2 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 3
FOREWORD
The unprecedented crisis created by the COVID-19 While the presence of data centers is primarily
outbreak has propelled the data center business in the major metropolitan locations as of now,
providing an unexpected tailwind. Technology soon tier II & III cities will emerge and offer quality
adoption and digitization across the sectors were supply for this new-age asset class.
fast-tracked globally and India also leap-frogged at
least a decade in the past couple of years. The current building- The total stock across As manufacturing and warehousing spread out
The lockdown and subsequent restrictions threw ready DC inventory the country, which is across the country to deliver and service demand
from the non-metro market, data centers in the
life and business out of gear. However, this very
black swan event became a massive catalyst for across top 7 cities is ~668 third-party operated, future are more likely to make their way to such
locations.
digital adoption across the country.
MW with 65% occupancy currently admeasures Our survey of IT-ITeS professionals across the
The government’s initiative and drive towards a
digital economy was accelerated further as all will be insufficient for ~11 Mn sf. country reveals that improvement in operational
efficiency is the topmost priority. The specialized
aspects of daily life from banking, education, and
shopping were forced to switch and adapt to the the projected scale soon. operators in this domain are likely to rule the
market as most companies are comfortable paying
digital ecosystem. This had led to increased use of
data consumption and internet bandwidth across the future planned a premium for the efficiency in services and eased
operations.
the country, driven by the ever-expanding reach of
social media, increased use of smart devices, data The industry is cognizant addition is likely to be Our latest publication on the preparedness for
localization, increased adoption of cloud services,
and digital transformation journeys of several of the demand and the ~13 Mn sf between 2022 the future of data centers reveals many more
interesting and lesser-known details on this
Indian companies.
new capacity addition and 2025. sunshine sector.
CONTENTS
01 02 03 04 05 06
Data explosion Data sovereignty: 360 walk-around
0
DC trends: The way forward: Binswanger
vs data center A growing world the India DC industry Industry survey 2022 A sunshine sector ANAROCK
explosion phenomenon DC solutions
06 12 16 32 48 52
6 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 7
CHAPTER 1
Data Explosion vs
Data Center Explosion
8 BINSWANGER ANAROCK Under
Underthe
theLens:
Lens:India’s
India’s Data
Data Center
Center Explosion
Explosion 9
32,397 PB1
Navigating the
India Data Centre Lifecycle
TRENDS & PERSPECTIVES
In our report titled ‘Navigating the India Data Center Lifecycle’ Total data consumption (Q2 2021)
released in November 2020, we brought about the compelling
proposition of India data story that warranted a substantial
capacity growth in data center infrastructure in India.
17 gb2
Data consumption/user/month (2022)
50 gb3
Average traffic/month/smartphone (2027E)
Since then, we have witnessed multiple announcements of land acquisitions and investment commitments
by data center operators. The growing question that is now becoming more pertinent in industry circles is
whether the magnitude of data center explosion is more or less than that of estimated data explosion itself.
In this report, we have attempted to analyze the industry dynamics and growth standpoint from a 360o
perspective, scanning the industry for its fundamentals.
Social media users (2020) 518 Mn 3,600 Mn 927 Mn 603 Mn 223 Mn 14%
Mobile subscriptions (2021) 1,150 Mn 8,140 Mn 1,630 Mn 1,070 Mn 364 Mn 14%
Total mobile data traffic (2021) 113 EB4 780 EB 240 EB 106 EB 59 EB 15%
Total mobile data traffic (2027E) 588 EB 3,456 EB 888 EB 384 EB 240 EB 17%
It is evident that there is phenomenal volume Creating and sustaining adequate supply
of data expected to be generated in India when infrastructure is core to India’s digital
compared to global benchmarks, which will need program.
storage capacity in India.
Hyperscalers & DC operators alike have taken
This is in addition to all the historic data that will note of India’s strategic importance in the
need to be migrated from offshore data centers data story and thereby intensified focus on
to India, to ensure compliance with India’s data augmenting DC supply infrastructure.
localization law once enacted.
CHAPTER 2
Data SOVEREIGNTY:
A GROWING WORLD
PHENOMENON
14 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 15
Data Sovereignty -
A growing world phenomenon 71% of all countries in the world have some
form of data protection laws in force currently.
