TOTAL

ITEM TOTAL
New 0
185
On Progress 59
Completed 185
TOTAL WR 244

59

0
New On Progress Completed

TOTAL NUMBER OF TASK - MONTHLY COMPARISON

0
0
JAN 0
FEB 0
MAR 0
APR 0
MEI 0
JUN 0
JUL 0
AGU 0
SEP 0
OKT 0
NOV 0
DES JAN 0

MONTH JAN FEB MAR APR MEI JUN JUL AGU SEP OKT NOV DES
TASK 0 0 0 0 0 0 0 0 0 0 0 0
SUMMARY TASK LIST
Production Team - VIDA Bekasi
02 September 2023
STATUS TASK (PIC)

PIC ON PROGRESS COMPLETED TOTAL


Deputy GM 5 9 14 82
bm 5 9 14
eng 39 82 121
sec 3 24 27
hk 4 40 44 39
park 0 8 10
lnd 4 19 23
9
TOTAL 55 182 239 5
bm eng
On Progress Completed

TOTAL NUMBER OF TASK - MONTHLY COMPARISON (STATUS TASK)

0
JAN 0 0 FEB 0 0 MAR 0 0 APR 0 0 MEI 0 0 JUN 0 0 JUL

MONTH JAN FEB MAR APR MEI


On Progress 0 0 0 0 0
Completed 0 0 0 0 0
STATUS TASK (PIC)

