGR- AMAZONAS, y el contrato de Obra con la
finalidad de viabilizar el adecuado funcionamiento del sistema de
agua potable y la sustitución de la misma.

Se propone realizar el cambio correspondiente de dichas partidas


Luego de la revisión detallada en campo y los diversos planos del expediente técnico, la tubería en la línea de
02.03.06.07.01 SUMINISTRO E INST. DE ACCESORIOS
conducción es de PVC-SAP de 2’ y HDPE de diámetro similar,
P/VALVULA AIRE DE DOBLE EFECTO 3/4" y 02.03.07.07.01
Realizar un expediente adicional
Solicito instrucción para la ejecución de la partida 02.03.06.07.01 SUMINISTRO E INST. VALVULA COMPUERTA DE BRONCE D=1
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
SUMINISTRO E INST. DE ACCESORIOS P/VALVULA AIRE DE DOBLE 1/2" PARA PURGA por otras que tienen la misma funcionabilidad,
9 generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, Nº016-2023/CONSORCIO trabajos que no fueron
EFECTO 3/4" y 02.03.07.07.01 SUMINISTRO E INST. VALVULA pero con un diámetro compatible con la línea de conducción de 2’.
corresponde al Ingeniero las instrucciones debidas para la ejecución de la partida 02.03.06.07.01 SUMINISTRO E ALHBA/RC-RCJF-CHICAIS considerados en el expediente
COMPUERTA DE BRONCE D=1 1/2" PARA PURGA Por lo que se deberá seguir el procedimiento adecuado bajo las
INST. DE ACCESORIOS P/VALVULA AIRE DE DOBLE EFECTO 3/4" y 02.03.07.07.01 SUMINISTRO E INST. tecnico.
directivas y lineamientos de la UGR- AMAZONAS, y el contrato de
VALVULA COMPUERTA DE BRONCE D=1 1/2" PARA PURGA, ya dichos diámetros proyectados son
Obra con la finalidad de viabilizar el adecuado funcionamiento del
incongruentes con el diámetro de la tubería de la línea de conducción.
sistema de agua potable y la sustitución de la misma.
FORMATO DE REPORTE DE CONSULTAS

Comentarios
Folios
(OPCIONAL, el Contratista puede
Consulta Sustento de la Consulta Propuesta de Solución del COB (Precisar la ubicación de los
N° hacer comentarios, de forma clara
(Breve resumen de la consulta) (Detallar el sustento de la consulta y su relación con el expediente técnico) (ES OPCIONAL. Plantear una propuesta de solución) documentos de sustento que
y precisa, que ayude a la Entidad
adjunte el Contratista)
a una pronta respuesta)

Se propone realizar el cambio correspondiente de dicha partida


02.06.03.04 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" de la
Caseta de cloración por el piso pulido, ya que tenemos partidas de
zócalo y contrazolcalo y tendrá un mejor uso cuando se tenga este
tipo de pisos. Además de esto, Un piso de concreto es resistente y
duradero, lo que garantiza que el almacén estará protegido contra
Luego de la revisión detallada en campo, planos del expediente técnico y metrados, no se encuentra detalle de
daños por el tránsito de personas, y carga pesada. El concreto es
donde se ejecutará la partida 02.06.03.04 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" de la Caseta de Realizar un expediente adicional
fácil de limpiar y mantener, lo que facilita la higiene del almacén.
cloración. Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
Solicito instrucción para la ejecución de la partida 02.06.03.04 TARRAJEO Además, no requiere de un mantenimiento constante como otros
10 Nº016-2023/CONSORCIO trabajos que no fueron
MUROS INT. PULIDO M=1:3 C:A e=1" de la Caseta de cloración. tipos de piso. El concreto ayuda a reducir la cantidad de polvo que se
Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones ALHBA/RC-RCJF-CHICAIS considerados en el expediente
produce en el almacén, lo que mejora la calidad del aire y la salud de
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, tecnico.
las personas que trabajan en el área. Por ultimo un piso de concreto
corresponde al Ingeniero las instrucciones debidas para la ejecución de la partida.
bien construido proporciona una base estable y uniforme para el
almacenamiento de materiales y equipos pesados, lo que reduce el
riesgo de accidentes y daños. Por lo que se deberá seguir el
procedimiento adecuado bajo las directivas y lineamientos de la
UGR- AMAZONAS, y el contrato de Obra con la finalidad de viabilizar
el adecuado funcionamiento del almacén y caseta de cloración.

Luego de la revisión detallada en campo, planos del expediente técnico y metrados, no se encuentra detalle de
donde se ejecutará, y/o quienes son los beneficiarios de las partidas 02.10 CONEXIONES DOMICILIARIAS DE
AGUA POTABLE (13 UND), así como tampoco se encuentra el detalle de las conexiones domiciliarias en los Realizar un expediente adicional
Solicito que se precise quienes son los beneficiarios a los que se les Planos del Expediente técnico. Folio Nº 1 - 5 de la CARTA donde se puedan contemplar los
Se propone solicitar al proyectista del expediente técnico los tramos
11 realizara las conexiones domiciliarias de agua potable. 02.10 CONEXIONES Nº016-2023/CONSORCIO trabajos que no fueron
en donde se formuló realizar dichas partidas.
DOMICILIARIAS DE AGUA POTABLE (13 UND) Por lo que en mérito del Inciso 1.5 y 1.9, del Numeral 1. Disposiciones generales, de la Sección VIII. Condiciones ALHBA/RC-RCJF-CHICAIS considerados en el expediente
generales del Contrato de Ejecución de Obra Nº 018-2022/VIVIENDA /VMCS/PNSR/AMAZONIA RURAL, tecnico.
corresponde al Ingeniero las instrucciones y planos debidos para la ejecución de la partida. Asimismo, solicitamos
indicar los beneficiarios en los que se realizaran dichas instalaciones.
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES ,
01 MOVILIZACION, DESMOVILIZACION DE EQUIPOS Y SEGURIDAD Y
SALUD DE OBRA
01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN TEMPORAL DE OBRA glb 1.00 S/.2,750.00 S/.2,750.00
01.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA glb 1.00 S/.4,500.00 S/.4,500.00
01.02 CARTEL DE OBRA
01.02.01 CARTEL DE OBRA 4.80 x 3.60 m und 1.00 S/.1,245.79 S/.1,245.79
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS LIVIANOS
01.03.01 MOVILIZACION Y DESMOVILIZACIÓN DE DE EQUIPOS glb 1.00 S/.5,000.00 S/.5,000.00
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DE PLAN
01.04 DE VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 EN EL
TRABAJO
ELABORACION DE PLAN DE VIGILANCIA, CONTROL Y
01.04.01
PREVENCION CONTRA EL COVID-19 EN EL TRABAJO
ELABORACIÓN DE PLAN DE VIGILANCIA, PREVENCION Y
01.04.01.01 glb 1.00 S/.1,000.00 S/.1,000.00
CONTROL DE COVID-19 (PVPCC19)
ELABORACION DE PLAN DE SEGURIDAD Y SALUD EN OBRA
01.04.01.02 glb 1.00 S/.1,000.00 S/.1,000.00
(PSST)
IMPLEMENTACION Y ADMINISTRACION DE PLAN DE
01.04.02
SEGURIDAD Y SALUD EN EL TRABAJO
01.04.02.01 EQUIPAMIENTO PARA PREVENCION Y RESPUESTA COVID glb 1.00 S/.5,000.00 S/.5,000.00
01.04.02.02 EQUIPAMIENTO DE PROTECCION COLECTIVA glb 1.00 S/.1,250.00 S/.1,250.00
01.04.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/.1,850.00 S/.1,850.00
01.04.02.04 EQUIPAMIENTO DE PROTECCION INDIVIDUAL glb 1.00 S/.9,000.00 S/.9,000.00
01.04.03 LIMPIEZA Y DESINFECCION DE OBRA
SERV. DE ELIMINACION DE RESIDUOS PELIGROSOS
01.04.03.01 mes 5.00 S/.500.00 S/.2,500.00
BIOCONTAMINANTES
01.04.03.02 SERV. DE LIMPIEZA Y DESINFECCION mes 5.00 S/.600.00 S/.3,000.00
02 SISTEMA DE AGUA POTABLE
02.01 REHABILITACION DE CAPTACION TIPO BARRAJE
TRATAMIENTO EN MURO DE BARRAJE PARA REPRESA DE
02.01.01
AGUA EXISTENTE
02.01.01.01 PERFORACION DE 8" EN MURO REFORZADO DE E= 0.30cm glb 1.00 S/.199.92 S/.199.92
02.01.02 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE COMPUERTA METALICA 1/4"
02.01.02.01 und 1.00 S/.268.65 S/.268.65
0.20x0.20m SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE COMPUERTA METALICA 1/4"
02.01.02.02 und 1.00 S/.330.33 S/.330.33
0.40x0.40m SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE VERTEDERO TRIANGULAR
02.01.02.03 und 1.00 S/.193.54 S/.193.54
MEDIDOR DE CAUDALES DE 0.55 m x0.60m SEGUN SU DISEÑO
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.01.02.04 und 1.00 S/.443.13 S/.443.13
0.60x0.80m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.01.02.05 und 1.00 S/.430.44 S/.430.44
0.50x0.90m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE REJA PARA VENTANA DE
02.01.02.06 und 1.00 S/.116.54 S/.116.54
CAPTACION 3/8"0.17X0.17m SEGUN S/DISEÑO
02.01.03 PINTURA
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.01.03.01 m2 11.27 S/.9.47 S/.106.73
MANOS
02.01.04 VALVULAS Y ACCESORIOS
02.01.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 2" m 5.00 S/.7.26 S/.36.30
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.01.04.02 und 1.00 S/.381.56 S/.381.56
BRONCE D=2" BOCATOMA
SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE
02.01.04.03 und 1.00 S/.163.97 S/.163.97
2"
SUMINISTRO E INSTALACION DE CODO DE FIERRO
02.01.04.04 und 1.00 S/.222.10 S/.222.10
GALVANIZADO 4"X45° + ACCESORIOS
SUMINISTRO E INSTALACION DE UPR HEMBRA 63mm +
02.01.04.05 und 1.00 S/.55.11 S/.55.11
ADAPTADOR
02.01.05 REVOQUES Y ENLUCIDOS
PICADO Y LIMPIEZA DE TARRAJEO DE CAMARAS HUMEDAS Y
02.01.05.01 m2 43.56 S/.5.94 S/.258.75
SECA
02.01.05.02 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 10.63 S/.36.56 S/.388.63
02.01.05.03 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 33.23 S/.32.63 S/.1,084.29
02.01.06 VARIOS
02.01.06.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 11.27 S/.6.25 S/.70.44
02.02 LINEA DE CONDUCCION
CONSTRUCCION DE CAJA PARA VALVULA DE AIRE DE 3/4"
02.02.01
(02UND)
02.02.01.01 OBRAS PRELIMINARES
02.02.01.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 2.00 S/.0.62 S/.1.24
02.02.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.28 S/.2.25 S/.2.88
02.02.01.02 MOVIMIENTO DE TIERRAS
02.02.01.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.74 S/.39.57 S/.29.28
02.02.01.03 OBRAS DE CONCRETO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.02.01.03.01 m3 0.04 S/.604.21 S/.24.17
S/MEZCLADORA
CONCRETO f'c=175 kg/cm2 PARA MUROS REFORZADOS
02.02.01.03.02 m3 0.38 S/.719.01 S/.273.22
S/MEZCLADORA
02.02.01.03.03 ENCOFRADO Y DESENCOFRADO m2 6.16 S/.68.44 S/.421.59
02.02.01.03.04 ACERO fy=4200 kg/cm2 kg 12.70 S/.9.94 S/.126.24
02.02.01.04 CURADOR DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.02.01.04.01 m2 3.04 S/.5.83 S/.17.72
PÉLICULA IMPERMEABLE)
02.02.01.05 REVOQUES Y ENLUCIDOS
02.02.01.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 3.04 S/.36.56 S/.111.14
02.02.01.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.40 x 0.40 m C/MECAN
02.02.01.06.01 und 2.00 S/.247.14 S/.494.28
DE SEGUR. S/DISEÑO
02.02.01.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS P/VALVULA
02.02.01.07.01 und 2.00 S/.274.61 S/.549.22
DE AIRE DOBLE EFECTO 3/4"
02.02.01.07.02 SUMINISTRO E INSTALACION DE COLLARIN PE 63mm A 3/4" und 2.00 S/.16.59 S/.33.18
02.02.01.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 2.00 S/.124.72 S/.249.44
02.03 REHABILITACION DE SEDIMENTADOR EXISTENTE
02.03.01 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/4" 1.10 x 0.90m C/MECAN DE
02.03.01.01 und 1.00 S/.731.21 S/.731.21
SEGUN S/DISEÑO
MARCO Y TAPA PLANCHA LAC 1/4" 1.30 x 1.30m C/MECAN DE
02.03.01.02 und 2.00 S/.1,041.36 S/.2,082.72
SEGUN S/DISEÑO
02.03.01.03 SUMINISTRO DE ESCALERA TRANSPORTABLE DE ALUMINIO und 2.00 S/.309.02 S/.618.04
02.03.02 PINTURA
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.03.02.01 m2 59.34 S/.9.47 S/.561.95
MANOS
02.03.03 CONCRETO SIMPLE
02.03.03.01 ENCOFRADO Y DESENCOFRADO m2 0.40 S/.68.44 S/.27.38
02.03.03.02 CONCRETO f'c=140 kg/cm2 m3 0.02 S/.530.11 S/.10.60
02.03.04 OBRAS DE CONCRETO
02.03.04.01 CONCRETO f'c=280 kg/cm2 PARA MUROS REFORZADOS m3 0.40 S/.524.82 S/.209.93
02.03.04.02 ENCOFRADO Y DESENCOFRADO m2 8.28 S/.68.44 S/.566.68
02.03.05 REVOQUES Y ENLUCIDOS
PICADO Y LIMPIEZA DE TARRAJEO DE CAMARAS HUMEDAS Y
02.03.05.01 m2 191.06 S/.5.94 S/.1,134.90
SECA
02.03.05.02 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 131.72 S/.36.56 S/.4,815.68
02.03.05.03 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 59.34 S/.32.63 S/.1,936.26
02.03.06 INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.03.06.01 und 1.00 S/.332.91 S/.332.91
BRONCE D=2" SEDIMENTADOR
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA
02.03.06.02 und 2.00 S/.2,369.94 S/.4,739.88
C/BRIDADA DE 8"
LIMPIEZA E INSTALACION DE VALVULA COMPUERTA
02.03.06.03 und 2.00 S/.109.70 S/.219.40
C/BRIDADA DE 8"
SUMINISTRO E INSTALACION DE COMPUERTA METALICA DE
02.03.06.04 und 2.00 S/.313.99 S/.627.98
1/4" 0.61x1.05m
SUMINISTRO E INSTALACION COMPUERTA METALICA DE 1/4"
02.03.06.05 und 1.00 S/.378.55 S/.378.55
0.50m x 1.20m
SUMINISTRO E INSTALACION DE VERTEDERO TRIANGULAR
02.03.06.06 und 1.00 S/.206.23 S/.206.23
MEDIDOR DE CAUDALES DE 0.30 m x0.40m
CONCRETO f'c=175 Kg/cm2 P/LOSAS REMOVIBLE DE 2" DE
02.03.06.07 m3 0.14 S/.669.97 S/.93.80
ORIFICIOS
02.03.07 TUBERIA DE DESCARGA - LIMPIEZA DEL SEDIMENTADOR
02.03.07.01 TRAZO, NIVELACION Y REPLANTEO m2 18.50 S/.2.63 S/.48.66
EXCAV. MANUAL T. ARCILL. A=0.40, H=2.00 P/TUBERIA MENOR
02.03.07.02 m 37.00 S/.59.35 S/.2,195.95
A 10"
02.03.07.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 37.00 S/.1.79 S/.66.23
PREPARACION DE CAMAS DE APOYO A=0.50, H=0.10 P/TUB.
02.03.07.04 m 37.00 S/.2.25 S/.83.25
MENOR A 10"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.50, H=0.25
02.03.07.05 m 37.00 S/.4.47 S/.165.39
EN TERR.ARCILL. P/TUBERIA < 10"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=1.65 EN
02.03.07.06 m 37.00 S/.25.64 S/.948.68
TERR.ARCILL. P/TUBERIA < 10"
02.03.07.07 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 9.25 S/.15.32 S/.141.71
SUMINISTRO E INSTALACION DE TUBERIA
02.03.07.08 m 32.00 S/.35.22 S/.1,127.04
P/ALCANTARILLADO NTP ISO 4435 DN 200 UF INCUIDO ANILLO
SUMINISTRO E INSTALACION DE TUBERIA
02.03.07.09 m 5.00 S/.11.95 S/.59.75
P/ALCANTARILLADO NTP ISO 4435 DN 100 UF INCUIDO ANILLO
SUMINISTRO E INSTALACION DE CODO PVC
02.03.07.10 m 2.00 S/.52.15 S/.104.30
P/ALCANTARILLADO DE 100mm X 45°
02.03.07.11 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 37.00 S/.2.29 S/.84.73
02.03.08 BUZON DEL TIPO I (4 UND)
02.03.08.01 TRAZO, NIVELACION Y REPLANTEO m2 7.08 S/.2.63 S/.18.62
02.03.08.02 EXCAVACION MANUAL EN ROCA SUELTA A MANO m3 16.24 S/.89.03 S/.1,445.85
02.03.08.03 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 20.32 S/.15.32 S/.311.30
02.03.08.04 CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES m3 1.72 S/.633.65 S/.1,089.88
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.03.08.05 ENCOFRADO Y DESENCOFRADO P/BUZON m2 31.68 S/.75.00 S/.2,376.00
02.03.08.06 CONCRETO f 'c=210 kg/cm2 m3 7.40 S/.735.14 S/.5,440.04
02.03.08.07 ACERO fy=4200 kg/cm2 kg 54.66 S/.9.94 S/.543.32
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.03.08.08 m2 35.28 S/.5.83 S/.205.68
PÉLICULA IMPERMEABLE)
02.03.08.09 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 28.20 S/.36.56 S/.1,030.99
02.03.08.10 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 7.08 S/.32.63 S/.231.02
02.03.08.11 MARCO DE FIERRO FUNDIDO PARA DESAGUE und 4.00 S/.64.92 S/.259.68
02.03.08.12 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 28.20 S/.6.25 S/.176.25
02.03.09 VEREDAS DE CONCRETO SIMPLE
02.03.09.01 TRAZO, NIVELACION Y REPLANTEO m2 32.50 S/.2.63 S/.85.48
02.03.09.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.98 S/.39.57 S/.38.78
02.03.09.03 CONCRETO f'c=175 Kg/cm2 e=0.10m P/VEREDA m3 4.23 S/.669.97 S/.2,833.97
02.03.09.04 ENCOFRADO Y DESENCOFRADO m2 10.86 S/.68.44 S/.743.26
02.03.09.05 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 1.23 S/.15.32 S/.18.84
02.03.10 ESTRUCTURA DE DESCARGA
02.03.10.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 1.62 S/.39.57 S/.64.10
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.03.10.02 m3 0.10 S/.604.21 S/.60.42
S/MEZCLADORA
02.03.10.03 CONCRETO f'c=175 Kg/cm2 m3 1.44 S/.673.09 S/.969.25
CONCRETO CICLOPEO f'c= 175 Kg/cm2 + 30%P.M.
02.03.10.04 m3 0.14 S/.599.45 S/.83.92
S/MEZCLADORA
02.03.10.05 ENCOFRADO Y DESENCOFRADO m2 8.26 S/.68.44 S/.565.31
02.03.10.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 36.51 S/.9.94 S/.362.91
02.03.10.07 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 2.03 S/.15.32 S/.31.10
02.03.11 ZANJA DE CORONACION
02.03.11.01 TRAZO, NIVELACION Y REPLANTEO m2 30.00 S/.2.63 S/.78.90
02.03.11.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 9.00 S/.39.57 S/.356.13
02.03.11.03 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 11.25 S/.15.32 S/.172.35
02.03.12 BY PASS HACIA EL PREFILTRO
02.03.12.01 LIMPIEZA Y DESBROCE DE MONTE m2 15.00 S/.0.62 S/.9.30
02.03.12.02 TRAZO, NIVELACION Y REPLANTEO m2 15.00 S/.2.63 S/.39.45
EXCAV. MANUAL T. ARCILL. A=0.50, H=2.00 P/TUBERIA MENOR
02.03.12.03 m 30.00 S/.59.35 S/.1,780.50
A 4"
02.03.12.04 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 30.00 S/.1.79 S/.53.70
PREPARACION DE CAMAS DE APOYO A=0.50, H=0.10 P/TUB.
02.03.12.05 m 30.00 S/.2.77 S/.83.10
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=0.25 EN
02.03.12.06 m 30.00 S/.4.47 S/.134.10
TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.50, H=0.25
02.03.12.07 m 30.00 S/.4.47 S/.134.10
EN TERR.ARCILL. P/TUBERIA < 10"
02.03.12.08 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 7.50 S/.15.32 S/.114.90
SUMINISTRO E INSTALACION DE TUBERIA PEAD DN 63mm PN
02.03.12.09 m 30.00 S/.7.94 S/.238.20
8
SUM. E INSTALACION DE UNIONES PEAD DN 63mm PN16
02.03.12.10 und 3.00 S/.57.18 S/.171.54
(Junta Rapida)
SUM. E INSTALACION DE CODO PEAD DN 63mm X 45° PN10
02.03.12.11 und 3.00 S/.46.81 S/.140.43
(Junta Rapida)
SUM. E INSTALACION DE CODO PEAD DN 63mm X 90° PN10
02.03.12.12 und 3.00 S/.54.04 S/.162.12
(Junta Rapida)
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE UPR HEMBRA 63mm +
02.03.12.13 und 2.00 S/.55.11 S/.110.22
ADAPTADOR
SUMINISTRO E INSTALACION DE ACCESORIOS P/ VALVULA
02.03.12.14 und 1.00 S/.242.46 S/.242.46
COMPUERTA
02.03.12.15 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 30.00 S/.2.29 S/.68.70
02.03.13 VARIOS
02.03.13.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 59.34 S/.6.25 S/.370.88
CONSTRUCCION DE CERCO PERIMETRICO PARA EL
02.04
SEDIMENTADOR
02.04.01 OBRAS PRELIMINARES
02.04.01.01 TRAZO, NIVELACION Y REPLANTEO m2 57.00 S/.2.63 S/.149.91
02.04.02 MOVIMIENTO DE TIERRAS
02.04.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 3.74 S/.39.57 S/.147.99
02.04.02.02 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 4.68 S/.15.32 S/.71.70
02.04.03 OBRAS DE CONCRETO
02.04.03.01 CONCRETO f'c=175 Kg/cm2 m3 4.99 S/.673.09 S/.3,358.72
02.04.03.02 ENCOFRADO Y DESENCOFRADO m2 12.48 S/.68.44 S/.854.13
02.04.04 CARPINTERIA DE MADERA
02.04.04.01 ROLLIZO DE DIAMETRO 4" X L=2.60 M TRATADOS und 37.00 S/.41.56 S/.1,537.72
02.04.04.02 POSTE DE MADERA 4" X 4" X L=2.60m TRATADOS und 2.00 S/.86.98 S/.173.96
CERCO C/ MALLA COCADA GALVANIZADO DE ALAMBRE # 12
02.04.04.03 m 55.00 S/.109.76 S/.6,036.80
COCADA 2" X 2" DE H=2m
PUERTA DE 2.00X2.00m (MARCO DE ROLLIZO Y C/MALLA
02.04.04.04 und 1.00 S/.278.33 S/.278.33
COCADA GALVANIZADA)
02.05 REHABILITACION DE PRE-FILTRO
02.05.01 REVOQUES Y ENLUCIDOS
PICADO Y LIMPIEZA DE TARRAJEO C/IMPERMEBILIZANTE
02.05.01.01 m2 141.87 S/.5.94 S/.842.71
M=1:3 C:A e=1"
PICADO Y LIMPIEZA DE TARRAJEO MUROS EXT. FROTACH.
02.05.01.02 m2 51.20 S/.5.94 S/.304.13
C/MORT. 1:4 x e=1"
02.05.01.03 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 141.87 S/.36.56 S/.5,186.77
02.05.01.04 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 51.20 S/.32.63 S/.1,670.66
02.05.02 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.05.02.01 und 1.00 S/.419.25 S/.419.25
0.80x0.0.80m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.05.02.02 und 2.00 S/.419.25 S/.838.50
0.70x0.85m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.05.02.03 und 2.00 S/.731.21 S/.1,462.42
0.70x1.45m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE VERTEDERO TRIANGULAR
02.05.02.04 und 1.00 S/.134.27 S/.134.27
MEDIDOR DE CAUDALES DE 0.30 m x0.30m
SUMINISTRO E INSTALACION COMPUERTA METALICA DE
02.05.02.05 und 2.00 S/.283.06 S/.566.12
0.53m x 1.10m
SUMINISTRO E INSTALACION COMPUERTA METALICA DE
02.05.02.06 und 4.00 S/.279.33 S/.1,117.32
0.35m x 1.05m
02.05.03 PRUEBA HIDRAULICA Y DESINFECCION
02.05.03.01 PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO m3 22.52 S/.2.88 S/.64.86
02.05.03.02 DESINFECCION DE PREFILTRO m3 22.52 S/.26.61 S/.599.26
02.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.05.04.01 und 1.00 S/.386.39 S/.386.39
BRONCE D=2" PRE FILTRO
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
INSTALACION DE VALVULA MARIPOZA REFORZADA PN 10,
02.05.04.02 und 4.00 S/.373.77 S/.1,495.08
160mm + ACCESORIOS
INSTALACION DE VALVULA MARIPOZA REFORZADA PN 10,
02.05.04.03 und 2.00 S/.717.56 S/.1,435.12
200mm + ACCESORIOS
02.05.05 SUM. E INST. DE COMPONENTES DEL LECHO FILTRANTE
INSTALACION DE LOSAS REMOVIBLE DE CANAL DE
02.05.05.01 und 114.00 S/.0.93 S/.106.02
PREFILTRO
CONCRETO f'c=210 Kg/cm2 P/LOSAS REMOVIBLE DE CANAL
02.05.05.02 DE PREFILTRO m3 0.13 S/.706.17 S/.91.80

