Instrument earthing system shall consist of the following earth type:

·         Electrical earthing (also called dirty earthing or Protective Earthing (PE)) Popular Posts

·         Instrument earthing (also called Reference Earth (RE)) Thermowell Insertion and Immersion
Length
·         Intrinsically safe earthing There are two different terminologies
for thermowell, one is insertion length,
and another one is immersion length.
Thermowell insertion...
  Earthing System of Instrument
Equipment
1.       Electrical earthing is used to protect the power system, electrical equipment, and personnel from Instrument earthing system shall
electric shock. consist of the following earth type: ·
         Electrical earthing (also called
 How to do an electrical earthing? dirty earthing or Pr...

·         Armor of field instrument cable shall be terminated at cable gland. The Difference Between API and ASME
Pressure Safety Valve (PSV)
·         Armor of single and multi core cable going to junction box shall be terminated at cable gland. If the In the vendor data sheet, calculation
junction box made from metal, then it only needs to connect the earth stud bolt to the nearest steel sheet, and or catalogue of the PSV, it
was stated two different terms which is
structure. If the junction box made from non metal, the earth stud bolt will be located at the metal
API and ASME PSV th...
gland plates which have direct contact with the cable gland.
Marshalling Cabinet or Marshalling
·         Armor of single and multi core cable going inside or outside marshalling and system cabinet shall be Panel
terminated and connected to a bus bar inside the cabinet. Each bus bar inside the cabinet will be As discussed in the Typical Architecture
connected to a grounding dispatcher by 35 mmsq cable (usually green – yellow stripped). This of Instrumentation and Automation
grounding dispatcher will collect all connection from individual bus bar and then connect it to a System , the automation architecture of
general electrical earth loop (to structure steel) by a 70 mmsq cable. In general used, the earth bus the plant is having a ...
bar is made from copper and has 1 ½” width and ¼” height.
Pressure Safety Valve (PSV) Material
2.       Instrument earth
Selection
S pecify the Pressure Safety Valve
(PSV) material could be simple and
·         The general principle of instrument earth is all individual shields (screen) and overall shield (screen)
might be difficult for some situation. It
of single or multi pair cable shall be isolated from electrical earthing and terminated at different bus
becomes simple because ...
bar. This instrument earth usually also called reference earth since it serve the reference point of the
instrument loop (ground of internal electric circuit inside the instrument). Flow Direction of Control Valves
Flow direction of control valves has a
·         Individual shield (drain wire) of single pair cable shall be terminated at earth or ground terminal block relationship with a failure action, High
inside the instrument enclosure. Delta Pressure, Cavitation, and %
opening of the valve. ...
·         Individual shield from analog single pair cable going inside the junction box shall be terminated to
terminal block. Individual shield from digital single pair cable going inside the junction box shall be 2 Wires, 3 Wires, or 4 Wires RTD
terminated to terminal block and jump out each other then connect it to bus bar.
(Resistance Temperature Detector)?
RTD is a temperature sensitive metal.
The resistance of the RTD metal is
·         Individual shield from multi pair cable going inside the junction box shall be also terminated to
gradually changed with the changed of
terminal block match with the individual shield from single pair cable.
temperature. In applicati...

·         Overall shield from multi pair analog cable going inside the junction box shall be terminated to
terminal block or bus bar (overall shield at analog cable doesn’t have a pair with the shield from single
pair cable). Overall shield from multi pair digital cable going inside the junction box shall be Labels
terminated to bus bar.
Commissioning
·         All individual and overall shields (screen) from multi pair cable shall be terminated into respective
Instrument
instrument earth bus bar at marshalling cabinet.
Maintenance
·         Instrument bus bar will be connected to grounding dispatcher by 25 mmsq green-yellow stripped
cable. From grounding dispatcher, it will be connected to main instrument earth loop by 70 mmsq Material
green-yellow stripped cable.
Piping
3.       Intrinsically Safe earthing
safety

·         Isolation and termination of IS field cable shields (screen) at field devices, junction boxes and
marshalling cabinets shall be done in the same manner as for instrument earth explained above.
However the overall shield (screen) of multi pair cable for IS signals goes to marshalling cabinet shall
be terminated individually and connected to its IS bus bar. The individual shield (screen) of this cable
will be terminated directly to a galvanic isolator and then connected to the respective IS bus bar.

ongengineering.blogspot.com/2013/03/instrumentation-earthing-system_3.html 1/5
15.05.2023, 14:35 Oil and Gas Engineering: Earthing System of Instrument Equipment

 The following maximum resistance limits shall be achieved after the instrument earthing system installed. This
resistance is minimized as much as possible so the un-normal current can be safely grounded at steel structure.

·         Between instrument earth bus bars and grounding dispatcher not greater than 0.5 ohm.

·         Between electrical equipment frame and nearest local stud earth on structural steel not greater than
1 ohm.

·         Between intrinsically safe installation and grounding dispatcher not greater than 0.5 ohm.