82

39 40

24
19
8
3 4 4
eng sec hk 0 park lnd
Completed

0 JUN 0 0 JUL 0 0 AGU 0 0 SEP 0 0 OKT 0 0 NOV 0 0 DES 0

JUN JUL AGU SEP OKT NOV


0 0 0 0 0 0
0 0 0 0 0 0
19

4
lnd

0 0 DES 0

DES
0
0
TASK LIST
Production Team - VIDA Bekasi

NO TICKET STATUS DATE AGE


1 TL-0001 Completed 27 April 2022 4 hari
2 TL-0002 Completed 05 Mei 2022 11 hari
3 TL-0003 Completed 13 Mei 2022 17 hari
4 TL-0004 Completed 13 Mei 2022 55 hari
5 TL-0005 Completed 13 Mei 2022 73 hari
6 TL-0006 Completed 13 Mei 2022 30 hari
7 TL-0007 Completed 13 Mei 2022 28 hari
8 TL-0008 Completed 13 Mei 2022 45 hari
9 TL-0009 On Progress 13 Mei 2022 477 hari
10 TL-0010 Completed 13 Mei 2022 37 hari
11 TL-0011 Completed 13 Mei 2022 216 hari
12 TL-0012 Completed 13 Mei 2022 19 hari
13 TL-0013 Completed 13 Mei 2022 213 hari
14 TL-0014 On Progress 13 Mei 2022 477 hari
15 TL-0015 On Progress 13 Mei 2022 477 hari
16 TL-0016 Completed 13 Mei 2022 35 hari
17 TL-0017 Completed 13 Mei 2022 72 hari
18 TL-0018 Completed 13 Mei 2022 61 hari
19 TL-0019 Completed 13 Mei 2022 1 hari
20 TL-0020 Completed 13 Mei 2022 46 hari
21 TL-0021 Completed 13 Mei 2022 28 hari
22 TL-0022 Completed 13 Mei 2022 73 hari
23 TL-0023 Completed 13 Mei 2022 43 hari
24 TL-0024 Completed 13 Mei 2022 142 hari
25 TL-0025 Completed 13 Mei 2022 184 hari
26 TL-0026 Completed 13 Mei 2022 49 hari
27 TL-0027 Completed 13 Mei 2022 89 hari
28 TL-0028 Completed 13 Mei 2022 49 hari
29 TL-0029 Completed 13 Mei 2022 41 hari
30 TL-0030 Completed 30 Mei 2022 107 hari
31 TL-0031 Completed 30 Mei 2022 61 hari
32 TL-0032 Completed 30 Mei 2022 4 hari
33 TL-0033 Completed 30 Mei 2022 13 hari
34 TL-0034 Completed 31 Mei 2022 30 hari
35 TL-0035 Completed 06 Juni 2022 3 hari
36 TL-0036 Completed 06 Juni 2022 6 hari
37 TL-0037 On Progress 07 Juni 2022 452 hari
38 TL-0038 Completed 07 Juni 2022 14 hari
39 TL-0039 Completed 07 Juni 2022 10 hari
40 TL-0040 On Progress 07 Juni 2022 452 hari
41 TL-0041 On Progress 07 Juni 2022 452 hari
42 TL-0042 Completed 08 Juni 2022 17 hari
43 TL-0043 On Progress 08 Juni 2022 451 hari
44 TL-0044 Completed 08 Juni 2022 6 hari
45 TL-0045 Completed 08 Juni 2022 4 hari
46 TL-0046 Completed 08 Juni 2022 6 hari
47 TL-0047 Completed 08 Juni 2022 47 hari
48 TL-0048 Completed 08 Juni 2022 13 hari
49 TL-0049 Completed 08 Juni 2022 16 hari
50 TL-0050 Completed 08 Juni 2022 17 hari
51 TL-0051 Completed 08 Juni 2022 47 hari
52 TL-0052 Completed 08 Juni 2022 46 hari
53 TL-0053 Completed 08 Juni 2022 48 hari
54 TL-0054 Completed 08 Juni 2022 51 hari
55 TL-0055 Completed 08 Juni 2022 16 hari
56 TL-0056 Completed 08 Juni 2022 48 hari
57 TL-0057 On Progress 08 Juni 2022 451 hari
58 TL-0058 On Progress 08 Juni 2022 451 hari
59 TL-0059 Completed 08 Juni 2022 13 hari
60 TL-0060 Completed 08 Juni 2022 13 hari
61 TL-0061 Completed 08 Juni 2022 15 hari
62 TL-0062 Completed 08 Juni 2022 163 hari
63 TL-0063 Completed 08 Juni 2022 200 hari
64 TL-0064 On Progress 08 Juni 2022 451 hari
65 TL-0065 Completed 08 Juni 2022 15 hari
66 TL-0066 On Progress 08 Juni 2022 451 hari
67 TL-0067 On Progress 11 Juli 2022 418 hari
68 TL-0068 Completed 08 Juni 2022 138 hari
69 TL-0069 Completed 08 Juni 2022 14 hari
70 TL-0070 Completed 08 Juni 2022 15 hari
71 TL-0071 Completed 08 Juni 2022 15 hari
72 TL-0072 Completed 08 Juni 2022 45 hari
73 TL-0073 Completed 08 Juni 2022 50 hari
74 TL-0074 Completed 08 Juni 2022 18 hari
75 TL-0075 Completed 08 Juni 2022 27 hari
76 TL-0076 Completed 08 Juni 2022 24 hari
77 TL-0077 Completed 08 Juni 2022 24 hari
78 TL-0078 Completed 08 Juni 2022 10 hari
79 TL-0079 Completed 08 Juni 2022 54 hari
80 TL-0080 Completed 08 Juni 2022 47 hari
81 TL-0081 Completed 08 Juni 2022 27 hari
82 TL-0082 Completed 08 Juni 2022 8 hari