02.05.05.03 LECHO FILTRANTE C/GRAVA ENTRE 1"-2" m3 2.14 S/.608.59 S/.1,302.38


02.05.05.04 LECHO FILTRANTE C/GRAVA ENTRE 1/2"-1" m3 2.60 S/.608.59 S/.1,582.33
02.05.05.05 LECHO FILTRANTE C/GRAVA ENTRE 1/4"-1/2" m3 3.42 S/.608.59 S/.2,081.38
02.05.06 PINTURA
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.05.06.01 m2 29.07 S/.9.47 S/.275.29
MANOS
02.05.07 VARIOS
02.05.07.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 51.20 S/.6.25 S/.320.00
02.06 REHABILITACION DE FILTRO LENTO
02.06.01 REVOQUES Y ENLUCIDOS
PICADO Y LIMPIEZA DE TARRAJEO C/IMPERMEBILIZANTE
02.06.01.01 m2 166.34 S/.5.94 S/.988.06
M=1:3 C:A e=1"
PICADO Y LIMPIEZA DE TARRAJEO MUROS EXT. FROTACH.
02.06.01.02 m2 67.99 S/.5.94 S/.403.86
C/MORT. 1:4 x e=1"
02.06.01.03 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 166.34 S/.36.56 S/.6,081.39
02.06.01.04 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 67.99 S/.32.63 S/.2,218.51
02.06.02 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.06.02.01 und 2.00 S/.317.06 S/.634.12
0.60x0.70m C/MECAN DE SEGÚN DISEÑO
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.06.02.02 und 2.00 S/.993.03 S/.1,986.06
0.65x1.70m C/MECAN DE SEGÚN DISEÑO
02.06.03 PRUEBAS HIDRAULICAS Y DESINFECCION
02.06.03.01 PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO m3 84.75 S/.2.88 S/.244.08
02.06.03.02 DESINFECCION DE FILTRO m3 84.75 S/.26.61 S/.2,255.20
EVACUACION DEL AGUA DE PRUEBA C/EMPL. DE LINEA DE
02.06.03.03 m3 84.75 S/.5.31 S/.450.02
SALIDA
02.06.04 INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA
02.06.04.01 und 1.00 S/.976.99 S/.976.99
BRIDADA DE 2 1/2"
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA
02.06.04.02 und 2.00 S/.1,556.30 S/.3,112.60
BRIDADA DE 4"
SUMINISTRO E INSTALACION DE VASTAGOS P/ COMPUERTA
02.06.04.03 und 3.00 S/.169.08 S/.507.24
DE BRONCE
02.06.05 UNIDAD DE LAVADO DE ARENA
02.06.05.01 TRAZO, NIVELACION Y REPLANTEO m2 1.76 S/.2.63 S/.4.63
02.06.05.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.62 S/.39.57 S/.24.53
02.06.05.03 CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES m3 0.18 S/.633.65 S/.114.06
02.06.05.04 ENCOFRADO Y DESENCOFRADO m2 10.10 S/.68.44 S/.691.24
02.06.05.05 ACERO fy=4200 kg/cm2 kg 39.45 S/.9.94 S/.392.13
02.06.05.06 CONCRETO f'c=20,5Mpa (210 Kg/cm2) m3 0.66 S/.697.76 S/.460.52
02.06.05.07 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 10.64 S/.32.63 S/.347.18
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE ACCESORIOS P/ UNIDAD
02.06.05.08 und 1.00 S/.54.68 S/.54.68
LAVADO DE ARENA
SUMINISTRO E INSTALACION DE ACCESORIOS P/UNIDAD DE
02.06.06
LAVADO DE ARENA
02.06.06.01 TRAZO, NIVELACION Y REPLANTEO m2 11.00 S/.2.63 S/.28.93
EXCAV. MANUAL T. ARCILL. A=0.50, H=0.65 P/TUBERIA MENOR
02.06.06.02 m 22.00 S/.19.29 S/.424.38
A 4"
02.06.06.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 22.00 S/.1.79 S/.39.38
PREPARACION DE CAMAS DE APOYO A=0.50, H=0.10 P/TUB.
02.06.06.04 m 22.00 S/.2.77 S/.60.94
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.50, H=0.25
02.06.06.05 m 22.00 S/.4.47 S/.98.34
EN TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELECC. A=0.50,
02.06.06.06 m 22.00 S/.4.69 S/.103.18
H=0.30 EN TERR. ARCILL. P/TUBERIA < 4"
02.06.06.07 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 0.89 S/.15.32 S/.13.63
02.06.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1/2" m 22.00 S/.2.97 S/.65.34
02.06.06.09 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 22.00 S/.2.29 S/.50.38
02.06.06.10 SUMINISTRO E INSTALACION DE TEE PVC SP 63mm UF X 1/2" und 1.00 S/.34.38 S/.34.38
02.06.06.11 SUMINISTRO E INSTALACION DE CODO PVC SP 1 1/2" X 90° und 3.00 S/.11.33 S/.33.99
02.06.07 SUM. E INST. DE COMPONENTES DEL LECHO FILTRANTE
02.06.07.01 SUM. E INST. LADRILLO PANDERETA 23 X 11 X 9cm und 2,426.00 S/.2.61 S/.6,331.86
02.06.07.02 LECHO FILTRANTE C/ARENA 0.20mm,CU=2 m3 24.80 S/.640.60 S/.15,886.88
02.06.07.03 LECHO FILTRANTE C/GRAVA ENTRE 1.5 - 4mm, e=0.05m m3 2.07 S/.884.83 S/.1,831.60
02.06.07.04 LECHO FILTRANTE C/GRAVA ENTRE 4 - 15mm, e=0.05m m3 2.07 S/.617.62 S/.1,278.47
02.06.07.05 LECHO FILTRANTE C/GRAVA ENTRE 10 - 40mm,e=0.10m m3 4.13 S/.582.77 S/.2,406.84
02.06.08 TUBERIA DE DESCARGA - LIMPIEZA DEL FILTRO
02.06.08.01 TRAZO, NIVELACION Y REPLANTEO m2 36.00 S/.2.63 S/.94.68
EXCAV. MANUAL T. ARCILL. A=0.40, H=2.00 P/TUBERIA MENOR
02.06.08.02 m 72.00 S/.59.35 S/.4,273.20
A 10"
02.06.08.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 72.00 S/.1.79 S/.128.88
PREPARACION DE CAMAS DE APOYO A=0.40, H=0.10 P/TUB.
02.06.08.04 m 72.00 S/.2.24 S/.161.28
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=0.25 EN
02.06.08.05 m 72.00 S/.4.47 S/.321.84
TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=1.65 EN
02.06.08.06 m 72.00 S/.25.64 S/.1,846.08
TERR.ARCILL. P/TUBERIA < 10"
02.06.08.07 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 18.00 S/.15.32 S/.275.76
SUMINISTRO E INSTALACION DE TUBERIA
02.06.08.08 m 59.50 S/.35.22 S/.2,095.59
P/ALCANTARILLADO NTP ISO 4435 DN 200 UF INCUIDO ANILLO
SUMINISTRO E INSTALACION DE TUBERIA
02.06.08.09 m 12.50 S/.23.74 S/.296.75
P/ALCANTARILLADO NTP ISO 4435 DN 160 UF INCUIDO ANILLO
SUMINISTRO E INSTALACION DE CODO PVC
02.06.08.10 m 4.00 S/.60.55 S/.242.20
P/ALCANTARILLADO DE 160mm X 45°
SUMINISTRO E INSTALACION DE CODO PVC
02.06.08.11 m 1.00 S/.60.55 S/.60.55
P/ALCANTARILLADO DE 160mm X 90°
02.06.08.12 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 72.00 S/.2.29 S/.164.88
BUZON DEL TIPO I en T.N. P/ 1.05<=H <= 2.05 m (1 UND A
02.06.09
CONSTRUIR Y 2 UND A REHABILITAR)
02.06.09.01 TRAZO, NIVELACION Y REPLANTEO m2 1.77 S/.2.63 S/.4.66
02.06.09.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 4.24 S/.39.57 S/.167.78
02.06.09.03 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 5.30 S/.15.32 S/.81.20
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.06.09.04 m3 0.09 S/.604.21 S/.54.38
S/MEZCLADORA
02.06.09.05 ENCOFRADO Y DESENCOFRADO m2 8.67 S/.68.44 S/.593.37
02.06.09.06 CONCRETO f 'c=210 kg/cm2 m3 2.42 S/.735.14 S/.1,779.04
02.06.09.07 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 13.66 S/.9.94 S/.135.78
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.06.09.08 m2 8.93 S/.5.83 S/.52.06
PÉLICULA IMPERMEABLE)
02.06.09.09 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 21.48 S/.36.56 S/.785.31
02.06.09.10 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 5.31 S/.32.63 S/.173.27
02.06.09.11 MARCO DE FIERRO FUNDIDO PARA DESAGUE und 3.00 S/.64.92 S/.194.76
02.06.10 VEREDA DE CONCRETO SIMPLE
02.06.10.01 TRAZO, NIVELACION Y REPLANTEO m2 99.20 S/.2.63 S/.260.90
02.06.10.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 2.18 S/.39.57 S/.86.26
02.06.10.03 CONCRETO f'c=175 Kg/cm2 e=0.10m P/VEREDA m3 11.57 S/.669.97 S/.7,751.55
02.06.10.04 ENCOFRADO Y DESENCOFRADO m2 19.78 S/.68.44 S/.1,353.74
02.06.11 ESTRUCTURA DE DESCARGA
02.06.11.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 1.62 S/.39.57 S/.64.10
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.06.11.02 m3 0.10 S/.604.21 S/.60.42
S/MEZCLADORA
02.06.11.03 CONCRETO f'c=175 Kg/cm2 m3 1.44 S/.673.09 S/.969.25
CONCRETO CICLOPEO f'c= 175 Kg/cm2 + 30%P.M.
02.06.11.04 m3 0.14 S/.599.45 S/.83.92
S/MEZCLADORA
02.06.11.05 ENCOFRADO Y DESENCOFRADO m2 8.26 S/.68.44 S/.565.31
02.06.11.06 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 36.51 S/.9.94 S/.362.91
02.06.12 ZANJA DE CORONACION
02.06.12.01 TRAZO, NIVELACION Y REPLANTEO m2 31.00 S/.2.63 S/.81.53
02.06.12.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 2.40 S/.39.57 S/.94.97
02.06.12.03 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 3.00 S/.15.32 S/.45.96
02.06.13 VARIOS
02.06.13.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 67.99 S/.6.25 S/.424.94
02.07 REHABILITACION DE CASETA
02.07.01 OBRAS DE CONCRETO ARMADO
02.07.01.01 DEMOLICION ESTRUCTURA DE CONCRETO m3 1.47 S/.76.59 S/.112.59
02.07.01.02 CONCRETO f'c=210 kg/cm2 P/ COLUMNAS m3 1.47 S/.697.56 S/.1,025.41
02.07.01.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 30.37 S/.62.69 S/.1,903.90
02.07.01.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 212.56 S/.9.94 S/.2,112.85
02.07.01.05 CONCRETO f'c=210 kg/cm2 P/VIGAS m3 1.22 S/.709.29 S/.865.33
02.07.01.06 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 23.72 S/.68.12 S/.1,615.81
02.07.01.07 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 226.30 S/.9.94 S/.2,249.42
02.07.01.08 CONCRETO f'c=210 Kg/cm2 P/ECALERAS m3 1.86 S/.709.29 S/.1,319.28
02.07.01.09 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 13.58 S/.69.40 S/.942.45
02.07.01.10 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 96.93 S/.9.94 S/.963.48
02.07.02 CURADOS DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.07.02.01 m2 127.73 S/.5.83 S/.744.67
PÉLICULA IMPERMEABLE)
02.07.03 MUROS Y TABIQUERIA DE ALBAÑILERIA
MURO DE LADRILLO K.K. DE ARCILLA 18H (0.09x0.13x0.24m)
02.07.03.01 m2 66.48 S/.124.85 S/.8,300.03
AMARRE DE SOGA JUNTA 1.5 cm, MORTERO 1:5
02.07.04 REVOQUES Y ENLUCIDOS
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.07.04.01 TARRAJEO MUROS INT. FROTACH. C/MORT 1:4 x e=1" m2 109.59 S/.32.63 S/.3,575.92
02.07.04.02 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 18.14 S/.32.63 S/.591.91
02.07.04.03 TARRAJEO PISO INTERIOR PULIDO M=1:3 C:A e=1" m2 28.35 S/.34.04 S/.965.03
02.07.05 PINTURA
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.07.05.01 m2 127.73 S/.9.47 S/.1,209.60
MANOS
02.07.06 CARPINTERIA DE MADERA
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
02.07.06.01 und 3.00 S/.445.57 S/.1,336.71
0.90mx1.90mx C/MARCO 2"x2"
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
02.07.06.02 und 1.00 S/.55.57 S/.55.57
MADERA 2"x1" DE 0.70m x2.20m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
02.07.06.03 und 1.00 S/.88.20 S/.88.20
MADERA 2"x1" DE 0.70m x4.35m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
02.07.06.04 und 1.00 S/.70.27 S/.70.27
MADERA 2"x1" DE 0.70m x3.15m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
02.07.06.05 und 1.00 S/.35.44 S/.35.44
MADERA 2"x1" DE 0.70m x1.15m
02.07.06.06 CERRADURA INTERIOR TIPO DOBLE PERILLA und 3.00 S/.36.47 S/.109.41
02.07.06.07 MASILLADO DE MADERA Y ACABADO CON LACA und 3.00 S/.91.17 S/.273.51
02.07.07 CONTRAZOCALO
CONTRAZOCALO DE CEMENTO COLOREADO DE H=0.10 m, E=
02.07.07.01 m2 35.10 S/.34.04 S/.1,194.80
2cm
02.07.08 ZOCALOS
02.07.08.01 ZÓCALO DE CEMENTO, DE 0.30m DE ALTO, e=2cm m2 24.00 S/.31.27 S/.750.48
02.07.09 CUBIERTAS
02.07.09.01 TECHO DE CALAMINA CON MADERA m2 48.38 S/.56.50 S/.2,733.47
02.07.10 CANALETA PLUVIAL
02.07.10.01 SUMINISTRO E INSTALACION DE CANALETA P/CASETA und 1.00 S/.503.81 S/.503.81
02.07.11 SUMINISTRO E INSTALACION DE TUBERIA Y ACCESORIOS
02.07.11.01 LIMPIEZA Y DESBROCE DE MONTE m2 30.00 S/.0.62 S/.18.60
02.07.11.02 TRAZO, NIVELACION Y REPLANTEO m2 30.00 S/.2.63 S/.78.90
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.40 P/TUBERIA MENOR
02.07.11.03 m 30.00 S/.9.49 S/.284.70
A 4"
02.07.11.04 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 30.00 S/.1.79 S/.53.70
PREPARACION DE CAMAS DE APOYO A=0.40, H=0.10 P/TUB.
02.07.11.05 m 30.00 S/.2.24 S/.67.20
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.40, H=0.25 EN
02.07.11.06 m 30.00 S/.3.57 S/.107.10
TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.40, H=0.10 EN
02.07.11.07 m 30.00 S/.1.99 S/.59.70
TERR.ARCILL. P/TUBERIA < 4"
02.07.11.08 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 0.96 S/.15.32 S/.14.71
02.07.11.09 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1" m 28.00 S/.4.87 S/.136.36
SUMINISTRO E INSTALACION DE TUBERIA PVC C-7.5 DE
02.07.11.10 m 2.00 S/.13.53 S/.27.06
63mm UF Incluido Anillo
02.07.11.11 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC und 1.00 S/.125.15 S/.125.15
02.07.12 VARIOS
SUMINISTRO E INSTALACION DE BOMBA DE MANO
02.07.12.01 und 1.00 S/.705.10 S/.705.10
SEMIROTATIVA 1"
02.07.12.02 INSTALACION DE EQUIPOS DE SALA DE DOSIFICACION und 2.00 S/.134.42 S/.268.84
02.07.12.03 SUMINISTRO E INSTALACION DE BARANDA H= 0.75m X 2.20m und 1.00 S/.521.68 S/.521.68
02.08 CONST. CERCO PERIMETRICO PARA PTAP (L=57.00m)
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.08.01 OBRAS PRELIMINARES
02.08.01.01 TRAZO, NIVELACION Y REPLANTEO m2 57.00 S/.2.63 S/.149.91
02.08.02 MOVIMIENTO DE TIERRAS
02.08.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 3.74 S/.39.57 S/.147.99
02.08.02.02 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 4.68 S/.15.32 S/.71.70
02.08.03 OBRAS DE CONCRETO ARMADO
02.08.03.01 CONCRETO f'c=175 Kg/cm2 m3 4.99 S/.673.09 S/.3,358.72
02.08.03.02 ENCOFRADO Y DESENCOFRADO m2 12.48 S/.68.44 S/.854.13
02.08.04 CARPINTERIA DE MADERA
02.08.04.01 ROLLIZO DE DIAMETRO 4" X L=2.60 M TRATADOS und 37.00 S/.41.56 S/.1,537.72
02.08.04.02 POSTE DE MADERA 4" X 4" X L=2.60m TRATADOS und 2.00 S/.86.98 S/.173.96
CERCO C/ MALLA COCADA GALVANIZADO DE ALAMBRE # 12
02.08.04.03 m 55.00 S/.109.76 S/.6,036.80
COCADA 2" X 2" DE H=2m
PUERTA DE 2.00X2.00m (MARCO DE ROLLIZO Y C/MALLA
02.08.04.04 und 1.00 S/.278.33 S/.278.33
COCADA GALVANIZADA)
02.09 MURO DE CONTENCION H=2.00m Y L= 20.00m
02.09.01 TRABAJOS PRELIMINARES
02.09.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 30.00 S/.0.62 S/.18.60
02.09.01.02 TRAZO, NIVELACION Y REPLANTEO m2 30.00 S/.2.63 S/.78.90
02.09.02 MOVIMIENTO DE TIERRAS
02.09.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 24.60 S/.39.57 S/.973.42
02.09.02.02 REFINE Y NIVELACION m2 30.00 S/.9.28 S/.278.40
02.09.02.03 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 12.00 S/.45.57 S/.546.84
02.09.02.04 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 50.00 m m3 15.75 S/.20.42 S/.321.62
02.09.03 CONCRETO SIMPLE
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.09.03.01 m3 1.50 S/.604.21 S/.906.32
S/MEZCLADORA
02.09.04 CONCRETO ARMADO
02.09.04.01 CONCRETO f'c=210 Kg/cm2 P/LOSAS DE FONDO DE PISO m3 10.80 S/.709.29 S/.7,660.33
02.09.04.02 CONCRETO f'c=210 kg/cm2 P/MUROS REFORZADOS m3 10.80 S/.720.76 S/.7,784.21
02.09.04.03 ENCOFRADO Y DESENCOFRADO m2 81.20 S/.68.44 S/.5,557.33
02.09.04.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 748.39 S/.9.94 S/.7,439.00
REHABILITACION DE RESERVORIO CON CAMARA DE CONTACTO
02.10
DE VOLUMEN = 19 m3
02.10.01 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/4" 0.60 x 0.60 m C/MECAN DE
02.10.01.01 und 2.00 S/.191.20 S/.382.40
SEGUN. S/DISEÑO
02.10.01.02 ESCALERA DE MARINERO SEGÚN S/DISEÑO und 1.00 S/.323.62 S/.323.62
02.10.01.03 ESCALERA DE GATO SEGUN S/DISEÑO und 1.00 S/.334.02 S/.334.02
02.10.01.04 TUBERIA DE ACERO S/DISEÑO DE 2" m 4.00 S/.16.57 S/.66.28
02.10.02 PINTURA
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.10.02.01 m2 50.00 S/.9.47 S/.473.50
MANOS
02.10.03 DESCARGA DE LODOS ( 2 UND)
SUMINISTRO E INSTALACION DE TAPA METALICA LAC 1/4"
02.10.03.01 und 2.00 S/.419.25 S/.838.50
0.80x0.0.80m C/MECAN DE SEGÚN DISEÑO
02.10.03.02 VALVULA COMPUERTA BRIDADA DE ACERO DE 4" und 2.00 S/.1,092.35 S/.2,184.70
CAJAS DE INGRESO, LIMPIEZA E INSPECCION DE RESERVORIO
02.10.04
Y CAMARA DE CONTACTO
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.10.04.01 OBRAS DE CONCRETO ARMADO
02.10.04.01.01 MARCO DE TAPA DEL TECHO
02.10.04.01.01.01 CONCRETO f'c=175 Kg/cm2 m3 0.10 S/.673.09 S/.67.31
02.10.04.01.01.02 ENCOFRADO Y DESENCOFRADO m2 1.07 S/.75.35 S/.80.62
02.10.04.01.01.03 ACERO fy=4200 kg/cm2 kg 7.00 S/.9.94 S/.69.58
02.10.04.02 CARPINTERIA METALICA
02.10.04.02.01 SUMINISTRO E INSTALACIÓN DE ACCESORIOS METÁLICOS und 1.00 S/.651.61 S/.651.61
02.10.04.03 INSTALACIONES HIDRAULICAS
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS DE CAJA
02.10.04.03.01 und 1.00 S/.2,516.54 S/.2,516.54
DE INGRESO DE 2" Y LIMPIA 4"
02.10.05 REHABILITACION DE CASETA DE VALVULAS P/RESERVORIO
02.10.05.01 OBRAS DE CONCRETO ARMADO
02.10.05.01.01 MARCO DE TAPA DEL TECHO
02.10.05.01.01.01 CONCRETO f'c=175 Kg/cm2 m3 0.20 S/.673.09 S/.134.62
02.10.05.01.01.02 ENCOFRADO Y DESENCOFRADO m2 3.42 S/.68.44 S/.234.06
02.10.05.01.01.03 ACERO fy=4200 kg/cm2 kg 14.73 S/.9.94 S/.146.42
02.10.05.02 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.40 x 0.40 m C/MECAN
02.10.05.02.01 und 1.00 S/.247.14 S/.247.14
DE SEGUR. S/DISEÑO
02.10.05.02.02 ESCALERA DE GATO SEGUN S/DISEÑO und 1.00 S/.334.02 S/.334.02
02.10.05.03 PINTURAS
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.10.05.03.01 m2 7.36 S/.9.47 S/.69.70
MANOS
02.10.05.04 INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
02.10.05.04.01 und 1.00 S/.1,542.21 S/.1,542.21
DE CAJA DE VALVULAS
02.10.06 PRUEBAS HIDRAULICAS Y DESINFECCION
02.10.06.01 PRUEBA HIDRAULICA CON EMPLEO DE LINEA DE INGRESO m3 44.54 S/.2.88 S/.128.28
DESINFECCION DE RESERVORIO CON EMPLEO DE LINEA DE
02.10.06.02 m3 44.54 S/.26.61 S/.1,185.21
INGRESO
EVACUACION DEL AGUA DE PRUEBA C/EMPL. DE LINEA DE
02.10.06.03 m3 44.54 S/.5.31 S/.236.51
SALIDA
02.10.07 VEREDAS DE CONCRETO SIMPLE
02.10.07.01 TRAZO, NIVELACION Y REPLANTEO m2 22.30 S/.2.63 S/.58.65
02.10.07.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.67 S/.39.57 S/.26.51
02.10.07.03 CONCRETO f'c=175 Kg/cm2 e=0.10m P/VEREDA m3 2.90 S/.669.97 S/.1,942.91
02.10.07.04 ENCOFRADO Y DESENCOFRADO m2 6.99 S/.68.44 S/.478.40
02.10.08 ZANJA DE CORONACION
02.10.08.01 TRAZO, NIVELACION Y REPLANTEO m2 30.00 S/.2.63 S/.78.90
02.10.08.02 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 9.00 S/.39.57 S/.356.13
02.10.08.03 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 11.25 S/.15.32 S/.172.35
02.10.09 LIMPIEZA Y DESINFECCION
02.10.09.01 LIMPIEZA Y DESINFECCION DE ESTRUCTURAS EXISTENTES m2 57.36 S/.1.23 S/.70.55
02.10.10 DESENCOFRADO DE ESTRUCTURAS EXISTENTES
02.10.10.01 DESENCOFRADO DE ESTRUCTURAS EXISTENTES m2 25.00 S/.8.23 S/.205.75
02.10.11 VARIOS
02.10.11.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 57.36 S/.6.25 S/.358.50

