You are on page 1of 1

IR-G

GL= V-L36-0
2 1
EQUAL TEE X:50 .50
3
X:503305.514 Y:24 303.629
1589
Y:2415892.845 7.28
22° B 7
X:50 END 1 2 3 4 5 6
3 3 0
ENTRY
/EXIT

5
99

Reefs Setback
116

Y:24
186
98

84

100
73

115
MARINA SERVICE AREA
85

71

72

83

97
96

1589 .021

100m
SERVICE BLDG. DOCK AREA

70

94

95
86

68

69
185

DOCK AREA
SLIPWAY

MARINA SERVICE AREA


PROMENADE

DOCK AREA
78

79
Marina

67

90
Zone

-4.9

80

178
m
105 114

89
174

106
93
DOCK AREA

104
77

81

82
AREA
103

107
113

179
DOCK

184
CUSTOM BLDG. 189
108

76
112
111

109
FLOATING DOCK

110
75
74
FUEL

5.15
DOCK

88

102
91

177
101
87
183

6
117

118
92
138

59

176
58

57
119

60

188
182
Area 61

Beach 56 120

Reefs
Setback
121 125

126
137 122 123

124
100m
Natural Filling

62
Level

64
7 8 9 10 11 12
shallow

for
Protec 139

63
175

tion
127

55

164
43
54

47
Beach

53
187

52
136

Area

44
181

45° BEND

141

174
135 134

51

42

128
133
48 132

142
66
131

50
180

41
49

130

129
140

143

173
45

40
65

38
144
146

37

26

165
35

36
X:503305.982
172

39
145

46

170
Reefs

Natural
Level

shallow
Setback
100m
161

147
153

2
3

27
160

34

171
154
152

159
8
151

33

28

155

156
7
Filling 157 158 169
6

25
Beach
area 30

32

31

29
Area
h
Beac
Y:2415890.646 IR-G
149

148
168
9
22 24 162 163

10

150

167
19

23

166
12 16 21

18
13

11

14

15

17

20
13 14 15 16 17 18
GL= V-L35-0
2 1
X:50 .50
3
Y:24 310.762
1589
3.81
4

IR-DCT-L32-01
GL=3.20
X:503453.841

EV
Y:2415957.100

A
RO
UT
E
IR-
X:5 WO-L
Y:2 0327 35-0 IR-DC-L35-01
415 0.28 1 IR- GL=3.05
805 7
.88 GL WO-L X:503379.649
2 X:5 =2.50 35-0 Y:2415884.60
1 8
Y:2 0327
415 2.54
806 8

UTE
.25
0

RO
EVA
IR-AV-L35-01
GL=3.50
X:503429.875 45° BEND
173 Y:2415874.92
9 X:503453.540
Y:2415881.49
0
45° BEND
X:503440.661

45° BEND
173 Y:2415872.801

X:503292.225
Y:2415751.997

IR-DGV-L30-02
4 GL=3.224
-3 45° BEND
X:503521.289
RD X:503477.342
Y:2415873.662
Y:2415875.82
9

45° BEND
X:503513.291
IR-DCT-L35-01 Y:2415868.496
X:503347.294

PVCU
21 96 01
110mm CAP
721.960.114
IR-DCT-L35-01
GL=2.90 Y:2415737.243 45° BEND
X:503345.905 X:503515.106
Y:2415729.407 END CAP
X:503350.960
172 Y:2415868.94
2 721.960.114

110mm
21 96 01CAP

PVCU

IR L=3 343 780


IR-DCT-L29-04
Y:2415736.294

-D .7 8. .06
G :50 15

RD-18
GL=3.29

C- 0 907 4
X :24
721.960.114

CAP
PVCU110mm
01
96
21

X:503517.560

L3
Y

0-
Y:2415862.688

01
IR-DGV-L35-01
TEE ( LINE-36)

IR-WO-L35-01

IR-DCT-L35-01
IR-DC-L35-01
IR-AV-L35-01
45° BEND

45° BEND
45° BEND
45° BEND

45° BEND

END CAP
5

SW HC Ø200
IL: 1.594
2

ALINMA ALTHURAYA REAL ESTATE CO.

PW 225 Ø
I.L = 0.289 SW HC Ø200
IL: 0.583 RED SEA VILLAGE DEVELOPMENT
0
SW Ø300
IL: -0.379 PW 225 Ø
I.L = -0.304
TP4 - INFRA STRUCTURE WORKS
ROADS AND UTILITIES

DATUM -2.00
DIAMETER (mm) 225 Ø HDPE SDR 11 225 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11 160 Ø HDPE SDR 11
ARABIAN CONSULTING ENGINEERING CENTRE
SLOP 0.313 1.027 1.643 0.364 0.067 1.161 0.000 0.000 0.000 0.000 0.000 0.000 1.409 0.000
3.25
3.25

3.55

3.50

3.40

3.20

3.10

3.00

2.55
2.50
2.50

2.50
2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.95

2.96

2.96
GROUND LEVEL (m)

1.45

1.45
1.14
2.01
2.00

1.95

1.83

1.60

1.22

1.20

0.95
0.93
0.93

0.93
0.93

0.93

0.93

0.93

0.93

0.93

0.93

1.45
INVERT LEVEL (m)

1.50

1.50
2.05

1.87

1.80

1.56
1.56

1.56

1.56

1.56
1.24
1.24

1.60

1.66

1.80

1.60
1.56
1.56

1.56

1.56

1.56

1.50
DEPTH
Thabat Construction Company Ltd. Saudi Arabia

1.40
1.01
1.02

1.37

1.43

1.57

1.40
1.40

1.40

1.40

1.40

1.34

1.34

1.34
1.82

1.64

1.57

1.37
1.33
1.37

PIPE COVER (m)


1.40

1.40

IRRIGATION NETWORK LAYOUT PLAN &


LENGTH (m) 15.92 11.00 23.08 28.00 22.00 30.00 20.00 22.00 28.00 23.12 26.88 4.51 45.49 13.10 36.90 23.89 PROFILE PHASE-04 LINE-35 SHEET 2 OF 2
0+276.91

0+402.51
0+403.26

0+563.07
0+246.68

0+265.92

0+504.51

0+620.08

0+623.88
0+250

0+300

0+328

0+350

0+380

0+400

0+422

0+450

0+500

0+550

0+600
0+419

0+473

CHAINAGE (m)

LONGITUDINAL SECTION LINE-35


FROM ST.0+246.68TO ST.0+623.88

You might also like