India ranked third in the world in data breaches in However, in August 2022, the Government
2021. The data protection and privacy regulations decided to withdraw the Data Protection Bill, 2021
in India, which is critical to ensure adequate data altogether and formulate a new privacy law from
protection mechanisms, has been in draft stage for the scratch, keeping in mind India’s digital eco-
the last 5 years with multiple deliberations. system.
In December 2021, the Joint Parliamentary With businesses growing online rapidly, data
Committee presented its report on The Personal protection has been a matter of sovereign
Data Protection Bill, 2019. This came in after importance across nations. More and more
over two years of deliberation. Under their countries are looking at mechanisms and laws to
recommendation, the draft law was renamed as protect data privacy.
Data Protection Bill, 2021 basing on its expanded
reach of personal as well as non-personal data. The comparison (below) is useful to understand
Further, the Committee had recommended a the extent of India’s protection laws vis-à-vis global
period of 24 months for implementation of the yardsticks.
provisions of the Act post enactment.
Privacy Law Data Protection Bill, Personal Information California Consumer General Data Protection Data Protection Act
2021 Protection Law (PIPL) Privacy Act (CCPA) Regulation (GDPR) (DPA)
Date of Enactment Withdrawn 1st Nov 2021 1st Jan 2020 25th May 2018 1st Sep 2015
Timeline Threshold All data in possession Law silent for data All data in possession, but All data in possession Only data collected after date
for Applicability (before & after collected prior to applicable only to data (before or after of enactment
enactment) enactment breaches post enactment enactment)
Personal Data Storage Local storage Local storage No restriction Local storage Local storage
Processing Local processing Can be conditionally No restriction Processing in ‘adequate’8 Can be conditionally processed
processed outside 3rd country permitted outside Russia; critical data can
China but with conditions only be processed locally
Cross Border Transfer Permitted Permitted No restriction Transfers to ‘adequate’ Permitted conditionally; critical
conditionally conditionally 3rd country permitted data cannot be transferred
but with conditions
Non-personal Data Governed - requires Not governed Not governed Not governed Not governed
local storage
7 USA does not have a federal law on data privacy 8 Countries that have adequate data privacy regulations like GDPR
Currently, California, Utah, Colorado & Virginia are the only states with data privacy laws
Further, these regulations are more on the lines of data privacy and protection rather than data sovereignty or residency
16 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 17
CHAPTER 3
360 walk-arounD
0
360o walk-around
the India Data center industry
Data Center Supply India currently has 138 third-party colocation data Future planned supply capacity includes capacities
centers operated amongst 52 players. on land that is procured and the entire project
India is on the cusp of a data center evolution. From a small, fragmented industry, colocation 72% of this capacity is concentrated amongst or specific phases of the project is either under
data centers are transitioning into a large, potentially consolidated industry over the next 5 5 players, while 90% of the total capacity is planning or under approvals or under construction.
years. concentrated amongst 9 DC operators.
India
138
No. of DCs (3rd party operated)
45
No. of DCs (3rd party operated)
183
No. of DCs (3rd party operated)
~11 Mn sf
Total area
~13 Mn sf
Total area
~24 Mn sf
Total area
~80,000 sf
Average area/facility
~282,000 sf
Average area/facility
~130,000 sf
Average area/facility
737+ MW9
Total IT capacity
1,015 MW10
Total IT capacity
1,752 MW
Total IT capacity
5 MW
Average IT power/facility
23 MW
Average IT power/facility
10 MW
Average IT power/facility
9 Capacity where building is ready irrespective of whether power has been brought in
10 Includes third-party operated facilities; excludes owned facilities announced by hyperscalers
20 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 21
13% Bengaluru
11% 12% Bengaluru
11%
By Area
(Mn sf) 10% Chennai
15% By IT Power
(MW) 9% Chennai
14%
7% Hyderabad
7% 7% Hyderabad
7%
1% Kolkata
1% 1% Kolkata
1%
49% Mumbai
50% 48% Mumbai
50%
7% Noida
9% 7% Noida
9%
6% Pune
4% Current Capacity
6% Pune
4% Current Capacity
7% Others
4% (As of Mar 2022)
Future Capacity
(As of Dec 2025E)
9% Others
4% (As of Mar 2022)
Future Capacity
(As of Dec 2025E)
The above future planned supply excludes over 120 MW (IT Capacity) of facilities announced by two large Also noteworthy is that 76% of all the future planned supply will be concentrated in just 6 specific
hyperscalers in Hyderabad on an ‘Own & Operate’ model. We are already witnessing a domino effect of micro-markets across the country, with Thane-Belapur Road in Navi Mumbai gaining maximum share.
these announcements, with an increased interest for Hyderabad amongst data center operators, specifically
around the micro-markets where the hyperscaler data centers are upcoming. This could potentially create
more third-party colocation supply in Hyderabad in coming months.