 
 
 
 

ongengineering.blogspot.com/2013/03/instrumentation-earthing-system_3.html 2/5
15.05.2023, 14:35 Oil and Gas Engineering: Earthing System of Instrument Equipment
Labels: Instrument

15 comments:

Unknown June 16, 2014 at 4:40 AM

Hello there,
I’ve been checking your pots and they are truly interesting.
This in particular explains very well everything about earthing connections.
In my case of study I have a specific question, as follows:
My company has the standard practice of using multicore cables instead of paired cables, for
Digital Inputs/Outputs and 24V DC supplies. Those cables are not screened, I only have the
armour which I’m intending to terminate at cable glands. How am I supposed to carry with the
reference earth connection all along the way, from Marshalling Cabinet, to Junction Boxes
and field devices?
Could you give a hand here?
Thanks in advance.
Fely
Reply

Replies

Ackerman Barnhardt May 26, 2021 at 3:07 PM

Good Day,

Are you looking for Storage Tanks In Rotterdam? Houston? Then worry no more
SOVREDMET LOGISTIC COMPANY GOT YOU COVERED. Contact us Now on
email address: ackermanbarnhardt@gmail.com

SOVREDMET LOGISTIC COMPANY are pleased to bring to your notice that we


have Tanks available for lease. Our Tank Farm have durable and reliable tanks
storage facilities at Rotterdam, and Houston. Our tank farm is a Crude/Petroleum
reservoir with high storage capacities located in all ports in Netherlands
(Rotterdam). Our Team of competent experts are always interested in giving you
one of the best services and total product security guaranteeing your satisfaction
and securing our values. Contact us today for our services and have your products
in safe custody.

Please contact us via our official email address: ackermanbarnhardt@gmail.com

Thank you..

Reply

Instrumentation Tools May 22, 2015 at 12:40 AM

You can find more information on Instrumentation here

http://www.instrumentationtools.com/

Thanks
Bharadwaj
Reply

Eutex International INC June 12, 2015 at 3:09 AM


Instrumentation earthing system is very important but it is safe or not - Eutex International
INC
Reply

Unknown December 7, 2016 at 5:24 AM


Interesting Article. Find more article on cable gland used in oil and gas engineering.

Reply

Jagan Jai February 8, 2017 at 3:03 AM


It seems like there are many boom lifts Rental. Usually, when I think of using a boom lift, I
think of construction workers using them when working on buildings. Making use of boom lifts
Bangalore for picking fruits from tall trees seems like a great use for them. Also We supply Of
Aluminium scaffolding for some customer.
Reply

ongengineering.blogspot.com/2013/03/instrumentation-earthing-system_3.html 3/5
15.05.2023, 14:35 Oil and Gas Engineering: Earthing System of Instrument Equipment
Pradeep Singh June 2, 2017 at 5:21 AM
U look sathiyam cinemas Pantry the Modular Kitchen In Chennai is more preferred for looking
and sound effects
Reply

Anonymous June 28, 2017 at 3:42 AM


It become an attractive part of a blog when author uses indirect speech while writing a blog. It
shows your creative mind as well as make your written essay different from others. belden
Reply

Unknown February 15, 2019 at 9:27 AM


Are you searching for a very Genuine cash? The good news is here ! ! ! We Offer
cashranging from $5000.00 to $50, 000, 000.00 Max. at 3% interest rate per annual. cash for
developing business We are certified, trustworthy,? reliable, efficient, Fast and dynamic.
Contact? us Email:allrisefinancial@gmail.com
Reply

Unknown September 18, 2019 at 1:26 AM

Dear what should me minimum resistance between pe and ie ?

Reply

Emad July 19, 2020 at 6:16 AM


thank you for your post.
can you please send me the reference of this article or standard.
Reply

Tycon Cables July 22, 2021 at 1:06 AM

Tycon Cables is a recognized brand of Submersible Cables Manufacturers in India. we have


created a highly skilled technical team and stringent quality controls to ensure that every
meter of cable leaving our premises is of highest quality. The manufacturing design of these
cable depends on the factors to achieve the highest possible degree of reliability and safety
in the area where it would be installed. Our Mulitcore Cables is very power saving, reliable,
flexible, tough, and can work in wet conditions for a longer period.
Reply

Ananka Fasteners September 6, 2021 at 9:50 PM


Great Blog Very Helpful. Also Visit - Bolt Manufacturer in India
Reply

Unknown January 24, 2022 at 9:02 PM

Hello Everyone,

Welcome to the future! Financing made easy with Prof. Mrs. DOROTHY LOAN
INVESTMENTS

Have you been looking for financing options for your new business plans, Are you seeking for
a loan to expand your existing business, Do you find yourself in a bit of trouble with unpaid
bills and you don’t know which way to go or where to turn to? Have you been turned down by
your banks? MRS. DOROTHY LOAN INVESTMENTS says YES when your banks say NO.
Contact us as we offer financial services at a low and affordable interest rate of 2% for long
and short term loans. Interested applicants should contact us for further loan acquisition
procedures via profdorothyinvestments@gmail.com

Services rendered include:

* Refinancing Loans
* Car Loan
* Truck Loans
* COVID-19 Financing Loan
* Home Loan
* Mortgage Loan
* Debt Consolidation Loan
* Farm Loan
* Business Loan [secure and unsecured]

ongengineering.blogspot.com/2013/03/instrumentation-earthing-system_3.html 4/5
15.05.2023, 14:35 Oil and Gas Engineering: Earthing System of Instrument Equipment
* Personal Loan [secure and unsecured]
* Students Loan and so many others.

For more info; Contact us via Email: profdorothyinvestments@gmail.com

With Prof. Mrs. DOROTHY LOAN INVESTMENTS. you can say goodbye to all your financial
crisis and difficulties as we are certified, trustworthy, reliable, efficient, fast and dynamic
Reply

Roll Fast February 1, 2023 at 12:51 AM


Thanks for sharing such a great blog, keep sharing.

Petrochemical Stud Bolts


Forged & Machined Components

Reply

To leave a comment, click the button below to sign in with Google.

SIGN IN WITH GOOGLE

Newer Post Home

Subscribe to: Post Comments (Atom)

Awesome Inc. theme. Powered by Blogger.

ongengineering.blogspot.com/2013/03/instrumentation-earthing-system_3.html 5/5

You might also like