83 TL-0083 Completed 08 Juni 2022 27 hari
84 TL-0084 Completed 08 Juni 2022 13 hari
85 TL-0085 Completed 08 Juni 2022 9 hari
86 TL-0086 Completed 08 Juni 2022 15 hari
87 TL-0087 Completed 08 Juni 2022 16 hari
88 TL-0088 On Progress 08 Juni 2022 451 hari
89 TL-0089 Completed 08 Juni 2022 15 hari
90 TL-0090 On Progress 08 Juni 2022 451 hari
91 TL-0091 Completed 08 Juni 2022 142 hari
92 TL-0092 Completed 08 Juni 2022 15 hari
93 TL-0093 Completed 13 Juni 2022 6 hari
94 TL-0094 Completed 13 Juni 2022 63 hari
95 TL-0095 Completed 13 Juni 2022 7 hari
96 TL-0096 Completed 13 Juni 2022 11 hari
97 TL-0097 Completed 13 Juni 2022 25 hari
98 TL-0098 On Progress 13 Juni 2022 446 hari
99 TL-0099 Completed 13 Juni 2022 67 hari
100 TL-0100 Completed 13 Juni 2022 81 hari
101 TL-0101 Completed 13 Juni 2022 88 hari
102 TL-0102 Completed 20 Juni 2022 57 hari
103 TL-0103 Completed 20 Juni 2022 11 hari
104 TL-0104 Completed 20 Juni 2022 99 hari
105 TL-0105 Completed 20 Juni 2022 10 hari
106 TL-0106 Completed 20 Juni 2022 3 hari
107 TL-0107 Completed 20 Juni 2022 1 hari
108 TL-0108 Completed 20 Juni 2022 12 hari
109 TL-0109 Completed 20 Juni 2022 103 hari
110 TL-0110 Completed 28 Juni 2022 1 hari
111 TL-0111 Completed 28 Juni 2022 2 hari
112 TL-0112 On Progress 28 Juni 2022 431 hari
113 TL-0113 Completed 05 Juli 2022 10 hari
114 TL-0114 Completed 05 Juli 2022 88 hari
115 TL-0115 Completed 05 Juli 2022 71 hari
116 TL-0116 Completed 05 Juli 2022 173 hari
117 TL-0117 Completed 05 Juli 2022 55 hari
118 TL-0118 Completed 05 Juli 2022 20 hari
119 TL-0119 Completed 05 Juli 2022 20 hari
120 TL-0120 Completed 11 Juli 2022 12 hari
121 TL-0121 Completed 11 Juli 2022 14 hari
122 TL-0122 Completed 11 Juli 2022 14 hari
123 TL-0123 Completed 11 Juli 2022 14 hari
124 TL-0124 Completed 11 Juli 2022 14 hari
125 TL-0125 On Progress 11 Juli 2022 418 hari
126 TL-0126 Completed 11 Juli 2022 93 hari
127 TL-0127 On Progress 11 Juli 2022 418 hari
128 TL-0128 Completed 11 Juli 2022 9 hari
129 TL-0129 On Progress 11 Juli 2022 418 hari
130 TL-0130 On Progress 11 Juli 2022 418 hari
131 TL-0131 On Progress 11 Juli 2022 418 hari
132 TL-0132 On Progress 11 Juli 2022 418 hari
133 TL-0133 On Progress 11 Juli 2022 418 hari
134 TL-0134 On Progress 11 Juli 2022 418 hari
135 TL-0135 Completed 11 Juli 2022 104 hari
136 TL-0136 On Progress 11 Juli 2022 418 hari
137 TL-0137 Completed 11 Juli 2022 25 hari
138 TL-0138 On Progress 11 Juli 2022 418 hari
139 TL-0139 Completed 11 Juli 2022 2 hari
140 TL-0140 Completed 11 Juli 2022 25 hari
141 TL-0141 Completed 18 Juli 2022 171 hari
142 TL-0142 Completed 18 Juli 2022 64 hari
143 TL-0143 Completed 18 Juli 2022 76 hari
144 TL-0144 Completed 18 Juli 2022 64 hari
145 TL-0145 Completed 18 Juli 2022 107 hari
146 TL-0146 Completed 25 Juli 2022 57 hari
147 TL-0147 Completed 25 Juli 2022 47 hari
148 TL-0148 Completed 25 Juli 2022 91 hari
149 TL-0149 Completed 15 Agustus 2022 4 hari
150 TL-0150 Completed 15 Agustus 2022 22 hari
151 TL-0151 Completed 15 Agustus 2022 36 hari
152 TL-0152 Completed 15 Agustus 2022 9 hari
153 TL-0153 Completed 15 Agustus 2022 9 hari
154 TL-0154 Completed 15 Agustus 2022 132 hari
155 TL-0155 Completed 15 Agustus 2022 114 hari
156 TL-0156 Completed 15 Agustus 2022 114 hari
157 TL-0157 Completed 15 Agustus 2022 108 hari
158 TL-0158 On Progress 24 Agustus 2022 374 hari
159 TL-0159 Completed 24 Agustus 2022 104 hari
160 TL-0160 Completed 24 Agustus 2022 9 hari
161 TL-0161 Completed 24 Agustus 2022 21 hari
162 TL-0162 Completed 24 Agustus 2022 26 hari
163 TL-0163 Completed 24 Agustus 2022 27 hari
164 TL-0164 Completed 06 September 2022 8 hari
165 TL-0165 Completed 06 September 2022 25 hari
166 TL-0166 Completed 06 September 2022 6 hari
