METHOD STATEMENT FOR QUALITY CONTROL OF CONCRETE MATERIAL


AUTHORISATION

Method · May 2023


DOI: 10.13140/RG.2.2.36384.97286

CITATIONS READS

0 127

1 author:

Sherin Akter
Independent University, Bangladesh
170 PUBLICATIONS   0 CITATIONS   

SEE PROFILE

All content following this page was uploaded by Sherin Akter on 16 May 2023.

The user has requested enhancement of the downloaded file.


ITDsINOHYDRO JV oh● h"Ⅱo Ropld TrJo△ 0gudoρ 濒 R。 I。吐

Cori0d)‘ o.CP O2

PrOOed听 e for subrsson d DoCuments

suBMITTAL FOR"

subⅡ ”
maI No. oato∶

Loo:tion Type ReV,


IT0gN0HYDR0 JV CpO2 "o. 油曰 B,2m7
"si DIPT GN o05 o1 "oVσ

ⅡDo 口 R 口 口 I叶 口 m.
^
PⅡ

Ⅱ ∶mr Tah!硬 四 0rr∞ L坐 凶四 L迦~坠垫


T"le∶ 1!烛 llya‘ 1,~§ ,“ 浊:匹n£】
ls~f‘ ・
【~9.“ n】 1△ ..9.9o!“ ‘
世~91..C‘ i江 l‘ :II:se.tlII]‘ 自Inl :

DilO‘ ip lr)e ∶
氵 illl‘ llllltlliil‘ Il1,∶ ‘
lil1|II‘ l‘ illil:l‘ IIIll!1

su.soct岫 曰 :三 四鱼 坐 ‘必 塑 塑 ‘ 扭 ‘g。 奥 臼唑 ‘卫 旦
sub0or0aCtof`supphr

For Coritractor u变 Fo了 Empk)yer or Empbyers Repiesmu“ ∷


″o use
D名 ReoeiVed
"e・

r)ate
ltem"o E)escrptK)n ReV ReVieW status Empbyer`Rep.
Rdurne(
NC×D NONCC
NONo
二 一一一一一一一一一一一
二三三〓≡≡
≡ 工工工工〓

memod sme“ :ntfor Oudio Contrd of Co盯 ete mgtends o1


匚 匚 r——— —
l

△ 4亠‖↓扛 匚 工工二二二二
l

(ooc~o ITO s1~C HYOR0 0V浴 ∞2ms`sTo阝 )

△△|+‖++
I

L土||||||
上Ⅱ土上
~~
TTT

匚二工二二二二
「 「 ← 仁 L—

一一一一一
T△ 十 4⊥ —

Γ
~~

r——

r——
|

r—

二 二□
「 |

Ⅱ工工工工工Ⅱ二二二二
||||||
TˉTˉ
ˉ
「 Iˉ
— 仁ˉ△ +4爿
| | | | | |
0etai1od Coment Revew A】 0ached Ref No
NInem Oubm呛 ∞ 帕 Ve boen岫 kod,回 田 ed and oo o闷 Ⅱ tod by伽 e∞ 吐odor TⅡ ya卩 m
∞ ntmErm喻 ht” 以 lW田 er心 “ !he(h订 妇 0ocum“ ,eXc.“ oB“ ed● nd ao 8p0roved
by Ⅱ 咖 铷 “ 廿“ PDOod- R斟 tⅡ 出 and stat1B oommtdl盯

Piepared by ReVeWed and^l)proVed (


`口

(mi wang (i Thninan Panplla) T(怡 :

0^"am。 er Proi・ ee manager o献 eˉ


t'
Date
,I`:06 Date 8 19 2。
Nde `⒎ NO)0 门 h.JⅡ .g中 响臼

FOi曰 蚰 田 K)0 故n力 dα 中d知 “mo・ r cummmo)

A 时 脚 喇 幻 hd№ ∞ 曲 l diC啸 “ t曲 ‘ “ r・ C∞ mmo)


"0鸱
FOr Ⅱ∝ num
Rec Fσ 即曰耐 田bmo d ER∞ 0 juir曲 ,a协 Cmuruo梅 C∝ tatld Cu妒 m”
"bˉ ^∝

ooc・ ument 0Io. Revision page N。 .

