You are on page 1of 2

0BR

02:0
.136
.21S
GT+

1 2 3 4 5 6 7 8 9 10 11 12
-O

em
5Tn

er=2
on Syst
DG

01V

tzas
mati

3:18

Brou
g Auto

131

23,
1.20
19:4 Drawin

3-1-

, 13.0
/202

0240
5PM

1532
3118
1 /13:

ct No:
EB0

Proje
ASW

DAS
C-D
FIK

REV CHANGE DESCRIPTION ECN DATE REVISED BY APPROVED BY

A Min 242 Span 20000 Min 242 A


1185
100
DG 5Tn-O

1200
A

303
1367

Ø80

100
5t
1066

50*30-S355J2
B B

490
74

1848 1722
A
707 726
C C

View A-A

8704 (Min. 500 mm safety gap)


9000
9891
8424

HBC2.5

D D

TECHNICAL DATA SURFACE TREATMENT OF CRANE


Bridge color : Gelb (RAL 1028)
Span : 20 m
Paint : AKRYL /70 µm
E Load : 5t E
Lifting height :9m Runway details not in scale
Hoisting speed : 5/0.83 m/min 2-speed Runway tolerances must comply with
Traversing speed : 20 m/min stepless standard ISO12488-1 tolerance class 2
20196
Travelling speed : 32/8 m/min 2-speed inverter
BC04M5CFP3 Max.static wheel load 43.8 kN

Weight of trolley : 400 kg Customer organices safe


manner whatsoever without the express written consent of SWF Krantechnik GmbH. Copyright © SWF Krantechnik. All rights reserved.

F F
confidential and proprietary trade secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any

Weight of bridge : 6860 kg Platform for crane service


This document and the information contained herein, is the exclusive property SWF Krantechnik and represents a non-public,

Crane group : U2/Q1, EN13001-1


Hoist group : 4,0 + 4,0 m (D_lin4) / M5 Indoor Use Crane 5°....40° C
Crane drive group : 20 m (D_lin5) / ISO M5 Radio controlled crane
SWF Krantechnik reserves the right to alter or amend the above information without notice.

Main / control voltage : 400 / 48 V; 50 Hz


G Supply power : 5.81 kW G
3570
3150

Length of runway : 40 m

ACCEPTED BY: Pos Amount Description Specification

KBR/SGT DAS / 2.136.21


Design Chd Appd Ref drawing Vx proj

13.01.2023
Date
BDC5t x 20m Hol:9m
1:40

H COMPANY: Thessaloniki
H

Twin copy
Dept M-film

DATE: Issue

1 2 3 4 5 6 7 8 9 10 11 12
TC1.1
$Sheet = TEAMCENTER, rev2
SWF Krantechnik reserves the right to alter or amend the above information without notice.
FIK
C-D
ASW
EB0
1 /13: DG
19:4 Drawin 5Tn
DAS 5PM g Auto -OI
Proje /202 mati
ct No: 3-1- on Syst
3118 131 em
1532 3:18
This document and the information contained herein, is the exclusive property SWF Krantechnik and represents a non-public, 0240
, 13.0
01V
er=2
1.20 .136
23, .21S
Brou GT+
tzas 02:0
0BR

confidential and proprietary trade secret that may not be reproduced, disclosed to third parties, altered or otherwise employed in any
manner whatsoever without the express written consent of SWF Krantechnik GmbH. Copyright © SWF Krantechnik. All rights reserved. DG 5Tn-OI

F
E
B

C
A

G
D

1
1

2
2

3
3

4
4

5
5

6
6

7
7

8
8

Twin copy
REV

Pos

Date

Dept
Design
Amount

KBR/SGT

9
9

13.01.2023

Thessaloniki
Description
CHANGE DESCRIPTION

Chd

10
10

Appd

BDC5t x 20m Hol:9m


ECN

Specification
DATE

11
11

Ref drawing
REVISED BY

Vx proj
DAS / 2.136.21
12

12
Issue
APPROVED BY

M-film
1:40
F
E
B

C
A

G
D

TC1.1
$Sheet = TEAMCENTER, rev2

You might also like