167 TL-0167 Completed 06 September 2022 28 hari
168 TL-0168 Completed 06 September 2022 12 hari
169 TL-0169 On Progress 06 September 2022 361 hari
170 TL-0170 Completed 06 September 2022 10 hari
171 TL-0171 On Progress 06 September 2022 361 hari
172 TL-0172 Completed 06 September 2022 21 hari
173 TL-0173 Completed 06 September 2022 21 hari
174 TL-0174 Completed 06 September 2022 6 hari
175 TL-0175 Completed 06 September 2022 21 hari
176 TL-0176 Completed 06 September 2022 0 hari
177 TL-0177 Completed 13 September 2022 13 hari
178 TL-0178 Completed 20 September 2022 6 hari
179 TL-0179 Completed 20 September 2022 48 hari
180 TL-0180 On Progress 20 September 2022 347 hari
181 TL-0181 Completed 20 September 2022 61 hari
182 TL-0182 Completed 20 September 2022 0 hari
183 TL-0183 Completed 20 September 2022 114 hari
184 TL-0184 Completed 20 September 2022 2 hari
185 TL-0185 Completed 20 September 2022 4 hari
186 TL-0186 Completed 20 September 2022 15 hari
187 TL-0187 Completed 12 Oktober 2022 119 hari
188 TL-0188 On Progress 12 Oktober 2022 325 hari
189 TL-0189 Completed 12 Oktober 2022 12 hari
190 TL-0190 Completed 12 Oktober 2022 12 hari
191 TL-0191 On Progress 12 Oktober 2022 325 hari
192 TL-0192 Completed 12 Oktober 2022 85 hari
193 TL-0193 Completed 12 Oktober 2022 12 hari
194 TL-0194 Completed 25 Oktober 2022 0 hari
195 TL-0195 Completed 25 Oktober 2022 7 hari
196 TL-0196 On Progress 02 November 2022 304 hari
197 TL-0197 Completed 02 November 2022 35 hari
198 TL-0198 Completed 02 November 2022 35 hari
199 TL-0199 Completed 02 November 2022 35 hari
200 TL-0200 Completed 16 November 2022 20 hari
201 TL-0201 On Progress 16 November 2022 290 hari
202 TL-0202 On Progress 16 November 2022 290 hari
203 TL-0203 On Progress 30 November 2022 276 hari
204 TL-0204 Completed 30 November 2022 25 hari
205 TL-0205 Completed 30 November 2022 25 hari
206 TL-0206 Completed 30 November 2022 7 hari
207 TL-0207 On Progress 30 November 2022 276 hari
208 TL-0208 Completed 30 November 2022 63 hari
209 TL-0209 Completed 30 November 2022 7 hari
210 TL-0210 Completed 30 November 2022 70 hari
211 TL-0211 Completed 30 November 2022 7 hari
212 TL-0212 Completed 30 November 2022 7 hari
213 TL-0213 On Progress 07 Desember 2022 269 hari
214 TL-0214 On Progress 07 Desember 2022 269 hari
215 TL-0215 Completed 07 Desember 2022 56 hari
216 TL-0216 On Progress 07 Desember 2022 269 hari
217 TL-0217 On Progress 07 Desember 2022 269 hari
218 TL-0218 Completed 07 Desember 2022 19 hari
219 TL-0219 On Progress 28 Desember 2022 248 hari
220 TL-0220 Completed 28 Desember 2022 8 hari
221 TL-0221 On Progress 28 Desember 2022 248 hari
222 TL-0222 Completed 28 Desember 2022 8 hari
223 TL-0223 On Progress 28 Desember 2022 248 hari
224 TL-0224 Completed 28 Desember 2022 12 hari
225 TL-0225 On Progress 28 Desember 2022 248 hari
226 TL-0226 Completed 28 Desember 2022 33 hari
227 TL-0227 Completed 28 Desember 2022 42 hari
228 TL-0228 Completed 28 Desember 2022 13 hari
229 TL-0229 Completed 18 Januari 2023 10 hari
230 TL-0230 On Progress 18 Januari 2023 227 hari
231 TL-0231 On Progress 18 Januari 2023 227 hari
232 TL-0232 Completed 18 Januari 2023 21 hari
233 TL-0233 On Progress 18 Januari 2023 227 hari
234 TL-0234 On Progress 18 Januari 2023 227 hari
235 TL-0235 On Progress 18 Januari 2023 227 hari
236 TL-0236 On Progress 18 Januari 2023 227 hari
237 TL-0237 On Progress 18 Januari 2023 227 hari
238 TL-0238 On Progress 18 Januari 2023 227 hari
239 TL-0239 On Progress 01 Februari 2023 213 hari
240 TL-0240 On Progress 01 Februari 2023 213 hari
241 TL-0241 On Progress 01 Februari 2023 213 hari
242 TL-0242 On Progress 01 Februari 2023 213 hari
243 TL-0243 On Progress 01 Februari 2023 213 hari