By IT Power
(MW)
2,688 MW
Total unplanned IT capacity
India
Mumbai Kolkata
Hyderabad
78%
of the total unplanned IT capacity
Pune Bengaluru
ANAROCK Capital Research & Industry Sources Map not to scale, for reference purpose only Future Unplanned Capacity (As of Dec 2025E)
By IT Power (MW)
24 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 25
- Hyperscale where they have been either contracted to or intended to be contracted to hyperscalers
- Wholesale colocation refers to facilities where operators have a minimum capacity threshold for sale
- Retail colocation have no such thresholds
The figure below represents building ready supply. Also, the classification is of supply and should not be
confused with actual demand. The split represents flexibility or lack thereof by DC operators to sell capacity
in lesser volumes. It is possible that some of the space classified as wholesale or retail colocation could be
The expected supply over the next 4 contracted to hyperscalers.
years is expected to be double the
capacity delivered during the last two
decades, signifying a ramped up pace
By IT Power in growth of supply.
(MW)
INNER DONUT OUTER DONUT
Current Future Planned
IT Supply (MW) IT Supply (MW)
25
%
25
%
By IT Power
(MW)
21%
75%11
3%
18%
13%
29%
17%
Hyperscale
7%
7%
54%12
Wholesale Colocation
DC Demand
Of the current data center supply, occupancy on This estimate excludes demand from hyperscalers
a pan-India level, stands at 68%. This is based on that could be developed under an ‘Own &
building ready supply, irrespective of whether
power has been brought in. Of the total current
occupancy, 39% of all contracted capacity has
Operate’ model. The mix between hyperscalers &
enterprises is expected to be 35:65. Mumbai
Highest DC demand
been sold to hyperscalers and 61% to enterprises. However, if we add the aggregate demand for & planned supply
Of the future planned supply, 22% has already been DC space of hyperscalers i.e. including proposed
contracted. capacities under ‘Own & Operate’ model, the mix by FY25E
is likely to be 50:50.
Going forward, hyperscalers are expected to
follow a hybrid strategy with a mix of ‘Own Considering the planned future supply, the data Mumbai
& Operate’ and colocation data centers. Of center colocation industry could potentially have
enterprises, Banking, Payment Services, other a supply shortfall of ~800 MW. The scenario
Financial Services, Cloud & Technology industries can, however, change significantly in case the
are expected to be the largest off-takers of DC unplanned supply is released in the market without
space in the next 4 years.
s
due consideration for demand or on a speculative
ie
C
it
he
basis.
nn
er
Based on an analysis of hyperscaler and enterprise
ai
th
demand over the past, demand estimates for the An indicative snapshot of the data center market
O
future and overall industry size, we estimate an in India from a future stock and occupancy
aggregate future demand for colocation data perspective as of FY25 is depicted here:
center space to be ~2,100 MW of IT Capacity over
the next 3-4 years.
Hyderabad
Mar 2022 DC colocation occupancy Hyperscalers Enterprises
Pune
As of
Dec 2025E
~2,100 MW
Future demand colocation DC
50% 50%
Hyperscalers Enterprises
By IT Power
(MW)
ta
en
ka
ga
l
Ko
lu
ru
Total Demand Noida
Hyperscale
FY25E
Total Planned Supply
Enterprises
FY25E ANAROCK Capital Research & Industry Sources
28 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 29
29%
33%
25% 24%
21% 20% 21% 21%
1,011
1,107
1,217
385
527
641
798
849
2014 2015 2016 2017 2018 2019 2020 2021
Pre-COVID
13 We have taken lowest of the given traded REIT EV/EBITDA Multiple As of date (Based on public sources) Revenue EBITDA Margin
multiples to discount for market maturity QTS Realty ~29.7x Date of acquisition (Jun 2021) (USD Mn) (%)
and other factors: Coresite ~27.0x Date of acquisition (Non 2021)
CyrusOne ~25.5x Date of acquisition (Nov 2021)
Equinix ~24.5x Year-end (31st Dec 2021)
Digital Realty ~14.2x Year-end (31st Dec 2021)
30 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 31
USD 235 MN
Pre-COVID (2019)
USD 1,100 MN
Pre-COVID (2019)
USD 515 MN
(2021)
USD 1,970 MN
(2021)
The heightened traction in the DC industry is The net fixed assets of the DC industry was
evidenced by increase in cash invested in business merely USD 101 Mn (2010). This increased by a
on an annual basis. billion dollars to USD 1.1 Bn (2019), and another
USD 870 Mn in just 2 years i.e. USD 1.97 Bn (2021).
