Professional Documents
Culture Documents
Temple Estimate With Fountain
Temple Estimate With Fountain
DETAILED ESTIMATE
DETAILED ESTIMATE OF DEVELOPMENT AND BEAUTIFICATION
AND NEW CONSTRUCTION OF TEMPLE AT CHHAPI DAM
1 NII-2.6
Earthwork in excavation by mechanical
means ( Hydraulic excavator ) /manual
means in over areas foundation trenches
or drains (not exceeding 1.5 m width or 10
sqm on plan ) incl dressing of side
151 cum
2.6.1 all kind of soil
(1) for footings of lower columns 2 2 1.5 1.5 2 18
(2) for footings of the column situated between
stair 2 2 1.5 1.5 1.5 13.5
for retaining wall for extended portion below
stairs 1 1 24.4 1 1 24.4
total 55.9 8440.9
3 II-4.1.6
Providing and laying in position cement
concrete of specific grade excluding the
cost of centring and shuttering - All work
up to plinth level
4.1.6Cement concrete grade M-10 (Nominal
Mix) with 40 mm maximum 4112 cum
pcc in footings (all) 1 8 1.3 1.3 0.1 1.352 5559.424
4 NII-5.1.1
Providing and laying in position specified
grade of reinforced cement concrete (with
20mm nominal size graded stone
aggregate) excluding the cost of centering
, shuttering, finishing and reinforcement
all work up to plinth level.
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
5 NII-5.2
Reinforced cement concrete work in walls
(any thickness),including attached
pilasters, buttresses, plinth and string
courses, fillets,columns, pillars, piers,
abutments, posts and struts etc. up to
floor two level excluding cost of
centering, shuttering, finishing and
reinforcement
7 NII-5.11.2
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
8 NII-19.1
Centring and shuttering including
strutting propping etc and removal of
form work
19.1.1 Foundations, footings, bases of columns,
etc. For mass concrete. 160 sqm
Pcc portion 4 8 1.3 0.1 4.16
square portion 4 8 1 0.2 6.4
trapozoidal portion 4 8 0.262 8.384
total 18.944 3031.04
19.1.6 Columns, Pillars, Piers, Abutments, Posts
and Struts. 362 sqm
columns
(i) lower columns
4 4 0.4 4.2 26.88
(ii) column on stair portion 2 4 0.4 1.9 6.08
beams
sides 2 1 39.86 0.4 31.888
bottom 1 1 39.86 0.4 15.944
side portions (side faces) 1 6 0.4 0.4 0.96
total 81.752 29594.224
10 NII-6.14.1
Brick work with fly ash lime bricks (FALG
Bricks) conforming to IS:12894- 2002,
class designation 100 (average
compressive strength) in
superstructure above plinth level up to
floor 2 level including the cost of
scaffolding :
4789 CUM
temple base above slab 1 1 6.19 0.3 0.6 1.1142 5335.9038
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
Garden portion
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
9700 each
total 5 48500
14622 each
19.10.8 250W
total 10 146220
total 13 4758
DETAILED ESTIMATE...
DIMENSION CONSULTANCY BHOPAL
1 FOUNTAIN
DESCRIPTION OF FOUNTAIN WORK
(a) CIVIL WORKS
i EARTH WORK 2.6.1 1 20 151 CUM 3020
ii SAND FILLING 2.18.2 1 3.5 687 CUM 2404.5
iii PCC 4.1.4 1 2.5 4219 CUM 10547.5
iv RCC 5.1.1 1 7 5435 CUM 38045
v STEEL 5.11.4 1 160 58 KG 9280
vi BRICKWORK 6.9 1 4 4115 CUM 16460
i (INCLUDING DI PIPES,
VALVES,SPRINKLER,NOZZELS,WATER
SEALS,ETC.) LUMP SUM 1 50000 lump sum 50000
DETAILED ESTIMATE...