244 TL-0244 On Progress 08 Februari 2023 206 hari
TASK
Kebocoran plafon diatas saklar Lt.3A koridor
Pengecatan marka panah lantai arah parkir
Pembersihan dinding kolam depan lobby
Kebocoran ac lt.3a depan lift
desain drop ceiling lt.2
pengecatan area dalam lobby bagian kusam/complaint BM
pemindahan rambu tiang belakang
Kanopi membran pos keluar (Sudah Pengajuan di QS)
F.U Purchasing Perbaikan huruf "E" tulisan di reklame "THE VIDA"
Pengecatan tiang rambu
Perbaikan pagar pintu masuk & keluar gedung
Pengecatan tutup ground tank dan water meter PAM
Perbaikan grill gutter seluruh area gedung
Perbaikan dan pengecatan tangga genset
Pengecatan area dinding luar gedung (BY Vendor), hitung volume pengecatan (done)
Perbaikan rambu gondola
Perbaikan Cover car gondola yang rusak (F.U QS)
Perbaikan lampu traffic yang pecah,pengaktifan seluruh lampu traffic mati
Perbaikan plafon smoking area
Perbaikan pintu area parkir motor
Perapihan sisa material
Uji coba pengecatan kanstin (Ditinjau kembali)
Rencana Samapta & pengetesan hydrant sisi barat dan utara diadakan tgl 25 Juni 2022
pembersihan kaca area lobby ground
Pembersihan stainless pilar di semua area lobby ground
Penambahan Man power Cleaning Service dan Security
Penambahan 1 orang untuk divisi Engineering
Perubahan kolam luar lobby menjadi taman
Pengecatan plafon ruang meeting kecil lt.8
Sistem tarif parkir inap sementara ke post
Pengadaan penambahan rambu (BM bantu f.u by email)
Perbaikan mesin brushing diperbaiki
Pembuangan puing
Perbaikan kebocoran dinding kaca lt. 8 gedung pada saat hujan (sisi timur)
Cat Bekas Bocoran di Lt.5,6,9
Renovasi pergantian keramik di pintu masuk janitor
Pembuatan/modifikasi sementara pintu cubical toilet menggunakan acryilic
Pengadaan asbak rokok untuk area meja smoking room,sudah order onlie
Pengadaan standing sign untuk signage event baru 1
Pergantian materi sign jalur evakuasi dgn material stainless di setiap lantai (Proses Desain Ulang)
Pengadaan jasa vendor pengangkatan/ pembuangan sampah limbah B3 (Menunggu Penawaran)
Dinding lobby lift rembes B1 (Baru Aquaproof)
Pintu control room cat kusam, lantai depan pintu mengelupas B1
Bekas bocor di dak langit-langit B1
Lantai depan lift barang mengelupas B1 dan B2 (Yg belum di B2)
Bekas bocor di dak langit-langit B1
Perapihan dan pembersihan taman belakang dekat ruang sampah
Box panel cctv terbuka diatas area smoking room
Kanstin rusak depan kantin B1
Bekas bocor di plafon lobby lift B1 (kondensasi AC)
Bekas bocor di dinding lobby lift B2
Bekas bocor di dinding B2 sisi barat
Tutup main hole rusak dan berkarat di B2 / pompa sampit
Lantai depan ruang gudang HK mengelupas
Dinding arah B2 Tergores
Pintu Main hole di B2 berkarat
Pintu ruang tidak ada / belum permanen di B2/dibuat penutup ruangan dari atas agar tidak bau ke B
Tidak ada signage toilet disable di Lt. Ground
Grill Ac depan bank mandiri berkarat di Lt.Ground
Grill Ac depan lobby lift berkarat di Lt.Ground
Perapihan kabel pompa kolam ikan koi di Lt. Ground
Tutup kunci pintu kaca tidak ada di Lt. Ground,B2
Pengecatan Lantai area smoking room sudah memudar di Lt.Ground
Kanopi lobby bocor di Lt.Ground (By Vendor)
Penutup pintu panel berkarat di Rooftop
Plafon sisi barat rembes dan bocor di Lt.10
Perbaikan/peremejaan Hpl Pintu toilet , dinding batik Lt.10, Pintu Gudang
Kebocoran plafon depan ruang pantry di Lt.10
Dinding depan toilet pria belum dicat sempurna di Lt.10
Dinding depan toilet Pria lt.8 Retak
Lampu di Ruang Baby Bu Stephanie lepas lt.8
Saklar koridor tidak berfungsi di lt.8
Signage Ruang Panel tidak ada lt.8
Dinding rembes didepan ruang pantry Toilet lt.6
Plafon koridor rembes lt.6
Dinding retak depan pintu tangga darurat lt.5
Plafon koridor rembes lt.5