The deployments have more than doubled from
USD 235 Mn (2019) to USD 515 Mn (2021). This is an accelerated rate of 34% CAGR over the
last 2 years (as compared to 30% per annum over
Another noteworthy phenomenon is the increase in 2010-19).
fixed assets.
144
1,099
1,649
1,969
375
187
605
232
751
371
930
235
525
515
2015 2016 2017 2018 2019 2020 2021
Pre-COVID
CHAPTER 4
DC TRENDS:
INDUSTRY SURVEY 2022
34 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 35
1,001-5,000
trends in Indian DC industry as perceived by
relevant professionals who manage data related 4% Steel (1%) 501-1,000
infrastructure within their organizations. 8% Electronics & FMCD (1%)
Gems & Jewellery (1%) 201-500
The survey was targeted at ‘data managers’ from
Biotechnology (1%)
diverse industries and company sizes: 0-200
Infrastructure (1%)
166
Media (1%)
13% Metals & Mining (1%)
Respondents consisiting of Oil & Gas (1%)
-
-
-
Chief Information Officers (CIOs)
Chief Information Security Officers (CISOs)
Chief Technology Officers (CTOs)
166
Respondents
48% 10%
Automobile
- Head – Information Technology (IT)
19%
Healthcare
27%
27% 2%
FMCG
4%
Chemicals
OUTER DONUT
9%
Pharma
By industry/sector
16%
Retail & E-commerce
10%
BFSI
36 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 37
01
Which type of hosting services do you feel is more well-roundedand suits
02
Select services that you have been or will be open to outsourcing
your organization’s growth trajectory better? to third-party service providers?
On-premise
Captive DC
23% Server
Colocation
29%
13% 30%
Infrastructure
Off-premise
Assessment
Captive DC
& Design
Colocation DC
16% IT-Infrastructure
Monitoring
37%
19% 29%
Operation
Cloud
Management for
Computing
IT-Infrastructure
30% 18%
End-user
Hybrid Computing
Services
Regular Audit
& Compliance
18% Note: Respondents were allowed
to select multiple options
29%
preferred option for data managers. This is
specifically applicable for data that is expected
to be on edge going forward e.g. floor systems
maintained by manufacturing and B2C companies. of all respondents also are open to evaluating
third-party facilities for server colocation
38 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 39
03
What should be the topmost priority right now for you / DC industry,
04
If you are already in a colocation facility, or would have to consider one in
from the point of view of DC performance? future, how important is each of the below selection criteria on a scale of
1 to 5? (1 = most important)
4.15
4.01
4.01
3.96
3.96
3.94
3.92
3.92
3.87
3.93
9%
Improve Bring in Cost Improve or Innovation in Aim for Develop Optimize Strengthen Implement Operator Scalability Physical Redundancy No. of Location Pricing Sustainability Availability Effective
Operational Savings & Upgrade Data & Infra Sustainable IT Team Hybrid Privacy & Edge Credibility Security & Uptime Networks of Facility of skilled Power
Efficiency Optimization Infra & Tech Technology & Net Zero Capabilities Cloud Compliance Computing & Previous Carriers manpower Usage
Performance Infra Track Record Availability
05
Colocation is better than Captive DCs
06
Has the pandemic situation increased data generation at your company and
accentuated need for data storage through cloud or DCs?