ITI)ˉ sINOHYDRo.Ⅳ 尤.P忱 PRO11泅 1


∷ No 01 Da怡 :NGu汕 er m,⒛ 17 id1
DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT
CONSTRUCTION OF CIVIL AND BUILDING WORKS
IN UTTARA DEPOT FOR MRT LINE 6
CONTRACT PACKAGE CP-02

METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE
MATERIAL

Document No. ITD-SINOHYDRO JV/CP02/MS/ST005, Rev. 01

PREPARED BY
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

(Jj)�
ITD-SINOHYDRO JV
DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT
CONSTRUCTION OF CIVIL AND BUILDING WORKS
IN UTIARA DEPOT FOR MRT LINE 6
CONTRACT NO. CP-02

ITD-SINOHYDRO JV ITD-SINOHYDRO JV/CP02/MS/ST005


DOCUMENT NO.:
REVISION: 01
TITLE: METHOD STATEMENT FOR QUALITY CONTROL OF
CONCRETE MATERIAL
AUTHORISATION
Prepared by: Reviewed by: Approved by:

Engr.Sherin Akter
QC Engineer
� .i. �t
....t?... fl........ ......... ....... �,S--i.f/
;· ·· (Mr.Shang Qingfeng) ······(Mr. - . . . . . Pan
itinan
···-�--- . . . . . .p. ila)
.. ... ....
Chief Engineer Project Manager

Date: .. M..1. 1••1•1. .'.�.: ...... Date: .. f--�:v. ... J.�.iJ....... Date.. .................................
� /11/2-ot:v
This Is a controlled document which shall not be copied without the permission of the Document Controller.
Note: A CONTROLLED copy is valid only if stamped "C" in red

Uncontrolled copies shall NOT be updated or amended.


Please refer to a controlled copy or check for amendments before use.

AMENDMENT/RELEASE RECORD
Revision Issue Description of Amendment/Release Effective Date
No. Type

01 c For Employer Representative's Approval November , 2017

ype of "A" For Acknowledgement & Information & Reference "R" For Internal Review & Comment
" C" For Employer Representative's Approval "U" For Internal Using and/or replacing the existing one.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No.01
I Date: November 6, 2017 1 of 5
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

CONTENTS

1.0 GENERAL/SCOPE............................................................................................................................3

2.0 SPECIFICATIONS AND REFERENCE DOCUMENTS.............................................................. 3

3.0 MATERIALS AND CONCRETE......................................................................................................3

4.0 RESOURCE, EQUIPMENT AND FACILITIES............................................................................. 3

5.0 PROCEDURE............................................................................................................................... 3
5.1Concrete Order Process...................................................................................................................3
5.2Incoming Inspection Process...........................................................................................................4
5.3Test Result Record............................................................................................................................4
5.4Test Result of Materias....................................................................................................................4

6.0 SAFETY PROVISIONS.....................................................................................................................4

7.0 ENVIRONMENTAL PROVISIONS..................................................................................................5

8.0 TRAFFIC MANAGEMENT............................................................................................................... 5

9.0 ATTACHMENTS............................................................................................................................5
Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of Concrete
Material......................................................................................................................... 5
Attachment 2 : Quality Control Checklist for Quality Control for Concrete Material.....................5

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 01 Date: November 6, 2017 2 of 5
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

1.0 GENERAL/SCOPE

This procedure is applicable for ready-mixed concrete produced from the approved
batching plants which shall supply the concrete for the permanent works of the
construction of Dhaka Mass Rapid Transit Development Project, Contract No. CP-02.

2.0 SPECIFICATIONS AND REFERENCE DOCUMENTS

Relevant specification is contained in Work Requirement, Section XII: Specification –


Particular Specifications, Part 02, Sub Clauses 2: Concrete Work, Sub Clauses 3: Piling
works(cast-in-situ), Sub Clauses 4: Reinforcement for Structure, and Sub Clauses 9 :
Concrete works for miscellaneous civil structure.

3.0 MATERIALS AND CONCRETE

Materials and Concrete this operation shall be listed as below :

a. Ordinary Portland Cement type 1 conform to AASHTO M85

b. Fine Aggregate conform to AASHTO M6

c. Coarse Aggregate conform to AASHTO M80

d. Water used mixing shell be tested by described in AASHTO T26

e. Admixture conform to ASTM C494,ASTM C979.

f. Reinforcement conform to BDS ISO 6953-2 or ASTM A615

g. Concrete to be used for this project is Grade 30, Grade 25, and Grade 15.