Drain dan lantai depan control room kotor di B1
Pengadaan Sign Smoking Area di B1
Sampah/ puing di area samping ram menuju B2
Sampah/ puing di bawah ram mobil di B2
Perapihan area B2
Perapihan sampah/puing samping ram turun arah B2
Bekas air menggenang di lt.b2
BTS (Penguat Sinyal) kotor di Lt. Ground
Tempat sampah berkarat di area smoking di Ground
Drum tempat cuci tangan berkarat
Ruang Sampah dan B3 tidak ada signage
Switch Control gondola rusak bagian maju dan mundur di Rooftop (Switch Control RUSAK)
Kaca retak di ruang penyimpanan barang di Lt.10
Kaca lobby lift retak di Lt.9
Roller Blind di Gudang lt.8 lepas
Perapihan pot dalam ex.kolam agar dibuat centre dan rata
Pengajuan proposal penambahan speed bump pos keluar motor
Perhatikan dalam pemberhentian pos keluar motor dan mobil lebih berhati-hati
Perapihan barang-barang bekas diruang mesin lift
Pengadaan 1 unit AC 1pk untuk ruang mesin lift R410
Kloning sistem bas ac dan pabx CPU di ruang control room/Vendor System Base AC
Pergantian sticker kerucut
Pengajuan Pergantian kontaktor lift di P3 (baru terpasang P1)
Pergantian kran wastafel di lt.10
Pemasangan Sling Wire roof
Persiapan penambahan personil di area parkir belakang
Perapihan Pohon Loa dekat TPS (pemangkasan sebagian)
Perapihan pohon nangka ditebang
Pembersihan Grill Fresh air di tangga darurat
Perapihan alat-alat HK di Janitor
Pembersihan kaca susu area lobby lift B2
Penggantian pintu kaca kantor operasional BM lantai 3A
Pintu musolah b1 dinaikkan posisinya
Penyulaman airis kuning parkir belakang
Penggantian 2 unit selang hydrant UK. 2,5 inch (URGENT),sudah diperbaiki 1
Perbaikan pompa joki
Refill APAR
Sertifikasi 1 personil
Pengetesan Hydrant per 2 bulan
Pembuatan Berita Acara kaca retak smoking area,lt.9,lt.10
Pembersihan Lampu gantung area ballroom
Pembersihan tangga darurat all area
Training class "basic intelegent"
Ceklist kelengkapan alat proteksi kebakaran
Pembersihan kanstin area GF
Pemangkasan Pohon Pepaya
Perapihan karung tanah di taman belakang
Pengecatan ulang smoke detektor, speaker, penguat sinyal area koridor perlantai
Penggantian lantai semen menjadi lantai konblok hitam ex area parkir VIP
Pengadaan pot pohon pucuk merah penutup tangki solar
Perbaikan handle pintu exit sisi selatan
Perbaikan paving konblok bergelombang sampai dengan batas area landscape tengah
Pergantian lampu dinding taman belakang
Pengecatan sebagian dinding koridor antara lift service sampai dengan toilet dengan cat minyak set
Improvement sticker tanda exit yang menyala di dinding bagian bawah Gf
Sign acrylic samping pintu lift service B2-10 (cari desain di internet)
Pengecatan marka parkir, arrow menjadi hitam putih b1,b2 Awal Tahun 2023
Sign tanda panah jalur intake fan dan hexause fan di b1,b2
Pemasangan sticker sandblast di kaca susu lobby lift b2
Ruang Engineering pindah ke bassement 2
Pemindahan atau perapihan CCTV gedung diruang control, custom meja besi
Perbaikan dan perapihan dinding kantin bagian luar
Perubahan ketinggian pijakan untuk ketiang bendera luar gedung depan GF
Pengadaan kartu Visitor
Denah kristalisasi marmer
Denah pembersihan kaca gedung
Pembibitan 7 palem kuning
Proses perbaikan kabel jaringan boomgate
Kesigapan personil yang baru diperbaiki lagi
Pembersihan kolam ikan Lt.GF per- 2 minggu,kuras keseluruhan per 1 bulan
Laporan kekurangan tanah
Perbaikan atau penggantian control board genset yg gagal start
Pengecekan pipa pompa hydrant (kuras gronteng sebelah)
Perbaikan kesigapan team security Secwan lebih ditingkatkan lagi
Tidak mengarahkan tenant/tamu ke lift service
Danru standby diruang control mulai tgl 16 agustus 2022
Pembersihan meja resepsionis yang kusam
Pengecekan dan pembersihan toilet dilobby harus lebih sering