02.11 CONST. DE CERCO PERIMETRICO DEL RESERVORIO (L=37.00m)


COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.11.01 OBRAS PRELIMINARES
02.11.01.01 TRAZO, NIVELACION Y REPLANTEO m2 36.50 S/.2.63 S/.96.00
02.11.02 MOVIMIENTO DE TIERRAS
02.11.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 2.50 S/.39.57 S/.98.93
02.11.02.02 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 20.00 m m3 3.13 S/.15.32 S/.47.95
02.11.03 OBRAS DE CONCRETO ARMADO
02.11.03.01 CONCRETO f'c=175 Kg/cm2 m3 3.33 S/.673.09 S/.2,241.39
02.11.03.02 ENCOFRADO Y DESENCOFRADO m2 8.32 S/.68.44 S/.569.42
02.11.04 CARPINTERIA METALICA
02.11.04.01 ROLLIZO DE DIAMETRO 4" X L=2.60 M TRATADOS und 24.00 S/.41.56 S/.997.44
02.11.04.02 POSTE DE MADERA 4" X 4" X L=2.60m TRATADOS und 2.00 S/.86.98 S/.173.96
CERCO C/ MALLA COCADA GALVANIZADO DE ALAMBRE # 12
02.11.04.03 m 34.50 S/.109.76 S/.3,786.72
COCADA 2" X 2" DE H=2m
PUERTA DE 2.00X2.00m (MARCO DE ROLLIZO Y C/MALLA
02.11.04.04 und 1.00 S/.278.33 S/.278.33
COCADA GALVANIZADA)
02.12 REHABILITACION DE LA LINEA DE ADUCCION
02.12.01 DESINSTALACION Y RETIRO DE TUBERIA DE PVC
02.12.01.01 DESINSTALACION Y ELIMINACION DE TUBERIA DE PVC 2" m 5.00 S/.3.76 S/.18.80
02.12.02 SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PEAD DN 63mm PN
02.12.02.01 m 5.00 S/.7.94 S/.39.70
8
02.12.03 PRUEBAS HIDRAULICAS
02.12.03.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 5.00 S/.2.29 S/.11.45
02.12.04 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE UNION PEAD DN 63mm PN 16
02.12.04.01 und 2.00 S/.49.95 S/.99.90
(Junta Rapida)
SUMINISTRO E INSTALACION DE UPR HEMBRA 63mm +
02.12.04.02 und 1.00 S/.55.11 S/.55.11
ADAPTADOR
SUMINISTRO E INSTALACION DE UNION MECANICA DE PVC A
02.12.04.03 und 1.00 S/.91.31 S/.91.31
HDPE DE 63mm
02.13 PASE AEREO DE L=60m (1 UND A REHABILITAR)
02.13.01 DESINSTALACION Y RETIRO DE TUBERIA DE PVC
02.13.01.01 DESINSTALACION Y ELIMINACION DE TUBERIA DE FºGº 2" m 60.00 S/.7.50 S/.450.00
02.13.02 REVOQUES Y ENLUCIDOS
02.13.02.01 TARRAJEO COLUMNAS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 14.40 S/.34.84 S/.501.70
02.13.03 PINTURAS
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.13.03.01 m2 14.40 S/.9.47 S/.136.37
MANOS
02.13.04 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE PASE
02.13.04.01 glb 1.00 S/.7,513.02 S/.7,513.02
AEREO P/60M
02.13.05 LIMPIEZA Y DESINFECCION
02.13.05.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 14.40 S/.6.25 S/.90.00
CONSTRUCCION DE CAJA PARA VALVULA DE AIRE DE 3/4" (2
02.14
UND)
02.14.01 TRABAJOS PRELIMINARES
02.14.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 2.00 S/.0.62 S/.1.24
02.14.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1.58 S/.2.63 S/.4.16
02.14.02 MOVIMIENTO DE TIERRAS
02.14.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.74 S/.39.57 S/.29.28
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.14.03 OBRAS DE CONCRETO ARMADO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.14.03.01 m3 0.04 S/.604.21 S/.24.17
S/MEZCLADORA
02.14.03.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 0.38 S/.640.53 S/.243.40
02.14.03.03 ENCOFRADO Y DESENCOFRADO m2 6.16 S/.68.44 S/.421.59
02.14.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 12.70 S/.9.94 S/.126.24
02.14.04 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.14.04.01 m2 3.04 S/.5.83 S/.17.72
PÉLICULA IMPERMEABLE)
02.14.05 REVOQUES Y ENLUCIDOS
02.14.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 3.04 S/.36.56 S/.111.14
02.14.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.40 x 0.40 m C/MECAN DE
02.14.06.01 und 2.00 S/.247.14 S/.494.28
SEGUR. S/DISEÑO
02.14.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS P/VALVULA DE
02.14.07.01 und 2.00 S/.274.61 S/.549.22
AIRE DOBLE EFECTO 3/4"
02.14.07.02 SUMINISTRO E INSTALACION DE COLLARIN PE 63mm A 3/4" und 2.00 S/.16.59 S/.33.18
02.14.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 2.00 S/.124.72 S/.249.44
CONSTRUCCION DE CAJA PARA VALVULA DE PURGA DE 2" (3
02.15
UND)
02.15.01 TRABAJOS PRELIMINARES
02.15.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 4.32 S/.0.62 S/.2.68
02.15.01.02 TRAZO, NIVELACION Y REPLANTEO m2 3.00 S/.2.63 S/.7.89
02.15.02 MOVIMIENTO DE TIERRAS
02.15.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 2.13 S/.39.57 S/.84.28
02.15.03 OBRAS DE CONCRETO ARMADO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.15.03.01 m3 0.12 S/.604.21 S/.72.51
S/MEZCLADORA
02.15.03.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 0.93 S/.640.53 S/.595.69
02.15.03.03 ENCOFRADO Y DESENCOFRADO m2 14.10 S/.68.44 S/.965.00
02.15.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 23.40 S/.9.94 S/.232.60
02.15.04 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.15.04.01 m2 7.08 S/.5.83 S/.41.28
PÉLICULA IMPERMEABLE)
02.15.05 REVOQUES Y ENLUCIDOS
02.15.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 7.08 S/.36.56 S/.258.84
02.15.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.60 x 0.60 m C/MECAN DE
02.15.06.01 und 3.00 S/.191.20 S/.573.60
SEGUR. S/DISEÑO
02.15.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.15.07.01 und 3.00 S/.428.87 S/.1,286.61
BRONCE 2" PARA PURGA
SUMINISTRO E INSTALACION DE TEE PEAD 63mm (junta
02.15.07.02 und 3.00 S/.56.41 S/.169.23
rapida) C/ SALIDA HEMBRA
02.15.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 3.00 S/.124.72 S/.374.16
02.16 RED DE DISTRIBUCION
02.16.01 TRABAJOS PRELIMINARES
02.16.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 5,570.74 S/.0.62 S/.3,453.86
02.16.01.02 TRAZO, NIVELACION Y REPLANTEO m2 2,785.37 S/.2.63 S/.7,325.52
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.16.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.50, H=0.80 P/TUBERIA MENOR
02.16.02.01 m 2,785.35 S/.20.95 S/.58,353.08
A 4"
02.16.02.02 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 2,785.35 S/.1.79 S/.4,985.78
PREPARACION DE CAMAS DE APOYO A=0.50, H=0.10 P/TUB.
02.16.02.03 m 2,785.35 S/.2.77 S/.7,715.42
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=0.25 EN
02.16.02.04 m 2,785.35 S/.4.47 S/.12,450.51
TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.50, H=0.45 EN
02.16.02.05 m 2,785.35 S/.7.00 S/.19,497.45
TERR.ARCILL. P/TUBERIA < 4"
02.16.02.06 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 50.00 m m3 226.31 S/.20.42 S/.4,621.25
OBRAS DE CONCRETO ARMADO (PROTECCION DE TUBERIA
02.16.03
PARA CRUCE DE HUAYCO)
02.16.03.01 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 0.72 S/.640.53 S/.461.18
02.16.03.02 ENCOFRADO Y DESENCOFRADO m2 4.80 S/.68.44 S/.328.51
02.16.04 SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC C-7.5 DE
02.16.04.01 m 1,808.71 S/.13.53 S/.24,471.85
63mm UF Incluido Anillo
02.16.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC C-7.5 DE 1 1/2" m 296.04 S/.4.94 S/.1,462.44
02.16.04.03 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1" m 680.62 S/.4.87 S/.3,314.62
02.16.05 PRUEBAS HIDRAULICAS
02.16.05.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA m 2,785.37 S/.2.29 S/.6,378.50
02.16.06 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE TEE PVC SP 63mm UF X 1
02.16.06.01 und 1.00 S/.34.39 S/.34.39
1/2"
02.16.06.02 SUMINISTRO E INSTALACION DE TEE PVC SP 63mm UF X 1" und 2.00 S/.34.39 S/.68.78
02.16.06.03 SUMINISTRO E INSTALACION DE TEE PVC DE 1 1/2" X 1" und 1.00 S/.13.14 S/.13.14
02.16.06.04 SUMINISTRO E INSTALACION DE TEE PVC SP 1" und 2.00 S/.9.71 S/.19.42
SUMINISTRO E INSTALACION DE CURVA PVC SAP 63mm X 90°
02.16.06.05 und 4.00 S/.33.67 S/.134.68
UF
SUMINISTRO E INSTALACION DE CURVA PVC SAP 63mm X 45°
02.16.06.06 und 2.00 S/.37.49 S/.74.98
UF
SUMINISTRO E INSTALACION DE CURVA PVC SAP 63mm X
02.16.06.07 und 3.00 S/.33.67 S/.101.01
22.5° UF
02.16.06.08 SUMINISTRO E INSTALACION DE CODO PVC SP 1 1/2" X 90° und 3.00 S/.11.33 S/.33.99
02.16.06.09 SUMINISTRO E INSTALACION DE CODO PVC SP 1 1/2" X 45° und 2.00 S/.10.78 S/.21.56
02.16.06.10 SUMINISTRO E INSTALACION DE CODO PVC DE 1" X 90° und 6.00 S/.9.19 S/.55.14
02.16.06.11 SUMINISTRO E INSTALACION DE CODO PVC DE 1" X 22.5° und 5.00 S/.7.31 S/.36.55
SUMINISTRO E INSTALACION DE REDUCCION PVC SP 63mm x
02.16.06.12 und 2.00 S/.16.01 S/.32.02
1 1/2"
SUMINISTRO E INSTALACION DE REDUCCION PVC SP 63mm x
02.16.06.13 und 2.00 S/.16.01 S/.32.02
1"
SUMINISTRO E INSTALACION DE REDUCCION PVC SP 1 1/2" x
02.16.06.14 und 1.00 S/.10.05 S/.10.05
1"
02.16.06.15 SUMINISTRO E INSTALACION DE TAPON PVC 1 1/2" und 1.00 S/.8.54 S/.8.54
PASE AEREO DE L=10m (1 UND A CONSTRUIR Y 2 UND A
02.16.07
REHABILITAR )
02.16.07.01 OBRAS PRELIMINARES
02.16.07.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 56.48 S/.0.62 S/.35.02
02.16.07.01.02 TRAZO, NIVELACION Y REPLANTEO m2 6.88 S/.2.63 S/.18.09
02.16.07.02 MOVIMIENTO DE TIERRAS
02.16.07.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 9.28 S/.39.57 S/.367.21
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.16.07.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 3.44 S/.45.57 S/.156.76
02.16.07.03 OBRAS DE CONCRETO SIMPLE
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.16.07.03.01 m3 0.34 S/.604.21 S/.205.43
S/MEZCLADORA
02.16.07.03.02 ENCOFRADO Y DESENCOFRADO m2 0.92 S/.68.44 S/.62.96
02.16.07.04 OBRAS DE CONCRETO ARMADO
02.16.07.04.01 CONCRETO f'c=210 kg/cm2 S/MEZCLADORA m3 2.24 S/.676.73 S/.1,515.88
02.16.07.04.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 4.40 S/.640.53 S/.2,818.33
02.16.07.04.03 ENCOFRADO Y DESENCOFRADO m2 30.40 S/.68.44 S/.2,080.58
02.16.07.04.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 90.36 S/.9.94 S/.898.18
02.16.07.05 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.16.07.05.01 m2 8.00 S/.5.83 S/.46.64
PÉLICULA IMPERMEABLE)
02.16.07.06 REVOQUES Y ENLUCIDOS
02.16.07.06.01 TARRAJEO COLUMNAS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 24.00 S/.34.84 S/.836.16
02.16.07.07 PINTURAS
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.16.07.07.01 m2 24.00 S/.9.47 S/.227.28
MANOS
02.16.07.08 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE PASE
02.16.07.08.01 glb 1.00 S/.2,989.14 S/.2,989.14
AEREO P/10M
02.16.07.09 LIMPIEZA Y DESINFECCION
02.16.07.09.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 16.00 S/.6.25 S/.100.00
02.16.08 PASE AEREO DE L=15m (1 UND A REHABILITAR)
02.16.08.01 REVOQUES Y ENLUCIDOS
02.16.08.01.01 TARRAJEO COLUMNAS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 8.00 S/.34.84 S/.278.72
02.16.08.02 PINTURAS
PINTADO DE MURO EXTERIOR C/ESMALTE SINTETICO DOS
02.16.08.02.01 m2 8.00 S/.9.47 S/.75.76
MANOS
02.16.08.03 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS DE PASE
02.16.08.03.01 glb 1.00 S/.1,455.11 S/.1,455.11
AEREO P/15M
02.16.08.04 LIMPIEZA Y DESINFECCION
02.16.08.04.01 LIMPIEZA Y RASQUETEO EN ESTRUCTURA EXISTENTE m2 8.00 S/.6.25 S/.50.00
CONSTRUCCION DE CAJA PARA VALVULA DE AIRE DE 3/4" (01
02.16.09
UND)
02.16.09.01 TRABAJOS PRELIMINARES
02.16.09.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 2.00 S/.0.62 S/.1.24
02.16.09.01.02 TRAZO, NIVELACION Y REPLANTEO m2 1.28 S/.2.63 S/.3.37
02.16.09.02 MOVIMIENTO DE TIERRAS
02.16.09.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 0.74 S/.39.57 S/.29.28
02.16.09.03 OBRAS DE CONCRETO ARMADO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.16.09.03.01 m3 0.04 S/.604.21 S/.24.17
S/MEZCLADORA
02.16.09.03.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 0.38 S/.640.53 S/.243.40
02.16.09.03.03 ENCOFRADO Y DESENCOFRADO m2 6.16 S/.68.44 S/.421.59
02.16.09.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 12.70 S/.9.94 S/.126.24
02.16.09.04 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.16.09.04.01 m2 3.04 S/.5.83 S/.17.72
PÉLICULA IMPERMEABLE)
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.16.09.05 REVOQUES Y ENLUCIDOS
02.16.09.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 3.04 S/.36.56 S/.111.14
02.16.09.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.40 x 0.40 m C/MECAN
02.16.09.06.01 und 2.00 S/.247.14 S/.494.28
DE SEGUR. S/DISEÑO
02.16.09.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE ACCESORIOS P/VALVULA
02.16.09.07.01 und 2.00 S/.274.61 S/.549.22
DE AIRE DOBLE EFECTO 3/4"
02.16.09.07.02 SUMINISTRO E INSTALACION DE COLLARIN PE 63mm A 3/4" und 2.00 S/.16.59 S/.33.18
02.16.09.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 2.00 S/.124.72 S/.249.44
CONSTRUCCION DE CAJA PARA VALVULA DE PURGA DE 2" (2
02.16.10
UND)
02.16.10.01 TRABAJOS PRELIMINARES
02.16.10.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 2.88 S/.0.62 S/.1.79
02.16.10.01.02 TRAZO, NIVELACION Y REPLANTEO m2 2.88 S/.2.63 S/.7.57
02.16.10.02 MOVIMIENTO DE TIERRAS
02.16.10.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 1.42 S/.39.57 S/.56.19
02.16.10.03 OBRAS DE CONCRETO ARMADO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.16.10.03.01 m3 0.08 S/.604.21 S/.48.34
S/MEZCLADORA
02.16.10.03.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 0.62 S/.640.53 S/.397.13
02.16.10.03.03 ENCOFRADO Y DESENCOFRADO m2 9.40 S/.68.44 S/.643.34
02.16.10.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 15.60 S/.9.94 S/.155.06
02.16.10.04 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.16.10.04.01 m2 4.72 S/.5.83 S/.27.52
PÉLICULA IMPERMEABLE)