33%
of the respondents are neutral between 72%
maintaining a captive DC & third-party colocation of the organizations have witnessed a data surge
facility post COVID-19
58%
A majority repondents find it more advantageous
This has clearly increased the focus on cloud and
data centers making enterprise architectures a key
area of focus.
to be colocated in a third-party facility
42 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 43
07
In the next two years, what percentage of your DC energy consumption do
08
There is a challenge identifying, recruiting, retaining and upskilling quality
you envision being powered by green power? talent in implementation / maintenance /management of IT infrastructure
64%
In general, there is a shortage of quality talent for
management and operation of IT-infrastructure.
of the respondents intend to have >60% of their
DC power consumption met through clean and
green sources 67%
of the respondents find it challenging to recruit
This is an encouraging sign showing increased and retain quality talent in this space, signifying
focus to improve carbon footprint of data centers. need for training and upskilling
44 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 45
09
What areas of technology improvements do you track closely vis-à-vis your
10
Data centers have been classified as ‘infrastructure’ in Union Budget 2022.
organization’s digital infrastructure strategy? Provide a rank for each What, in your view, are the top 2 most important government support /
(1 = most important) initiatives required to improve this essential infrastructure in India?
3.91
3.90
3.89
3.87
3.86
3.85
17%
Enhanced tax deductions for capex
incurred on DC infrastructure upgrades
and enhancements
7%
Data Improve the Improve Edge Energy Cooling Reaching
Special incentives for export of services
Compression Power Usage Resilience to Computing Storage Systems Net Zero
to make India a regional data hub
Effectiveness Changing Weather Capabilities Carbon
(PUE) Conditions Emissions
10 DC Trends: SUMMARY
166
IT professionals
credibility, track regulations and
are to bring in
record and future creating of large
Respondents (IT professionals) operational
scalability top DC parks - key
consisting of (CIOs, CISOs, efficiencies and
criteria in DC Government
CTOs & Head – IT) across cost savings to
selection support envisaged
different industries in India their data centers
by the DC industry
37%
voted for IT- 58%
Data compression
and enhancing
power usage
infrastructure of IT professionals
effectiveness -
assessment, feel colocation
top technology
monitoring and is better than
improvements
operations for captive DCs
sought
outsourcing
30%
of companies
72% 67%
of IT professionals
of IT professionals
looking at hybrid find it challenging
have witnessed
(cloud + data to recruit and
data surge in their
center) hosting retain quality
organizations post
services for data talent in the IT
COVID-19
management domain
64%
of organizations
are looking to
power their DCs
by more than 60%
clean power in the
next 2 years
48 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 49
CHAPTER 5
CHAPTER 6
BINSWANGER ANAROCK
DC SOLUTIONS
54 BINSWANGER ANAROCK Under the Lens: India’s Data Center Explosion 55
BINSWANGER
ANAROCK:
DC SOLUTIONS 1. Colocation & Migration Services
We help hyperscale & enterprise clients identify
2. Land Advisory
We help clients identify the right land parcel(s)
3. DC Audit
We offer comprehensive DC audits, assessments
the right server colocation options (or migrate for building captive data center facilities. We and certifications. Our audit and assessment
from current) at third-party data center facilities. also assist in strategic partnership with a data cover all aspects of DC. This includes Power and
Colocations that are successful are based on center operator for development, operation and Electrical, Cooling and Mechanical, Civil and
thorough evaluations and analysis of key metrics management of such captive facilities. Architecture, Safety and Security, IT and Telecom
such as the redundancy, rack space real estate and and all other feasible criteria across the DC eco-
proximity. Land decisions depend on multiple criteria viz. system.
micro-market dynamics, power proximity, fiber
We help identify distinct factors in each data mapping for a location, susceptibility to natural
center & benchmark its essentials of redundancy, disasters, soil and air quality, etc.
efficiency & security. We understand client’s
needs and business goals to assist and advice on Our real estate expertise and location advisory
the best suitable DC solutions. We handhold our services allows enterprises to identify and shortlist
clients in supplier identification, total cost analysis, the right land parcels with adequate information to
proposal management, service provider contract make informed decisions.
negotiation. The goal is to assist our clients
through the entire DC lifecycle.
AUTHOR
Devi Shankar
President – Industrial & Logistics | Data Centers
ANAROCK Capital
CONTRIBUTORS
FOLLOW US ON FOLLOW US ON
Disclaimer: All information in this report is provided solely for internal circulation and reference purposes. BINSWANGER & ANAROCK makes no statement, representation, warranty
or guarantee as to the accuracy, reliability or timeliness of the information provided. No part of this report may be reproduced, distributed, or transmitted in any form or by any
means, including photocopying, recording, or other electronic or mechanical methods without the expressed written consent of the organisation.