Professional Documents
Culture Documents
net/publication/370779738
CITATIONS READS
0 127
1 author:
Sherin Akter
Independent University, Bangladesh
170 PUBLICATIONS 0 CITATIONS
SEE PROFILE
All content following this page was uploaded by Sherin Akter on 16 May 2023.
Cori0d)‘ o.CP O2
suBMITTAL FOR"
subⅡ ”
maI No. oato∶
ⅡDo 口 R 口 口 I叶 口 m.
^
PⅡ
DilO‘ ip lr)e ∶
氵 illl‘ llllltlliil‘ Il1,∶ ‘
lil1|II‘ l‘ illil:l‘ IIIll!1
su.soct岫 曰 :三 四鱼 坐 ‘必 塑 塑 ‘ 扭 ‘g。 奥 臼唑 ‘卫 旦
sub0or0aCtof`supphr
r)ate
ltem"o E)escrptK)n ReV ReVieW status Empbyer`Rep.
Rdurne(
NC×D NONCC
NONo
二 一一一一一一一一一一一
二三三〓≡≡
≡ 工工工工〓
△ 4亠‖↓扛 匚 工工二二二二
l
△△|+‖++
I
L土||||||
上Ⅱ土上
~~
TTT
匚二工二二二二
「 「 ← 仁 L—
一一一一一
T△ 十 4⊥ —
Γ
~~
r——
「
r——
|
—
r—
二 二□
「 |
Ⅱ工工工工工Ⅱ二二二二
||||||
TˉTˉ
ˉ
「 Iˉ
— 仁ˉ△ +4爿
| | | | | |
0etai1od Coment Revew A】 0ached Ref No
NInem Oubm呛 ∞ 帕 Ve boen岫 kod,回 田 ed and oo o闷 Ⅱ tod by伽 e∞ 吐odor TⅡ ya卩 m
∞ ntmErm喻 ht” 以 lW田 er心 “ !he(h订 妇 0ocum“ ,eXc.“ oB“ ed● nd ao 8p0roved
by Ⅱ 咖 铷 “ 廿“ PDOod- R斟 tⅡ 出 and stat1B oommtdl盯
METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE
MATERIAL
PREPARED BY
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
(Jj)�
ITD-SINOHYDRO JV
DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT
CONSTRUCTION OF CIVIL AND BUILDING WORKS
IN UTIARA DEPOT FOR MRT LINE 6
CONTRACT NO. CP-02
Engr.Sherin Akter
QC Engineer
� .i. �t
....t?... fl........ ......... ....... �,S--i.f/
;· ·· (Mr.Shang Qingfeng) ······(Mr. - . . . . . Pan
itinan
···-�--- . . . . . .p. ila)
.. ... ....
Chief Engineer Project Manager
Date: .. M..1. 1••1•1. .'.�.: ...... Date: .. f--�:v. ... J.�.iJ....... Date.. .................................
� /11/2-ot:v
This Is a controlled document which shall not be copied without the permission of the Document Controller.
Note: A CONTROLLED copy is valid only if stamped "C" in red
AMENDMENT/RELEASE RECORD
Revision Issue Description of Amendment/Release Effective Date
No. Type
ype of "A" For Acknowledgement & Information & Reference "R" For Internal Review & Comment
" C" For Employer Representative's Approval "U" For Internal Using and/or replacing the existing one.
CONTENTS
1.0 GENERAL/SCOPE............................................................................................................................3
5.0 PROCEDURE............................................................................................................................... 3
5.1Concrete Order Process...................................................................................................................3
5.2Incoming Inspection Process...........................................................................................................4
5.3Test Result Record............................................................................................................................4
5.4Test Result of Materias....................................................................................................................4
9.0 ATTACHMENTS............................................................................................................................5
Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of Concrete
Material......................................................................................................................... 5
Attachment 2 : Quality Control Checklist for Quality Control for Concrete Material.....................5
1.0 GENERAL/SCOPE
This procedure is applicable for ready-mixed concrete produced from the approved
batching plants which shall supply the concrete for the permanent works of the
construction of Dhaka Mass Rapid Transit Development Project, Contract No. CP-02.
g. Concrete to be used for this project is Grade 30, Grade 25, and Grade 15.