02.16.10.05 REVOQUES Y ENLUCIDOS
02.16.10.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 4.72 S/.36.56 S/.172.56
02.16.10.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.60 x 0.60 m C/MECAN
02.16.10.06.01 und 2.00 S/.191.20 S/.382.40
DE SEGUR. S/DISEÑO
02.16.10.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.16.10.07.01 und 2.00 S/.428.87 S/.857.74
BRONCE 2" PARA PURGA
SUMINISTRO E INSTALACION DE TEE PEAD 63mm (junta
02.16.10.07.02 und 2.00 S/.56.41 S/.112.82
rapida) C/ SALIDA HEMBRA
02.16.10.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 2.00 S/.124.72 S/.249.44
CONSTRUCCION DE CAJA PARA VALVULA DE CONTROL DE 2"
02.16.11
(8 UND)
02.16.11.01 TRABAJOS PRELIMINARES
02.16.11.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 8.00 S/.0.62 S/.4.96
02.16.11.01.02 TRAZO, NIVELACION Y REPLANTEO m2 11.52 S/.2.63 S/.30.30
02.16.11.02 MOVIMIENTO DE TIERRAS
02.16.11.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 5.52 S/.39.57 S/.218.43
02.16.11.03 OBRAS DE CONCRETO ARMADO
CONCRETO f'c=140 kg/cm2 PARA SOLADO Y/O BASES
02.16.11.03.01 m3 0.32 S/.604.21 S/.193.35
S/MEZCLADORA
02.16.11.03.02 CONCRETO f'c=175 Kg/cm2 S/MEZCLADORA m3 2.16 S/.640.53 S/.1,383.54
02.16.11.03.03 ENCOFRADO Y DESENCOFRADO m2 34.24 S/.68.44 S/.2,343.39
02.16.11.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 62.40 S/.9.94 S/.620.26
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.16.11.04 CURADO DE CONCRETO
CURADO DE CONCRETO CON ADITIVO (EMULSIÓN LÍQUIDA-
02.16.11.04.01 m2 18.88 S/.5.83 S/.110.07
PÉLICULA IMPERMEABLE)
02.16.11.05 REVOQUES Y ENLUCIDOS
02.16.11.05.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 18.88 S/.36.56 S/.690.25
02.16.11.06 CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" 0.60 x 0.60 m C/MECAN
02.16.11.06.01 und 8.00 S/.191.20 S/.1,529.60
DE SEGUR. S/DISEÑO
02.16.11.07 SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INSTALACION DE VALVULA COMPUERTA DE
02.16.11.07.01 und 8.00 S/.428.87 S/.3,430.96
BRONCE 2" PARA PURGA
SUMINISTRO E INSTALACION DE TEE PEAD 63mm (junta
02.16.11.07.02 und 8.00 S/.56.41 S/.451.28
rapida) C/ SALIDA HEMBRA
02.16.11.07.03 SUMINISTRO E INSTALACION DE SUMIDEROS DE 2" und 8.00 S/.124.72 S/.997.76
CONEXIONES INTRADOMICILIARIAS DE AGUA POTABLE A
02.17
VIVIENDAS (94 UND)
02.17.01 TRABAJOS PRELIMINARES
02.17.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 728.50 S/.0.62 S/.451.67
02.17.01.02 TRAZO, NIVELACION Y REPLANTEO m2 728.50 S/.2.63 S/.1,915.96
02.17.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.50 P/TUBERIA MENOR
02.17.02.01 m 1,457.00 S/.11.87 S/.17,294.59
A 1/2"
02.17.02.02 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 1,457.00 S/.1.79 S/.2,608.03
PREPARACION DE CAMAS DE APOYO A=0.40, H=0.10 P/TUB.
02.17.02.03 m 1,457.00 S/.2.25 S/.3,278.25
MENOR A 1/2"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.40, H=0.20
02.17.02.04 m 1,457.00 S/.3.57 S/.5,201.49
EN TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.40, H=0.15 EN
02.17.02.05 m 1,457.00 S/.1.89 S/.2,753.73
TERR.ARCILL. P/TUBERIA < 4"
02.17.02.06 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 50.00 m m3 174.84 S/.20.42 S/.3,570.23
02.17.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.17.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 1/2" m 1,457.00 S/.2.97 S/.4,327.29
02.17.04 PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS ZANJA
02.17.04.01 m 1,457.00 S/.2.29 S/.3,336.53
TAPADA 1/2"
02.17.05 SUMINISTRO E INSTALACION DE ACCESORIOS
02.17.05.01 SUMINISTRO E INSTALACION DE TEE PVC SP 63mm UF X 1/2" und 65.00 S/.34.38 S/.2,234.70
02.17.05.02 SUMINISTRO E INSTALACION DE TEE PVC 1 1/2" X 1/2" und 10.00 S/.13.14 S/.131.40
02.17.05.03 SUMINISTRO E INSTALACION DE TEE PVC 1" X 1/2" und 19.00 S/.9.71 S/.184.49
SUMINISTRO E INSTALACION DE ACCESORIOS P/ VALVULA DE
02.17.05.04 und 94.00 S/.87.38 S/.8,213.72
PASO DE 1/2"
02.17.06 SUMINISTRO E INSTALACION DE CAJA DE VALVULAS
SUMINISTRO E INSTALACION DE CAJAS DE CON CONCRETO
02.17.06.01 und 94.00 S/.48.70 S/.4,577.80
DE 0.60 m x 0.40 m x 0.30m
SUMINISTRO E INSTALACION DE MARCO Y TAPA
02.17.06.02 und 94.00 S/.49.94 S/.4,694.36
TERMOPLÁSTICO DE 1/2”- 3/4” CON CERRADURA DE PERNO
02.18 LAVADEROS MULTIUSO FAMILIAR (92 UND)
02.18.01 OBRAS PRELIMINARES
02.18.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 132.48 S/.0.62 S/.82.14 92.00
02.18.01.02 TRAZO, NIVELACION Y REPLANTEO m2 53.36 S/.2.63 S/.140.34 92.00
02.18.02 MOVIMIENTO DE TIERRAS
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.18.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 15.46 S/.39.57 S/.611.75 92.00
02.18.02.02 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 19.32 S/.21.89 S/.422.91 92.00
02.18.03 CONCRETO SIMPLE
02.18.03.01 CONCRETO P/CIMIENTOS 1:10 + 30% P.G. m3 3.59 S/.429.12 S/.1,540.54 92.00
02.18.03.02 CONCRETO P/VEREDAS 1:10 m3 11.87 S/.429.12 S/.5,093.65 92.00
02.18.04 OBRAS DE CONCRETO ARMADO
02.18.04.01 CONCRETO f'c=175 Kg/cm2 P/LAVADERO m3 17.81 S/.673.09 S/.11,987.73 92.00
02.18.04.02 ENCOFRADO Y DESENCOFRADO P/LAVADERO m2 345.20 S/.68.44 S/.23,625.49 92.00
02.18.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 885.50 S/.9.94 S/.8,801.87 92.00
02.18.05 REVOQUES Y ENLUCIDOS
02.18.05.01 TARRAJEO EN LAVADERO m2 237.88 S/.35.56 S/.8,459.01 92.00
02.18.06 VALVULAS Y ACCESORIOS
SUMINISTRO E INSTALACION DE LAVADERO MULTIUSOS,
02.18.06.01 glb 1.00 S/.27,490.26 S/.27,490.26 92.00
VALVULAS Y ACCESORIOS
INSTALACION DE VALVULAS Y ACCESORIOS P/LAVADERO
02.18.06.02 und 1.00 S/.375.14 S/.375.14 1.00
MULTIUSOS FAMILIAR
CONEXIONES INTRADOMICILIARIAS DE AGUA POTABLE A
02.19
INSTITUCIONES (4 UND)
02.19.01 TRABAJOS PRELIMINARES
02.19.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 32.39 S/.0.62 S/.20.08
02.19.01.02 TRAZO, NIVELACION Y REPLANTEO m2 32.39 S/.2.63 S/.85.19
02.19.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.50 P/TUBERIA MENOR
02.19.02.01 m 64.78 S/.11.87 S/.768.94
A 1/2"
02.19.02.02 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 64.78 S/.1.79 S/.115.96
PREPARACION DE CAMAS DE APOYO A=0.40, H=0.10 P/TUB.
02.19.02.03 m 64.78 S/.2.25 S/.145.76
MENOR A 1/2"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.40, H=0.20
02.19.02.04 m 64.78 S/.3.57 S/.231.26
EN TERR.ARCILL. P/TUBERIA < 4"
RELLENO Y COMPACT. C/MAT. PROPIO A=0.40, H=0.15 EN
02.19.02.05 m 64.78 S/.1.89 S/.122.43
TERR.ARCILL. P/TUBERIA < 4"
02.19.02.06 ACARREO DE MATERIAL EXCEDENTE / Dpromedio= 50.00 m m3 7.77 S/.20.42 S/.158.66
02.19.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.19.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC C-10 DE 3/4" m 64.78 S/.2.77 S/.179.44
02.19.04 PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS ZANJA
02.19.04.01 m 64.78 S/.2.29 S/.148.35
TAPADA 3/4"
02.19.05 SUMINISTRO E INSTALACION DE ACCESORIOS
02.19.05.01 SUMINISTRO E INSTALACION DE TEE PVC SP 63mm UF X 3/4" und 2.00 S/.34.38 S/.68.76
02.19.05.02 SUMINISTRO E INSTALACION DE TEE PVC DE 1 1/2" X 3/4" und 1.00 S/.13.14 S/.13.14
02.19.05.03 SUMINISTRO E INSTALACION DE TEE PVC DE 1" X 3/4" und 1.00 S/.9.71 S/.9.71
SUMINISTRO E INSTALACION DE ACCESORIOS P/VALVULA DE
02.19.05.04 und 4.00 S/.96.08 S/.384.32
PASO 3/4"
02.19.06 SUMINISTRO E INSTALACION DE CAJA DE VALVULA
SUMINISTRO E INSTALACION DE CAJAS DE CON CONCRETO
02.19.06.01 und 4.00 S/.48.70 S/.194.80
DE 0.60 m x 0.40 m x 0.30m
SUMINISTRO E INSTALACION DE MARCO Y TAPA
02.19.06.02 und 4.00 S/.49.94 S/.199.76
TERMOPLÁSTICO DE 1/2”- 3/4” CON CERRADURA DE PERNO
02.20 LAVADEROS MULTIUSOS INSTITUCIONAL (6 UND)
02.20.01 OBRAS PRELIMINARES
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
02.20.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 13.50 S/.0.62 S/.8.37 6.00
02.20.01.02 TRAZO, NIVELACION Y REPLANTEO m2 5.22 S/.2.63 S/.13.73 6.00
02.20.02 MOVIMIENTO DE TIERRAS
02.20.02.01 EXCAVACION MANUAL EN TERRENO ARCILLOSO m3 1.29 S/.39.57 S/.51.05 6.00
02.20.02.02 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 1.61 S/.21.89 S/.35.24 6.00
02.20.03 CONCRETO SIMPLE
02.20.03.01 CONCRETO P/CIMIENTOS 1:10 + 30% P.G. m3 0.23 S/.429.12 S/.98.70 6.00
02.20.03.02 CONCRETO P/VEREDAS 1:10 m3 0.84 S/.429.12 S/.360.46 6.00
02.20.04 OBRAS DE CONCRETO ARMADO
02.20.04.01 CONCRETO f'c=175 Kg/cm2 P/LAVADERO m3 1.61 S/.673.09 S/.1,083.67 6.00
02.20.04.02 ENCOFRADO Y DESENCOFRADO P/LAVADERO m2 29.14 S/.68.44 S/.1,994.34 6.00
02.20.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 65.55 S/.9.94 S/.651.57 6.00
02.20.05 REVOQUES Y ENLUCIDOS
02.20.05.01 TARRAJEO EN LAVADERO m2 21.09 S/.35.56 S/.749.96 6.00
02.20.06 VALVULAS Y ACCESORIOS
VALVULAS Y ACCESORIOS P/LAVADERO MULTIUSOS
02.20.06.01 und 6.00 S/.436.18 S/.2,617.08 6.00
INSTITUCIONAL
02.21 FLETE DE MATERIALES
FLETE TERRESTRE LIMA A PUERTO LA CURVA INCLUIDO
02.21.01 glb 1.00 S/.25,000.00 S/.25,000.00
CARGA Y DESCARGA - AGUA POTABLE
FLETE TERRESTRE INCLUIDO CARGA Y DESCARGA CHIRIACO A
02.21.02 glb 1.00 S/.8,500.00 S/.8,500.00
PUERTO LA CURVA - AGUA POTABLE
FLETE DE PEKE CARGA EN PUERTO LA CURVA Y DESCARGA
02.21.03 glb 1.00 S/.10,500.00 S/.10,500.00
EN ALMACEN DE CC.NN NUEVO BELEN - AGUA POTABLE
FLETE FLUVIAL CON PEKE PEKE DE PUERTO LA CURVA A
02.21.04 glb 1.00 S/.65,000.00 S/.65,000.00
ALMACEN DE CC.NN NUEVO BELEN - AGUA POTABLE
FLETE RURAL: ALMACEN DE CC.NN NUEVO BELEN A PIE DE
02.21.05 glb 1.00 S/.55,000.00 S/.55,000.00
OBRA (VIVIENDA PROMEDIO) - AGUA
REHABILITACION DE UNIDADES BASICAS DE SANEAMIENTO TIPO
03
COMPOSTERAS
CONSTRUCCION DE UBS DOMICILIARIAS - TIPO COMPOSTERA (3
03.01
UND)
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 60.44 S/.0.63 S/.38.08 3.00
03.01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 22.94 S/.2.63 S/.60.33 3.00
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION MANUAL P/CIMIENTOS m3 10.99 S/.59.38 S/.652.59 3.00
03.01.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 1.77 S/.45.58 S/.80.68 3.00
03.01.02.03 REFINE, NIVELACION Y COMPACTACION A MANO m2 22.94 S/.2.78 S/.63.77 3.00
03.01.02.04 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 11.52 S/.21.90 S/.252.29 3.00
03.01.03 CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE PLASTICO
03.01.03.01 m2 37.83 S/.1.89 S/.71.50 3.00
P/IMPERMEABILIZANTE DE CIMIENTO
03.01.03.02 CONCRETO f'c=100 kg/cm2 PARA SOLADO Y/O BASES m2 1.81 S/.565.35 S/.1,023.28 3.00
03.01.03.03 CONCRETO P/FALSO PISO 1:12 m3 1.13 S/.509.25 S/.575.45 3.00
03.01.04 CONCRETO ARMADO
03.01.04.01 LOSA DE CIMENTACION
03.01.04.01.01 CONCRETO f'c=210 Kg/cm2 P/LOSAS DE CIMENTACION m3 3.63 S/.709.34 S/.2,574.90 3.00
03.01.04.01.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE CIMENTACION m2 6.06 S/.68.10 S/.412.69 3.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS
03.01.04.01.03 kg 138.43 S/.9.94 S/.1,375.99 3.00
CIMENTACION
03.01.04.02 SOBRECIMIENTO
03.01.04.02.01 CONCRETO f'c= 210 kg/cm2 P/SOBRECIMIENTO m3 1.29 S/.821.43 S/.1,059.64 3.00
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 13.80 S/.54.99 S/.758.86 3.00
03.01.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/SOBRECIMIENTO kg 68.88 S/.9.94 S/.684.67 3.00
03.01.04.03 COLUMNAS
03.01.04.03.01 CONCRETO f 'c=210 kg/cm2 m3 2.36 S/.735.20 S/.1,735.07 3.00
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 29.83 S/.61.40 S/.1,831.56 3.00
03.01.04.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 437.82 S/.9.94 S/.4,351.93 3.00
03.01.04.04 LOSA MACIZA
03.01.04.04.01 CONCRETO f'c= 210 kg/cm2 m3 1.84 S/.709.34 S/.1,305.19 3.00
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA MACIZAS m2 12.20 S/.68.11 S/.830.94 3.00
03.01.04.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 60.15 S/.9.94 S/.597.89 3.00
03.01.04.05 VIGA
03.01.04.05.01 CONCRETO f'c= 210 kg/cm2 m3 1.55 S/.735.20 S/.1,139.56 3.00
03.01.04.05.02 ENCOFRADO Y DESENCOFRADO P/VIGAS m2 23.34 S/.68.00 S/.1,587.12 3.00
03.01.04.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 197.40 S/.9.94 S/.1,962.16 3.00
03.01.04.06 ESCALERA
03.01.04.06.01 CONCRETO f'c= 210 kg/cm2 m3 2.71 S/.709.34 S/.1,922.31 3.00
03.01.04.06.02 ENCOFRADO Y DESENCOFRADO m2 15.23 S/.68.10 S/.1,037.16 3.00
03.01.04.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 92.59 S/.9.94 S/.920.34 3.00
03.01.05 MUROS Y TABIQUES
MURO DE LADRILLO K.K. DE ARCILLA 18H (0.09x0.13x0.24m)
03.01.05.01 m2 53.79 S/.124.86 S/.6,716.22 3.00
AMARRE DE SOGA JUNTA 1.5 cm, MORTERO 1:5
MURO DE LADRILLO ARCILLA KING KONG 24 X 12 X 9 cm,
03.02.02.02 m2 1.00 S/.124.86 0.00 3.00
C/MEZCLA 1:5 PARA EXTENSION DE DUCHA
03.01.05.02 SARDINELES DE DUCHA H= 0.20m m 0.28 S/.35.83 S/.10.03 1.00
03.01.06 REVOQUES, ENLUCIDOS Y MOLDURAS
03.01.06.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 27.98 S/.36.56 S/.1,022.95 3.00
03.01.06.02 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 46.43 S/.32.63 S/.1,515.01 3.00
03.01.06.03 TARRAJEO MUROS INT. FROTACH. C/MORT 1:3 x e=1" m2 46.63 S/.34.04 S/.1,587.29 3.00
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y
03.02.03.08 m 728.00 S/.38.60 0.00 3.00
VANOS
03.01.07 CUBIERTAS Y VENTANAS
03.01.07.01 CUBIERTAS
SUMINISTRO E INSTALACION DE TECHO C/ CALAMINA
03.01.07.01.01 und 3.00 S/.1,079.99 S/.3,239.97 3.00
GALVANIZADA 0.83X1.80 e=0.25mm P/UBS FAMILIAR
03.01.07.02 VENTANAS Y PUERTAS
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