4.0 RESOURCE, EQUIPMENT AND FACILITIES

Equipment and tools for this operation shall be listed as below:


a. Inspection and Test Plan for Method Statement for Concrete and Materials as
detailed in Attachment 1 : Inspection and Test Plan .
b. Quality Control Checklist for Quality Control of Concrete Material as detailed in
Attachment 2 : Checklist Form

5.0 PROCEDURE

5.1 Concrete Order Process

According to the time frame, if the respective engineer checks the works, and ensures
that the reinforcing bars installation, formwork installation and cleanness have been
accomplished as per the approved construction technical drawings and specifications,
he shall issue the concrete order form, as shown in Form No. ITD-SINOHYDRO
JV/CP02/MS/ST005/01 to request ready-mixed concrete from the batching plant.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 01 Date: November 6, 2017 3 of 5
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

5.2 Incoming Inspection Process


a. When the ready-mixed concrete truck arrives on-site, the delivery concrete code
shall be verified in comparison with the concrete order form issued. The slump
shall be tested as per specified requirements as shown in Form No. ITD-
SINOHYDRO JV/CP02/MS/ST005/03 to concrete placing inspection and
laboratory test report.
b. Quality of Ready mixed Concrete shall be sampled and tested for the quality
control of fresh concrete and sampling specimens as shown on the Inspection
and Test Plan. The identification tags, such as location, gridline, type of
placement work and placement date shall be marked on all concrete cylinders, as
shown in Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/02 to Identification
Tag.
Once the concrete cylinder are met 24 hours, they shall be delivered to concrete
curing tank. The information given in the tags shall be immediately transferred to
the concrete cylinders using permanent marking prior to curing.
The cylinder curing process shall be performed and controlled in accordance with
the associated documents due to the fact that all cylinders represent the concrete
placed in those areas.
c. Once the compressive strength test of cylinders reach the specified date, they
shall be delivered to the Central Laboratory for testing. Relevant concrete
cylinders shall be identification tag and the recorded in specimen testing record in
Form No.ITD-SINOHYDRO JV/CP02/MS/ST005/04 to Cylindrical compressive
strength test report.
d. Summary cylindrical compressive strength test report completed age 28 days
shall be recorded in Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/05 to
compressive strength of concrete.

5.3 Test Result Record


a. If the respective engineer participates during the testing process, the read out
data shall be recorded by him in order to verify with the results to be shown in the
corresponding certificates.
b. Where the concrete cylinders fail to meet the requirements, the Procedure for
Control of Nonconforming Product shall be implemented.
c. Once completion, all information shown in the test certificates shall be verified to
ensure that all cylinder test results are in full compliance with the specified
requirements prior to the certificate documents being retained as required by
quality records.

Note: 1. Quality control for ready-mixed concrete is prescribed in the ITP attached 1.

5.4 Test Result of Materials


Quality control test of all materials is prescribed in the Inspection and Test Plan in as
attached 1.

6.0 SAFETY PROVISIONS


a. All workers entering the construction areas will be provided with safety induction
training.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 01 Date: November 6, 2017 4 of 5
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

b. All workers will use personal protective equipment during work process.

7.0 ENVIRONMENTAL PROVISIONS


a. The work areas will be carried out with sufficient environmental protection.
b. The debris arising from the concrete activity shall be regularly cleared and
removed out.

8.0 TRAFFIC MANAGEMENT

N/A

9.0 ATTACHMENTS

Attachment 1 : Inspection and Test Plan for Method Statement for Quality Control of
Concrete Material
Attachment 2 : Quality Control Checklist for Quality Control of Concrete Material

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005 No. 01 Date: November 6, 2017 5 of 5
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

ATTACHMENT 1
INSPECTION AND TEST PLAN FOR METHOD STATEMENT
FOR QUALITY CONTROL OF CONCRETE MATERIAL
Project :
ITD-SINOHYDRO JV
The Dhaka Mass Rapid Transit Development Project
INSPECTION AND TEST PLAN
FOR
Contract No. CP-02 Quality System : ISO 9001
Item Description : N/A METHOD STATEMENT FOR QUALITY Document Type : Controlled
Location/Area : N/A CONTROL FOR CONCRETE MATERIAL Date : November 6, 2017
Storage Location: N/A Prepared by : Mr.Wang Wenliang
Specification No : Work Requirement, Section XI: Specification – Particular Specifications, Approved by : Mr. Thitinan Panpila
Part 02, Sub Clauses 2: Concrete work ER Approved : N/A
Inspection Activity Document
Frequency of
No. Activity Inspection and Tests Required Form Verification/Acceptance Acceptance Criteria
Inspection/Test Subcont. Vendor ITD ER
Checklist No. Sign Off By
1 Submission - Material, Shop Drawing, Method Statement N/A N/A N/A N/A N/A N/A
- Mock up Inspection N/A N/A N/A N/A N/A N/A
2 Materials - Appoved Ready Mixed Concrete N/A X X W/O N/A EN/FM Refer to Trial Mix report, Material Submission

3 Equipment - Mold, Measuring tap, Plastic sheet, Straight bar and Slump cones N/A X X W/O N/A EN/FM Refer to item 2 in this Method Statement