Pembuatan jadwal brushing area all toilet (setiap 1 minggu sekali)
Pemangkasan pohon-pohon besar
Perbaikan pipa pompa air bersih, Safety Valve,dan hydrant di GWT yang sudah karat by Vendor
dibuat ceklist cctv kondisinya baik / rusak
Penamaan CCTV
Persiapan Training MKKG dan Refil Apar yang akan diadakan bulan September 2022
jadwalkan training untuk team per bulan
Perapihan nurseri
Persiapan Training MKKG : Tong, Bensin, Solar / Apar siapkan 10
Event Wedding tgl 18,24,25 September
Kunci Ruang B3 dari Hiber dikasih ke Sec. untuk menaruh APAR
Perapihan / pengecatan dinding ground mulai lift service - belakang
Perbaikan keramik lepas di lt.10
Perbaikan marmer retak depan lift GF
Spanduk kantin B1 diganti / dilepas
Tutup Tombol lift yg sudah tidak digunakan kecuali lt.10 (By Vendor)
Perbaikan Pompa diesel Alcon
jadwalkan kristalisasi marmer di lift min.1 bulan sekali
Pemangkasan pucuk merah
Perapihan rumput
Pergantian sticker kerucut di B2
Istilah Security dalam bahasa inggris dibuatkan list
Skenario Latihan Tanggap Darurat By HT
Perbaikan mcfa
Perbaikan Emergency Call Lift P2
Pengajuan Pengadaan PCB AC lt. 3A dan 3
Penarikan APAR Di Bank Mandiri Lt.G
Pergantian Lampu Lobby GF
Buffing lantai marmer lift
Buffing lantai marmer lobby lt.8
Pemasangan vertical garden
Pergantian Lampu yang mati di ballroom lt.10,lampu koridor 24 jam, all lantai
Pengecatan Baja Lift lt 2-B2 untuk rencana kerja tahun 2023
Perbaikan AC ruang lift
Brushing marmer lt.8 setiap hari jumat per-2 mnggu sekali
Penjadwalan pembersihan baja lift minimal per 6 bulan
Perawatan rumput,tanaman baru dan vertikal garden
Glass Cleaning Kaca Lobby Lift Pessanger
Buang karpet yang dimusolah
Pembersihan area kaca susu dalam lift
Perubahan titik CCTV genset ke arah pintu keluar
Kontrol Mop
Resepsionis keramahan dan greeting ditingkatkan lagi
Kerapihan seragam Landscape diperhatikan
Cctv parkir motor mati 1
Praktek Pemakaian Baju Api
Perapihan plafon Regus
Perapihan Plafon bekas rembesan koridor depan lift Pesangger 3A-7
Pengetesan Head Sprinkler di koridor toilet lt.10 & samapta
Training tanggap darurat
Perapihan janitor lebih diperhatikan
Pengadaan trolley cleaning service
Pembersihan Glass Cleaning kaca dalam unit Tenan Per-6bulan
Pembersihan kaca luar gedung lt.5-6
Perapihan/Kontrol Nurseri
Grooming SPI diperhatikan
Grooming Cleaning Service diperhatikan
Penggantian 1 Unit DVR CCTV yang sering eror
Pembersihan sisa bekas air di urinal
Pembersihan Pipa, Exhaus Pan di basement
Perbaikan ACP Batik yang lepas By Vendor
Perbaikan Kebocoran dinding Ballroom BY Vendor
Penambahan lampu di musolah B1
Cari vendor CCTV online
Perbaikan hydrant pilar
Pembelian plank hydrant 4inch dan 6inch
Penyedotan Limbah STP per6bulan(Reminder)
Training Parkir Mobil
Surat penjadwalan GC Kaca dalam unit tenan mulai minggu tgl 9 januari 2023 mulai dari kantin b1
Pembersihan Detail lantai toilet perlantai
Peremajaan perawatan pengecatan, tambah lampu di dalam musolah
Pemasangan pot melati air
Pengadaan kartu VIP parkir
Training SAMAPTA materi MKKG
Persiapan event donor darah Mei atau Juni
Persiapan Event 17 Agustus 2023
Training Main Power Per- 2 Minggu
Pembaruan Seragam, Pembaruan Cutting Sticker,Pengadaan rambu Disable
Pengutamaan Penebangan Pohon besar kantin belakang
Pembuatan Resapan dekat kolam
Memaksimalkan Vertical Garden
Training Evakuasi Lift saat Lift Eror
Pengadaan UPS untuk tangga darurat sisi utara & selatan
Pengecatan Koridor All Lantai
Pengecatan akustik tiap koridor all lantai
Training SAMAPTA materi HYDRANT
Perapihan atau Pembersihan taman belakang
Penjadwalan Perawatan Pembersihan komputer,server minimal 1 tahun
Rencana jadwal pekerjaan 1 bulan kedepan, Persentasi Pekerjaan Bulan sebelumnya
02 September 2023

