Professional Documents
Culture Documents
CH-30 200
CH-30 200
A1
P2 P3
CHAINAGE (m)
LINE 1-1
MATCH
GENERAL ARRANGEMENT DRAWING
Consultancy Services for carrying out Feasibility Study, Preparation
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 S-101 HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 01 OF 05 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale:
LINE 2-2
LINE 3-3
MATCH DIMAPUR KOHIMA
MATCH
P3
P4 P5
P6
SECTION-A-A
D
LINE 2-2
LINE 3-3
MATCH
MATCH
GENERAL ARRANGEMENT DRAWING
Consultancy Services for carrying out Feasibility Study, Preparation
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39
HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 02 OF 05 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale:
LINE 3-3
MATCH
DIMAPUR KOHIMA
LINE 4-4
MATCH
P6 P7 P8
LINE 4-4
MATCH
LINE 3-3
MATCH
DIMAPUR KOHIMA
LINE 5-5
MATCH
LINE 4-4
MATCH
LINE 5-5
MATCH
GENERAL ARRANGEMENT DRAWING
Consultancy Services for carrying out Feasibility Study, Preparation
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39
HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 04 OF 05 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale:
SECTION AT B-B ABUTMENT SECTION AT D-D PIER
DETAIL-Y
LEGEND:-
B C
D D
DETAIL - X
A A
B
E E
DETAIL- A
C
B
HALF PLAN AT DECK LEVEL HALF PLAN AT SOFFIT LEVEL
SECTION D-D
Y
X
DETAIL-Y
SECTION E-E
SECTION - B-B SECTION - C-C
DETAIL- B
VIEW A-A
LEGEND:-
NOTES:-
AT SUPPORT AT MID SPAN SECTION F-F
LEGEND:-
SCHEDULE OF REINFORCEMENT
SECTION A-A
REINFORCEMENT DETAILS OF
Consultancy Services for carrying out Feasibility Study, Preparation
DECK SLAB (30.0m SPAN)
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39
HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 OF IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale:
A A
B
Y=485
B
Y=305
X=-200
C
Z (-) Z (-)
X
Z (+) Z (+) X=14900
Z=0
C X=14900
SECTION A-A
X=0 X=0
Z=0 Z=0
C
Z (-) Z (-) X=14900
Z=-180
X
X=14900
Z (+) Z (+) Z=180
C X=14900
SECTION B-B
X=0 X=0
Z=180 Z=-180
TABLE - 1
ANCHORAGE No. OF JACKING CABLE CUT LENGTH EXTENSION EMERGENCE STRESSING AGE OF
CABLE No. FORCE (t) LENGTH (m) (m) (mm)
TYPE STRANDS ANGLE STAGE CONCRETE
TABLE - 2 -Z +Z -Z +Z
COORDINATES AT DISTANCE X FROM END (X=0)
CABLE -200 800 1800 2800 3800 4800 5800 6800 7800 8800 9800 10800 11800 12800 13800 15000
No. Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z Y Z
1 450 180 387 180 325 180 262 180 200 180 147 180 126 180 125 180 125 180 125 180 125 180 125 180 125 180 125 180 125 180 125 180
2 450 -180 387 -180 325 -180 262 -180 200 -180 147 -180 126 -180 125 -180 125 -180 125 -180 125 -180 125 -180 125 -180 125 -180 125 -180 125 -180 SECTION OF PRE-CAST PSC GIRDER
3 850 0 775 0 700 0 624 0 549 0 474 0 399 0 334 0 306 0 305 0 305 0 305 0 305 0 305 0 305 0 305 0
4 1250 0 1167 0 1084 0 1000 0 917 0 834 0 751 0 668 0 585 0 515 0 486 0 485 0 485 0 485 0 485 0 485 0
C). ALL THE DESIGN PARAMETERS ADOPTED SHALL BE VERIFIED AT SITE II) IF THE CALCULATED ELONGATION HAS NOT BEEN REACHED CONTINUE
BEFORE USE. TENSIONING BY INTERVALS OF 5KG/SQ CM UNTIL THE CALCULATED
D). CONCRETE MIX ELONGATION IS REACHED PROVIDED THE GAUGE PRESSURE DOES NOT
a.) PSC GIRDER - M45 EXCEED 1.05 TIMES THE CALCULATED GAUGE PRESSURE.
X=-200
4. PRESTRESSING OPERATION 12. ALL CABLES SHALL BE GROUTED AS SOON AS STRESSING OF ALL STRANDS
A) ALL CABLES SHALL BE LAID IN SMOOTH PROFILE (WITHOUT KINKS) PASSING COMPLETED.
THROUGH THE GIVEN ORDINATES AND SHALL BE SUPPORTED AT A SPACING
13. SHEATHING DUCT JOINTS AND GROUTING OF DUCTS SHALL BE AS PER APPENDIX-2
NOT EXCEEDING 1000MM BY A 16MM DIA CROSS BARS SECURELY HELD IN
& 5 OF IRC-18:2000
Y=450 Y=450 Y=850 Y=1250 POSITION AND VERTICAL WEB REINFORCEMENT.
Z=180 Z=-180 Z=0 Z=0 14. ADEQUATE SAFETY MEASURES SHALL BE TAKEN WHILE CASTING ,SHIFTING ,
B) RADIUS OF CURVES SHALL BE 10.6 M MINIMUM. LIFTING AND PLACING OF GIRDER.
DETAILS OF END BLOCK C) PRESTRESSING SHALL BE CARRIED OUT FROM BOTH ENDS
SIMULTANEOUSLY.
E) EXTENSION ARE GIVEN FOR HALF CABLE LENGTHS , LOSS UPTO 6MM DUE TO
SLIP OF ANCHORAGES ARE NOT TO BE COMPENSATED DURING SITE
OPERATIONS.JACK PRESSURE AND EXTENSIONS OF CABLES AT EACH
END GIVEN IN THE DRAWING SHALL BE VERIFIED AT SITE .
SECTION D-D
SECTION E-E
C
B
SCHEDULE OF REINFORCEMENT
01 12 4 -
02 12 4 -
03 12 - 200
12 10x2 -
04
BOTTOM PLAN OF GIRDER
A
C
12 - 200
05
12 6 -
A
C
06
07 12 - 200
08 12 - 200
SECTION C-C
12 5 -
09
10. 12 11x2x2=44 -
NOTE :-
11. 12 200
12. 12 200
C
13. 12 200
LEGEND:-
SCHEDULE OF REINFORCEMENT:-
PIER SHAFT
SECTION- B-B
PIER CAP
SECTION- C-C
SECTION D-D
DETAIL-X
EARTH RIVER
SIDE SIDE
'Z'
SECTION AT B-B
(ABUTMENT SHAFT)
DETAIL AT 'P'
(DETAILS OF BRACKET) DETAILS OF APPROACH SLAB
DETAILS OF PEDESTAL
RC DETAILS OF DIRT WALL
& ABUTMENT CAP
REINF. IN PEDESTAL
Y Y
X X
NOTES:-
MISCELLANEOUS DRAWING
Consultancy Services for carrying out Feasibility Study, Preparation BRIDGE
of Detailed Project Report (DPR) and providing pre-construction
services in respect of 2 Laning of Kohima Bypass connecting NH-39
(New NH-02) ,NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 S-501 HIGHWAY ENGINEERING CONSULTANT
(New NH-02) on Engineering, Procurement and Construction (EPC) Original Size: A2 01 OF 01 IN ASSOCIATION WITH
mode in the state of Nagaland Path -
Plotting Scale: