Variation Statement

Agreement Details:
Railway Name: North Central Railway Unit Name: Jhansi Department Name: Civil
Tender Number: Tender Type: Open Tender Opened On: 05/05/2021
Tender Validity (Up To): 05/05/2021 Nature of Contract: Works LOA Number: 00917400037899
LOA Date: 05/07/2021 LOA Amount (Rs.): 20073971 PG Amount (Rs.): 602219.0
Contractor's Name: THE RAPID GREEN-MEERUT Contractor's Code: 91740 Date of Completion: 05/07/2022
Agreement No: NCR/JHS/Civil/2021/0040 Agreement Date: 24/12/2021 Variation Number: 1
Name of Work Under TRR(P)8.033 kms & Misc. work on Sithouli-Dhoulpur section.
Proposed LOA:

Signature Not Verified Signature Not Verified Signature Not Verified Signature Not Verified
Digitally signed by BRAJESH KUMAR Digitally signed by ANKUR GUPTA Digitally signed by TARUN KUMAR Digitally signed by Sudhir Kumar
BATHAM Date: 2022.05.31 16:43:02 IST Date: 2022.06.14 22:38:59 IST
Date: 2022.05.30 14:53:27 IST Date: 2022.06.17 16:59:28 IST
Reason: Variation Signing By Reason: Variation Signing By
Reason: Variation Signing By ADEN GWL Contractor Reason: Variation Signing By
SSE/PW/GWL Sr.DEN/North/JHS

Signature Not Verified Signature Not Verified


Digitally signed by AMRITANSHU Digitally signed by Sudhir
MAURYA Kumar
Date: 2022.07.05 11:22:36 PDT
Reason: Variation Vetted By Sr. DFM/JHS Date: 2022.07.15 13:46:54 IST
Reason: Variation Approval
Schedules Details:
Amount(Rs.) up to Last Amount(Rs.) as per Proposed Amount(Rs.) as per Proposed %age Variation, Including
Schedule Org. Agmt. Amount(Rs.) Total %age Variation
Variation Qty Qty, Including Special Cond. Spcl. Cond.
9 256,462.11 0 297,000.34 297,000.34 15.807 15.807
8 634,780.671 0 937,145.84 937,145.84 47.633 47.633
7 760,347.795 0 1,305,256.68 1,305,256.68 71.666 71.666
6 660,082.8 0 970,710 970,710 47.059 47.059
5 5,234,393.135 0 8,248,355.14 8,248,355.15 57.58 57.58
4 827,844.24 0 48,696.72 48,696.72 -94.118 -94.118
3 6,784,703.625 0 6,295,703.63 6,295,703.63 -7.207 -7.207
2 2,034,243.813 0 3,544,524.29 3,544,524.29 74.243 74.243
1 2,881,113.176 0 3,440,743.35 3,440,743.35 19.424 19.424
Total of All above 20,073,971.364 0 25,088,135.99 25,088,136 24.978 24.978
Schedules:
Total of New Schedules: 0 0 0
Total of Old Schedules: 20,073,971.364 25,088,135.99 25,088,136
Rebate (0.0 %) on Org Sdl 0 Rebate (0.0 %) on Org Sdl 0
Total Amount 20,073,971.364 Total Amount 25,088,136

Last Sanctioned Variation Details:


Variation Details:
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Track
SOR 9 211110 Group 2000.0 18.12 2000.0 17.99316 35986.32 2000.0 35986.32 35986.32 0.0
metre
Group Description: Chapter 21 SOR 2019
Description: Removal of night soil from track (ballast profile and cess) in yard line / block section by manual or mechanical means and dumping at indicated place outside the working area. This item can
be operated at locations where trackmen are to be deputed for only track maintenance activities, as per satisfaction to the site engineer in-charge
Remarks:
SOR 9 211140 Group Each 200.0 467.94 200.0 464.66442 92932.884 150.0 69699.66 69699.66 -25.0
Group Description: Chapter 21 SOR 2019
Description: Making Trolley Refuge of size 2.75m x 2.75m and placing released unserviceable PSC sleepers at all four sides of refuge (Earth-work to be paid separately)
Remarks:
1275.4290 127542.90 150.0
SOR 9 211220 Group Hour 100.0 1284.42 100.0 191314.36 191314.36 50.0
6 6
Group Description: Chapter 21 SOR 2019
Description: Hiring of JCB/Hitachi for levelling and dressing ground/dismantling structures ,Removal of jungle, clearing of earth, lowering high cess etc., along side the track between up and down lines
obstructing drainages of rain water, clearing of bushes obstructing visibility at curves and Level Crossings with all lead and lift etc. complete and as directed by the Engineer-in-charge .All labour, tools
and plants consumables stores including supply of JCB/Hitachi with crew to be provided by the contractor at his own cost. The contractor shall arrange road permit for vehicle for all the States of
operation, as per instructions of engineer in-charge and vehicle shall not be more than three years old. Payment shall be made for actual working hours at site.
Remarks:
SOR 8 201111 Group Each 5.0 5327.5 5.0 6073.35 30366.75 14.0 85026.9 85026.9 180.0
Group Description: Chapter 20 SOR 2019
Description: Bilingual Whistle Boards for level crossing
Remarks:
SOR 8 201112 Group Each 5.0 4168.91 5.0 4752.5574 23762.787 16.0 76040.92 76040.92 220.0
Group Description: Chapter 20 SOR 2019
Description: Speed Breaker / Rumble Strips Board
Remarks:
SOR 8 201113 Group Each 5.0 3404.11 5.0 3880.6854 19403.427 0.0 0.0 0.0 -100.0
Group Description: Chapter 20 SOR 2019
Description: Un-manned Level Crossing Danger Stop Board
Remarks:
SOR 8 201114 Group Each 5.0 4812.39 5.0 5486.1246 27430.623 5.0 27430.62 27430.62 0.0
Group Description: Chapter 20 SOR 2019
Description: Manned Level Crossing Indicator Board
Remarks:
SOR 8 201115 Group Each 60.0 3404.11 60.0 3880.6854 232841.12 60.0 232841.12 232841.12 0.0
4
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Group Description: Chapter 20 SOR 2019
Description: Single Strip / Double Strip Level Crossing Road Warning Board
Remarks:
SOR 8 201116 Group Each 15.0 4774.93 15.0 5443.4202 81651.303 20.0 108868.4 108868.4 33.33
Group Description: Chapter 20 SOR 2019
Description: Caution Indicator Board
Remarks:
SOR 8 201117 Group Each 10.0 4078.3 10.0 4649.262 46492.62 20.0 92985.24 92985.24 100.0
Group Description: Chapter 20 SOR 2019
Description: Speed Indicator Board
Remarks:
SOR 8 201118 Group Each 5.0 4774.93 5.0 5443.4202 27217.101 5.0 27217.1 27217.1 0.0
Group Description: Chapter 20 SOR 2019
Description: Stop Indicator Board
Remarks:
SOR 8 201119 Group Each 15.0 6140.2 15.0 6999.828 104997.42 25.0 174995.7 174995.7 66.67
Group Description: Chapter 20 SOR 2019
Description: Termination Indicator Board
Remarks:
SOR 8 201120 Group Each 5.0 3625.84 5.0 4133.4576 20667.288 5.0 20667.29 20667.29 0.0
Group Description: Chapter 20 SOR 2019
Description: Flag Station Board
Remarks:
SOR 8 201121 Group Each 5.0 3500.04 5.0 3990.0456 19950.228 5.0 19950.23 19950.23 0.0
Group Description: Chapter 20 SOR 2019
Description: Circular Stop Disc of 600mm dia. with vertical holding stand for fixing on emergency chain at level crossing
Remarks:
SOR 8 201154 Group Each 0.0 2481.87 0.0 2829.3318 0.0 10.0 28293.32 28293.32 0.0
Group Description: Chapter 20 SOR 2019
Description: 26.5 mm dia.
Remarks:
SOR 8 201156 Group Each 0.0 3756.93 0.0 4282.9002 0.0 10.0 42829.0 42829.0 0.0
Group Description: Chapter 20 SOR 2019
Description: 31.75 mm dia.
Remarks:
SOR 7 171034 Group MT 0.0 112.46 0.0 128.2044 0.0 150.0 19230.66 19230.66 0.0
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Group Description: Chapter 17 SOR 2019
Description: In Wagon where mechanical handling is possible and traffic block is not required or in Truck/Trailor.
Remarks:
391576.03
SOR 7 171040 Group MT 1025.0 335.11 1025.0 382.0254 1500.0 573038.1 573038.1 46.34
5
Group Description: Chapter 17 SOR 2019
Description: Loading, unloading and hauling of 52Kg / 60Kg rail upto 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic in case road carriage is not
possible with lead upto 500 metre and all lift upto 5 metre during block period
Remarks:
SOR 7 171081 Group MT 1025.0 32.36 1025.0 36.8904 37812.66 1025.0 37812.66 37812.66 0.0
Group Description: Chapter 17 SOR 2019
Description: During period of traffic block
Remarks:
Running
SOR 7 171091 Group 0.0 35.43 0.0 40.3902 0.0 1200.0 48468.24 48468.24 0.0
Metre
Group Description: Chapter 17 SOR 2019
Description: Rails upto and including 13 m length
Remarks:
Running
SOR 7 171092 Group 0.0 41.45 0.0 47.253 0.0 500.0 23626.5 23626.5 0.0
Metre
Group Description: Chapter 17 SOR 2019
Description: Rails more than 13 m and upto 40 m length
Remarks:
Running
SOR 7 171094 Group 0.0 8.86 0.0 10.1004 0.0 1200.0 12120.48 12120.48 0.0
Metre
Group Description: Chapter 17 SOR 2019
Description: Extra over item No 171091 for crossing each additional line
Remarks:
SOR 7 171131 Group MT 2500.0 101.06 2500.0 115.2084 288021.0 2500.0 288021.0 288021.0 0.0
Group Description: Chapter 17 SOR 2019
Description: Lead upto 10 Km
Remarks:
SOR 7 171132 Group MT 1000.0 30.6 1000.0 34.884 34884.0 2500.0 87210.0 87210.0 150.0
Group Description: Chapter 17 SOR 2019
Description: Extra to Item no. 171131 for additional lead over 10 Km for every 5 Km lead or part thereof upto 100 Kms
Remarks:
SOR 7 171133 Group MT 500.0 14.13 500.0 16.1082 8054.1 500.0 8054.1 8054.1 0.0
Group Description: Chapter 17 SOR 2019
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Description: Extra to Items no. 171131 & 171132 for additional lead beyond 100 Km for every 5 Km or part thereof upto 400 Kms
Remarks:
SOR 7 171160 Group Each 0.0 48.54 0.0 55.3356 0.0 2000.0 110671.2 110671.2 0.0
Group Description: Chapter 17 SOR 2019
Description: Spreading of New / SH PSC sleepers along track on either side manually or mechanically including loading, unloading & transportation, if required with lead of every 250m or part thereof
upto total lead of 1000m and all lifts
Remarks:
SOR 7 171161 Group Each 0.0 26.83 0.0 30.5862 0.0 500.0 15293.1 15293.1 0.0
Group Description: Chapter 17 SOR 2019
Description: Extra to Item no. 171160 for additional lead of every 500m or part thereof beyond 1 km and upto 3 km with all lift
Remarks:
SOR 7 171172 Group MT 0.0 102.91 0.0 117.3174 0.0 300.0 35195.22 35195.22 0.0
Group Description: Chapter 17 SOR 2019
Description: Not involving traffic block
Remarks:
SOR 7 171183 Group MT 0.0 96.98 0.0 110.5572 0.0 150.0 16583.58 16583.58 0.0
Group Description: Chapter 17 SOR 2019
Description: From Truck / Trailer
Remarks:
SOR 7 171192 Group MT 0.0 87.52 0.0 99.7728 0.0 300.0 29931.84 29931.84 0.0
Group Description: Chapter 17 SOR 2019
Description: Not involving traffic block
Remarks:
Track
SOR 6 151311 Group 17000.0 34.06 17000.0 38.8284 660082.8 25000.0 970710.0 970710.0 47.06
metre
Group Description: Chapter 15 SOR 2019
Description: (a) For day time block working
Remarks:
Track
SOR 5 131031 Group 14300.0 113.92 14300.0 64.9344 928561.92 14300.0 928561.92 928561.92 0.0
metre
Group Description: CHAPTER 13 SOR 2019
Description: For PSC Sleeper Track (BG)
Remarks:
SOR 5 131081 Group Set 25.0 17472.13 25.0 9959.1141 248977.85 20.0 199182.28 199182.28 -20.0
25
Group Description: CHAPTER 13 SOR 2019
Description: 1 in 8.5 PSC layout
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Remarks:
13570.138 882058.98
SOR 5 131083 Group Set 65.0 23807.26 65.0 20.0 271402.76 271402.76 -69.23
2 3
Group Description: CHAPTER 13 SOR 2019
Description: 1 in 12 PSC layout
Remarks:
Track
SOR 5 131111 Group 0.0 210.79 0.0 120.1503 0.0 5500.0 660826.65 660826.65 0.0
Metre
Group Description: CHAPTER 13 SOR 2019
Description: For Sleeper Density of 1540 sleepers/Km or more
Remarks:
Track
SOR 5 131203 Group 8500.0 69.81 8500.0 39.7917 338229.45 20000.0 795834.0 795834.0 135.29
metre
Group Description: CHAPTER 13 SOR 2019
Description: Without Rail tensor
Remarks:
SOR 5 131300 Group Sleeper 15000.0 23.21 15000.0 13.2297 198445.5 30000.0 396891.0 396891.0 100.0
Group Description: CHAPTER 13 SOR 2019
Description: Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire
brush, scrapper / sand emery paper etc., supply & provision of anti-corrosive treatment by application of graphite grease, as prescribed by Railway under side of liners & corresponding area of
rail foot & SGCI insert with ERCs and re-fixing the same as per Para-1411(5) of Indian Railways Permanent Way Manual.
Remarks:
SOR 5 131360 Group Each 110.0 3178.27 110.0 1811.6139 199277.52 110.0 199277.53 199277.53 0.0
9
Group Description: CHAPTER 13 SOR 2019
Description: Removing existing glued joints from running track under traffic condition, duly cutting rails, inserting transported cut rails / glued joints of required length by providing gap for carrying out
welding or joining rails with fish plates, duly drilling holes in cut rail and approach rail, if required as directed by engineer in-charge
NOTE: 1.Drilling holes & rail cutting will be paid separately)
(2) Rails, fish plates will be made available within free lead of 250m in yard (3) One set consists of two numbers of two joints
Remarks:
SOR 5 131440 Group R metre 75000.0 12.92 75000.0 7.3644 552330.0 90000.0 662796.0 662796.0 20.0
Group Description: CHAPTER 13 SOR 2019
Description: Removing weeds & bushes in ballast section and cess upto 3.5m from centre line of track in section & station yard, as specified by Engineer in-charge including disposal of
branches, bushes outside cess/yard
Remarks:
SOR 5 131520 Group R metre 17000.0 145.4 17000.0 82.878 1408926.0 31200.0 2585793.6 2585793.6 83.53
Group Description: CHAPTER 13 SOR 2019
Description: Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane as per requirement with two coats of bituminous emulsion without mica (IP No. 56192 and RDSO
Specification No. IRS-P-30-1996) of reputed make including surface preparation, i.e. cleaning with wire brush / sand paper as a complete job as per Para 250 of Indian Railways Permanent Way Manual
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Remarks:
Running
SOR 5 131530 Group 0.0 125.17 0.0 71.3469 0.0 15000.0 1070203.5 1070203.5 0.0
Metre
Group Description: CHAPTER 13 SOR 2019
Description: Anti-corrosive painting of rail on running track on web, foot etc. including liner contact area (excluding bottom of foot) and fishing plane as per requirement with two coats of bituminous
emulsion without mica (IP No. 56192 and RDSO Specification No. IRS-P-30-1996) of reputed make including surface preparation, i.e. cleaning with wire brush / sand paper as a complete job as per Para
250 of Indian Railways Permanent Way Manual
.Note : 60% of payment shall be made if painting on one side is done
Remarks:
SOR 5 131590 Group Each 3000.0 279.29 3000.0 159.1953 477585.9 3000.0 477585.9 477585.9 0.0
Group Description: CHAPTER 13 SOR 2019
Description: Removing existing seized / corroded / broken rail screws/Plate screws in PSC sleepers by using gas ,duly drilling holes in broken screws and removing existing rail screw pieces from the holes
alongwith existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials and refixing new Railway's rail
screws duly greasing dowel portion with Railway's grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift, crossing of track etc. complete and as
directed by the Engineer in-charge
Remarks:
SOR 4 121093 Group R metre 17000.0 49.04 17000.0 48.69672 827844.24 1000.0 48696.72 48696.72 -94.12
Group Description: CHAPTER 12 SOR2019
Description: For rails/panels of more than 40m length
Remarks:
Track 4052868.7 10500.0 4052868.7 4052868.7 0.0
SOR 3 081034 Group 10500.0 514.65 10500.0 385.9875
metre 5 5 5
Group Description: CHAPTER 8 SOR 2019
Description: Depth of 300 mm below bottom of sleeper
Remarks:
Track 775834.87 3350.0
SOR 3 081038 Group 3350.0 308.79 3350.0 231.5925 775834.88 775834.88 0.0
metre 5
Group Description: CHAPTER 8 SOR 2019
Description: Extra to item no. 081034 for deep screening of Turnout (60% of relevant item rate)
Remarks:
Track
SOR 3 081100 Group 100000.0 26.08 100000.0 19.56 1956000.0 75000.0 1467000.0 1467000.0 -25.0
metre
Group Description: CHAPTER 8 SOR 2019
Description: Boxing of ballast as per profile mentioned in IR's LWR Manual including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the
same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge
Remarks:
13649.748 0.0
SOR 2 071051 Group Set 0.0 13745.97 0.0 10.0 136497.48 136497.48 0.0
21
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 8.5 Turnout
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Remarks:
17595.612
SOR 2 071052 Group Set 0.0 17719.65 0.0 0.0 16.0 281529.8 281529.8 0.0
45
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 12 Turnout
Remarks:
21541.466
SOR 2 071053 Group Set 0.0 21693.32 0.0 0.0 3.0 64624.4 64624.4 0.0
76
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 16 Turnout
Remarks:
22974.395
SOR 2 071111 Group Set 0.0 23136.35 0.0 0.0 10.0 229743.96 229743.96 0.0
55
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 8.5 Turnout
Remarks:
25987.137
SOR 2 071112 Group Set 0.0 26170.33 0.0 0.0 16.0 415794.2 415794.2 0.0
69
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 12 Turnout
Remarks:
28808.786
SOR 2 071113 Group Set 0.0 29011.87 0.0 0.0 3.0 86426.36 86426.36 0.0
91
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 16 Turnout
Remarks:
31228.549
SOR 2 071121 Group Set 0.0 31448.69 0.0 0.0 2.0 62457.1 62457.1 0.0
17
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 8.5 Turnouts
Remarks:
35471.082 354710.82
SOR 2 071122 Group Set 10.0 35721.13 10.0 0.0 0.0 0.0 -100.0
09 09
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 12 Turnouts
Remarks:
SOR 2 071161 Group Each 200.0 427.56 200.0 424.56708 84913.416 11.0 4670.24 4670.24 -94.5
Group Description: CHAPTER 7 SOR 2019
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Description: Sleepers upto 3.5m length
Remarks:
151285.53
SOR 2 071162 Group Each 300.0 507.84 300.0 504.28512 9.0 4538.57 4538.57 -97.0
6
Group Description: CHAPTER 7 SOR 2019
Description: Sleepers of more than 3.5m length
Remarks:
SOR 2 071171 Group Each 0.0 747.77 0.0 742.53561 0.0 150.0 111380.34 111380.34 0.0
Group Description: CHAPTER 7 SOR 2019
Description: Sleepers upto 3.5m length
Remarks:
SOR 2 071172 Group Each 0.0 968 0.0 961.224 0.0 200.0 192244.8 192244.8 0.0
Group Description: CHAPTER 7 SOR 2019
Description: Sleepers of more than 3.5m length
Remarks:
14315.723
SOR 2 071191 Group Set 0.0 14416.64 0.0 0.0 10.0 143157.24 143157.24 0.0
52
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 8.5 Switch Assembly
Remarks:
18255.738 365114.77
SOR 2 071192 Group Set 20.0 18384.43 20.0 16.0 292091.82 292091.82 -20.0
99 98
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 12 Switch Assembly
Remarks:
19640.954
SOR 2 071193 Group Set 0.0 19779.41 0.0 0.0 3.0 58922.86 58922.86 0.0
13
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 16 Switch Assembly
Remarks:
5163.4907
SOR 2 071201 Group Set 0.0 5199.89 0.0 0.0 10.0 51634.91 51634.91 0.0
7
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 8.5 Turnout
Remarks:
6973.2332
SOR 2 071202 Group Set 0.0 7022.39 0.0 0.0 16.0 111571.73 111571.73 0.0
7
Group Description: CHAPTER 7 SOR 2019
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Description: 1 in 12 Turnout
Remarks:
7836.8056
SOR 2 071203 Group Set 0.0 7892.05 0.0 0.0 3.0 23510.42 23510.42 0.0
5
Group Description: CHAPTER 7 SOR 2019
Description: 1 in 16 Turnout
Remarks:
44925.802 1123145.0
SOR 2 071210 Group Set 25.0 45242.5 25.0 22.0 988367.66 988367.66 -12.0
5 625
Group Description: CHAPTER 7 SOR 2019
Description: Through Switches Renewals of existing curved/Thick web switches with Thick Web Switches on 60Kg 1 in 12 Points and crossings including approach rails, removal and laying of same
section rails, on sleepers of any type, removing and re-fixing fittings, fastenings, stretcher bar, blocks etc., including stacking of released materials within a lead of 50m and packing of any disturbed
sleepers and boxing, picking of slacks of track at switch portion, crossing of track wherever necessary as directed by Engineer in charge at site.
(Note: Rail cutting and Hole Drilling shall be paid extra)
Remarks:
-
-
SOR 2 071212 Group Set 5.0 -9048.5 5.0 8985.1605 44925.802 8.0 -71881.28 -71881.28 60.0
5
Group Description: CHAPTER 7 SOR 2019
Description: Deduct to Item No 071210 for 1 in 8.5 Turnouts (20% of Relevant Item)
Remarks:
SOR 2 071220 Group Each 0.0 29.98 0.0 29.77014 0.0 12000.0 357241.68 357241.68 0.0
Group Description: CHAPTER 7 SOR 2019
Description: Lubrication of Plate/Rail screws of Points and crossings,SEJs, Bridges, Curves etc, including removal of plate/rail screw carefully without breaking the screw, cleaning with wire brush etc
both screws and dowel hole applying railways grease graphite, refixing the screw with spring washer and sealing the top and sides of screw with Railway's grease graphite to prevent ingress of moisture
and corrosion with contractors labour, tools all lead and lift complete.
Remarks:
Running
SOR 1 061011 Group 0.0 8.57 0.0 7.3702 0.0 1200.0 8844.24 8844.24 0.0
Metre
Group Description: CHAPTER 6 SOR 2019
Description: Upto 40 m long rail panel
Remarks:
Running
SOR 1 061012 Group 0.0 12.88 0.0 11.0768 0.0 26400.0 292427.52 292427.52 0.0
Metre
Group Description: CHAPTER 6 SOR 2019
Description: More than 40 m long rail panel
Remarks:
SOR 1 061021 Group R metre 8500.0 28.4 8500.0 24.424 207604.0 26400.0 644793.6 644793.6 210.59
Group Description: CHAPTER 6 SOR 2019
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Description: BG Track - For Through Renewal work
Remarks:
Running
SOR 1 061023 Group 0.0 42.84 0.0 36.8424 0.0 1200.0 44210.88 44210.88 0.0
Metre
Group Description: CHAPTER 6 SOR 2019
Description: BG Track - For Casual/Scattered Renewal work
Remarks:
Track
SOR 1 061031 Group 8500.0 59.35 8500.0 51.041 433848.5 13200.0 673741.2 673741.2 55.29
metre
Group Description: CHAPTER 6 SOR 2019
Description: BG Track - For Through Renewal work
Remarks:
Running
SOR 1 061033 Group 0.0 54.4 0.0 46.784 0.0 1200.0 56140.8 56140.8 0.0
Metre
Group Description: CHAPTER 6 SOR 2019
Description: BG Track - For Casual/Scattered Renewal work
Remarks:
SOR 1 061041 Group Each 0.0 110.87 0.0 95.3482 0.0 1000.0 95348.2 95348.2 0.0
Group Description: CHAPTER 6 SOR 2019
Description: For location of work not involving deep screening
Remarks:
SOR 1 061061 Group Each 1000.0 191.07 1000.0 164.3202 164320.2 136.0 22347.55 22347.55 -86.4
Group Description: CHAPTER 6 SOR 2019
Description: For location of work not involving deep screening
Remarks:
SOR 1 061071 Group Each 1000.0 244.79 1000.0 210.5194 210519.4 1350.0 284201.19 284201.19 35.0
Group Description: CHAPTER 6 SOR 2019
Description: For location of work not involving deep screening
Remarks:
SOR 1 061091 Group Each 0.0 502.7 0.0 432.322 0.0 200.0 86464.4 86464.4 0.0
Group Description: CHAPTER 6 SOR 2019
Description: BG Track (PSC to PSC sleepers)
Remarks:
SOR 1 061130 Group Each 57000.0 30.22 57000.0 25.9892 1481384.4 26000.0 675719.2 675719.2 -54.39
Group Description: CHAPTER 6 SOR 2019
Description: Through Fitting Renewal (TFR) on PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs (excluding seized ERCs) without damaging PSC sleepers. Scope includes
cleaning rail seat on sleeper, ERC and eye of Inserts with wire brushes and applying grease to eye of insert and central leg of ERC with contractor's grease of Railway's specification, cleaning
rail flange at liner seats, putting-back liners in correct position & squaring of sleepers and sealing liner edges with grease. [Rate includes lead upto 500m)
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
Remarks:
SOR 1 061201 Group Each 50.0 351.38 50.0 302.1868 15109.34 200.0 60437.36 60437.36 300.0
Group Description: CHAPTER 6 SOR 2019
Description: On Cess
Remarks:
SOR 1 061202 Group Each 50.0 550.56 50.0 473.4816 23674.08 200.0 94696.32 94696.32 300.0
Group Description: CHAPTER 6 SOR 2019
Description: In-situ situation
Remarks:
SOR 1 061211 Group Each 200.0 221.61 200.0 190.5846 38116.92 500.0 95292.3 95292.3 150.0
Group Description: CHAPTER 6 SOR 2019
Description: Hole of dia. 25mm and above
Remarks:
SOR 1 061212 Group Each 200.0 136.17 200.0 117.1062 23421.24 300.0 35131.86 35131.86 50.0
Group Description: CHAPTER 6 SOR 2019
Description: Hole of dia. below 25mm
Remarks:
SOR 1 061222 Group Each 1500.0 145.49 1500.0 125.1214 187682.1 1500.0 187682.1 187682.1 0.0
Group Description: CHAPTER 6 SOR 2019
Description: Rail section of 52Kg and above
Remarks:
SOR 1 061260 Group Set 0.0 10333.76 0.0 8887.0336 0.0 4.0 35548.13 35548.13 0.0
Group Description: CHAPTER 6 SOR 2019
Description: Renewal with insertion of improved SEJ with PSC / Wooden special size sleepers as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail
fittings. Work includes providing temporary connection till the time welding of SEJ is done. Sleepers shall be given initial packing to make track fit for 20 kmph speed.
(Rail cutting and Holes drilling shall be paid separately)
Remarks:
SOR 1 061270 Group Set 20.0 5548.43 20.0 4771.6498 95432.996 10.0 47716.5 47716.5 -50.0
Group Description: CHAPTER 6 SOR 2019
Description: Renewal of existing SEJ (in running line & yard) on PSC / Wooden sleepers with cutting of rails, as required and lubrication, gauging & aligning rails, providing temporary
connection with adequate welding gap with adjoining rail and ensuring proper track geometry for 30 kmph speed, as directed by Engineer in-charge.
(Rail cutting and Holes drilling shall be paid separately)
Remarks:
20,073,97 25,088,13 25,088,13
Total: Total: 24.978
1.364 5.99 6
%age
Rebate (0.0 %) Amount 0 Var.Incl.Spc
l.Cond.
Amount
(Rs.) as per %age
Amount
Previous Last Amount Proposed variation of
Schedule Qty. as per Base Agreement Proposed (Rs.) as per
Variation Schedule Item No. Item Type Unit variation (Rs.) as per Qty. Proposed
Type Orig.Agmt. Rate(Rs.) Rate(Rs.) Qty. Proposed
Revno. Qty. Orig. Agmt. including Qty. with
Qty. special Agmt. Qty.
cond.
25,088,13
Total Amount 24.978