4 Interface Coordination N/A N/A N/A N/A N/A N/A N/A N/A
ITD-SINOHYDRO
5 In-process Inspection - Concrete order N/A X X W/O EN/FM Follow to drawings
JV/CP02/MS/ST005/01
ITD-SINOHYDRO
- Concrete Slump Test N/A X X W/O EN/FM AASHTO T119 and Volume 4, Part 2,Clauses 2, item 2.1.3
JV/CP02/MS/ST005/01
ITD-SINOHYDRO 32 °C (Refer to Volume 4, Part 2,Clauses 2, item 2.3.1 (2) and
- Fresh Concrete temperature (Inspection on site prior to placement) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 ACI305.1-06
ITD-SINOHYDRO ≤ 2 hr. (Based on the experience of concrete work performed in the
- Period from Batching Plant to placement (each truck) N/A X X W/O EN/FM
JV/CP02/MS/ST005/03 hot weather country zone)
3 ITD-SINOHYDRO
- Cylinder make (3 cylinders for every 30 m /Each class) N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03
ITD-SINOHYDRO
- At least 3 cylinders shall be taken for each class of concrete placed each day. N/A X X W/O EN/FM Volume 4, Part 2,Clauses 2, item 2.1.4
JV/CP02/MS/ST005/02,03

Symbol Legend Symbol Legend


H Mandatory Hold Point-Hold Until Approved D Document or Record Required
W/O Witness Point-Optional X Subcontract Inspection
W Witness Point R Review Point
S/......... Surveillance Point - Random ITP/Each Quantity N/A Not Applicable
N Notify ER (Request for Inspection)

Document No. Revision Page No.


ITP/CP02/MS/ST005/01 No. 01 Date: November 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02

Method Statement for Quality Control of Concrete Material

ATTACHMENT 2
QUALITY CONTROL CHECKLIST FOR QUALITY CONTROL
OF CONCRETE MATERIAL
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete Material

No.
Concrete Order Form
Batching Plant: Order Date:
Fax No./Email Address: Attention:
Attention:

Location/Work Type of Pouring Method


Item Concrete Code Slump Gridline Level Required Date Required Time Quantity (m3) Remarks
Area Structure
Pump Bucket

Requested by:
( )

Approved by:
( )
Note: Site Engineer shall phone/email to the batching plant for confirming the Site Engineer
required time prior to ready-mixed concrete being supplied.

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/01 No. 01 Date: June 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete Material

Dhaka Mass Rapid Transit Development Project


Contract No. CP-02

Identification Tag
Type of Structure:
Level/Gridline:
Cast Date: Time :
Ticket No.:
Concrete Code:
Compressive Strength: N/mm2
Name/Plant:
Collected by:
Code No.:
Form No. ITD-SINOHYDRO JV/CP02/MS/ST005/02, Rev.01

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/02 No. 01 Date: June 6, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete Materials

Concrete Control on Site

Concrete Supplied by: Concrete Code: Casting Date:


Type of Structure: Level/Grid Line:

Concrete Delivery Casting


Item Quantity Batching Arrival Slump Unloading Temperature (°C) Remarks
Truck No. Delivery Ticket No. 3 Batching Plant
(m ) Time Time (cm) Start Finish Air Concrete

Recorded by: Verified by: Witnessed by:


( ) ( ) ( )
Concrete's Supplier ITD-SINOHYDRO JV's QC Engineer/Staff NKDM

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/03 No. 01 Date: June 2, 2017 1 of 1
ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project
Contract No. CP-02
Method Statement for Quality Control for Concrete Material

Specimen Testing Status

Code Certificate
Age of Test Result
Item Part of Structure Casting Date Testing Date Number of 2 Received Remarks
Specimen (N/mm )
Specimen Date

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/04 No. 01 Date: June 6, 2017 1 of 1
View publication stats

ITD-SINOHYDRO JV Dhaka Mass Rapid Transit Development Project


Contract No. CP-02

Compressive Strength Test of Concrete Cylinder


Concrete Class : Test Method AASHTO-T22

Name of Structure : Lab. Ref. No.

Component of Structure : Cement (Brand) :

Sampling Place : Cement Content (kg/m3)

Date of Casting : Water Cement Ratio :

Days Test Result : Date of Crushing:


Cylinder Cylinder Size Observed Load Actual Compressive
Area (mm2)
No. (mm) (KN) Load(KN) Strength (N/mm2)

Average
Days Test Result : Date of Crushing:

Average

Calibration Equation:

Average Days Crushing Strength : N/mm2

Average Days Crushing Strength : N/mm2

Target Mean Days Crushing Strength (Minm) : N/mm2

Remarks

LAB Engineer QC Engineer


Contractor Consultant

Document No. Revision Page No.


ITD-SINOHYDRO JV/CP02/MS/ST005/05 No. 01 Date: June 6, 2017 1 of 1