I. PEKERJAAN PERSIAPAN
01 Pengukuran lokasi Juru Ukur
02 Pembersihan lokasi Area kerja
03 Pasang bouwplank Kaso,bambu
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
Sub Total
JUMLAH TOTAL
Sarana:
Penyambungan PLN 1300 VA
Sumur Bor 30 m
Prasarana :
PJU
Drainase
Fasos Fasum
Bak Sampah / TPS
Grand Total 109,330,390
Harga
Volume Satuan Satuan Total Harga
(Rp) (Rp)
72 M2 2,500 180,000
72 M2 5,000 360,000
50 M' 75,000 2,025,000
2,565,000
50 M3 75,000 2,850,000
6 M3 50,000 300,000
7.5 M3 125,000 937,500
1.2 M3 125,000 150,000
4,237,500
5 M3 700,000 3,710,000
1 M3 2,200,000 2,200,000
5,910,000
11,665,500
36 M2 60,000 2,160,000
3 M2 60,000 180,000
12 M2 50,000 600,000
36 M' 20,000 720,000
6 M2 70,000 420,000
4,080,000
63 M2 185,000 11,655,000
63 M2 158,730 9,999,990
7 M2 50,000 350,000
13.3 M' 45,000 598,500
16 M' 85,000 1,360,000
16 m 185,000 370,000
24,333,490
36 M2 75,000 2,700,000
36 M2 60,000 2,160,000
13.3 M2 60,000 798,000
3.25 M2 428,000 1,391,000
7,049,000
8,540,000
2,285,000
1,500,500
2,450,000
36 M2 37,000 1,332,000
36 M2 30,000 1,080,000
16 M2 15,000 240,000
2,652,000
96,380,390
93.600.000 2,677,000.00
1,650,000
5,000,000
6,650,000
700,000
1,200,000
4,000,000
300,000
6,200,000
Hormat kami,
PT. SATRIA HENGGAR WANGSA
RINCIAN
RENCANA ANGGARAN BIAYA
Pekerjaan : Pembangunan Rumah Tipe 36/72 ( KOM
Lokasi : Perumahan KRAKATOA VILLAGE LINK. KEDUNG BAYA
Kec. CIBEBER Cilegon - Banten
Sub Total
Sub Total
Sub Total
Sub Total
X. PEK.ACCESSORIES PINTU DAN JENDELA
01 Handel Pintu Utama ex lokal
02 Handel Pintu Dalam ex lokal
03 Slot Jendela ex lokal
04 Hak Angin ex lokal
05 Engsel Pintu ex lokal
06 Engsel Jendela ex lokal
Sub Total
JUMLAH TOTAL
AN
GARAN BIAYA
mah Tipe 36/72 ( KOMERSIL )
LINK. KEDUNG BAYAH Ds KALITIMBANG
legon - Banten
Harga
Volume Satuan Satuan Total Harga
(Rp) (Rp)
5 M3 700,000 3,710,000
1 M3 2,200,000 2,200,000
5,910,000
11,665,500
63 M2 185,000 11,655,000
63 M2 158,730 -
7 M2 50,000 -
13.3 M' 45,000 -
16 M' 85,000 1,360,000
16 m 185,000 -
13,015,000
8,540,000
1 psg 120,000 120,000
3 psg 90,000 270,000
5 Set 25,000 125,000
5 Set 45,000 225,000
4 Unit 20,000 80,000
5 Set 25,000 125,000
945,000