MASALA AND SEASONING EXISTING PLANT
SR. CONSUMPTION MT/ DAYS OF STORAGE
NO. MATERIAL NAME STORAGE TYPE DAY NATURE AS PER CLIENT
1 White salt Silo 10 Dry 15
2 Black salt Silo 3 Dry 15
3 Black pepper Silo 1.5 Dry 15
4 Pudhina Powder Silo 2 Hygroscopic 15
5 Maize Starch Silo 2 Dry 15
6 Malto Dextrin Silo 5 Hygroscopic 15
7 Degi Mirch Powder Silo 3 Dry 15
8 Red Chilli powder Silo 5 Dry 15
9 Sugar powder Container 5 Hygroscopic 15
10 Coriander Powder Container 1.5 Dry 15
11 Cumin Powder Container 1.5 Dry 15
12 Ginger Powder Container 0.8 Dry 15
13 Onion Powder Container 2 Hygroscopic 15
14 Garlic powder Container 2 Hygroscopic 15
15 Tomato powder Container 1.5 Hygroscopic 15
16 Dextose Container 1.5 Hygroscopic 15
17 Citric Acid Container 1 Hygroscopic 15
18 Saunf Powder Mandos 0.08 Dry 15
19 Amchur Powder Mandos 3 Hygroscopic 15
20 Turmeric powder Mandos 0.15 Dry 15
21 Green Chilli powder Mandos 0.1 Dry 15
22 Green coriander powder Mandos 0.1 Dry 15
23 I+G Mandos 0.1 Hygroscopic 15
24 2002 Mandos 0.1 Hygroscopic 15
25 Hing Powder Mandos 0.1 Hygroscopic 15
26 Whey powder Mandos 0.1 Hygroscopic 15
PREMIX INGREDIENTS
SR. CONSUMPTION MT/ DAYS OF STORAGE
NO. MATERIAL NAME STORAGE TYPE DAY NATURE AS PER CLIENT
27 Aloo Bhujia Block Container 2 Sticky
28 Garam Masala Container 2.5 Dry
29 Bholaram Chatni Container 2 Dry
Khatta Meetha
30 Chat Masala Container 0.5 Dry
31 Taka Tak block Container 2.5 Highly Hygroscopic
32 Punjabi Tadka block Container 2.5 Highly Hygroscopic
As per current scenario of production plan
Seasoning Production- 50 MT to 55MT per day
80% powder
20% Grinding (i.e. whole Ingredients and Premix)
So required Grinding production is 12 MT per day to produce 55 MT per day
Current plant 800 kg/h. Line cap in one shift @ 10 T, Currently making - Sugar 500 kg/h, Coriander 300 kg/h, Chili 500 kg/h.
Axtel New line 1.5 TPH.
Final Capacity:
Seasoning:
Today current capacity is 45 TPD. This is to be taken to 85 tons / shift. (12 hours).
Retail Masala:
RM
UNLOADING/SAMPLING
RM
STORAGE
RM WHOLE
POWDER RM
MAUNAL CONTAINER /
AZO SILO FILLING
GRINDERS
POWDER
PREMIX INGREDIENTS
SMALL BAGS
PRODUCT LINE 1
PRODUCT LINE -1
WEIGHING
HOPPER
BUFFER
RECIEVER
AS PER REQUIREMENT
MICRO INGREDIENTS MIXER - 1
LIQUIDS
SIFTER
(2 MT/hr)
SMALL BAGS /
PACKING
PRODUCT LINE 2
PRODUCT LINE -2
WEIGHING
HOPPER
BUFFER
RECIEVER
AS PER REQUIREMENT
MICRO INGREDIENTS MIXER - 2
LIQUIDS
SIFTER
(2 MT/hr)
SMALL BAGS /
PACKING
PRODUCT LINE 3
PRODUCT LINE -3
WEIGHING
HOPPER
BUFFER
RECIEVER
AS PER REQUIREMENT
MICRO INGREDIENTS MIXER - 3
LIQUIDS
SIFTER
(2 MT/hr)
SMALL BAGS /
PACKING
GRINDING SYSTEMS
UNIVERSAL MILL
500 KG/hr
GRINDING - 1
RUBBY
500 KG/hr
GRINDING - 2
PREMIX / POWDER
RUBBY
500 KG/hr
GRINDING - 3
PREMIX / POWDER
SUGAR KAPS
500 KG/hr
GRINDING - 4
CHILLY
PLANT
GRINDING - 5
AXTEL
GRINDING - 6 (1 MT/hr)
(UNDER PROGRESS)
MOONG DAL BLOCK
FLOW CHARTS
RM STORAGE
MANUAL AUTO
HOPPING CYCLONE HOPPER
DE STONER
SILO STORAGE
BUFFER
TANK
SOAKING
(6 HRS)
BUCKET
ELEVATOR
FRYER
(184 °C)
COOKING
SYSTEM
SPECTRUM
MIXING
SYSTEM
PACKAGING
SYSTEM
CONVERYOR FOR FG
EXISTING PLANT OBSERVATIONS
1. In washing, time takes around 2-2.5 hrs. Total nos. of tank is 10. Capacity of tank is 800 kg.
2. Perforation tank (soaking tank) time takes around 6-7 hrs. Total no. of tank is 40 nos.
3. For washing, RO water used.
4. Frying temperature is around 184 °C. with the capacity of 3 Ton.
5. Oil consumption is 1500 liters.
6. Frequency of oil changed is everyday
7. The initial temperature of product is around 35-40 °C. and the final temperature is 185 °C.
8. Silo storage tank capacity is 30 Ton. Total no. of silos are 2 nos.
9. Buffer tank capacity is 1600 kg. The total nos. of tank is 2 nos.
10. Cooling system is used to cool material is done by a natural process.
11. Packaging machine is 24 nos. The speed of packaging machine for 18 gram is 48 PPM and for the 200 gram is 60 PPM
12. Frying time is 54 seconds.
13. Water consumption 4000 liters. 800 kg tank is filled with 800 kg of Moong dal which is filled with 4000 ltrs of water (Ration
1:5)
14. The percentage of oil consumption is 18%. For e.g. To fry 100 kg of Moong dal then 18 liters of oil will be consumed
15. Load of heat exchanger is 1500 kw
16. Mixing temperature is around 50-55 °C
17. Moisture content in Raw material is 11%
18. Moisture content after soaking is 55-58%
BIKANERI BHUJIYA BLOCK
FLOW CHARTS
RM STORAGE
GRINDER
MIXING
BEASN SILOS
BHATTIS
MIXING SYSTEM
PACKAGING
CONVEYOR TO FGS
Hand Bhujia
18 inch
1 day / kahdi – 200 to 225 kg Output.
Currently 124 Kadhi – 35 TPD output
15 tons Continuous fryer
Total 50 TPD
Aloo Bhujia – 125 tons/day – 3 fryer – 2 lines (12h) + 1 line (24 h) operation.
375 tons / 12 hours.
Mixing and packing = 12 hours.
Fryer required = 4
Capacity – 1 to 1.5 TPH fryer
Ration
200 T
1. Oil tanks
BOILER
1. Nos. of boiler 3
a) TP 6 - 1 no. : 600000 kcal/hr
b) TP 10 -2 nos : 1000000 kcal/hr
2. Heat consumption for bhujia and moong dal is 170 kcal/hr
3. Circulation pump 3 nos. 22 kw -2 nos. and 11 kw 1 no.
4. Fuel used in boiler is diesel and gas
a) Diesel consumption is 110 liters per hour on full load
b) Gas consumption is 110 kg per hour on full load
5. Pressure of gas at burner is 110 mbar (millibar)
6. PNG gas is used through pipe line
7. Connection load is 16 kw and 11kw
8. Maximum temperature is 280 °C
9. Inlet temperature tripping point is 275 °C
10. Outlet temperature tripping point is 300 °C
11. Stack temperature tripping point is 300 °C
12. Oil in boiler is 12000 liter
13. Frequency of change of oil is not defined.
C3 ETP Scheme