Which of the following is not a part of Five M’s?

a. Material
b. Machine
c. Motion
d. Method

(Ans:c)

The correct sequence of operations in production planning and control is

a. Routing-Scheduling-Dispatching-Follow up
b. Scheduling-Routing- Dispatching-Follow up
c. Dispatching-Routing-Scheduling- Follow up
d. Routing-Scheduling-Follow up-Dispatching

(Ans:a)

Which of the following is true for ‘Routing’?

a. It is flow of work in the plant


b. Route sheets include list of machine tools that are to be followed
c. It depends upon material handling facilities
d. All of the above

(Ans:d)

Loading may be defined as

a. Sending the raw material to the machine


b. Sending the finished material to the store
c. Assign the work to the facilities
d. Uploading a software in machine control panel

(Ans:c)

Dispatching authorizes the start of production operations by

i. Release of material and components from stores to first process


ii. Release of material from process to process
iii. Issue of drawings instruction sheets

Which of the following is (are) true?

a. Only i
b. Only ii
c. i & ii
d. i , ii & iii

(Ans:d)

The bill of material does not consists of

a. Part number
b. Specifications of part
c. Name of the part
d. Price of the part

(Ans:d)
StockX 0% Brokrage
Comex Forex MCX Features.StockX
0% Brokrage.Start Minimum With
1000 INR
स्टॉकX

Open

Procurement cycle time is time consumed for

a. Receiving of raw material


b. Inspection of various raw materials
c. Inspection of purchased components parts
d. All of the above

(Ans:d)

The transit time consist of

a. Time taken by raw material from machine to machine


b. Time consumed in moving the work between various departments
c. Time taken by a worker to machine a component
d. None of the above

(Ans:b)

Master schedule is prepared for

a. Single product continuous production


b. Multi product batch production
c. Assembly product continuous production
d. Single product batch production

(Ans:c)

StockX 0% Brokrage
Comex Forex MCX Features.StockX 0%
Brokrage.Start Minimum With 1000 INR

स्टॉकX

Open

Which of the following chart is drawn Machine vs time?

a. Man machine chart


b. The load chart
c. The progress chart
d. Curve chart

(Ans:b)

Gantt chart is mostly used for

a. Routing
b. Scheduling
c. Follow up
d. Inspection and quality control
(Ans:b)

Key to chart is provided in

a. Man machine chart


b. The load chart
c. The progress chart
d. Gantt chart

(Ans:d)

Centralized and decentralized are the types of

a. Routing
b. Dispatching
c. Scheduling
d. Follow up

(Ans:b)

StockX 0% Brokrage
Comex Forex MCX Features.StockX 0%
Brokrage.Start Minimum With 1000 INR

स्टॉकX

Open
Multiple Choice Questions (MCQ) on Forecasting

Multiple Choice Questions (MCQ) on Supply chain management

 You May Also Like

Multiple Choice Questions (MCQ) on Quality Management

Multiple Choice Questions (MCQ) on Just-In-Time (JIT)

Fundamentals of Accounting – Multiple Choice Questions (MCQ) with


Answers
StockX 0% Brokrage
Comex Forex MCX Features.StockX 0%
Brokrage.Start Minimum With 1000 INR

स्टॉकX

Open

Scholarexpress.com
Follow Page 32 followers

Scholarexpress.com
on Sunday

MCQ Questions on Business


Management
https://scholarexpress.com/mcq-
questions-on-business-manag…/
#objectivequestions #MCQsTest
#multiplechoicequestions
#businessmanagement
#businessadministration #MBA

Categories

Automobile Engineering (55)

B.tech CSE Question Papers (6)

B.tech ECE Question Papers (6)

B.tech First / Second Semester Question Papers (6)

B.tech IT Question Papers (4)

B.tech ME Question Papers (6)


CBSE 10th Objective Questions (14)

CBSE Objective Questions (18)

Civil Engineering (13)

Computer Science Engineering (36)

Environmental Science (31)

General Studies (258)

Management Studies (222)

Mathematics (7)

MCQ on ages (1)

MCQ on area and volume (4)

MCQ on Automobile Engineering (42)

MCQ on Electrical engineering (25)

MCQ on Engineering Drawing (12)

MCQ on Fluid machinery / Turbo machines (4)

MCQ on Fluid mechanics (10)

MCQ on General aptitude (17)

MCQ on General awareness (106)

MCQ on General Science (46)

MCQ on HCF and LCM (1)

MCQ on height and distance (1)

MCQ on logical reasoning (3)

MCQ on Manufacturing management (38)

MCQ on Manufacturing processes (67)

MCQ on mean, mode and median (2)

MCQ on Mechanical engineering (35)

MCQ on mechanics (5)

MCQ on numbers (3)

MCQ on percentage (3)

MCQ on Power plant engineering (14)


MCQ on profit, loss and discount (3)

MCQ on Refrigeration and air conditioning (9)

MCQ on series (4)

MCQ on simple and compound interest (2)

MCQ on speed, distance and time (1)

MCQ on Strength of materials (18)

MCQ on Theory of machines (24)

MCQ on Thermodynamics (8)

MCQ on work done and time (1)

Mechanical Engineering (163)

Organisation Behaviour (25)

PTU Question Papers (5)

Science (15)

Uncategorized (28)

StockX 0% Brokrage
Comex Forex MCX Features.StockX 0%
Brokrage.Start Minimum With 1000 INR

स्टॉकX

Open
Copyright © 2023 Scholarexpress. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.

You might also like