03.01.07.02.01 und 3.00 S/.356.51 S/.1,069.53 3.00
0.70mx1.75x C/MARCO 2"x4" INC. ACCESORIOS
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.01.07.02.02 und 3.00 S/.48.39 S/.145.17 3.00
MADERA 2"x1" DE 0.55m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.01.07.02.03 und 3.00 S/.64.12 S/.192.36 3.00
MADERA 2"x1" DE 0.80m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.01.07.02.04 und 3.00 S/.86.91 S/.260.73 3.00
MADERA 2"x1" DE 2.30m x0.30m
SUMINISTRO E INSTALACION DE TAPA METALICA 3/16" 0.85
03.01.07.02.05 und 6.00 S/.305.38 S/.1,832.28 3.00
X 0.60m
03.01.08 APARATOS Y ACCESORIOS SANITARIOS
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
03.01.08.01 und 3.00 S/.630.21 S/.1,890.63 3.00
SANITARIOS P/UBS-FAMILIAR
03.01.09 INSTALACIONES SANITARIAS SISTEMA DE DESAGUE
03.01.09.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 2" m 34.50 S/.5.85 S/.201.83 3.00
03.01.09.02 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 4" m 21.00 S/.13.09 S/.274.89 3.00
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.01.09.03 pza 3.00 S/.11.61 S/.34.83 3.00
VENTILACION 2"
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.01.09.04 pza 6.00 S/.14.15 S/.84.90 3.00
VENTILACION 4"
SUMINISTRO E INSTALACION DE SUMIDEROS DE BRONCE
03.01.09.05 pza 3.00 S/.23.34 S/.70.02 3.00
ROSCADO 2"
03.01.09.06 SUMINISTRO E INSTALACION DE YEE PVC SAL 2" pza 9.00 S/.9.77 S/.87.93 3.00
03.01.09.07 SUMINISTRO E INSTALACION DE YEE DOBLE PVC SAL 2" pza 3.00 S/.9.82 S/.29.46 3.00
03.01.09.08 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 24.00 S/.7.72 S/.185.28 3.00
03.01.09.09 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X45° und 6.00 S/.11.43 S/.68.58 3.00
03.01.09.10 SUMINISTRO E INSTALACION DE TRAMPA PVC SAL 2" und 6.00 S/.14.86 S/.89.16 3.00
03.01.09.11 SUMINISTRO E INSTALACION DE TEE PVC 2" pza 3.00 S/.7.64 S/.22.92 3.00
03.01.09.12 SUMINISTRO E INSTALACION DE TEE PVC 4" pza 6.00 S/.12.55 S/.75.30 3.00
03.01.09.13 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X90° pza 3.00 S/.5.03 S/.15.09 3.00
03.01.09.14 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X90° pza 6.00 S/.12.68 S/.76.08 3.00
03.01.10 INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA
SUMINISTRO E INSTALACION DE SALIDA DE AGUA FRIA CON
03.01.10.01 pto 3.00 S/.227.73 S/.683.19 3.00
TUBERIA DE PVC-SAP 1/2" - UBS FAMILIAR
03.01.11 CAJA DE REGISTRO CON TRAMPA DE GRASA
CAJA DE CONCRETO PRE FABRICADO 0.60X0.40X0.40m
03.01.11.01 und 3.00 S/.123.79 S/.371.37 3.00
(INTERIORES) e=0.05
03.01.12 DESCARGA DE AGUAS GRISES (3 UND)
03.01.12.01 OBRAS PRELIMINARES
03.01.12.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 13.50 S/.0.63 S/.8.51 3.00
03.01.12.01.02 TRAZO, NIVELACION Y REPLANTEO m2 13.50 S/.2.63 S/.35.51 3.00
03.01.12.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.30, H=0.40 P/TUBERIA
03.01.12.02.01 m 45.00 S/.7.12 S/.320.40 3.00
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.01.12.02.02 m 45.00 S/.3.32 S/.149.40 3.00
H=0.40 P/TUBERIA < 4"
03.01.12.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.01.12.03.01 INSTALACION DE TUBERIA DE PVC 2" m 45.00 S/.0.96 S/.43.20 3.00
03.01.12.04 DADO DE CONCRETO SIMPLE
03.01.12.04.01 CONCRETO SIMPLE 1:12 S/MEZCLADORA m3 0.08 S/.640.57 S/.51.25 3.00
REHABILITACION DE UBS DOMICILIARIAS - TIPO COMPOSTERA
03.02
( 91 UND)
03.02.01 CONCRETO ARMADO
03.02.01.01 COLUMNAS
03.02.01.01.01 CONCRETO f 'c=210 kg/cm2 m3 13.39 S/.735.20 S/.9,844.33 17.00
03.02.01.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 169.02 S/.61.40 S/.10,377.83 17.00
03.02.01.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,480.98 S/.9.94 S/.24,660.94 17.00
DEMOLICION Y ELIMINACION DE CONCRETO F'C= 210
03.02.01.01.04 m3 3.15 S/.48.53 S/.152.87 4.00
KG/CM2 P/COLUMNAS
DESINSTALACION Y ELIMINACION DE ACERO DE REFUERZO
03.02.01.01.05 kg 1,605.34 S/.1.56 S/.2,504.33 11.00
fy=4,200 kg/cm2 P/COLUMNAS
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
03.02.01.02 LOSA MACIZA
03.02.01.02.01 CONCRETO f'c= 210 kg/cm2 m3 7.36 S/.709.34 S/.5,220.74 12.00
03.02.01.02.02 ENCOFRADO Y DESENCOFRADO P/LOSA MACIZAS m2 48.81 S/.68.11 S/.3,324.45 12.00
03.02.01.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 240.60 S/.9.94 S/.2,391.56 12.00
03.02.01.03 VIGA
03.02.01.03.01 CONCRETO f'c= 210 kg/cm2 m3 9.32 S/.735.20 S/.6,852.06 18.00
03.02.01.03.02 ENCOFRADO Y DESENCOFRADO P/VIGAS m2 140.04 S/.68.00 S/.9,522.72 18.00
03.02.01.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,184.40 S/.9.94 S/.11,772.94 18.00
DESINSTALACION Y ELIMINACION DE ACERO DE REFUERZO
03.02.01.03.04 kg 197.40 S/.1.56 S/.307.94 3.00
fy=4,200 kg/cm2 P/VIGAS
03.02.01.04 ESCALERA
03.02.01.04.01 CONCRETO f'c= 210 kg/cm2 m3 38.82 S/.709.34 S/.27,536.58 43.00
03.02.01.04.02 ENCOFRADO Y DESENCOFRADO m2 218.35 S/.68.10 S/.14,869.64 43.00
03.02.01.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,327.19 S/.9.94 S/.13,192.27 43.00
03.02.02 MUROS Y TABIQUES
MURO DE LADRILLO K.K. DE ARCILLA 18H (0.09x0.13x0.24m)
03.02.02.01 m2 222.36 S/.124.86 S/.27,763.87 12.00
AMARRE DE SOGA JUNTA 1.5 cm, MORTERO 1:5
MURO DE LADRILLO ARCILLA KING KONG 24 X 12 X 9 cm,
03.02.02.02 m2 1.00 S/.124.86 S/.124.86
C/MEZCLA 1:5 PARA EXTENSION DE DUCHA
03.02.02.03 SARDINELES DE DUCHA H= 0.20m m 19.84 S/.35.83 S/.710.87 14.00
03.02.03 REVOQUES, ENLUCIDOS Y MOLDURAS
03.02.03.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 516.60 S/.36.56 S/.18,886.90 32.00
PICADO DE TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x
03.02.03.02 m2 54.19 S/.3.07 S/.166.36 -
e=1"
03.02.03.03 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 748.66 S/.32.63 S/.24,428.78 48.00
RESANE DE TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x
03.02.03.04 m2 123.80 S/.3.07 S/.380.07
e=1"
PICADO DE TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1"
03.02.03.05 m2 53.95 S/.3.07 S/.165.63
PARA INSTALACIONES SANITARIOS PARA TODAS
TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" PARA LAS UBS
03.02.03.06 m2 52.45 S/.34.04 S/.1,785.40
INSTALACIONES SANITARIOS
03.02.03.07 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" m2 748.60 S/.34.04 S/.25,482.34
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y
03.02.03.08 m 728.00 S/.38.60 S/.28,100.80
VANOS
03.02.04 CUBIERTAS Y VENTANAS
03.02.04.01 DESMONTAJE DE CALAMINAS Y VIGAS
03.02.04.01.01 DESMONTAJE DE CALAMINAS Y VIGAS ( 56 UBS) glb 1.00 S/.265.73 S/.265.73
03.02.04.02 REPOSICION DE CALAMINAS
SUMINISTRO E INSTALACION DE CALAMINA GALVANIZADA
03.02.04.02.01 glb 1.00 S/.6,149.08 S/.6,149.08
0.83X1.80 e=0.25mm (56 UBS)
03.02.04.03 CUBIERTAS
SUMINISTRO E INSTALACION DE CALAMINA GALVANIZADA
03.02.04.03.01 und 55.00 S/.612.87 S/.33,707.85
0.83X1.80 e=0.25mm PARA AMPLIACION DE TECHO (55 UBS)
SUMINISTRO E INSTALACION DE CALAMINA GALVANIZADA
03.02.04.03.02 und 36.00 S/.1,347.05 S/.48,493.80
0.83X1.80 e=0.25mm PARA UBS DOMICILIARIA (36 UBS)
03.02.04.04 VENTANAS Y PUERTAS
DESINSTALACION Y ELIMINACION DE PUERTA MADERA DE
03.02.04.04.01 und 5.00 S/.10.42 S/.52.10 5.00 88.00
0.70mx1.75x C/MARCO 2"x4" INC. ACCESORIOS
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
03.02.04.04.02 und 62.00 S/.356.51 S/.22,103.62 62.00
0.70mx1.75x C/MARCO 2"x4" INC. ACCESORIOS
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.02.04.04.03 und 50.00 S/.48.39 S/.2,419.50
MADERA 2"x1" DE 0.55m x0.30m
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.02.04.04.04 und 54.00 S/.64.12 S/.3,462.48
MADERA 2"x1" DE 0.80m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.02.04.04.05 und 52.00 S/.86.91 S/.4,519.32
MADERA 2"x1" DE 2.30m x0.30m
SUMINISTRO E INSTALACION DE MALLAS PARA LA VENTANA
03.02.04.04.06 und 6.00 S/.5.78 S/.34.68
C/MARCOS MADERA 2"x1" DE 0.55m x0.30m
SUMINISTRO E INSTALACION DE MALLAS PARA LA VENTANA
03.02.04.04.07 und 6.00 S/.6.09 S/.36.54
C/MARCOS MADERA 2"x1" DE 0.80m x0.30m
SUMINISTRO E INSTALACION DE MALLAS PARA LA VENTANA
03.02.04.04.08 und 4.00 S/.8.15 S/.32.60
C/MARCOS MADERA 2"x1" DE 2.30m x0.30m
SUMINISTRO E INSTALACION DE TAPA METALICA 3/16" 0.85
03.02.04.04.09 und 71.00 S/.305.38 S/.21,681.98
X 0.60m
MANTENIMIENTO E INSTALACION DE TAPA METALICA
03.02.04.04.10 und 117.00 S/.24.58 S/.2,875.86
EXISTENTE DE F°G° e=3/16" CON 0.60mx0.85m
03.02.05 EXCAVACION DE CAMARA COMPOSTERA
03.02.05.01 EXCAVACION DE CAMARA COMPOSTERA ENTERRADA m3 3.00 S/.76.63 S/.229.89
03.02.06 APARATOS Y ACCESORIOS SANITARIOS
INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
03.02.06.01 glb 1.00 S/.368.08 S/.368.08
P/UBS-FAMILIAR( 26 TAZAS, 31 URINARIOS Y 60 LAVATORIOS)
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
03.02.06.02 SANITARIOS P/UBS-FAMILIAR( 65 TAZAS, 58 URINARIOS Y 31 glb 1.00 S/.34,294.65 S/.34,294.65
LAVATORIOS)
03.02.07 INSTALACIONES SANITARIAS SISTEMA DE DESAGUE
03.02.07.01 INSTALACION DE TUBERIA DE PVC 2", EXISTENTE m 32.00 S/.0.96 S/.30.72
03.02.07.02 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 2" m 193.50 S/.5.85 S/.1,131.98
03.02.07.03 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 4" m 87.50 S/.13.09 S/.1,145.38
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.02.07.04 pza 78.00 S/.14.15 S/.1,103.70
VENTILACION 4"
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.02.07.05 pza 36.00 S/.11.61 S/.417.96
VENTILACION 2"
SUMINISTRO E INSTALACION DE SUMIDEROS DE BRONCE
03.02.07.06 pza 24.00 S/.23.34 S/.560.16
ROSCADO 2"
03.02.07.07 SUMINISTRO E INSTALACION DE YEE PVC SAL 2" pza 30.00 S/.9.77 S/.293.10
03.02.07.08 SUMINISTRO E INSTALACION DE YEE DOBLE PVC SAL 2" pza 10.00 S/.9.82 S/.98.20
03.02.07.09 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 50.00 S/.7.72 S/.386.00
03.02.07.10 INSTALACION DE CODO PVC SAL DE 2"X90° und 30.00 S/.7.72 S/.231.60
03.02.07.11 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X45° und 20.00 S/.11.43 S/.228.60
03.02.07.12 SUMINISTRO E INSTALACION DE TRAMPA PVC SAL 2" und 20.00 S/.14.86 S/.297.20
03.02.07.13 SUMINISTRO E INSTALACION DE TEE PVC 2" pza 91.00 S/.7.64 S/.695.24
03.02.07.14 SUMINISTRO E INSTALACION DE TEE PVC 4" pza 182.00 S/.12.55 S/.2,284.10
03.02.07.15 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X90° pza 91.00 S/.5.03 S/.457.73
03.02.07.16 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X90° pza 182.00 S/.12.68 S/.2,307.76
03.02.08 INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA
SUMINISTRO E INSTALACION DE SALIDA DE AGUA FRIA CON
TUBERIA DE PVC-SAP 1/2"-UBS FAMILIAR (650 M DE TUBERIA, 78
03.02.08.01 glb 1.00 S/.11,004.82 S/.11,004.82
VALVULAS, 71 DUCHAS, 71 GRIFOS PARA LAVAMANOS Y 198 CODO
F°G°)
03.02.09 CAJA DE REGISTRO CON TRAMPA DE GRASA
CAJA DE CONCRETO PRE FABRICADO 0.60X0.40X0.40m
03.02.09.01 und 91.00 S/.123.79 S/.11,264.89
(INTERIORES) e=0.05
03.02.10 DESCARGA DE AGUAS GRISES (66 UBS)
03.02.10.01 OBRAS PRELIMINARES
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
03.02.10.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 693.00 S/.0.63 S/.436.59
03.02.10.01.02 TRAZO, NIVELACION Y REPLANTEO m2 693.00 S/.2.63 S/.1,822.59
03.02.10.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.30, H=0.40 P/TUBERIA
03.02.10.02.01 m 990.00 S/.7.12 S/.7,048.80
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.02.10.02.02 m 990.00 S/.3.32 S/.3,286.80
H=0.40 P/TUBERIA < 4"
03.02.10.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.02.10.03.01 INSTALACION DE TUBERIA DE PVC 2" m 990.00 S/.0.96 S/.950.40
03.02.10.04 DADO DE CONCRETO SIMPLE
03.02.10.04.01 CONCRETO SIMPLE 1:12 S/MEZCLADORA m3 1.78 S/.640.57 S/.1,140.21
03.02.11 ZANJA DE PERCOLACION (25 UBS)
03.02.11.01 OBRAS PRELIMINARES
03.02.11.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 490.00 S/.0.63 S/.308.70
03.02.11.01.02 TRAZO, NIVELACION Y REPLANTEO m2 490.00 S/.2.63 S/.1,288.70
03.02.11.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.40 P/TUBERIA
03.02.11.02.01 m 175.00 S/.9.50 S/.1,662.50
MENOR A 4"
EXCAV. MANUAL T. ARCILL. A=0.60, H=0.50 P/TUBERIA
03.02.11.02.02 m 525.00 S/.17.82 S/.9,355.50
MENOR A 4"
03.02.11.02.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 700.00 S/.1.79 S/.1,253.00
PREPARACION DE CAMAS DE APOYO H=0.10 P/TUB. MENOR
03.02.11.02.04 m 175.00 S/.1.78 S/.311.50
A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.02.11.02.05 m 175.00 S/.3.32 S/.581.00
H=0.30 P/TUBERIA < 4"
RELLENO CON HORMIGON SELEC. A=0.60, H=0.20
03.02.11.02.06 m 525.00 S/.27.73 S/.14,558.25
P/TUBERIA < 4"
RELLENO C/MAT. PROPIO A=0.60, H=0.30 P/TUBERIA
03.02.11.02.07 m 525.00 S/.5.59 S/.2,934.75
CRIBADA < 4"
03.02.11.02.08 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 47.25 S/.21.90 S/.1,034.78
03.02.11.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.02.11.03.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-SAL 2" m 175.00 S/.6.74 S/.1,179.50
SUMINISTRO E INSTALACION DE TUBERIA CRIBADA DE PVC-
03.02.11.03.02 m 525.00 S/.6.74 S/.3,538.50
SAL 2"
SUM. E INST. DE CAJA DE CONCRETO - REPARTIDOR DE
03.02.11.03.03 und 25.00 S/.85.09 S/.2,127.25
CAUDAL 0.45mX 0.55m X0.57m
03.02.11.03.04 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 75.00 S/.7.72 S/.579.00
03.02.11.04 MALLA ARPILLERA
03.02.11.04.01 SUMINISTRO E INSTALACION DE MALLA ARPILLERA m2 315.00 S/.2.15 S/.677.25
03.02.12 VARIOS
LIJADO Y PINTADO DE MURO EXTERIOR C/ESMALTE
