All water used underground will be treated mine discharge water. This water will be supplied from the existing
Water for mining use will be brought by pipeline to the portal area from the freshwater storage pond located n
Service waterlines will be installed in all development drifts. Initially, the decline may be serviced with a pump a
Mining Equipment: 250 l/min for Jumbos, long hole drills and bolters
Underground Services: 100 l/min for up to 4 active headings
Shotcrete and Paste Fill Plants: 110 m3/day
ill be supplied from the existing reverse osmosis plant and pumped from the discharge water pond to three 30,000 L head tanks locate
shwater storage pond located near the water treatment plant and stored for use in a water header tank. A water line from the portal
e may be serviced with a pump and tank-truck arrangement. The required water for mining is estimated below:
hree 30,000 L head tanks located near the portal entrance. Provision for water reticulation and pressure reduction is allowed for in th
nk. A water line from the portal will be installed in the decline.
re reduction is allowed for in the underground development cost.
AREA