PROGRESS PIC CLOSED INSPEKSI BOD


done ENG 01 Mei 2022
done ENG 16 Mei 2022
done HK 30 Mei 2022 ü
done ENG 07 Juli 2022
done ENG 25 Juli 2022 ü
done ENG 12 Juni 2022
done ENG 10 Juni 2022 ü
done ENG 27 Juni 2022 ü
tgl 7/7/22 sudah diprioritaskan Qs ENG ü
done ENG 19 Juni 2022 ü
done ENG 15 Desember 2022 ü
done ENG 01 Juni 2022 ü
done ENG 12 Desember 2022 ü
60%, target ENG ü
target ENG ü
done ENG 17 Juni 2022 ü
done ENG 24 Juli 2022 ü
done ENG 13 Juli 2022 ü
done ENG 14 Mei 2022 ü
done ENG 28 Juni 2022 ü
done ENG 10 Juni 2022 ü
done HK 25 Juli 2022 ü
done SEC 25 Juni 2022
Done HK 02 Oktober 2022
DONE HK 13 November 2022
done, per 1 juli 2022 BM 01 Juli 2022
done BM 10 Agustus 2022
done BM 01 Juli 2022 ü
done ENG 23 Juni 2022
done Park 14 September 2022
done Park 30 Juli 2022
done HK 03 Juni 2022
done LND 12 Juni 2022 ü
done ENG 30 Juni 2022
done ENG 09 Juni 2022
done, ditinjau kembali ENG 12 Juni 2022 ü
hold ENG
done BM 21 Juni 2022 ü
done BM 17 Juni 2022
target BM
target BM
done ENG 25 Juni 2022
Per tgl 27/6/22 sudah po pengajuan m ENG
done ENG 14 Juni 2022
done ENG 12 Juni 2022
done ENG 14 Juni 2022
done LND 25 Juli 2022
done ENG 21 Juni 2022
done ENG 24 Juni 2022
done ENG 25 Juni 2022
done ENG 25 Juli 2022
done ENG 24 Juli 2022
done ENG 26 Juli 2022
done ENG 29 Juli 2022
done ENG 24 Juni 2022
done ENG 26 Juli 2022
target ENG
target ENG
Done ENG 21 Juni 2022
Done ENG 21 Juni 2022
Done ENG 23 Juni 2022
done ENG 18 November 2022
DONE ENG 25 Desember 2022
done 90% ENG
done ENG 23 Juni 2022
Proses 70%,target ENG
target ENG ü
done ENG 24 Oktober 2022
Done ENG 22 Juni 2022
done ENG 23 Juni 2022
done ENG 23 Juni 2022
Done ENG 23 Juli 2022
done ENG 28 Juli 2022
done ENG 26 Juni 2022
done ENG 05 Juli 2022
done ENG 02 Juli 2022
done ENG 02 Juli 2022
done HK 18 Juni 2022
done BM 01 Agustus 2022
done HK 25 Juli 2022
done HK 05 Juli 2022
done HK 16 Juni 2022
done HK 05 Juli 2022
done HK 21 Juni 2022
done HK 17 Juni 2022
done HK 23 Juni 2022 ü
done ENG 24 Juni 2022
target BM
Done ENG 23 Juni 2022
hold ENG
DONE ENG 28 Oktober 2022
done ENG 23 Juni 2022
done LND 19 Juni 2022
done Park 15 Agustus 2022
done (reminder) SEC 20 Juni 2022
done ENG 24 Juni 2022
done ENG 08 Juli 2022
target ENG
done Park 19 Agustus 2022
done ENG 02 September 2022
done ENG 09 September 2022
done ENG 16 Agustus 2022
done SEC 01 Juli 2022
DONE LND 27 September 2022
done LND 30 Juni 2022
done HK 23 Juni 2022
done HK 21 Juni 2022
done HK 02 Juli 2022
done ENG 01 Oktober 2022
done ENG 29 Juni 2022
done LND 30 Juni 2022
Progress 50% ENG
done ENG 15 Juli 2022
done BM 01 Oktober 2022
done SEC 14 September 2022
DONE SEC 25 Desember 2022
Done SEC 29 Agustus 2022
done HK 25 Juli 2022
daily activity HK 25 Juli 2022
done SEC 23 Juli 2022
done SEC 25 Juli 2022
done HK 25 Juli 2022
done LND 25 Juli 2022
done LND 25 Juli 2022
Lt.G done,Dilanjut lantai berikutnya ENG
done ENG 12 Oktober 2022
hold BM
done ENG 20 Juli 2022
target ENG
target ENG
target ENG
target ENG
target ENG
target ENG
done ENG 23 Oktober 2022
hold ENG
done ENG 05 Agustus 2022
target ENG
done ENG 13 Juli 2022
done LND 05 Agustus 2022 ü
done BM 05 Januari 2023
done, mulai lagi tgl 05 okt 2022 HK 20 September 2022
done HK 02 Oktober 2022
DONE LND 20 September 2022
DONE Park 02 November 2022
target SEC 20 September 2022
done HK 10 September 2022
DONE LND 24 Oktober 2022
done ENG 19-Aug
done ENG 6-Sep
target SEC 9/20/2022
done SEC 24-Aug
done SEC 24-Aug
done HK 12/25/2022
DONE HK 12/7/2022
DONE HK 12/7/2022
DONE,Sisa Pohon besar di Lobby LND 12/1/2022
target ENG
done,ada dilaporan bulanan septemb SEC 12/6/2022
done ENG 2-Sep
9/14/2022 SEC 9/14/2022
done HK 9/19/2022
DONE LND 9/20/2022
done SEC 9/14/2022
Mengetahui : All Dept all dept 10/1/2022
done SEC 9/12/2022
done ENG 10/4/2022
done ENG 9/18/2022
target ENG
done SEC 9/16/2022
target ENG
done SEC 9/27/2022
done HK 9/27/2022
done LND 9/12/2022
DONE LND 9/27/2022
done Park 9/6/2022
Done SEC 9/26/2022
DONE SEC 9/26/2022
DONE Eng 11/7/2022
target ENG
DONE ENG 11/20/2022
done SEC 9/20/2022
done ENG 1/12/2023
DONE HK 9/22/2022
DONE HK 9/24/2022
done BM 10/5/2022
done ENG 2/8/2023
sedang berjalan ENG
done ENG 10/24/2022
done HK 10/24/2022
90% HK
done LND 1/5/2023
done HK 10/24/2022
done HK 10/25/2022
done HK 11/1/2022
target ENG
DONE HK 12/7/2022
DONE SEC 12/7/2022
DONE LND 12/7/2022
done ENG 12/6/2022
target 1 minute, waktu tercepat ba SEC
60% berjalan ENG
lt 6 done,target ENG
done ENG/SEC 12/25/2022
done SEC 12/25/2022
DONE HK 12/7/2022
target 2023 HK
done HK 2/1/2023
DONE HK 12/7/2022
done LND 2/8/2023
Done Park 12/7/2022
DONE HK 12/7/2022
target, sudah PO ENG
target HK
done,pekerjaan perbulan HK 2/1/2023
Target, sudah PO ENG
target ENG
DONE ENG 12/26/2022
target ENG
done ENG 1/5/2023
target ENG
done ENG 1/5/2023
done SEC
done admin BM 1/9/2023
target HK
done ENG 1/30/2023
done LND 2/8/2023
done Park 1/10/2023
done SEC 1/28/2023
target BM
target all dept
done HK 2/8/2023
target Park
target LND
target LND
50%,target LND
target ENG
target ENG
lt 9 selesai, lanjut lantai lain ENG
target ENG
target 18 Februari 2023 SEC
target LND
target Park
target all dept
TE TS COL
No Item Pekerjaan Target Sel
Jan Feb Mar Apr
1 Pergantian Safety Valve, Pipa Hisap air bersih dan Hydrant
2 Pergantian MCCB 1600Amp (AC) V
3 Perubahan Marka Parkir
4 Penambahan Atap STP
5 Training Evakuasi Lift
6 Perbaikan kebocoran dinding Ballroom
7 Pengecatan Façade Gedung, Basement
8 Pengecatan all koridor dari B2-10
9 Treatment oli travo, preventive panel
10 Preventive Genset Tahunan
11 Penggantian Seling Gondola
12 Penggantian Seling Lift Service
13 Perbaikan ACB Genset
14 Training Pengoperasian Genset / Bagian Kelistrikan
15 Waterproofing Atap Genset dan Rooftop
16 Injeksi Lantai dan dinding B1 & B2
17 Perbaikan Lantai Paving Blok Area Belakang
18 Perbaikan HPL pintu toilet All Lantai,ballroom
19 Antisipasi backup PDAM (Filter deepwell / sumur bor jetpump)
20 Perubahan Sign Evakuasi
21 Pergantian Kaca
Target Selesai Deskripsi Realisasi
Mei Jun Jul Agst Sept Okt Nov Des
v
Sudah selesai