03.02.12.01 m2 1,706.10 S/.16.00 S/.27,297.60
SINTETICO DOS MANOS
REHABILITACION DE UBS PARA INSTITUCIONES - TIPO
03.03
COMPOSTERA DE BATERIA DE 01 BAÑO (CANT: 3Und. )
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 60.44 S/.0.63 0.00 2.00 -2.00
03.01.01.02 TRAZO, NIVELACION Y REPLANTEO m2 22.94 S/.2.63 0.00 2.00 -2.00
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION MANUAL P/CIMIENTOS m3 10.99 S/.59.38 0.00 2.00 -2.00
03.01.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 1.77 S/.45.58 0.00 2.00 -2.00
03.01.02.03 REFINE, NIVELACION Y COMPACTACION A MANO m2 22.94 S/.2.78 0.00 2.00 -2.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
03.01.02.04 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 11.52 S/.21.90 0.00 2.00 -2.00
03.01.03 CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE PLASTICO
03.01.03.01 m2 37.83 S/.1.89 0.00 2.00 -2.00
P/IMPERMEABILIZANTE DE CIMIENTO
03.01.03.02 CONCRETO f'c=100 kg/cm2 PARA SOLADO Y/O BASES m2 1.81 S/.565.35 0.00 2.00 -2.00
03.01.03.03 CONCRETO P/FALSO PISO 1:12 m3 1.13 S/.509.25 0.00 2.00 -2.00
03.01.04 CONCRETO ARMADO
03.01.04.01 LOSA DE CIMENTACION
03.01.04.01.01 CONCRETO f'c=210 Kg/cm2 P/LOSAS DE CIMENTACION m3 3.63 S/.709.34 0.00 2.00 -2.00
03.01.04.01.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE CIMENTACION m2 6.06 S/.68.10 0.00 2.00 -2.00
ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS
03.01.04.01.03 kg 138.43 S/.9.94 0.00 2.00 -2.00
CIMENTACION
03.01.04.02 SOBRECIMIENTO
03.01.04.02.01 CONCRETO f'c= 210 kg/cm2 P/SOBRECIMIENTO m3 1.29 S/.821.43 0.00 2.00 -2.00
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 13.80 S/.54.99 0.00 2.00 -2.00
03.01.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/SOBRECIMIENTO kg 68.88 S/.9.94 0.00 2.00 -2.00
03.01.04.03 COLUMNAS
03.01.04.03.01 CONCRETO f 'c=210 kg/cm2 m3 2.36 S/.735.20 0.00 2.00 -2.00
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 29.83 S/.61.40 0.00 2.00 -2.00
03.01.04.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 437.82 S/.9.94 0.00 2.00 -2.00
03.01.04.04 LOSA MACIZA
03.01.04.04.01 CONCRETO f'c= 210 kg/cm2 m3 1.84 S/.709.34 0.00 2.00 -2.00
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO P/LOSA MACIZAS m2 12.20 S/.68.11 0.00 2.00 -2.00
03.01.04.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 60.15 S/.9.94 0.00 2.00 -2.00
03.01.04.05 VIGA
03.01.04.05.01 CONCRETO f'c= 210 kg/cm2 m3 1.55 S/.735.20 0.00 2.00 -2.00
03.01.04.05.02 ENCOFRADO Y DESENCOFRADO P/VIGAS m2 23.34 S/.68.00 0.00 2.00 -2.00
03.01.04.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 197.40 S/.9.94 0.00 2.00 -2.00
03.03.01.01 ESCALERA
03.03.01.01.01 CONCRETO f'c=210 Kg/cm2 P/ECALERAS m3 1.67 S/.709.34 S/.1,184.60 3.00 3.00 0.00
03.03.01.01.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 10.37 S/.68.10 S/.706.20 3.00 3.00 0.00
03.03.01.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 67.87 S/.9.94 S/.674.63 3.00 3.00 0.00
03.03.02 MUROS Y TABIQUES
MURO DE LADRILLO K.K. DE ARCILLA 18H (0.09x0.13x0.24m)
03.03.02.01 m2 39.54 S/.124.86 S/.4,936.96 3.00 3.00 0.00
AMARRE DE SOGA JUNTA 1.5 cm, MORTERO 1:5
03.03.03 REVOQUES, ENLUCIDOS Y MOLDURAS
03.03.03.01 TARRAJEO C/IMPERMEBILIZANTE M=1:3 C:A e=1" m2 32.88 S/.36.56 S/.1,202.09 3.00 3.00 0.00
03.03.03.02 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 42.12 S/.32.63 S/.1,374.38 3.00 3.00 0.00
03.03.03.03 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" m2 31.95 S/.34.04 S/.1,087.58 3.00 3.00 0.00
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y
03.02.03.08 m 728.00 S/.38.60 0.00 3.00
VANOS
03.03.04 CUBIERTAS
SUMINISTRO E INSTALACION DE CALAMINA GALVANIZADA DE
03.03.04.01 und 3.00 S/.1,026.21 S/.3,078.63 3.00 3.00 0.00
0.83mx1.80m x e=0.25mm, EN TECHO DE UBS
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
03.03.04.02 und 3.00 S/.467.11 S/.1,401.33 3.00 3.00 0.00
0.70mx1.90x C/MARCO 2"x4"
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.03.04.03 und 3.00 S/.64.53 S/.193.59 3.00 3.00 0.00
MADERA 2"x1" DE 1.10m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.03.04.04 und 3.00 S/.86.91 S/.260.73 3.00 3.00 0.00
MADERA 2"x1" DE 1.95m x0.30m
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE TAPA METALICA 3/16" 0.60 X
03.03.04.05 und 6.00 S/.234.11 S/.1,404.66 3.00 3.00 0.00
0.65m
03.03.05 APARATOS Y ACCESORIOS SANITARIOS
INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
03.03.05.01 und 3.00 S/.561.83 S/.1,685.49 3.00 3.00 0.00
P/UBS INSTITUCIONAL
03.03.06 INSTALACIONES SANITARIAS SISTEMA DE DESAGUE
03.03.06.01 INSTALACION DE TUBERIA DE PVC 2" m 39.00 S/.0.96 S/.37.44 3.00 3.00 0.00
03.03.06.02 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 2" m 11.44 S/.5.85 S/.66.92 3.00 3.00 0.00
03.03.06.03 INSTALACION DE TUBERIA DE PVC 4" EXISTENTE m 21.00 S/.1.04 S/.21.84 3.00 3.00 0.00
03.03.06.04 SUMINISTRO E INSTALACION DE TUBERIA DE PVC 4" m 21.00 S/.13.09 S/.274.89 3.00 3.00 0.00
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.03.06.05 pza 3.00 S/.11.61 S/.34.83 3.00 3.00 0.00
VENTILACION 2"
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.03.06.06 pza 6.00 S/.14.15 S/.84.90 3.00 3.00 0.00
VENTILACION 4"
SUMINISTRO E INSTALACION DE SUMIDEROS DE BRONCE
03.03.06.07 pza 3.00 S/.23.34 S/.70.02 3.00 3.00 0.00
ROSCADO 2"
03.03.06.08 SUMINISTRO E INSTALACION DE TRAMPA PVC SAL 2" und 3.00 S/.14.86 S/.44.58 3.00 3.00 0.00
03.03.06.09 SUMINISTRO E INSTALACION DE TEE PVC 2" pza 3.00 S/.7.64 S/.22.92 3.00 3.00 0.00
03.03.06.10 SUMINISTRO E INSTALACION DE TEE PVC 4" pza 6.00 S/.12.55 S/.75.30 3.00 3.00 0.00
03.03.06.11 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X90° pza 3.00 S/.5.03 S/.15.09 3.00 3.00 0.00
03.03.06.12 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X90° pza 6.00 S/.12.68 S/.76.08 3.00 3.00 0.00
03.03.07 INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"-UBS
03.03.07.01 pto 3.00 S/.252.39 S/.757.17 3.00 3.00 0.00
INSTITUCIONAL
03.03.08 CAJA DE REGISTRO CON TRAMPA DE GRASA
CAJA DE CONCRETO PRE FABRICADO 0.60X0.40X0.40m
03.03.08.01 und 3.00 S/.123.79 S/.371.37 3.00 3.00 0.00
(INTERIORES) e=0.05
03.03.09 DESCARGA DE AGUAS GRISES (3 UBS)
03.03.09.01 OBRAS PRELIMINARES
03.03.09.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 31.50 S/.0.63 S/.19.85 3.00 3.00 0.00
03.03.09.01.02 TRAZO, NIVELACION Y REPLANTEO m2 31.50 S/.2.63 S/.82.85 3.00 3.00 0.00
03.03.09.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.30, H=0.40 P/TUBERIA
03.03.09.02.01 m 45.00 S/.7.12 S/.320.40 3.00 3.00 0.00
MENOR A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.03.09.02.02 m 45.00 S/.3.32 S/.149.40 3.00 3.00 0.00
H=0.40 P/TUBERIA < 4"
03.03.09.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.03.09.03.01 INSTALACION DE TUBERIA DE PVC 2" m 45.00 S/.0.96 S/.43.20 3.00 3.00 0.00
03.03.09.04 DADO DE CONCRETO SIMPLE
03.03.09.04.01 CONCRETO SIMPLE 1:12 S/MEZCLADORA m3 0.08 S/.640.57 S/.51.25 3.00 3.00 0.00
03.02.11 ZANJA DE PERCOLACION (25 UBS)
03.02.11.01 OBRAS PRELIMINARES
03.02.11.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 490.00 S/.0.63 0.00 3.00 -3.00
03.02.11.01.02 TRAZO, NIVELACION Y REPLANTEO m2 490.00 S/.2.63 0.00 3.00 -3.00
03.02.11.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.40 P/TUBERIA
03.02.11.02.01 m 175.00 S/.9.50 0.00 3.00 -3.00
MENOR A 4"
EXCAV. MANUAL T. ARCILL. A=0.60, H=0.50 P/TUBERIA
03.02.11.02.02 m 525.00 S/.17.82 0.00 3.00 -3.00
MENOR A 4"
03.02.11.02.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 700.00 S/.1.79 0.00 3.00 -3.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
PREPARACION DE CAMAS DE APOYO H=0.10 P/TUB. MENOR
03.02.11.02.04 m 175.00 S/.1.78 0.00 3.00 -3.00
A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.02.11.02.05 m 175.00 S/.3.32 0.00 3.00 -3.00
H=0.30 P/TUBERIA < 4"
RELLENO CON HORMIGON SELEC. A=0.60, H=0.20
03.02.11.02.06 m 525.00 S/.27.73 0.00 3.00 -3.00
P/TUBERIA < 4"
RELLENO C/MAT. PROPIO A=0.60, H=0.30 P/TUBERIA
03.02.11.02.07 m 525.00 S/.5.59 0.00 3.00 -3.00
CRIBADA < 4"
03.02.11.02.08 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 47.25 S/.21.90 0.00 3.00 -3.00
03.02.11.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.02.11.03.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-SAL 2" m 175.00 S/.6.74 0.00 3.00 -3.00
SUMINISTRO E INSTALACION DE TUBERIA CRIBADA DE PVC-
03.02.11.03.02 m 525.00 S/.6.74 0.00 3.00 -3.00
SAL 2"
SUM. E INST. DE CAJA DE CONCRETO - REPARTIDOR DE
03.02.11.03.03 und 25.00 S/.85.09 0.00 3.00 -3.00
CAUDAL 0.45mX 0.55m X0.57m
03.02.11.03.04 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 75.00 S/.7.72 0.00 3.00 -3.00
03.02.11.04 MALLA ARPILLERA
03.02.11.04.01 SUMINISTRO E INSTALACION DE MALLA ARPILLERA m2 315.00 S/.2.15 0.00 3.00 -3.00
03.02.12 VARIOS 0.00
LIJADO Y PINTADO DE MURO EXTERIOR C/ESMALTE
03.02.12.01 m2 1,706.10 S/.16.00 0.00 3.00 -3.00
SINTETICO DOS MANOS
CONSTRUCCION DE UBS INSTITUCIONALES - TIPO
03.04
COMPOSTERA DE BATERIA 02 BAÑOS (CANT: 2Und. )
03.04.01 TRABAJOS PRELIMINARES
03.04.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 32.67 S/.0.63 S/.20.58 1.00
03.04.01.02 TRAZO, NIVELACION Y REPLANTEO m2 13.37 S/.2.63 S/.35.16 1.00
03.04.02 MOVIMIENTO DE TIERRAS
03.04.02.01 EXCAVACION MANUAL P/CIMIENTOS m3 10.69 S/.59.38 S/.634.77 2.00
03.04.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 0.91 S/.45.58 S/.41.48 1.00
03.04.02.03 REFINE, NIVELACION Y COMPACTACION A MANO m2 13.37 S/.2.78 S/.37.17 1.00
03.04.02.04 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 12.22 S/.21.90 S/.267.62 1.00
03.04.03 CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE PLASTICO
03.04.03.01 m2 22.02 S/.1.89 S/.41.62 1.00
P/IMPERMEABILIZANTE DE CIMIENTO
03.04.03.02 CONCRETO f'c=100 kg/cm2 PARA SOLADO Y/O BASES m2 1.34 S/.565.35 S/.757.57 1.00
03.04.03.03 CONCRETO P/FALSO PISO 1:12 m3 0.83 S/.509.25 S/.422.68 1.00
03.04.04 CONCRETO ARMADO
03.04.04.01 LOSA DE CIMENTACION
03.04.04.01.01 CONCRETO f'c=210 Kg/cm2 P/LOSAS DE CIMENTACION m3 2.67 S/.709.34 S/.1,893.94 1.00
03.04.04.01.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE CIMENTACION m2 3.06 S/.68.10 S/.208.39 1.00
ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS
03.04.04.01.03 kg 101.30 S/.9.94 S/.1,006.92 1.00
CIMENTACION
03.04.04.02 SOBRECIMIENTO
03.04.04.02.01 CONCRETO f'c= 210 kg/cm2 P/SOBRECIMIENTO m3 0.54 S/.821.43 S/.443.57 1.00
03.04.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 8.16 S/.50.88 S/.415.18 1.00
03.04.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/SOBRECIMIENTO kg 29.62 S/.9.94 S/.294.42 1.00
03.04.04.03 COLUMNAS
03.04.04.03.01 CONCRETO f 'c=210 kg/cm2 m3 7.33 S/.735.20 S/.5,389.02 1.00
03.04.04.03.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 19.10 S/.71.75 S/.1,370.43 1.00
03.04.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/COLUMNAS kg 280.68 S/.9.94 S/.2,789.96 1.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
03.04.04.04 LOSA MACIZA
03.04.04.04.01 CONCRETO f 'c=210 kg/cm2 m3 0.97 S/.735.20 S/.713.14 1.00
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS
03.04.04.04.02 m2 5.79 S/.80.25 S/.464.65 1.00
MACIZAS
03.04.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS MACIZAS kg 33.60 S/.9.94 S/.333.98 1.00
03.04.04.05 VIGAS
03.04.04.05.01 CONCRETO f 'c=210 kg/cm2 m3 0.72 S/.735.20 S/.529.34 1.00
03.04.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 8.15 S/.51.23 S/.417.52 1.00
03.04.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/VIGAS kg 96.54 S/.9.94 S/.959.61 1.00
03.04.04.06 ESCALERA
03.04.04.06.01 CONCRETO f 'c=210 kg/cm2 m3 1.05 S/.735.20 S/.771.96 1.00
03.04.04.06.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 7.11 S/.74.67 S/.530.90 1.00
03.04.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/ESCALERAS kg 32.87 S/.9.94 S/.326.73 1.00
03.04.05 MUROS TABIQUERIAS
MURO DE LADRILLO DE ARCILLA KING KONG 24X12X9cm
03.04.05.01 m2 21.15 S/.113.51 S/.2,400.74 1.00
C/MEZCLA 1:5
03.04.06 REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO MUROS INT. PULIDO C/IMPERMEBILIZANTE M=1:3
03.04.06.01 m2 21.71 S/.37.95 S/.823.89 1.00
C:A e=1"
03.04.06.02 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 21.87 S/.32.63 S/.713.62 1.00
03.04.06.03 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" m2 18.06 S/.34.04 S/.614.76 1.00
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y
03.02.03.08 m 728.00 S/.38.60 0.00 2.00
VANOS
03.04.07 CUBIERTAS
TECHO C/ CALAMINA GALVANIZADA 0.83X1.80 e=0.25mm
03.04.07.01 und 1.00 S/.1,156.94 S/.1,156.94 1.00
P/UBS INSTITUCIONAL
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
03.04.07.02 und 2.00 S/.1,004.99 S/.2,009.98 2.00 2.00
0.90mx1.90mx C/MARCO 2"x4" INCLUYE ACCESORIOS
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.04.07.03 und 2.00 S/.53.77 S/.107.54 1.00
MADERA 2"x1" DE 0.65m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.04.07.04 und 2.00 S/.87.00 S/.174.00 1.00
MADERA 2"x1" DE 1.80m x0.30m
SUMINSTRO E INSTALACION DE TAPA METALICA F°G° e=3 /16"
03.04.07.05 und 4.00 S/.234.11 S/.936.44 1.00
CON 0,60m x 0,65m
03.04.08 APARATOS Y ACCESORIOS SANITARIOS
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
03.04.08.01 und 1.00 S/.833.61 S/.833.61 1.00
SANITARIOS P/UBS-INSTITUCIONAL
03.04.09 INSTALACIONES SANITARIAS SISTEMA DE DESAGUE