5.0 PROCEDURE
According to the time frame, if the respective engineer checks the works, and ensures
that the reinforcing bars installation, formwork installation and cleanness have been
accomplished as per the approved construction technical drawings and specifications,
he shall issue the concrete order form, as shown in Form No. ITD-SINOHYDRO
JV/CP02/MS/ST005/01 to request ready-mixed concrete from the batching plant.
Note: 1. Quality control for ready-mixed concrete is prescribed in the ITP attached 1.
b. All workers will use personal protective equipment during work process.
N/A
9.0 ATTACHMENTS
Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of
Concrete Material
Attachment 2 : Quality Control Checklist for Quality Control of Concrete Material
ATTACHMENT 1
INSPECTION AND TEST PLAN FOR METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE MATERIAL
Project :
ITD-SINOHYDRO JV
The Dhaka Mass Rapid Transit Development Project
INSPECTION AND TEST PLAN
FOR
Contract No. CP-02 Quality System : ISO 9001
Item Description : N/A METHOD STATEMENT FOR QUALITY Document Type : Controlled
Location/Area : N/A CONTROL FOR CONCRETE MATERIAL Date : November 6, 2017
Storage Location: N/A Prepared by : Mr.Wang Wenliang
Specification No : Work Requirement, Section XI: Specification – Particular Specifications, Approved by : Mr. Thitinan Panpila
Part 02, Sub Clauses 2: Concrete work ER Approved : N/A
Inspection Activity Document
Frequency of
No. Activity Inspection and Tests Required Form Verification/Acceptance Acceptance Criteria
Inspection/Test Subcont. Vendor ITD ER
Checklist No. Sign Off By
1 Submission - Material, Shop Drawing, Method Statement N/A N/A N/A N/A N/A N/A
- Mock up Inspection N/A N/A N/A N/A N/A N/A
2 Materials - Appoved Ready Mixed Concrete N/A X X W/O N/A EN/FM Refer to Trial Mix report, Material Submission
3 Equipment - Mold, Measuring tap, Plastic sheet, Straight bar and Slump cones N/A X X W/O N/A EN/FM Refer to item 2 in this Method Statement
4 Interface Coordination N/A N/A N/A N/A N/A N/A N/A N/A
ITD-SINOHYDRO
5 In-process Inspection - Concrete order N/A X X W/O EN/FM Follow to drawings
JV/CP02/MS/ST005/01
ITD-SINOHYDRO
- Concrete Slump Test N/A X X W/O EN/FM AASHTO T119 and Volume 4, Part 2,Clauses 2, item 2.1.3
JV/CP02/MS/ST005/01
ITD-SINOHYDRO 32 °C (Refer to Volume 4, Part 2,Clauses 2, item 2.3.1 (2) and
- Fresh Concrete temperature (Inspection on site prior to placement) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 ACI305.1-06
ITD-SINOHYDRO ≤ 2 hr. (Based on the experience of concrete work performed in the
- Period from Batching Plant to placement (each truck) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 hot weather country zone)
3 ITD-SINOHYDRO
- Cylinder make (3 cylinders for every 30 m /Each class) N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03
ITD-SINOHYDRO
- At least 3 cylinders shall be taken for each class of concrete placed each day. N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03
ATTACHMENT 2
QUALITY CONTROL CHECKLIST FOR QUALITY CONTROL
OF CONCRETE MATERIAL
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete Material
No.
Concrete Order Form
Batching Plant: Order Date:
Fax No./Email Address: Attention:
Attention:
Requested by:
( )
Approved by:
( )
Note: Site Engineer shall phone/email to the batching plant for confirming the Site Engineer
required time prior to ready-mixed concrete being supplied.
Identification Tag
Type of Structure:
Level/Gridline:
Cast Date: Time :
Ticket No.:
Concrete Code:
Compressive Strength: N/mm2
Name/Plant:
Collected by:
Code No.:
Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/02, Rev.01
Code Certificate
Age of Test Result
Item Part of Structure Casting Date Testing Date Number of 2 Received Remarks
Specimen (N/mm )
Specimen Date
Average
Days Test Result : Date of Crushing:
Average
Calibration Equation:
Remarks