03.04.09.01 TUBERIA DE PVC SAL 2" m 22.50 S/.5.83 S/.131.18 1.00
03.04.09.02 TUBERIA DE PVC SAL 4" m 14.00 S/.30.94 S/.433.16 1.00
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.04.09.03 pza 2.00 S/.11.61 S/.23.22 2.00
VENTILACION 2"
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.04.09.04 pza 8.00 S/.14.15 S/.113.20 2.00
VENTILACION 4"
SUMINISTRO E INSTALACION DE SUMIDEROS DE BRONCE
03.04.09.05 pza 2.00 S/.23.34 S/.46.68 1.00
ROSCADO 2"
03.04.09.06 SUMINISTRO E INSTALACION DE YEE PVC SAL 2" pza 5.00 S/.9.77 S/.48.85 1.00
03.04.09.07 SUMINISTRO E INSTALACION DE TEE DOBLE PVC SAL 2" und 6.00 S/.9.89 S/.59.34 1.00
03.04.09.08 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 7.00 S/.7.72 S/.54.04 1.00
03.04.09.09 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X45° und 2.00 S/.8.18 S/.16.36 1.00
03.04.09.10 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X45° und 4.00 S/.11.43 S/.45.72 1.00
03.04.09.11 SUMINISTRO E INSTALACION DE TRAMPA PVC SAL 2" und 2.00 S/.14.86 S/.29.72 1.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE CANALETA PARA UBS 2
03.04.09.12 und 1.00 S/.281.68 S/.281.68 1.00
BAÑOS
03.04.09.13 SUMINISTRO E INSTALACION DE TEE PVC 2" pza 2.00 S/.7.64 S/.15.28 2.00
03.04.09.14 SUMINISTRO E INSTALACION DE TEE PVC 4" pza 8.00 S/.12.55 S/.100.40 1.00
03.04.09.15 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X90° pza 2.00 S/.5.03 S/.10.06 2.00
03.04.09.16 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X90° pza 8.00 S/.12.68 S/.101.44 2.00
03.04.10 INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"-UBS
03.04.10.01 pto 1.00 S/.252.39 S/.252.39 1.00
INSTITUCIONAL
03.04.11 CAJA DE REGISTRO CON TRAMPA DE GRASA
CAJA DE CONCRETO PRE FABRICADO 0.60X0.40X0.40m
03.04.11.01 und 2.00 S/.123.79 S/.247.58 2.00 2.00
(INTERIORES) e=0.05
03.04.12 ZANJA DE PERCOLACION (1 UBS)
03.04.12.01 OBRAS PRELIMINARES
03.04.12.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 30.80 S/.0.63 S/.19.40 2.00 2.00
03.04.12.01.02 TRAZO, NIVELACION Y REPLANTEO m2 30.80 S/.2.63 S/.81.00 2.00 2.00
03.04.12.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.40 P/TUBERIA
03.04.12.02.01 m 14.00 S/.9.50 S/.133.00 2.00 2.00
MENOR A 4"
EXCAV. MANUAL T. ARCILL. A=0.60, H=0.50 P/TUBERIA
03.04.12.02.02 m 30.00 S/.17.82 S/.534.60 2.00 2.00
MENOR A 4"
03.04.12.02.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 44.00 S/.1.79 S/.78.76 2.00 2.00
PREPARACION DE CAMAS DE APOYO H=0.10 P/TUB. MENOR
03.04.12.02.04 m 14.00 S/.1.78 S/.24.92 2.00 2.00
A 4"
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.04.12.02.05 m 14.00 S/.3.32 S/.46.48 2.00 2.00
H=0.30 P/TUBERIA < 4"
RELLENO CON HORMIGON SELEC. A=0.60, H=0.20
03.04.12.02.06 m 30.00 S/.27.73 S/.831.90 2.00 2.00
P/TUBERIA < 4"
RELLENO C/MAT. PROPIO A=0.60, H=0.30 P/TUBERIA
03.04.12.02.07 m 30.00 S/.5.59 S/.167.70 2.00 2.00
CRIBADA < 4"
03.04.12.02.08 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 2.70 S/.21.90 S/.59.13 2.00 2.00
03.04.12.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.04.12.03.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-SAL 2" m 14.00 S/.6.74 S/.94.36 2.00 2.00
SUMINISTRO E INSTALACION DE TUBERIA CRIBADA DE PVC-
03.04.12.03.02 m 30.00 S/.6.74 S/.202.20 2.00 2.00
SAL 2"
SUM. E INST. DE CAJA DE CONCRETO - REPARTIDOR DE
03.04.12.03.03 und 2.00 S/.85.09 S/.170.18 2.00 2.00
CAUDAL 0.45mX 0.55m X0.57m
03.04.12.03.04 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 6.00 S/.7.72 S/.46.32 2.00 2.00
03.04.12.04 MALLA ARPILLERA
03.04.12.04.01 SUMINISTRO E INSTALACION DE MALLA ARPILLERA m2 18.00 S/.2.15 S/.38.70 2.00 2.00
03.02.12 VARIOS 0.00
LIJADO Y PINTADO DE MURO EXTERIOR C/ESMALTE
03.02.12.01 m2 1,706.10 S/.16.00 0.00 2.00 -2.00
SINTETICO DOS MANOS
CONSTRUCCION DE UBS INSTITUCIONALES - TIPO
03.05
COMPOSTERA DE BATERIA 04 BAÑOS (CANT: 2Und. )
03.05.01 TRABAJOS PRELIMINARES
03.05.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 108.57 S/.0.63 S/.68.40 2.00
03.05.01.02 TRAZO, NIVELACION Y REPLANTEO m2 51.57 S/.2.63 S/.135.63 2.00
03.05.02 MOVIMIENTO DE TIERRAS
03.05.02.01 EXCAVACION MANUAL P/CIMIENTOS m3 41.26 S/.59.38 S/.2,450.02 2.00
03.05.02.02 RELLENO CON MATERIAL PROPIO COMPACTADO A MANO m3 4.07 S/.45.58 S/.185.51 2.00
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
03.05.02.03 REFINE, NIVELACION Y COMPACTACION A MANO m2 51.57 S/.2.78 S/.143.36 2.00
03.05.02.04 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 46.49 S/.21.90 S/.1,018.13 2.00
03.05.03 CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE PLASTICO
03.05.03.01 m2 78.07 S/.1.89 S/.147.55 2.00
P/IMPERMEABILIZANTE DE CIMIENTO
03.05.03.02 CONCRETO f'c=100 kg/cm2 PARA SOLADO Y/O BASES m2 5.16 S/.565.35 S/.2,917.21 2.00
03.05.03.03 CONCRETO P/FALSO PISO 1:12 m3 2.78 S/.509.25 S/.1,415.72 2.00
03.05.04 CONCRETO ARMADO
03.05.04.01 LOSA DE CIMENTACION
03.05.04.01.01 CONCRETO f'c=210 Kg/cm2 P/LOSAS DE CIMENTACION m3 10.31 S/.709.34 S/.7,313.30 2.00
03.05.04.01.02 ENCOFRADO Y DESENCOFRADO P/LOSA DE CIMENTACION m2 9.80 S/.68.10 S/.667.38 2.00
ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS
03.05.04.01.03 kg 386.06 S/.9.94 S/.3,837.44 2.00
CIMENTACION
03.05.04.02 SOBRECIMIENTO
03.05.04.02.01 CONCRETO f'c= 210 kg/cm2 P/SOBRECIMIENTO m3 2.10 S/.821.43 S/.1,725.00 2.00
03.05.04.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 31.84 S/.50.88 S/.1,620.02 2.00
03.05.04.02.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/SOBRECIMIENTO kg 118.38 S/.9.94 S/.1,176.70 2.00
03.05.04.03 COLUMNAS
03.05.04.03.01 CONCRETO f 'c=210 kg/cm2 m3 16.83 S/.735.20 S/.12,373.42 2.00
03.05.04.03.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 74.23 S/.71.75 S/.5,326.00 2.00
03.05.04.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/COLUMNAS kg 941.56 S/.9.94 S/.9,359.11 2.00
03.05.04.04 LOSA MACIZA
03.05.04.04.01 CONCRETO f 'c=210 kg/cm2 m3 3.94 S/.735.20 S/.2,896.69 2.00
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS
03.05.04.04.02 m2 23.53 S/.80.25 S/.1,888.28 2.00
MACIZAS
03.05.04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/LOSAS MACIZAS kg 133.39 S/.9.94 S/.1,325.90 2.00
03.05.04.05 VIGAS
03.05.04.05.01 CONCRETO f 'c=210 kg/cm2 m3 2.57 S/.735.20 S/.1,889.46 2.00
03.05.04.05.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS m2 29.75 S/.51.23 S/.1,524.09 2.00
03.05.04.05.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/VIGAS kg 332.79 S/.9.94 S/.3,307.93 2.00
03.05.04.06 ESCALERA
03.05.04.06.01 CONCRETO f 'c=210 kg/cm2 m3 3.69 S/.735.20 S/.2,712.89 2.00
03.05.04.06.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 40.10 S/.74.67 S/.2,994.27 2.00
03.05.04.06.03 ACERO DE REFUERZO fy=4,200 kg/cm2 P/ESCALERAS kg 141.96 S/.9.94 S/.1,411.08 2.00
03.05.05 MUROS TABIQUERIAS
MURO DE LADRILLO DE ARCILLA KING KONG 24X12X9cm
03.05.05.01 m2 83.67 S/.113.51 S/.9,497.38 2.00
C/MEZCLA 1:5
03.05.06 REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO MUROS INT. PULIDO C/IMPERMEBILIZANTE M=1:3
03.05.06.01 m2 86.42 S/.37.95 S/.3,279.64 2.00
C:A e=1"
03.05.06.02 TARRAJEO MUROS EXT. FROTACH. C/MORT. 1:4 x e=1" m2 85.97 S/.32.63 S/.2,805.20 2.00
03.05.06.03 TARRAJEO MUROS INT. PULIDO M=1:3 C:A e=1" m2 71.52 S/.34.04 S/.2,434.54 2.00
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y
03.02.03.08 m 728.00 S/.38.60 0.00 2.00
VANOS
03.05.07 CUBIERTAS
TECHO C/ CALAMINA GALVANIZADA 0.83X1.80 e=0.25mm
03.05.07.01 und 2.00 S/.1,795.72 S/.3,591.44 2.00
P/UBS INSTITUCIONAL
SUMINISTRO E INSTALACION DE PUERTA MADERA DE
03.05.07.02 und 8.00 S/.467.11 S/.3,736.88 2.00
0.70mx1.90x C/MARCO 2"x4" INCLUYE ACCESORIOS
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.05.07.03 und 4.00 S/.92.62 S/.370.48 2.00
MADERA 2"x1" DE 0.95m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.05.07.04 und 4.00 S/.64.53 S/.258.12 2.00
MADERA 2"x1" DE 1.10m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.05.07.05 und 4.00 S/.76.07 S/.304.28 2.00
MADERA 2"x1" DE 1.65m x0.30m
SUMINISTRO E INSTALACION DE VENTANA C/MARCOS
03.05.07.06 und 4.00 S/.87.00 S/.348.00 2.00
MADERA 2"x1" DE 1.80m x0.30m
SUMINSTRO E INSTALACION DE TAPA METALICA F°G° e=3 /16"
03.05.07.07 und 16.00 S/.234.11 S/.3,745.76 2.00
CON 0,60m x 0,65m
03.05.08 APARATOS Y ACCESORIOS SANITARIOS
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS
03.05.08.01 und 2.00 S/.1,575.20 S/.3,150.40 2.00
SANITARIOS P/UBS-INSTITUCIONAL
03.05.09 INSTALACIONES SANITARIAS SISTEMA DE DESAGUE
03.05.09.01 TUBERIA DE PVC SAL 2" m 77.00 S/.5.83 S/.448.91 2.00
03.05.09.02 TUBERIA DE PVC SAL 4" m 56.00 S/.30.94 S/.1,732.64 2.00
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.05.09.03 pza 4.00 S/.11.61 S/.46.44 2.00
VENTILACION 2"
SUMINISTRO E INSTALACION DE SOMBRERO DE
03.05.09.04 pza 16.00 S/.14.15 S/.226.40 2.00
VENTILACION 4"
SUMINISTRO E INSTALACION DE SUMIDEROS DE BRONCE
03.05.09.05 pza 8.00 S/.23.34 S/.186.72 2.00
ROSCADO 2"
03.05.09.06 SUMINISTRO E INSTALACION DE YEE PVC SAL 2" pza 20.00 S/.9.77 S/.195.40 2.00
03.05.09.07 SUMINISTRO E INSTALACION DE TEE PVC SAL 2" und 18.00 S/.10.41 S/.187.38 2.00
03.05.09.08 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 32.00 S/.7.72 S/.247.04 2.00
03.05.09.09 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X45° und 8.00 S/.8.18 S/.65.44 2.00
03.05.09.10 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X45° und 16.00 S/.11.43 S/.182.88 2.00
03.05.09.11 SUMINISTRO E INSTALACION DE TRAMPA PVC SAL 2" und 8.00 S/.14.86 S/.118.88 2.00
SUMINISTRO E INSTALACION DE CANALETA PARA UBS 4
03.05.09.12 und 2.00 S/.289.03 S/.578.06 2.00
BAÑOS
03.05.09.13 SUMINISTRO E INSTALACION DE TEE PVC 2" pza 4.00 S/.7.64 S/.30.56 2.00
03.05.09.14 SUMINISTRO E INSTALACION DE TEE PVC 4" pza 16.00 S/.12.55 S/.200.80 2.00
03.05.09.15 SUMINISTRO E INSTALACION DE CODO PVC SAL 2"X90° pza 4.00 S/.5.03 S/.20.12 2.00
03.05.09.16 SUMINISTRO E INSTALACION DE CODO PVC SAL 4"X90° pza 16.00 S/.12.68 S/.202.88 2.00
03.05.10 INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"-UBS
03.05.10.01 pto 2.00 S/.424.24 S/.848.48 2.00
INSTITUCIONAL
03.05.11 CAJA DE REGISTRO CON TRAMPA DE GRASA
CAJA DE CONCRETO PRE FABRICADO 0.60X0.40X0.40m
03.05.11.01 und 2.00 S/.123.79 S/.247.58 2.00
(INTERIORES) e=0.05
03.05.12 ZANJA DE PERCOLACION (2 UBS)
03.05.12.01 OBRAS PRELIMINARES
03.05.12.01.01 LIMPIEZA Y DESBROCE DE MONTE m2 147.70 S/.0.63 S/.93.05 2.00
03.05.12.01.02 TRAZO, NIVELACION Y REPLANTEO m2 147.70 S/.2.63 S/.388.45 2.00
03.05.12.02 MOVIMIENTO DE TIERRAS
EXCAV. MANUAL T. ARCILL. A=0.40, H=0.40 P/TUBERIA
03.05.12.02.01 m 28.00 S/.9.50 S/.266.00 2.00
MENOR A 4"
EXCAV. MANUAL T. ARCILL. A=0.60, H=0.50 P/TUBERIA
03.05.12.02.02 m 183.00 S/.17.82 S/.3,261.06 2.00
MENOR A 4"
03.05.12.02.03 REFINE Y NIVEL DE FONDO DE ZANJA T.N. P/TUBERIA m 211.00 S/.1.79 S/.377.69 2.00
PREPARACION DE CAMAS DE APOYO H=0.10 P/TUB. MENOR
03.05.12.02.04 m 28.00 S/.1.78 S/.49.84 2.00
A 4"
COMPARACIÓN PRESUPUESTO EXP. TEC. VS REAL
N° DE UBS
N° DE UBS
PRESUPUESTO SEGÚN SEGÚN UBS A TOTAL DE UBS
REAL EN POR PROYECTADO N° DE UBS POR
ITEM DESCRIPCIÓN METRADO Y
OBRA EJECUTAR
METRADO Y REHABILITAR
S EN OBRA ADICIONAR
DOMICILIARIA
UND CANT P.U PARCIAL PRESUP. PRESUPUEST (EXISTENTES) S
(NUEVOS)
O
RELLENO Y COMPACT. C/MAT. PROPIO SELEC. A=0.30,
03.05.12.02.05 m 28.00 S/.3.32 S/.92.96 2.00
H=0.30 P/TUBERIA < 4"
RELLENO CON HORMIGON SELEC. A=0.60, H=0.20
03.05.12.02.06 m 183.00 S/.27.73 S/.5,074.59 2.00
P/TUBERIA < 4"
RELLENO C/MAT. PROPIO A=0.60, H=0.30 P/TUBERIA
03.05.12.02.07 m 183.00 S/.5.59 S/.1,022.97 2.00
CRIBADA < 4"
03.05.12.02.08 RETIRO Y ACOMODO DE DESMONTE EN ZONA ALEDAÑA m3 16.47 S/.21.90 S/.360.69 2.00
03.05.12.03 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
03.05.12.03.01 SUMINISTRO E INSTALACION DE TUBERIA DE PVC-SAL 2" m 28.00 S/.6.74 S/.188.72 2.00
SUMINISTRO E INSTALACION DE TUBERIA CRIBADA DE PVC-
03.05.12.03.02 m 183.00 S/.6.74 S/.1,233.42 2.00
SAL 2"
SUM. E INST. DE CAJA DE CONCRETO - REPARTIDOR DE
03.05.12.03.03 und 4.00 S/.85.09 S/.340.36 2.00
CAUDAL 0.45mX 0.55m X0.57m
03.05.12.03.04 SUMINISTRO E INSTALACION DE CODO PVC SAL DE 2"X90° und 12.00 S/.7.72 S/.92.64 2.00
03.05.12.04 MALLA ARPILLERA
03.05.12.04.01 SUMINISTRO E INSTALACION DE MALLA ARPILLERA m2 108.80 S/.2.15 S/.233.92 2.00
03.02.12 VARIOS
LIJADO Y PINTADO DE MURO EXTERIOR C/ESMALTE
03.02.12.01 m2 1,706.10 S/.16.00 0.00 2.00 -2.00
SINTETICO DOS MANOS
03.06 CONTINGENCIAS
03.06.01 EQUIPO CONTRA INCENDIOS (EXTINTORES) und 2.00 S/.545.25 S/.1,090.50
REPOSICIÓN DE COBERTURA VEGETAL POR OBRAS
03.06.02 und 360.00 S/.12.55 S/.4,518.00
GENERALES Y REDES DE AGUA
03.07 ABANDONO
03.07.01 LIMPIEZA FINAL DE OBRA glb 1.00 S/.3,127.32 S/.3,127.32
03.07.02 DESMONTAJE Y MOVILIZACION DE CAMPAMENTOS glb 1.00 S/.2,658.60 S/.2,658.60
03.08 FLETE DE MATERIALES
FLETE TERRESTRE INC. CARGA Y DESCARGA CHIRIACO A
03.08.01 glb 1.00 S/.18,500.00 S/.18,500.00
PUERTO LA CURVA - SANEAMIENTO
FLETE DE CARGA EN PUERTO LA CURVA Y DESCARGA EN
03.08.02 glb 1.00 S/.14,000.00 S/.14,000.00
ALMACEN DE CC.NN. NUEVO BELEN - SANEAMIENTO
FLETE FLUVIAL CON PEKE PEKE DE PUERTO LA CURVA A
03.08.03 glb 1.00 S/.92,000.00 S/.92,000.00
ALMACEN DE CC.NN NUEVO BELEN - SANEAMIENTO
FLETE RURAL: ALMACEN DE CC.NN NUEVO BELEN A PIE DE
03.08.04 glb 1.00 S/.12,000.00 S/.12,000.00
OBRA (VIVIENDA PROMEDIO)

A TOTAL COSTO DIRECTO S/. 1,791,531.40


B GASTOS GENERALES (12.00%) 12.00% S/. 214,983.77
C UTILIDAD (10.00%) 10.00% S/. 179,153.14
D SUB TOTAL S/. 2,185,668.31
E IGV (0.00%) 0.00% S/. -
F TOTAL PRESUPUESTO S/. 2,185,668.31
UBS DOMICILIARIAS
N° DE UBS
UBS A
SEGÚN
REHABILITAR
METRADO Y
(EXISTENTES)
PRESUPUESTO

ESCALERAS 43 45

PUERTAS PARA 5 0
DESINSTALAR

PUERTAS A INSTALAR 62 0

VENTANA C/MARCOS
MADERA 2"x1" DE 0.55m 50 37
x0.30m
VENTANA C/MARCOS
MADERA 2"x1" DE 0.80m 54 32
x0.30m
VENTANA C/MARCOS
MADERA 2"x1" DE 2.30m 52 38
x0.30m

ZANJAS DE 25 0
PERCOLACIÓN

LAVADEROS MULTIUSO 92 0
FAMILIAR
UBS DOMICILIARIAS
N° DE UBS
PROYECTADOS N° DE UBS POR TOTAL DE UBS
EN OBRA ADICIONAR DOMICILIARIAS
(NUEVOS)

49 6 94

55 50 55

94 32 94

57 7 94

62 8 94

56 4 94

94 69 94

94 2 94